Loading...
HomeMy WebLinkAboutR88-066 Special Use Permit Mobile PremixCommissioner ��67`X-F-;5JA moved adoption of the following Resolution: BOARD OF COUNTY COMMISSIONERS COUNTY OF EAGLE, STATE OF COLORADO RESOLUTION NO. 88- 6 6 APPROVAL OF SPECIAL USE PERMIT - MOBILE PREMIX File No. 271 -88 WHEREAS, Mobile Premix did file with the Eagle County Department of Community Development, on or about June 1, 1988, an application for a Special Use Permit for operation of an asphalt plant within the Resource Zone District; and WHEREAS, based on the evidence, testimony, exhibits, study of the Master Plan for the unincorporated areas of Eagle County, comments of the Eagle County Department of Community Development, comments of public officials and agencies, the recommendation of the Eagle County Planning Commission, and comments from all interested parties, the Board of County Commissioners of the County of Eagle, State of Colorado, finds as follows: 1. That proper publication and public notice was provided as required by law for the hearing before the Planning Commission and the Board of County Commissioners. 2. That the proposed special use conforms to the requirements of Section 2.09 of the Eagle County Land Use Regulations. 3. That the neighborhood surrounding the existing gravel pit which is proposed as the site for an asphalt plant will be subjected to increased truck traffic, noise and dust during the construction of Highway 82. 4. That the Blue Lake Gravel Pit will supply the necessary gravel for asphalt paving to be completed on the Highway 82 regardless of where the asphalt plant is located. J 5. By locating the asphalt plant within the gravel77Xpit, efficiencies in noise, dust and truck traffic can be accomplished, thereby reducing the impact of the highway construction project on the neighborhood and other existing uses in the area. 6. Due to the temporary increase in noise, dust and truck traffic during construction, the location of the asphalt plant within the gravel pit is a use compatible with other uses in the area during the highway construction project. 7. Access to and from the gravel pit is adequate. Location of the asphalt plant at the gravel pit will minimize damage to public roads caused by traffic related to the highway construction project. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of the County of Eagle, State of Colorado: THAT the application of Mobile Premix, File No. ZS 271 -88. within the Resource Zone District in the following described unincorporated area of Eagle County be approved: A parcel of land located in Lot 5 and in the Northwest One - Quarter of the Southeast One - Quarter (NW- 1/4 SE 1/4) of Section 33, Township 7 South, Range 87 West of the Sixth Principal Meridian, Eagle County, Colorado, being more particularly described as follows, to wit: Beginning at a point on the Northerly right -of -way line of State Highway No. 82 whence a brass cap found in place and properly marked for the Southeast Corner of said Section 33 bears S50 059158" E. 2280.85 feet; thence N00° 00101" 1515.00 feet; thence S 86 016151" E. 200.42 feet; thence S641 58' 59" E. 413.82 feet; thence 5220 04' 04" E. 159.70 feet; thence S 40 050101" E. 214.11 feet; thence 5900 0010011 E. 35.00 feet; thence 5450 00'0011 E. 113.14 feet; thence S220 24119" E. 616.54 feet; thence 721.27 feet on the arc of a curve to the left having a radius of 1018.00 feet, the chord of which bears S30 042123" W. 711.66 feet to the northerly right -of -way line of State Highway No. 82; thence N72 010133" W. 800.00 feet along said Northerly right -of -way to the point of beginning. Said parcel of land contains 31.408 acres, more or less. -2- I THAT the following conditions shall be placed upon this approval and that violation of any condition shall be the basis for revocation of the permit: 1. The term of the permit shall be limited to three weeks' paving, beginning with the first day of paving and ending no later than October 31, 1988. 2. The hours of operation are limited to 7:00 a.m. to 7:00 p.m., Monday through Friday. 3. An environmental inspection must be performed by the Eagle County Environmental Health Officer prior to operations of the asphalt plant. 4. The applicant will notify thepl657XEnvironmental Health Officer prior to commencement of construction. 5. During operations, noise and air quality tests should be done. THAT the Board of County Commissioners directs the Department of Community Development to provide a copy of this Resolution to the applicant. MOVED, READ AND ADOPTED by the Board of County Commissioners of the Count of Eagle, State of Colorado, at its regular meeting held the day of July, 1988. county commissioners COUNTY OF EAGLE, STATE OF COLORADO, By and Through Its BOARD OF COUNTY COMMISSIONER By: rn- A- George A. Gates, Chairman -3- 3 Commissioner %..e-1 C�✓ seconded adoption of the foregoing resolution. The roll having been called, the vote was as follows: Commissioner George A. Gates Commissioner Donald H. Welch �4i Commissioner Richard L. Gustafson -� This Resolution passed by vote of the Board of County Commissioners of the County of Eagle, State of Colorado. -4-