Loading...
HomeMy WebLinkAbout2451 Alkali Creek Rd - 185520100084Environmental Health Department P.O. Box 179 500 Broadway Eagle, CO 81631-0179 Phone: (970) 328-8730 Fax: (970) 328-7185 Permit Permit No. OWTS-020822-2021 Permit Type: OWTS Permit Work Classification: New Permit Status: Active Issue Date: 3/31/2021 Expires: 7/29/2021 On-Site Wastewater Treatement System Project Address Parcel Number 2451 ALKALI CREEK RD, WOLCOTT AREA,185520100084 Owner Information Address Larry Taylor 102 water street unit 33 water street STE 33 Red cliff, CO 81649 Phone: Cell: (970) 389-3342 Email: outwestmech@yahoo.com Inspections: For Inspections Call: (970) 328-8755 and call the Design Engineer Engineer Phone Email LKP Engineering, Inc., Luiza Petrovska, PE (970) 390-0307 luiza@lkpeng.com Contractor License Number Phone Email Bossow Excavation LLC richiebossow@yahoo.com(970) 376-6310OWTSPL-000123-20 21 Permitted Construction / Details: Install the new system exactly as depicted in the LKP Engineering design dated, stamped and signed March 10th, 2021 by Luiza Petrovska P.E.. The new system will be sized to accomodate the maximum daily flows for a 3 bedroom residence. This OWTS consists of one sewer line from the residence. A Valley Precast 1,000 gallon, three-compartment septic tank with a 1,500 gallon total volume shall be used with an effluent filter in the outlet tee. An Orenco PF500511 High Head effluent discharge pump shall be used. The floats will be set to dose 90 gallons per dose. The STA consists of two rows of 24 Infiltrator Quick 4 Plus Standard chambers for a total of 48. Gradation analysis must confirm that sand is secondary sand media prior to installation. Contact Eagle County Environmental Health and the design engineer well in advance of requesting inspections prior to backfilling any component of the OWTS. The design engineer is responsible for conducting all inspections necessary to certify the installation and assure the functionality of the system. System certification, along with photos and a record drawing is required to be submitted to and approved by Eagle County Environmental Health prior to the use of the system or certifying occupancy. THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT Issued by: Environmental Health Department, Eagle County, CO Danielle Sell Date March 31, 2021 CONDITIONS 1. 2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED 3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT 4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED Wednesday, March 31, 2021 1 Inspection Result Eagle County, Colorado P.O. Box 179 500 Broadway Eagle, CO Phone: (970) 328-8730 Fax: (970) 328-7185 IVR Phone: 1-866-701-3307 Inspection Number: WOLCOTT AREA - 2451 ALKALI CREEK - 507043 Permit Number: OWTS-020822-2021 Inspection Date: 05/07/2021 Inspector: Salinsky, Danielle Permit