Permit
Permit No. OWTS-019732-2020
Permit Type: OWTS Permit
Work Classification: New
Permit Status: Active
Issue Date: 9/25/2020 Expires: 1/25/2021
On-Site Wastewater
Treatement System
Project Address Parcel Number
434 HUNTERS VIEW LN, EAGLE AREA,210925211013
Owner Information Address
Hunters View JVCO Land, LLC PO Box 1609
Silverthorne, CO 80498
Phone: (970) 406-1785
Cell:
Email: adam@hvbldrs.com
Inspections:
For Inspections Call: (970) 328-8755
and call the Design Engineer
Engineer Phone Email
JVA Inc, Simon Farrell (303) 444-1951 sfarrell@jvajva.com
Contractor License Number Phone Email
Beaumont Excavating bexinc@mail.com(970) 390-9393OWTSPL-000063-20
20
Permitted Construction / Details:
Install the OWTS exactly as depicted in the JVA, Inc. design stamped, signed and dated September 11, 2020 by
Kevin A. Tone, PE. The OWTS is designed with capacity to serve three single family residences, Lots 114, 115, and
116 in Hunters View, with twelve bedrooms maximum total between the three.
The primary treatment for the system consists of a two Valley Precast 2,000 gallon, single compartment tanks (Item
#2000T-1CP) in series with an effluent filter and alarm placed at the outlet tee of the second tank. The primary
treatment tanks are followed by a 2,000 gallon Valley Precast three-compartment recirculating/dose tank which will
send wastewater to an Advantex AX 100 pod for nitrification using an Orenco PF 500712 pump. Nitrified effluent
flows to the splitter valve for recirculation to the first 2,000 gallon tank for denitrification then is dosed using an
Orenco PF 500512 pump to and automatic distribution valve (ADV), set level at the high point of the system and
made accessible at grade. The ADV will alternate dosed effluent to 5,280 square feet of soil treatment area between
five beds, each consisting of four rows of 22 Infiltrator Quick 4 Plus Standard chambers for a total of 440 Infiltrator
chambers. Maintain all elevations and setbacks, including encasement at water line crossings, as shown in the
design drawing.
NOTE: The contractor must verify that all electrical components and inspections are covered under the electrical
permit associated with the Orenco Vericom control panel and pump connections. The alarm must be connected to a
separate circuit. Additional pump details are on the design drawing. Advantex systems must conform to the CDPHE
technology approval letter dated May 1, 2018.
Contact Eagle County Environmental Health and the design engineer well in advance of requesting inspections prior
to backfilling any component of the OWTS. The design engineer is responsible for conducting all inspections
necessary to certify the installation and assure functionality of the system. System certification, along with photos
and a record drawing is required to be submitted to, and approved by, Eagle County Environmental Health prior to
the use of the system or occupancy of the dwellings.
Friday, October 2, 2020 1
THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF
ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT
Issued by: Environmental Health Department, Eagle County, CO
Claire Lewandowski
Date
September 25, 2020
CONDITIONS
1.
2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM
REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED
3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND
BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS
SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT
4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS,
ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED
Friday, October 2, 2020 2
September 9th, 2020
Ms. Claire Lewandowski, REHS
Environmental Health Specialist III
PO Box 179
Eagle, CO 81631
RE: Frost Creek - Onsite Wastewater Treatment System Design – Hunter’s View Lots 114,
115, 116, Eagle County, CO
Dear Claire:
JVA Inc. (JVA) has prepared a design of an onsite wastewater treatment system (OWTS) to
serve Hunter’s View Lots 114, 115 and 116 within the Frost Creek PUD. JVA Inc. (JVA) is the
designated engineer to process all OWTS permit applications within Frost Creek. JVA has
prepared the OWTS design to be in general conformance with OWTS requirements of the PUD.
The most recently reported sampling results from the Water Quality Monitoring and Mitigation
Plan did not result in any exceedances of the water quality trigger limits. Please proceed with
the permit review of this OWTS design.
Sincerely,
JVA, INCORPORATED
By: _______________________
Simon Farrell, P.E.
