Loading...
HomeMy WebLinkAbout820 Aspen Bluff - 194127203003Environmental Health Department P.O. Box 179 500 Broadway Eagle, CO 81631-0179 Phone: (970) 328-8730 Fax: (970) 328-7185 Permit Permit No. OWTS-021278-2021 Permit Type: OWTS Permit Work Classification: New Permit Status: Active Issue Date: 5/21/2021 Expires: 9/20/2021 On-Site Wastewater Treatement System Project Address Parcel Number 820 ASPEN BLUFF LN, WOLCOTT AREA,194127203003 Owner Information Address Melanie Aitken Phone: Cell: (202) 802-8122 Email: aitkenm@bennettjones.com Inspections: For Inspections Call: (970) 328-8755 and call the Design Engineer Engineer Phone Email Eliminite, Thomas Kallenbach (406) 581-1613 tjk@eliminite.com Contractor License Number Phone Email Stenson Excavation Inc.stensonbill@gmail.com(970) 904-1661OWTSPL-000102-20 20 Permitted Construction / Details: Install exactly as depicted in the Eliminite Inc design, dated March, 29, 2021, with requested ECEH edits on May 21, 2021, stamped and signed by Thomas J. Kallenbach, PE. The OWTS is designed to serve a 5 bedroom single family residence. This system connects to the common drainfield referred to as Lower Aspen Bluffs, permit 2112-01IS. The Eliminite Biological Nutrient Removal System to be installed consists of a 1,530 gallon primary treatment tank followed by the Eliminite 120 treatment tank equipped with a Liberty 280 internal recirculation pump, and a Liberty FL-51M discharge pump, with floats set to deliver effluent to the Aspen Bluff Cluster drainfield dosing tank on demand, by connection to an existing stubbed out sewer line. Contact Eagle County Environmental Health and the design engineer well in advance of requesting inspections prior to backfilling any component of the OWTS. The design engineer is responsible for conducting all inspections necessary to certify the installation and assure the functionality of the system. System certification, along with photos and a record drawing is required to be submitted to and approved by Eagle County Environmental Health prior to the use of the system or occupancy of the dwelling. THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT Issued by: Environmental Health Department, Eagle County, CO Claire Lewandowski Date May 21, 2021 CONDITIONS 1. 2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED 3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT 4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED Friday, May 21, 2021 1 *************************************************************************** APPLICATION FOR ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) PERMIT INCOMPLETE APPLICATIONS MAY NOT BE ACCEPTED (SITE PLAN MUST BE INCLUDED) FEE SCHEDULE APPLICATION FEE FOR NEW OWTS OR MAJOR REPAIRS $800.00 MINOR REPAIR FEE $400.00 Fee includes the design review, permitting and maintenance of OWTS records Make all checks payable to: Eagle County Treasurer Property Owner: _______________________________________Phone: ________________________ Owner Mailing Address: ________________________________ email: _________________________ Professional Engineer: __________________________________ Phone: ________________________ Applicant / Contact Person: ______________________________Phone: ________________________ Licensed Systems Contractor Name / Company: ___________________________________________ Contractor Mailing Address: _________________________________ Contractor License #:_______ Contractor Phone Number: ________________________ email: ______________________________ OWTS Permit Application is for: ____ New Installation ____ Alteration ____ Repair Tax Parcel Number: _________________________________ Lot Size: ________________________ Assessor’s Link: www.eaglecounty.us/patie/ Physical Address: _____________________________________________________________________ Legal Description: ____________________________________________________________________ Building Type: _____ Residential / Single Family _____ Residential / Multi Family _____ Commercial / Industrial Number of Bedrooms: ______ Number of Bedrooms: ______ Type of Use: _______________ *As of 06/27/2014, all systems require design by a Registered Professional Engineer. Type of Water Supply: ____ Private Well ____ Spring ____ Surface ____ Public If Public, Name of Supplier: ____________________________________________________________ Applicant Signature: ______________________________________Date:_______________________ **************************************************************************** Office Use Only: OWTS PERMIT # __________________ BUILDING PERMIT # ____________________ Amount Paid: ___________ Receipt #: ___________ Check #: ___________ Date: ______________ DEPARTMENT OF ENVIRONMENTAL HEALTH (970) 328-8755 FAX: (970) 328-8788 TOLL FREE: 800-225-6136 www.eaglecounty.us P.O. Box 179 500 Broadway Eagle, CO 81631 environment@eaglecounty.us INSPECTION WORKSHEET (WOLCOTT AREA - 820 ASPEN BLUFF - 519561) FOR EAGLE COUNTY GOVERNMENT OWTS-021278-2021Case Number:Case Module:Permit Management 12/09/2022 ApprovedInspection Status:Inspection Date: OWTS Final InspectionInspection Type:Inspector:Claire Lewandowski Job Address:Parcel Number:820 Aspen Bluff Ln Wolcott Area, CO 194127203003 Company Name NameContact Type Applicant Holland Creek Metro John Volk Contractor Stenson Excavation Inc.Bill Stenson Engineer Eliminite Thomas Kallenbach Owner Melanie Aitken CommentsPassedChecklist Item TrueSeptic Tank - Septic Tank True ReceivedRecord Drawing - Record Drawing TrueRecord Photos - Record Photos TrueFinal Certification Letter - Final Certification Letter April 06, 2023 Page 1 of 1P.O. Box 179, 500 Broadway, Eagle, CO 81631-0179 November 15, 2022 Claire Lewandowski, RHES Environmental Health Specialist III Eagle County Environmental Health P.O. Box 179 Eagle, Colorado 81631 Subject: Onsite Wastewater System Final Certification, Aitken, 820 Aspen Bluff Ln, Wolcott, CO 81655. Permit Number: OWTS-021278-2021 Dear Claire, Please accept this letter as final certification of the installation of the wastewater system for the above referenced property. Holland Creek Metro District and Stetson Excavation Inc. completed installation and I have reviewed their work and found it to be in compliance with the approved plans. The installers record drawings and installation report are attached. If you have questions, please contact me at your convenience. Sincerely, Tom Thomas J. Kallenbach, P.E. Water Quality