Type: OWTS Permit Inspection Type: OWTS Final Inspection Work Classification: NewOwner:Out West Mechanical Job Address:2451 ALKALI CREEK RD IVR Pin Number:192490 WOLCOTT AREA, CO Project:<NONE> Parcel Number:185520100084 Contractor:Phone: (970) 376-6310 / Cell: (970) 376-6310Bossow Excavation LLC Inspection Status: Approved Inspection Notes The above-referenced permit has been inspected and finalized. The Onsite Wastewater Treatment System (OWTS) was designed and installed to serve the thre-bedroom residence on the above property. Additional information about the maintenance of your septic system needs can be accessed through our website links, provided on the Environmental Health Department’s septic system resource page. Be aware that changes in the use of your property or alterations of your building may require commensurate changes to, or relocation of, your septic system. Landscape features, trees with taproots, irrigation systems, and parking areas above the soil treatment area can cause a premature system failure. It is equally important that you notice and immediately repair dripping faucets and hissing toilets as this will certainly cause the system to fail. If you have any questions regarding this information, please contact us at (970) 328-8755 and reference the OWTS septic permit number. Inspector Comments Added Item: Septic Tank 1500 gallon three compartment Valley Precast concrete tank. Added Item: Record Drawing Provided by LKP Engineering. Added Item: Record Photos Provided by LKP Engineering. Added Item: Site and Soil Received sand gradation confirming secondary sand specifications were met. Added Item: Final Certification Letter Provided by LKP Engineering, stamped, signed, and dated September 29, 2021. Added Item: General Plan Received March 10th, 2021 from LKP Engineering. Monday, June 6, 2022 For more information visit: http://www.eaglecounty.us Page 1 of 2 Added Item: Soil Treatment Area (STA) The STA consists of two rows of 24 Infiltrator Quick 4 Plus Standard chambers for a total of 48. Added Item: Identification of Systems Contractor Bossow Excavating was the licensed installer. Monday, June 6, 2022 For more information visit: http://www.eaglecounty.us Page 2 of 2 P.O. Box 724, Eagle, CO 81631 Tel. (970) 390-0307 September 29, 2021 Larry Taylor Out West Mechanical, Inc. PO Box 521 Minturn, CO 81645 (970) 389-3342 outwestmech@yahoo.com RE: Inspection of Septic System Installation Taylor 3-Bedroom Residence Lot 3, Horse Mountain Ranch 2451 Alkali Creek Road Eagle County, Colorado Project No. 20-3451– OWTS-020822-2021 Dear Larry: At the request of the installer, Richie Bossow, Bossow Excavation, LLC, on May 7 and July 6, 2021, we visited your property at 2451 Alkali Creek Road, Lot 3, Horse Mountain Ranch, Eagle County, Colorado. The purpose of our site visits was to inspect the