Project Manager
Attachment A - OWTS design – Lot 114, 115, 116
Attachment B - Visual and Tactile Soil Evaluation
Attachment C - Discharge pump calculations
WSWSWS
OWTS NOTES & SITE PLANC3.0 REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
WSWSCIVIL UTILITY PLANC3.1 REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
2476.15.1c
JLS
QDH/RMM
QDH/RMM
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, CO9/2/2020
FORCEMAIN PLAN AND PROFILEC3.2 REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
OPEN
CLOSE
OPEN
CLOSE CLOSE
OPEN OPEN
CLOSE
OPEN
CLOSE
OPEN
CLOSE
OPEN
CLOSE OPEN
CLOSE
TREATMENT SYSTEM DETAILSCD3.0 REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
SOIL TREATMENT AREA DETAILSCD3.1 REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
September 11, 2020
Ms. Claire Lewandowski, REHS
Eagle County Environmental Health
590 Broadway
Eagle, CO 81631
RE: Frost Creek, Hunter’s View Lots 114, 115 & 116 – Site and Soil Investigation Report for
an Onsite Wastewater Treatment System (OWTS)
JVA Job No. 1037.6e
Dear Claire:
Enclosed in this report are the results of the site and soil evaluation for proposed Hunter’s View
OWTS 6 serving lots 114, 115, & 116 located in Frost Creek, Colorado. This report provides
information needed to support the design of an OWTS including: results from the preliminary
investigation, the site visit, and the soil evaluation. Design calculations are included in the
drawing Permit Set attached.
PRELIMINARY INVESTIGATION
In preparation for a more efficient and informed site visit and soil evaluation, a preliminary
investigation was conducted the week of October 1st, 2019. Architectural site plans, aerial
imagery, and previous Geotechnical investigations were used for the preliminary investigation.
Geotechnical investigations were performed by HP Geotech in October 2002 across Frost Creek
for OWTS suitability; this geotechnical investigation has been submitted to Eagle County
previously. Results from the HP Geotech report showed that Test Hole A had a consistent silt
layer from just below grade to eight feet deep. Test Hole B had a gravel-sand layer from just
below grade to eight feet deep. No groundwater was encountered in either test holes.
SITE VISIT AND SOIL EVALUATION
A site visit and soil evaluation were conducted on October 9th, 2019 by James Cochran; James has
passed the Colorado Professionals in Onsite Wastewater (CPOW) Soils Evaluation Course. The
purpose of the site visit and soil evaluation was to confirm hypotheses from the preliminary
investigation, identify the topography, landscape position, vegetation, and site constraints for the
proposed OWTS, and to conduct a visual and tactile soil evaluation of the underlying soils where
the proposed soil treatment area (STA) is to be located for both suitability and sizing.
The topography of the site is on a ridge gently sloping from west to east. The dominant vegetation
at the proposed OWTS consists of native grasses. Site Constraints are shown in the Permit
Documents. For the visual and tactile soil evaluation, two soil profile holes were excavated using
a tracked excavator in the locations identified in the Permit Documents. As seen in Table 1 below,
soil morphology for each soil profile hole from the surface to three feet deep was consistent with
a Soil Type 4, and from three to five feet deep bedrock was encountered. Figures 1 through 4
below show the soil profile holes and corresponding morphology. No redoximorphic features,
Frost Creek, Hunter’s View OWTS 6
Site and Soil Investigation
11/4/2019
2 of 2
indicating seasonally high groundwater, were observed in either profile hole. Therefore, Soil Type
4 was identified as the soil type. The proposed STA will be five beds with the infiltrative surface
one foot below existing grade.
Table 1 – Visual and Tactile Soil Results
Profile
Hole
Depth
(ft.)
Percent
Rock
Soil
Texture
Soil Structure
Type
Soil Structure
Grade
Soil
Type
1 0 – 3 0% Clay Blocky Strong 4
3 – 5 Bedrock (Limiting Layer)
2
0 – 3 0% Clay Blocky Strong 4
3 – 5 Bedrock (Limiting Layer)
Figure 1 – Profile Hole One Figure 2 – Profile Hole One Soil Morphology
Figure 3 – Profile Hole Two Figure 4 – Profile Hole Two Soil Morphology
Sincerely,
JVA, INCORPORATED
By: _______________________
James Cochran, P.E.
Project Engineer
Job Name: Hunters View OWTS 6
Job Number: 1037.6e
Date: 9/9/2020
By: JNG
Line Variable Description Value Unit Note
Lateral Distribution Piping
Nlaterals Number of Laterals being feed by one pump cycle = 4.0 -- 20 total laterals. ADV feeds 4 at once
Llateral Lateral Length = 91 ft
Orifice Spacing = 2.5 ft Manual Input
Norifices Number of Orifices per Lateral = 36 --
Orifice Discharge and Total Flow
Corifice Orifice Discharge Coefficient = 0.63 -- Sharp Edge
Dorifice Diameter of Orifice = 0.13 in 1/8'' diameter orifice
g Acceleration due to Gravity = 32.2 ft/s2
hn Residual Head at last Orifice = 4.22 ft Chosen value.
