HomeMy WebLinkAboutR05-116 special use permit for El Jebowl Telecommunications Facility
;//
Commissioner It:~t~~(;/Yv~;f-rrv~l moved adoption
of the followi~g Resolution:
RESOLUTION
of the
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 2005 - II ~J
.
APPROV AL
OF THE SPECIAL USE PERMIT
for the VERIZON WIRELESS
EL JEBOWL
TELECOMMUNICATIONS FACILITY
FILE NO. ZS-00123
WHEREAS, on or about November 14th, 2004, Verizon Wireless; (herein after
"Applicant") did file an application with the Eagle County Department of Community
Development for a Special Use Permit for a Telecommunications Facility, located in the
Commercial General Zone District in the unincorporated area of Eagle County described as
follows:
A parcel of land owned by Crawford Properties, LLC; Section 3, Township 8 South,
Range 87 West, 6th P.M., County of Eagle, State of Colorado; 0280 Favre Lane, EI Jebel;
See attached Exhibit A
WHEREAS, the applicant desires to install a Telecommunications Facility which will be
integrated into the EI Jebowl, bowling alley in El Jebel. The facility is proposed to consist of an
equipment shelter at ground level, and two (2) antenna arrays with four (4) antennas in each
which will be located on the roof and screened behind a facade; and,
WHEREAS, the Special Use Permit request was considered at a public meeting by the
Roaring Fork Valley Regional Planning Commission July 21 st, 2005 and by the Eagle County
Board of County Commissioners on August 9th, 2005; and;
WHEREAS, based on the evidence, testimony, exhibits, and study of the Master Plan for
the unincorporated areas of Eagle County, comments of the Eagle County Department of
Community Development, comments of public officials and agencies, the recommendation of the
Planning Commission, and comments from all interested parties, the Board of County
Commissioners of the County of Eagle, State of Colorado (lithe Board"), finds as follows:
1
1. That proper publication and public notice was provided as required by law for the
hearings before the Planning Commission and the Board.
2. That pursuant to Eagle County Land Use Regulations Section 5-250.B Standards
for the review of a Special Use Permit:
[1] Section 5-250.B.1. Consistent with Master Plan. The proposed Special
Use Permit CAN be shown to be appropriate for its proposed location and
be consistent with the purposes, goals, objectives and policies of the
Master Plan and Master Plan FLUM, and related sub-area master plans.
[2] Section 5-250.B.2 Compatibility. The proposed Special Use IS
appropriate for its proposed location and IS compatible with the character
of surrounding land uses.
[3] Section 5-250.B.3 Zone District Standards. The proposed Special Use
DOES comply with the standards of the zone district in which it is located
and the standards applicable to the particular use, as identified in Section
3-310, Review Standards Applicable to Particular Residential.
Agricultural and Resource Uses.
[4] Section 5-250.B.4 Design Minimizes Adverse Impact. The design of the
proposed Special Use DOES adequately minimize adverse impacts,
including visual impact of the proposed use on adjacent lands. The
Special Use WILL avoid significant adverse impact on surrounding lands
regarding trash, service delivery, parking and loading, odors, glare, and
vibration. Adverse impact on surrounding lands regarding noise and
traffic, WILL NOT create a nuisance.
[5] Section 5-240.F.3.e (5) Design Minimizes Environmental Impact. The
proposed Special Use CAN fully minimize environmental impacts, and
though it will not cause significant deterioration of water and air resources,
wildlife habitat, and other natural resources, it WILL NOT cause
significant deterioration to scenic resources.
[6] Section 5-250.B.6 Impact on Public Facilities. The proposed Special Use
IS adequately served by public facilities and services such as roads,
pedestrian paths, potable water and waste water facilities, parks, schools,
police and fire protection, and emergency medical services.
[7] Section 5-250.B.7 Site Development Standards. The proposed Special
Use, as conditioned, DOES fully comply with all the appropriate standards
in Article 4, Site Development Standards.
[8] Section 5-250.B.8 Other Provisions. The proposed Special Use DOES
comply with all standards imposed on it by all other applicable provisions
2
of these Land Use Regulations for use, layout, and general development
characteristics.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
the County of Eagle, State of Colorado:
THAT the Special Use Permit application for the Verizon Wireless, EI lebowl
Telecommunications Facility, located in the Commercial General Zone District, in the
unincorporated area of Eagle County described herein, be approved, subject to the following
conditions, and that violation of any condition shall be the basis for revocation of the Special Use
Permit:
1. Except as otherwise modified by this Permit, all material representations made by the
Applicant in this application and in public meeting shall be adhered to and considered
conditions of approval.
2. The new portions of the EI lebowl including architectural features and equipment
shelter, shall utilize the same colors and architectural finish materials as are on the
existing building.
3. Applicant (Verizon Wireless) shall notify the Community Development Director
when altering or modifying equipment on the Telecommunications Facility. Any
increase in the number of antennas, or expansion of the equipment shelter, may
necessitate a new Special Use Permit.
THAT, this permit shall be subject to review as provided for by the Eagle County Land
Use Regulations.
THAT, the Board of County Commissioners directs the Department of Community
Development to provide a copy of this Resolution to the Applicant.
THAT, the Board hereby finds, determines and declares that this Resolution is necessary
for the health, safety and welfare of the citizens of Eagle County.
MOVED, READ AND ADOPTED by the Board of County Commissioners of the
County of Eagle, State of Colorado, at its regular meeting held the day of ,
2005, nunc pro tunc to the 9th day of August, 2005.
3
COUNTY OF EAGLE, STATE OF COLORADO, By and
OF TY COMMISSIONERS
BY:
Clerk to the Board of
County Commissioners
BY:
Tom C. Stone,
Commissioner seconded adoption of the foregoing resolution. The roll having
been called, the vote was as
Commissioner Am M. Menconi
Commissioner Peter F. Runyon
Commissioner Tom C. Stone
This Resolution passed by f2/() vote of the Board of County Commissioner of the
,
County of Eagle, State of Colorado.
4
EXHIBIT 'A'
Verizon Wireless, EI Jebowl
ZS-00123
0
r----_
6J
u.n r (CUNf\,
USE OF THIS MAP SHOULD BE FD
GENERAL AND INFORMATIONAL PURPOSE
ONLY, EAGLE COUNTY DOES NO
WARRANT TI1E ACCURACY OF TH
INFORMATION CONTAINED HEREI I