installation of the septic system. The system was installed in overall compliance with the septic system design, Drawing No. 20- 3451OWTS.dwg, dated February 24, 2021. At the time of the inspection, we observed the following: The building sewer line was connected to the west side of the residence under construction (attached garage) and the cleanout was constructed at 12-inches from the foundation wall, as shown on the attached as- built sketch. The building sewer line was about 30 feet of 4-inch diameter SDR35 PVC pipe. They installed 1000-gallons, three compartments, precast, concrete, septic tank by Valley Precast with an effluent filter in the second compartment and an Orenco PF500511 high-head pump assembly in the third compartment. The inlet of the tank had the Tee installed. The tank access ports had corrugated, plastic risers with secured, green, plastic covers. The covers were secured with nuts, bolts and screws. All risers were 36-inch high. The effluent line from the pump chamber to end manifold of the soil treatment area, was about 180 feet long, 1.5-inch diameter, sch40 pvc pipe. The end manifold was about 3 feet long, 1.5-inch sch40 pvc. The soil treatment area consisted of infiltrator chambers arranged in a bed configuration with two rows of 24 Quick Four Plus Standard Infiltrator Chambers in each. Three feet of the onsite silty, clayey soil was overexcavated from the bottom of the trenches and replaced with three feet of secondary sand media (the graph is attached to this report). Pressure dosing system consisting of 95-ft, 1.5-inch sch40 laterals perforated at the top with 1/8- inch holes at 4-ft intervals, suspended from the inside side of each row of infiltrator chambers. The ends of the laterals were equipped with flushing assemblies. A squirt test was performed during the inspection and it was satisfactory. All inspection ports were installed (in the end caps of the first and last chamber of each row of infiltrators) in the opening opposite the pressure distribution lines. The septic tank installation and startup of the pump system were done by Valley Precast. The control panel for the pump was on the back of the house. There is no other warranty either expressed or implied. Sincerely, LKP Engineering, Inc. Luiza Petrovska, PE cc: Eagle County Environmental Health Department E-mail: Danielle Salinsky danielle.salinsky@eaglecounty.us; environment@eaglecounty.us J:\_WP X4-LKP\_2020\20-3451OSIQ4PLUS-SAND-PRESSURE.DOCX 9/29/2021 GRADATION ANALYSIS TESTLABORATORY TEST REPORT DATALaboratoryClient:Location / Plant:Sample / Product:Sample Date:Lab Test Date:Job Number:SIEVESIEVE OPENING IN MILLIMETERSPERCENT PASSING THRU SIEVE3"751.537.53/4"193/8"9.5 100.0No. 44.75 98.0No. 82.36 83.0No. 161.18 67.0No. 300.6 44.0No. 500.3 19.0No. 1000.15 5.0No. 2000.075 2.1GRADATION RESULTS COMPARED TO PREFERRED