Qn Discharge from Single Orifice = 0.40 gpm
= 2.45Corfice·(Dorfice)2·(2ghn)0.5
Qlateral Flow into Each Lateral = 14.47 gpm = Qn x Norifice
Qtotal Total Flow into Soil Treatment Area = 57.9 gpm
= Qlateral x Nlaterals
Headloss in Lateral Distribution Piping (Hazen-Williams)
Clateral Hazen-Williams Coefficient = 150 -- For PVC
dLateral Lateral Inside Diameter = 1.59 in For 1.5'' SCH 40
hlateral Headloss due to Friction in Lateral = 1.31 ft = 10.5Llateral·(Qlateral/Clateral)1.85·(dlateral)-4.87
hf-lateral Actual Headloss due to Friction in Lateral = 0.436 ft
= 1/3 x hlateral (Accounting for Orifices)
Headloss in Manifold (Hazen-Williams)
Lmanifold Length of Manifold = 12 ft Same as the STA Max Width
dmanifold Manifold Inside Diameter = 1.59 in For 1.5'' SCH 40
Cmanifold Hazen-Williams Coefficient = 150 -- For PVC
hmanifold Headloss due to Friction in Manifold = 2.24 ft
= 10.5Lmanifold·(Qtotal/Cmanifold)1.85·(dmanifold)-4.87
hf-manifold Actual Headloss due to Friction in Manifold = 0.75 ft = 1/3 x hmanifold (Accounting for Orifices)
Headloss in Delivery Piping (Hazen-Williams)
Lpipe Length of Delivery Pipe = 400 ft From Dosing chamber to ADV, and ADV to manifold
dpipe Delivery Pipe Inside Diameter = 1.82 in For 2'' HDPE DR 9
Cpipe Hazen-Williams Coefficient = 150 -- For HDPE Pipe
hf-pipe Headloss due to Friction in Pipe = 39.59 ft
= 10.5Lpipe·(Qtotal/Cpipe)1.85·(dpipe)-4.87
Total Dynamic Head (Hazen-Williams)
hf-fittings Headloss due to Fittings = 2.88 ft One 90 deg bend to STA. Six 90 deg bends to laterals
Headloss through Automatic Distirbuting Valve = 23.00 ft
hs Static Head = 13.00 ft Max Elevation difference (typically in tank or to ADV)
TDH Total Dynamic Head = 83.87 ft = hs + hf-fittings + hf-pipe + hf-manifold + hf-lateral + hn
Volume of pipes
Delivery Pipe (drainback to tank) = 54 gal = ((3.14/4)*(dpipe/12)2*(Lpipe))*7.48
STA Laterals = 38 gal
= ((3.14/4)*(dpipe/12)2*(Lpipe))*7.49
Total Volume = 91 gal
Duty Point
Flowrate =58 gpm
Total Dynamic Head =84 ft
HUNTERS VIEW OWTS 6 (Lots 114 115 116)
PUMP CALCULATIONS
OWTS 6 Pump Calculation - Pump Design Calculations Page 1 of 1
Inspection Result
Eagle County, Colorado
P.O. Box 179 500 Broadway Eagle, CO
Phone: (970) 328-8730 Fax: (970) 328-7185
IVR Phone: 1-866-701-3307
Inspection Number: INSP-509027-2021 Permit Number: OWTS-019732-2020
Inspection Date: 08/09/2021
Inspector:
Permit Type: OWTS Permit
Inspection Type: OWTS Final Inspection
Work Classification: NewOwner:Hunters View
Job Address:434 HUNTERS VIEW LN IVR Pin Number:191340
EAGLE AREA, CO Project:<NONE>
Parcel Number:210925211013
Contractor:Phone: (970) 390-9393 / Cell: Beaumont Excavating
Inspection Status: Approved
Inspection Notes
Inspector Comments
Added Item: Septic Tank
The primary treatment for the system consists of a two Valley Precast 2,000 gallon, single
compartment tanks (Item #2000T-1CP) in series with an effluent filter and alarm placed at the outlet tee
of the second tank. The primary treatment tanks are followed by a 2,000 gallon Valley Precast
three-compartment recirculating/dose tank which will send wastewater to an Advantex AX 100 pod for
nitrification using an Orenco PF 500712 pump.
Added Item: Record Drawing
Received 8/6/2021 from JVA Inc.