Control Professionals LLC November 10, 2022 Subject: Holland Creek MD Lot #15, 820 Aspen Bluff installation certification. Attn: Tom Kallenbach, PE WQCP LLC conducted the tests and verifications that were requested in order for the design engineer to sign off on the system. Watertight test: The test started at 16:00 on 9/9/2022. The static water level was 21.25” below tank lid. The test was complete on 9/12/2021 at 09:00. The static level remained at 21.25” below the tank lids for the duration of the test indicating the tanks are watertight. Drain field test: Not applicable. System reports to common dose field on Aspen Bluff. Installation: The Eliminate system was constructed per the drawings received from Tom Kallenbach PE. The primary and Eliminite tanks were installed per the drawing. A 1.5” force main leaves the pump chamber and discharges into the 4” main line that reports to the Aspen Bluff common dose field. Pump check: Float system was tested and working properly. Eliminite pump 7.6 Amps. Drain field pump 7.8 amps. Water Quality Control Professionals LLC Pump Panel. Water Quality Control Professionals LLC Connections. NEMA 4X enclosure Water Quality Control Professionals LLC Pump chamber. Water Quality Control Professionals LLC Water Quality Control Professionals LLC Water Quality Control Professionals LLC Sincerely, John M. Volk Water Quality Control Professionals LLC 13863 W LaSalle Pl Lakewood, CO 80228 970-389-4491 jvolk@wqcpllc.com HOLLAND CREEK METRO DISTRICT TO VERIFY SITE CONDITIONS.CONTACT ENGINEER IMMEDIATELY IN THE EVENT SITECONDITIONS RELATED TO OWTS INSTALLATION DIFFERFROM THSE PRESENTED ON THESE PLANS.AITKEN RESIDENCEONSITE WASTEWATER TREATMENT SYSTEMELIMINITE INC.TJK@ELIMINITE.COM(406) 581-1613VARIESCOVERFIRST ISSUE 3-29-2021ONSITE WASTEWATER TREATMENT SYSTEM820 ASPEN BLUFF LANE, LOT 15RED SKY RANCHWOLCOTT, COLORADO0SITE LOCATIONAPPROXIMATE LOCATION OF PRIMARY TANK ANDELIMINITE TREATMENT UNIT. SEE SHEET 2.EAGLE COUNTY ENVIRONMENTAL HEALTH DEPARTMENTENVIRONMENTAL HEALTH APPROVALTHIS SET OF PLANS IS NOT VALID FORCONSTRUCTION UNLESS PROJECTENGINEER'S SEAL AND SIGNATURE ISAFFIXED AND VALID EAGLE COUNTY ISDSPERMIT IS SHOWN ON THIS COVER SHEET.ASPEN BLUFF LANEDRAINFIELD IS STATE APPROVED CENTRAL DRAINFIELDELIMINITE BIOLOGICAL NUTRIENT REMOVAL SYSTEMECEH EDITS 5-21-20211GENERAL PROJECT OVERVIEWGOLF CART PATH PUMP CIRCUIT BREAKERSPROGRAMMABLE LOGIC CONTROLLERALARM HORNMOTOR CONTACTORSTRANSFER PUMPHAND-OFF-AUTOTOGGLE SWITCHRECIRCULATION PUMPHAND-OFF-AUTOTOGGLE SWITCHLEVEL FLOATCONNECTION BLOCKRECIRCULATION PUMPCURRENT SENSORPUMP INCOMINGPOWERCONTROL INCOMINGPOWER CONTROL PANELThis control panel operates one recirculation pump and one drainfieldpump. The recirculation pump and drainfield pump is controlled with atimer The control panel requires two separate feeds from the mainservice panel: 1) A 120 v, 15 A, single phase circuit for the controls.2) A 240 v, 30 A, single phase circuit for the pumps.From Regulation 43:TREATMENT TANK IS SUPPLIED ASA COMPLETE, PRE-BUILT UNIT.THE DRAINFIELD PUMP ANDRECIRCULATION PUMP ISINSTALLED AND CONNECTED.CONTRACTOR SHALL BE FAMILIARWITH THE DOCUMENT"INFILTRATOR IM-SERIES SEPTICTANK GENERAL INSTALLATIONINSTRUCTIONS." A COPY OFTHESE