AND SECONDARY SAND FILTER SPECIFICATIONSValue UnitsPreferred Sand ValuePass / Fail Preferred SandSecondary Sand ValuePass / Fail Secondary Sand1.00 millimeters0.204 millimeters 0.25 to 0.60FAIL0.15 to 0.60 PASS4.93 unitless ratio < or = 4.0FAIL< or = 7.0 PASS2.1 millimeters < or = 3 PASS < or = 3 PASSUniformity Coefficient (D60 / D10)Percent passing thru #200 Sieve20-3451ParameterD60 - Diameter that 60 percent of the sample is finer than.Effective Size - D10 - Diameter that 10 percent of the sample is finer than.ENTER INFORMATION IN BLUE CELLSUnitedLarry Taylor102_01202-Eagle14111-Gypsum 1/4" Concrete Sand4-26-21 to 4-26-202101020304050607080901000.01 0.1 1 10 100Percent Passing SieveDiameter of Particle in MillimetersPlot of Gradation Analysis3"1.5"3/4"3/8"#4#8#30#50#100#200#16J:\_WP X4-LKP\_2020\20-3451LaryTaylorLot3HMR\OWTS\OSI\20-3451United4-26-2021 to 4-26-2021Sand Gradation Analysis Spreadsheet PROFILE HOLE #10 TO 1.5 FEET TOPSOIL1.5 TO 2.5 FEET BLOCKY CLAY WITH ROOTS0.5 TO 5 FEET BROWN, SANDY, GRAVELLY,CLAYEY MATRIX WITH SUBROUND TOSUBANGULAR BOULDERSNO GROUND WATER ENCOUNTEREDDESIGN CALCULATIONSDESIGN LONG TERM ACCEPTANCE RATE RATE = 0.8 GPD/SFNUMBER OF BEDROOMS: 3MAXIMUM DAILY FLOW = QMAXQmax = 3 BEDROOMS X 2 PERSONS/BEDROOM X 75 GALLONS/PERSON/DAYQMAX = 450 GPDSEPTIC TANKV = 1000 GALLONS FOR 2 TO 3 BEDROOMS PLUS 250 GALLONS FOR EACH ADDITIONAL BEDROOMUSE 1000-GALLONS THREE COMPARTMENTS, CONCRETE SEPTIC TANK WITH EFFLUENT FILTER,AND HIGH HEAD PUMP BY VALLEY PRECAST OR EQUIVALENT APPROVED BY THE ENGINEER.ABSORPTION AREABASED ON APPLICATION RATE:A = 450GPD/0.8GPD/S.F.A = 563S.F.QUICK 4 PLUS, STANDARD INFILTRATOR CHAMBER SYSTEM IN A BED CONFIGURATIONCONSTRUCTED OVER 3 FOOT OF UNLINED SAND FILTERSURFACE AREA OF ONE QUICK4, PLUS STANDARD INFILTRATOR CHAMBER = 12 S.F.USE 48 QUICK4, PLUS, STANDARD, INFILTRATOR CHAMBERS IN BED AS SHOWN ON THE PLAN.NOTES:1. BENDS IN THE BUILDING SEWER SHALL BE LIMITED TO 45 DEGREES.2. THE SEPTIC TANK SHALL BE INSTALLED LEVEL.3. THE TANK SHALL HAVE RISERS OVER EACH ACCESS MANHOLE AND ALL RISERS SHALLEXTEND TO OR ABOVE FINAL GRADE.4. EACH RISER LEAD WILL HAVE A SECURE CLOSING MECHANISM, SUCH AS A LOCK, SPECIALHEADED BOLTS OR SCREWS, OR SUFFICIENT WEIGHT TO PREVENT UNAUTHORIZED ACCESS.5.THE SEPTIC TANK AND ALL THE PIPING WILL BE BACKFILLED UP TO THE INVERTS PRIOR TOSCHEDULING AN INSPECTION.6. THE BED WITH THE INFILTRATOR CHAMBERS SHALL BE INSTALLED LEVEL, ALONG THECONTOUR.7. EXCAVATE NINE (6) FEET WIDE BED8. THE BOTTOM AND THE SIDEWALLS OF THE BEDS SHALL BE RAKED (IF NEEDED) TO ELIMINATESMEARING.8. THE BED WILL BE EXCAVATED ADDITIONAL THREE FEET BELOW THE PROPOSED BOTTOM OFTHE INFILTRATOR CHAMBERS FOR THE SAND FILTER PLACEMENT.9.THE CLASSIFICATION OF THE SAND TO BE USED IN THE BED OF THE SOIL TREATMENT AREA(STA) MUST BE LESS THAN 30 DAYS OLD AND SUBMITTED TO THE ENGINEER