Added Item: Record Photos
Received 8/6/2021 from JVA Inc.
Added Item: Site and Soil
Received 9/25/2020 from JVA Inc.
Added Item: Final Certification Letter
Received 8/6/2021 from JVA Inc.
Added Item: General Plan
Received 9/25/2020 from JVA Inc.
Added Item: Soil Treatment Area (STA)
The ADV will alternate dosed effluent to 5,280 square feet of soil treatment area between five beds,
each consisting of four rows of 22 Infiltrator Quick 4 Plus Standard chambers for a total of 440 Infiltrator
chambers.
Monday, August 9, 2021
For more information visit: http://www.eaglecounty.us
Page 1 of 2
Added Item: Identification of Systems Contractor
Beaumont Excavating was the licensed installer for this system.
Monday, August 9, 2021
For more information visit: http://www.eaglecounty.us
Page 2 of 2
August 6, 2021
Claire Lewandowski, Environmental Health Specialist III
Eagle County Environmental Health
500 Broadway Street
Eagle, CO 81631
RE: Onsite Wastewater Treatment System Final Certification – 434, 414, & 448 Hunters View
Lane, Lots 114 115 116
Dear Claire:
The Onsite Wastewater Treatment System (OWTS) covered under Eagle County Permit No.
OWTS-019732-2020 was installed by Beaumont Excavating for 434, 414, & 448 Hunters View
Lane. This letter certifies that the construction of the OWTS was completed as per the approved
design plan. The final record drawings from JVA, and construction photographs are provided as
attachments.
As part of the final approval process JVA observed that start-up was completed by the
manufacturer’s representative and completed a site visit to check all system components.
Although all unit processes function properly, the system cannot currently be remotely
monitored via Vericomm due to lack of internet infrastructure. CenturyLink is aware of the issue
and is upgrading the main panel in Eagle Spur. In the interim Frost Creek will have a more
concerted onsite effort by stopping biweekly to check the OWTS and respond to local visual and
audio alarms.
Sincerely,
JVA, INCORPORATED
By: ________________________
Simon Farrell, P.E.
Project Manager, Associate
Enclosure:
Attachment A – Record Drawings
Attachment B – Construction Photographs
CC: James Cochran, JVA
ATTACHMENT A – RECORD DRAWINGS
WSWSWS
OWTS NOTES & SITE PLANC3.0 08/2021JNGJNGRECORD DRAWINGS1REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
WSWSCIVIL UTILITY PLANC3.1 8/6/2020RMMRMMTHREE CAR GARAGE OPTION ADDED1REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
2476.15.1c
JLS
QDH/RMM
QDH/RMM
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, CO12/02/2020
CONFORMED TO CONSTRUCTION RECORD
FORCEMAIN PLAN AND PROFILEC3.2 08/2021JNGJNGRECORD DRAWINGS1REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
CONFORMED TO CONSTRUCTION RECORD
OPEN
CLOSE
OPEN
CLOSE CLOSE
OPEN OPEN
CLOSE
OPEN
CLOSE
OPEN
CLOSE
OPEN
CLOSE OPEN
CLOSE
TREATMENT SYSTEM DETAILSCD3.0 08/2021JNGJNGRECORD DRAWINGS1REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
CONFORMED TO CONSTRUCTION RECORD
SOIL TREATMENT AREA DETAILSCD3.1 08/2021JNGJNGRECORD DRAWINGS1REVISION DESCRIPTIOND'WNDES'DDATENO.DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB #:
DATE:
© JVA, INC.
SHEET NO.
1037.6e
KAT
JNG
JNG
JVA, Inc.JVA, Inc.817 Colorado Ave., Suite 301
www.jvajva.com
970.404.3100
Glenwood Springs, CO Zip 81601
Boulder ● Fort Collins ● Winter Park
Glenwood Springs ● Denver
LOT 114, 115, 116HUNTERS VIEW LANEFROST CREEK, EAGLE COUNTY, COSEPTEMBER 2020
CONFORMED TO CONSTRUCTION RECORD
ATTACHMENT B – CONSTRUCTION PHOTOGRAPHS
Hunters View Lots 114 115 116 OWTS Photographs:
August 03, 2021
To Whom It May Concern:
We have been to the following site(s):
Lots 114-116, Frost Creek, Eagle
Pump startup has been completed.
We have verified that the system was started properly. The System went through several
cycles with no issues.
Sincerely,
Travis Nall
Service Manager
At the time of startup, no phone connection was available from CenturyLink. Once