INSTRUCTIONS MUST BEAVAILABLE ON-SITE AT ALL TIMESCONSTRUCTION IS OCCURRING.TANKS MUST BE INSTALLEDACCORDING TO TANKMANUFACTURERS INSTRUCTIONS.ELECTRICIAN WILL BE REQUIREDTO PROVIDE TWO CIRCUITS TOTHE CONTROL PANEL.ELECTRICIAN WILL BERESPONSIBLE FOR SELECTINGAND INSTALLING APPROPRIATELYSIZED WIRE TO CONTROL PANEL.ELECTRICIAN TO PROVIDEELECTRICAL CONDUIT IFREQUIRED. IT IS IMPERATIVETHAT A PERMANENT VAPORBARRIER BE INSTALLED IN THECONDUIT TO PROTECT THECONTROL PANEL FROMCORROSIVE GAS. "GREAT STUFF"STYLE SPRAY FOAM DOES NOTPROVIDE AN ACCEPTABLE VAPORBARRIER AND WILL NOT BE USED.PIPE BEDDING TO CONFORM TOHCMD PIPE BEDDINGREQUIREMENTS.ELIMINITE(406) 581-16133 OF 33-29-2021VARIES‘%8,/',1*6(:(5INSTALL CLEANOUTSIN SEWER EVERY 50FT. OR AS REQUIREDBY EAGLE COUNTY.AITKEN RESIDENCE820 ASPEN BLUFF LNRED SKY RANCHWOLCOTT, COLORADODOUBLE CLEANOUT175.6" EXTERIOR LENGTH61.7EXTERIORWIDTH54.5"EXTERIORHEIGHTTOP VIEWEND VIEWLIFTING STRAP(TYP.)RISER CONNECTION (TYP.)LIFTING STRAP (TYP.)LIFTING LUG (TYP.)OUTLET TEE(TYP.)PRIMARY AND TREATMENT TANKINFILTRATOR IM-15302" SUBGRADE INSULATION(TYP.)2" SUBGRADE INSULATIONINCLUDING TOP OF TANKRECIRCULATION PUMPTANK DIMENSIONS AND INSULATION PLACEMENTFIRST ISSUE3-29-210‘6&+39&',6&+$5*(‘$12;,&5(7851/,1(WATER-PROOF ELECTRICALJUNCTION BOX. HCMD ALTERNATEJUNCTION BOX IS ACCEPTABLE1530 GAL PRIMARY TANKELIMINITE 120 TREATMENT SYSTEMINSTALL SEAM CLIPSACCORDING TO MFGRINSTRUCTIONSDOUBLE CLEANOUT AS SHOWN ON SITE PLANINSTALL ADDITIONAL CLEANOUTS AT 50' INTERVALSIN BUILDING SEWER.TANK BEDDING AND BACKFILLACCORDING TO MFGR INSTRUCTIONSMAXIMUM BURY DEPTH: 18"LIDS MUST BE SECURED WITH SS STEEL SCREWS. ALLSCREW HOLES MUST BE FITTED WITH A SCREW.PLASTIC VALVE BOXCOVER FLUSH WITHFINAL GRADEAIR INTAKEBUILDINGSEWEREFFLUENT FILTERTHREADED CAPSANITARYTEECIRCULAR VALVE BOXFLUSH WITH SURFACES x F THREADSSILENCE/RESETSWITCHCIRCULAR VALVE BOXFLUSH WITH SURFACE‘',6&+$5*(&211(&76TO ASPEN BLUFF CENTRALDRAIN FIELD.‘6&+39&LIBERTY FL50 EFFLUENT PUMPINSTALL CHECK VALVES AS NECESSARYTO PREVENT BACK-FLOW FROM MAIN.ADD HIGH LEVEL FLOATTO SIGNAL EFFLUENTFILTER BLINDINGELIMINITE BIOLOGICAL NUTRIENT REMOVAL SYSTEMLIBERTY 280, 1/2 HP, 115 V SINGLE PHASE8.5 FLA. INTERNAL RECIRCULATION PUMPNO OUTSIDE DISCHARGE1530 GAL PRIMARY TANKELIMINITE 120 TREATMENT SYSTEMECEH EDITS5-21-211 HOLLAND CREEK METRO DISTRICT TO VERIFY SITE CONDITIONS.CONTACT ENGINEER IMMEDIATELY IN THE EVENT SITECONDITIONS RELATED TO OWTS INSTALLATION DIFFERFROM THSE PRESENTED ON THESE PLANS.AITKEN RESIDENCEONSITE WASTEWATER TREATMENT SYSTEMELIMINITE INC.TJK@ELIMINITE.COM(406) 581-1613VARIESCOVERFIRST ISSUE 3-29-2021ONSITE WASTEWATER TREATMENT SYSTEM820 ASPEN BLUFF LANE, LOT 15RED SKY RANCHWOLCOTT, COLORADO0SITE LOCATIONAPPROXIMATE LOCATION OF PRIMARY TANK ANDELIMINITE TREATMENT UNIT. SEE SHEET 2.EAGLE COUNTY ENVIRONMENTAL HEALTH DEPARTMENTENVIRONMENTAL HEALTH APPROVALTHIS SET OF PLANS IS NOT VALID FORCONSTRUCTION UNLESS PROJECTENGINEER'S SEAL AND SIGNATURE ISAFFIXED AND VALID EAGLE COUNTY ISDSPERMIT IS SHOWN ON THIS COVER SHEET.ASPEN BLUFF LANEDRAINFIELD IS STATE APPROVED CENTRAL DRAINFIELDELIMINITE BIOLOGICAL NUTRIENT REMOVAL SYSTEMECEH EDITS 5-21-20211GENERAL PROJECT OVERVIEWGOLF CART PATH PUMP CIRCUIT BREAKERSPROGRAMMABLE LOGIC