PRIOR TO THESAND FILL PLACEMENT.10. MARK A LINE ON THE BED EXCAVATION WALLS AT THE 3-FOOT DEPTH FROM THE BOTTOMWITH SPRAY PAINT BEFORE THE SAND PLACEMENT11. PLACE THE SEND FILTER IN THE PREPARED BED TO THE MARKED DEPTH12. ASSEMBLE AND INSTALL THE INFILTRATOR CHAMBERS IN THE BED ACCORDING TO THEMANUFACTURERS RECOMMENDATIONS.13. INSTALL THE PERFORATED PRESSURE DISTRIBUTION LATERALS ACCORDING TO THEMANUFACTURERS RECOMMENDATIONS.14. SCHEDULE A SQUIRT TEST OF THE LATERALS15. BACKFILL THE SIDEWALL AREA WITH NATIVE ON-SITE SOIL FOR PROPER SUPPORT.16. BACKFILL THE BED WITH A MINIMUM OF 12 INCHES OF TAMPED SOIL COVER.17. THE FINAL GRADING OVERT THE STA WILL PROVIDE FOR UNIFORM RUNOFF AWAY FROM THESOIL TREATMENT AREA, WITHOUT ALLOWING WATER TO PUDDLE ON TOP.18. AVOID VEHICLE TRAFFIC OVER THE SYSTEM.19. ALL INSTALLATIONS SHALL MEET THE RULES AND REGULATIONS OF THE EAGLE COUNTYENVIRONMENTAL HEALTH DEPARTMENT AND OWTS REG 43 EFFECTIVE AUGUST 24, 2018 .20.FOR THE INSPECTION OF THE SEPTIC SYSTEM - NOTIFY THE EAGLE COUNTYENVIRONMENTAL HEALTH DEPARTMENT AND THE DESIGN ENGINEER A MINIMUM OF48-HOURS PRIOR TO BACKFILLING ANY PART OF THE SYSTEM TO SCHEDULE AN INSPECTION.PROFILE HOLE NO. 20 TO 3 FEET TOPSOIL3 TO 4 FEET BLOCKY CLAY WITH ROOTS4 TO 6.5 FEET LIGHT BROWN CLAY WITH SOMEGRAVEL AND BOULDERSNO GROUND WATER ENCOUNTEREDRECOMMENDED: PRESSURE DISTRIBUTION, WITH 3 FEET OF UNLINED SAND FILTERFROM PROFILE HOLE # 1 - SAMPLE AT 4 FEET, Type 4, LTAR = 0.2 gpd/sf>35% Rock (>2mm) Type R-1 Option 1, 2 feet of SandFROM PROFILE HOLE #2 - SAMPLE AT 4.5 FEET, Type 4, LTAR = 0.2 gpd/sf>50% Rock (>20mm), Type R-2, 3 feet of SandPROFILEHOLE-1CLEANOUT WITHIN 5FEET OF THE OUTSIDEOF THE HOUSEINVin=8003.5'BUILDING SEWER LINE, ABOUT 27 FEET OF4-INCH DIAMETER SDR35 PVC, (THE FIRSTAND LAST 5 FEET TO BE AT 2% SLOPEEND CAP(TYP)128.6'20.6'FLUSHINGASSEMBLY(TYPICAL)INVout= 8004'INSPECTION PORT (TYPICAL IN THE FIRSTAND LAST INFILTRATOR CHAMBER OF EACHROW, INSTALLED IN THE OPENING OF THECAP OPPOSITE OF THE PRESSURE LINEINVout= 8003.2'INVin=8000.3'~2.8' END MANIFOLD, 1.5 INCHDIAMETER SCH40 PVC~98 FEET OF 1.5-INCH SCH40PVC LATERAL, PERFORATEDWITH 1/8-INCH HOLES AT4-FOOT INTERVALS AT THE TOPOF THE PIPE (TYPICAL)DRILL ONE 1/4-INCH HOLE AT THE INVERT OFTHE FAR END OF THE LATERAL FOR DRAININGOF THE REMAINING EFFLUENT FROM THE PIPEBETWEEN DOSING AND PLACE A ROCK UNDERIT TO PREVENT EROSION (TYPICAL)PROFILEHOLE - 2QUICK 4 PLUS,STANDARD INFILTRATORCHAMBER (TYPICAL)STA BED WITH TWO ROWS OF 24INFILTRATOR CHAMBERS EACH500'+ STATO WELLALL RISERSAT EL=8006.5'230'+/-to WestPL07080708 09060504 1000 GALLONS, THREE COMPARTMENTSCONCRETE SEPTIC TANK WITH EFFLUENTFILTER AND ORENCO PUMP ASSEMBLY BYVALLEY PRECAST OR EQUIVALENTABOUT 143 FEET TRANSPORT(EFFLUENT) LINE,1.5 INCHDIAMETER SCH 40PVCPUMP SELECTIONA DISCHARGE PUMP CAPABLE OFDELIVERING 22 GPM AGAINST 15.4 FEET OFTOTAL