V)
APPROVAL OF PERMIT FOR
CONSTRUCTION OF WATER PIPELINE
(Vail Mountain Snowmaking Pipeline)
File No. 1041- 023 -93
WHEREAS, on June 2, 1993, The Eagle and Colorado Valley
Planning Commission considered the application of Vail
Associates, Inc. (hereinafter "Applicant ") - and recommended
approval - to conduct the following activity of state interest:
6.05: Efficient utilization of municipal and
industrial water pro - iect .
Said application seeks approval to construct Stage 1 of a pipe-
line to be used for the purpose of conveying water to the Vail
Ski Area for snowmaking during the winter ski season. The
pipeline would be designed to move water from a diversion point
near the confluence of Gore Creek and the Eagle River to the
existing Vail Mountain snowmaking raw water intake located on
Gore Creek. (Stage 1 will not be functional without the con-
struction of Phase 2, which will be the subject of a future
application.)
WHEREAS the Application also requests a waiver of a Special
Use Permit for the above - described project.
WHEREAS, The Board of County Commissioners of Eagle County,
in its capacity as the Eagle County Permit Authority ( "Permit
Authority "), conducted a public hearing on June 15, 1993, after
publication and notice as required by law; to consider said
application; and
WHEREAS, the Permit Authority has considered all the evi-
dence, exhibits and arguments presented, as well as comments of
the Colorado Department of Transportation and the Colorado
Geologic Survey and other referral agencies, and the recommenda
tion of the Planning Commission.
WHEREFORE, the Permit Authority makes the following findings
with regard to the Application as it pertains to Section 6.05.15
of the County Administrative Regulations:
1. The
substantiated
growth rate of
need for the proposed water supply extension can be
based on historic growth rates and an expected
two- to three - percent per year.
C
2. The proposed development does not conflict with the
Eagle County Master Plan, the Vail Land Use Plan, the Regional
208 Plan, the Vail Master Development Plan, and the Land and
Resource Management Plan for the White River National Forest.
3. The proposed project will emphasize efficient use of
water through metering and financial incentives due to pumping
costs. The potential to pollute aquifer recharge areas will be
minimized by a specific reclamation plan.
4. Provisions have been proposed to control sedimentation
and erosion to insure that the proposed water project will not
contaminate surface water resources.
5. The requirement that the proposed water project be
capable of providing water pursuant to standards of the Colorado
Department of Health is not applicable to this permit.'
6. A finding concerning the quality of peripheral or
downstream surface water resources is not applicable to this
permit: there is no water diversion proposed as part of Stage 1,
and Stage 2 does not propose to divert water from the source
development area.
7. The proposed development will not significantly deteri-
orate aquatic habitats, marshlands and wetlands, groundwater
recharge areas, steeply sloping.or unstable terrain, forest and
woodlands, critical wildlife habitat, big game migratory routes,
calving grounds, migratory ponds, nesting areas and the habitats
of rare and endangered species, public outdoor recreation areas,
and unique areas.of geologic, historic or archaeological impor
tance, if mitigation is implemented in accordance with the
application submitted, and the staff recommendations are imple-
mented.
8. Salinity and advanced wastewater treatment offset plans
are not applicable to this permit.
9. The construction of improvements associated with the
proposed development will not significantly impact existing or
proposed communities within the development area and source
development area if the staff recommendations implemented.
In addition, the Permit Authority finds that waiver of the
Special Use Permit requirements as provided for in Section
2.09.04 (3) (c) (1) (2) is appropriate, based on a determination that
requiring a Special Use Permit in addition to the permit required
under 6.04 of the Eagle County Administrative Regulations would
serve no further legitimate planning, zoning or other land use
objective.
-2-
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO, acting
as the Permit Authority:
THAT, the permit to construct Stage 1 of a pipeline to
convey water to the Vail Mountain Snowmaking raw water intake on
Gore Creek, be and is hereby approved, subject to the following
conditions:
1. Applicant shall comply with Section 404 of the Clean
Water Act.
2. Applicant shall comply with the recommendations of the
Colorado Geologic Survey.
3. Applicant shall comply with the Colorado Department of
Transportation utility permit, which includes erosion control.
4. Applicant shall not conduct construction activities
prior to June 15 or after September 30, pursuant to the request
of the Colorado Division of Wildlife.
5. Applicant shall comply with its U.S. Forest Service
Special Use Permit.
6. Applicant shall submit to the County a site- specific
reclamation plan for the water line corridor, and shall not begin
construction prior to staff approval of the plan.
7. All disturbed areas shall be reclaimed to prevent soil
erosion and to mitigate visual scarring. Both temporary and
long -term erosion.control shall be implemented.
8. All construction staging areas shall be designed to
contain incidental and accidental fuel and lubricant spills.
THAT, approval of this Stage 1 Permit Application in no way
obligates the Eagle County Permit Authority to approve an appli-
cation for Stage 2 of the project.
THAT, Applicant is not required to obtain a Special Use
Permit for this project.
-3-
a
MOVED, READ AND ADOPTED by the Board of County Commissioners
(as the Permit Authority) of the County of Eagle, State of
Colorado, at its regular meeting held the day of
1993; nuns pro tuns June 15, 1993.
ATTEST:
- By:
Clerk to the Board of
County Commissioners
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
BOARD OF COUNTY COMMISSIONERS
George A. Gates, Chairman
Commissioner seconded adoption of the fore-
going resolution. The roll having been called, the vote was as
follows:
Commissioner Gates
Commissioner Phillips
Commissioner Johnson
This °passed by vote of the Board of
County Commiss oners of the County of Eagle, State of Colorado.
c - dev \1041 \snowmake.023
-4-