CONTROLLERALARM HORNMOTOR CONTACTORSTRANSFER PUMPHAND-OFF-AUTOTOGGLE SWITCHRECIRCULATION PUMPHAND-OFF-AUTOTOGGLE SWITCHLEVEL FLOATCONNECTION BLOCKRECIRCULATION PUMPCURRENT SENSORPUMP INCOMINGPOWERCONTROL INCOMINGPOWER CONTROL PANELThis control panel operates one recirculation pump and one drainfieldpump. The recirculation pump and drainfield pump is controlled with atimer The control panel requires two separate feeds from the mainservice panel: 1) A 120 v, 15 A, single phase circuit for the controls.2) A 240 v, 30 A, single phase circuit for the pumps.From Regulation 43:TREATMENT TANK IS SUPPLIED ASA COMPLETE, PRE-BUILT UNIT.THE DRAINFIELD PUMP ANDRECIRCULATION PUMP ISINSTALLED AND CONNECTED.CONTRACTOR SHALL BE FAMILIARWITH THE DOCUMENT"INFILTRATOR IM-SERIES SEPTICTANK GENERAL INSTALLATIONINSTRUCTIONS." A COPY OFTHESE INSTRUCTIONS MUST BEAVAILABLE ON-SITE AT ALL TIMESCONSTRUCTION IS OCCURRING.TANKS MUST BE INSTALLEDACCORDING TO TANKMANUFACTURERS INSTRUCTIONS.ELECTRICIAN WILL BE REQUIREDTO PROVIDE TWO CIRCUITS TOTHE CONTROL PANEL.ELECTRICIAN WILL BERESPONSIBLE FOR SELECTINGAND INSTALLING APPROPRIATELYSIZED WIRE TO CONTROL PANEL.ELECTRICIAN TO PROVIDEELECTRICAL CONDUIT IFREQUIRED. IT IS IMPERATIVETHAT A PERMANENT VAPORBARRIER BE INSTALLED IN THECONDUIT TO PROTECT THECONTROL PANEL FROMCORROSIVE GAS. "GREAT STUFF"STYLE SPRAY FOAM DOES NOTPROVIDE AN ACCEPTABLE VAPORBARRIER AND WILL NOT BE USED.PIPE BEDDING TO CONFORM TOHCMD PIPE BEDDINGREQUIREMENTS.ELIMINITE(406) 581-16133 OF 33-29-2021VARIES‘%8,/',1*6(:(5INSTALL CLEANOUTSIN SEWER EVERY 50FT. OR AS REQUIREDBY EAGLE COUNTY.AITKEN RESIDENCE820 ASPEN BLUFF LNRED SKY RANCHWOLCOTT, COLORADODOUBLE CLEANOUT175.6" EXTERIOR LENGTH61.7EXTERIORWIDTH54.5"EXTERIORHEIGHTTOP VIEWEND VIEWLIFTING STRAP(TYP.)RISER CONNECTION (TYP.)LIFTING STRAP (TYP.)LIFTING LUG (TYP.)OUTLET TEE(TYP.)PRIMARY AND TREATMENT TANKINFILTRATOR IM-15302" SUBGRADE INSULATION(TYP.)2" SUBGRADE INSULATIONINCLUDING TOP OF TANKRECIRCULATION PUMPDISCHARGE PUMPTANK DIMENSIONS AND INSULATION PLACEMENTFIRST ISSUE3-29-210‘6&+39&',6&+$5*(‘$12;,&5(7851/,1(WATER-PROOF ELECTRICALJUNCTION BOX. HCMD ALTERNATEJUNCTION BOX IS ACCEPTABLE1530 GAL PRIMARY TANKELIMINITE 120 TREATMENT SYSTEMINSTALL SEAM CLIPSACCORDING TO MFGRINSTRUCTIONSDOUBLE CLEANOUT AS SHOWN ON SITE PLANINSTALL ADDITIONAL CLEANOUTS AT 50' INTERVALSIN BUILDING SEWER.TANK BEDDING AND BACKFILLACCORDING TO MFGR INSTRUCTIONSMAXIMUM BURY DEPTH: 18"LIDS MUST BE SECURED WITH SS STEEL SCREWS. ALLSCREW HOLES MUST BE FITTED WITH A SCREW.PLASTIC VALVE BOXCOVER FLUSH WITHFINAL GRADEAIR INTAKEBUILDINGSEWEREFFLUENT FILTERTHREADED CAPSANITARYTEECIRCULAR VALVE BOXFLUSH WITH SURFACES x F THREADSSILENCE/RESETSWITCHCIRCULAR VALVE BOXFLUSH WITH SURFACE‘',6&+$5*(&211(&76TO ASPEN BLUFF CENTRALDRAIN FIELD.‘6&+39&LIBERTY FL50 EFFLUENT PUMPINSTALL CHECK VALVES AS NECESSARYTO PREVENT BACK-FLOW FROM MAIN.ADD HIGH LEVEL FLOATTO SIGNAL EFFLUENTFILTER BLINDINGELIMINITE BIOLOGICAL NUTRIENT REMOVAL SYSTEMPUMP OPERATING POINTLIBERTY FL-51M 1/2 HP, 115 VSINGLE PHASE, 12.0 FLADISCHARGES TO CLUSTERDOSE TANKLIBERTY 280, 1/2 HP, 115 V SINGLE PHASE8.5 FLA. INTERNAL RECIRCULATION PUMPNO OUTSIDE DISCHARGE1530 GAL PRIMARY TANKELIMINITE 120 TREATMENT SYSTEMECEH EDITS5-21-211