DYNAMIC HEAD WILL BE USED. THEELEVATIONS BETWEEN THE PUMP INVERT ANDTHE INVERT OF THE DISTRIBUTION VALVESHOULD BE FIELD VERIFIED AND REPORTEDBACK TO THE ENGINEER.FOR THE DISCHARGE PUMP USE ORENCO,PF500511 HIGH HEAD EFFLUENT PUMP. THEPUMP DOSING WILL BE ON DEMAND WITH 90GALLONS PER DOSE.INFILTRATOR SYSTEMS INC.QUICK4 PLUS STANDARD CHAMBERPRODUCT SPECIFICATION(NOT TO SCALE)PRESSURIZED PIPE DRILLPOINTS LOCATIONS(2 PLACES)(EFFECTIVE LENGTH)TOP VIEWSIDE VIEWEND VIEWQUICK4 PLUS ALL-IN-ONE 12 END CAPINSPECTION PORTSAND FILL PLACEMENTPLACE THE SAND FILL MATERIAL IN THE EXCAVATED BED.THE FILTERING MATERIAL USED IN A SAND FILTER MUST BE CLEAN, COARSE SAND, CLASSIFIED ASPRIMARY SAND OR SECONDARY SAND. THE ABOVE DESIGN WAS PREPARED BASED ON SECONDARYSAND.THE CLASSIFICATION OF THE SAND TO BE USED IN THE TRENCHES OF THE SOIL TREATMENT AREA(STA) MUST BE LESS THAN 30 DAYS OLD AND SUBMITTED TO THE ENGINEER PRIOR TO THE SAND FILLPLACEMENT.INFILTRATOR SYSTEMS INC.QUICK4 PLUS STANDARD CHAMBERTYPICAL BED DETAILSECTION VIEW(NOT TO SCALE)NATIVE BACKFILLTOPSOIL3'SAND FILTERPRESSUREDISTRIBUTIONLINES4-FTMAX.ESTABLISH VEGETATIVE COVER6-FTPROPOSED 3-BRMRESIDENCECLEANOUTINVin=8003.5'OWTS X-SECTION SKETCHN.T.S2.8' ENDMANIFOLD1.5-INCH SCH40 PVCABOUT 143 FEET OF 1.5 INCH SCH40PVC TRANSPORT (EFFLUENT LINE)EL=8006.5'INVout=8003.2'PROPOSEDINVout =8004'VERIFY!LOWEST FLOOREL=8007'27 FEET 4-INCH DIAM.SDR35PVC, BUILDINGSEWER LINEGROUNDELEVATION8002.5'MANIFOLDINVin=8000.34'BOTTOM OF ALLINFILTRATORSAT =7999.84'NATIVE BACKFILLTOPSOIL3'SAND FILTERPRESSUREDISTRIBUTIONLINES4-FT MAX.6-FTSurvey by:MATTHEW SLAGLE, PLSSLAGLE SURVEY SERVICESVENT CAPOPEN BOTTOMVENT CAPINSPECTION PORT4-INCH DIAMETERSDR35 WITHPERFORATIONS ONTHE BOTTOM 8-INCHES2'12"+ATTACH TOINFILTRATORWITH A RING ORSCREWSINSPECTION PORTN.T.S.FINISHEDGRADEOPEN BOTTOMPRESSURE DISTRIBUTIONLATERAL (TYP.)(EFFECTIVE LENGTH)SIDE VIEWValve BoxBall ValveSweeping EllFLUSHING ASSEMBLYN.T.S.SQUIRT TEST OF THE RESIDUAL HEAD OF THE STA BED LATERALSREMOVE THE END CAPS OF THE FLUSHING ASSEMBLY IN ORDER TO FLUSH THE LATERALSCLEAN FROM ANY DRILLING DEBRIS OR DIRT. DO NOT INSTALL THE LAST INFILTRATORCHAMBER SO THAT THE PERFORATIONS ON THE LATERALS ARE OPEN IN ORDER TO RUN THESQUIRT TEST FOR THE MEASUREMENT OF THE 5-FT RESIDUAL HEAD (+/-10%). THEPREPARATIONS FOR THE SQUIRT TEST MUST BE READY FOR THE TEST TO BE DONE DURINGTHE FINAL INSPECTION.AFTER THE TEST, INSTALL THE LAST CHAMBER ON ALL ROWS.DRAWN BY:CHECKED BY:PROJECT NO.:SHEET:DRAWING NO.:DATE:BYDESCRIPTIONDATENO.L.P.L.P.OWTS-1MARCH 10, 202120-3451.DWGONSITE WASTEWATER TREATMENT SYSTEMSE ¼ NE ¼ OF SEC20, T3S, R3W OF THE 6thP.M.(AKA HORSE MOUNTAIN PARCEL NO. 35)COUNTY PARCEL # 1855-201-00-084ALKALI CREEK ROADEAGLE COUNTY, COLORADOPREPARED FORP.O. Box 724 EAGLE, CO 81631Tel (970) 390-0307www.LKPEngineering.comLARRY TAYLOR20-3451MAP~1"=500'SITE03/10/2021