HomeMy WebLinkAbout375 McLaughlin Ln - 247106306013INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
EAGLE COUNTY ENVIRONMENTAL HEALTH DIVISION
P.O. Box 179 - 500 Broadway • Eagle, Colorado 81631 ��
Telephone: 328-87556 —I
i
YELLOW COPY OF PERMIT MUST BE POSTED AT INSTALLATION SITE. PERMIT NO. 1 5 64
740
Please call for final inspection before covering any portion of installed system.
RETAIN WITH RECEIPT RECORDS
APPLICANT / AGENT:
OWNER:
PERMIT FEE PERCOLATION TEST FEE RECEIPT # CHECK #
(`Site Plan MUST be attached)
I
ISDS Permit # / .� � -1
APPLICATION FOR INDIVIDUAL.SEWAGE DISPOSAL SYSTEM PERMIT
ENVIRONMENTAL HEALTH OFFICE - EAGLE COUNTY
P. 0. BOX 179
EAGLE, CO 81631
328-8755/927-3823 (El Jebel)
* PERMIT APPLICATION FEE $150.00 PERCOLATION TEST FEE $200.00
* *
*_ MAKE ALL REMITTANCE PAYABLE TO: "EAGLE COUNTY TREASURER"
PROPERTY OWNER: MJM Ltd. PHONE: 970 963-9778
MAILING ADDRESS: l300 Puppysmith #215-184 Aspen, CO 81611
APPLICANT/CONTACT PERSON- Robert Nicols PHONE: (_97n)963-9778
MAILING ADDRESS: 300 Puppysmith #215-184 Aspen, CO 81611
Hughes
LICENSED ISDS CONTRACTOR: _Randy Hughes/Excavating PHONE: (g70)A6 - 004
COMPANY/DBA: Hughes Excavating ADDRESS: P.O. Box 606 Carbondale, CO 81623
***************************************************************************
PERMIT APPLICATION IS FOR: (X)o New Installation ( ) Alteration ( ) Repair
***************************************************************************
LOCATION OF PROPOSED INDIVIDUAL SEWAGE DISPOSAL SYSTEM:
Building Permit # (Q 3q(if known)
Legal Description: Subdivision: Ruedi Shores Filing: Block:- Lot No. 2
Tax Parcel Number: 2 4 7 1- 0 6 3- 0 6- 0 1 3 Lot Size: 1 .O1 Acre
Street Address: 0375 McLaughlin Road/Ruedi Shores Subdivision
***************************************************************************
BUILDING TYPE: (Check applicable category)
(x) Residential/Single Family
( ) Residential/Multi-Family*'
( ) Commercial/Industrial*
Number
Number
Type _
of Bedrooms 3
of Bedrooms
TYPE OF WATER SUPPLY: (Check applicable category)
( ) Well ( ) Spring ( ) Surface.
(K� Public Name of Supplier: Ruedi Shores Homeowners Association
*These systems quire desi by a Registered Professional Engineer
SIGNATURE: ='
Date:
TO BE COMPLETED BY THE COUNTY
AMOUNT PAID: RECEIPT #: 16.2,-19 DATE:�/Sx/f0
CHECK #: 316_07 CASHIER: �%�
Community Development Department
(970) 328-8730
Fax: (970) 328-7185
TDD: (970) 328-8797
EAGLE COUNTY, COLORADO
December 6, 1996
Robert Nicols
MJM Ltd.
300 Puppysmith #215-184
Aspen, CO 81611
Eagle County Building
P.O. Box 179
500 Broadway
Eagle, Colorado 81631-0179
RE: Final of ISDS Permit No. 1564-96, Tax Parcel #2471-063-06-013.
Property location: Lot #2, Ruedi Shores, 0375 McLaughlin Rd., Basalt, CO.
Dear Mr. Nicols:
This letter is to inform you that the above referenced ISDS Permit has been finalized. Enclosed is
a copy to retain for your records. This permit does not indicate compliance with any other Eagle
County requirements. Also enclosed is a brochure regarding the care of your septic system.
Be aware that later changes to your building may require appropriate alterations of your septic
system.
If you have any questions regarding this permit, please contact the Eagle County Environmental
Health Division at (970) 328-8755.
Sincerely, p�
Heather Savalox
Environmental Health Department
Eagle County Community Development
ENCL:Information Brochure
Final ISDS Permit
cc: files
,-community Development Department
(970)328-8730
Fax:(970) 328-7185
TDD: (970) 328-8797
EAGLE COUNTY, COLORADO
DATE: April 15, 1996
TO: Hughes Excavating
FROM: Environmental Health Division
Eagle County Building
P.O. Box 179
500 Broadway
Eagle, Colorado 81631-01 , 9
RE: Issuance of Individual Sewage Disposal System Permit No. 1564-96 Tax Parcel
#2471-063-06-013. Property Location: 0375 McLaughlin Rd., Basalt, CO, Nicols
residence.
Enclosed is your ISDS Permit No. 156496. It is valid for 120 days. The enclosed copy of the
permit must be posted. at the installation site. Any changes in plans or specifications invalidates
the permit unless otherwise approved. Please call our office well in advance for the final
inspection.
Permit specifications are minimum requirements only, and should be brought to the property
owner's attention.
This permit does not indicate conformance with other Eagle County requirements.
If you have any questions, please feel free to contact the Environmental Health Division at 328-
8755.
cc: files
HEPVI ORTH — PAWLAK GEOTECHNICALe INC.
5020 Road 1 S4
Glenwood Springs, Co 81aoi
970-945.7098
970.945.84$4 Feosimils
PAX TRANSMITTAL FORM
TO: Pa/u A
COMPANY:
95 S;�71
FAX NUM85R: `V� � 6SJOB NUMF�EAR:
FROM:
DATE: 41 (slq6
NUMBER OF PAGES:
(including this page)
MSSSAGE: ---
if you experience any problems receiving this transmission, please call:
SENT BY:
rIC tJIUUI 1,11 QI.U1QK. 'JCU 4CL,II ICL•JVJ-a4J-04J4
P1N1 1J 7V i i •1G HU . V VV f . VL
14EPWORTH-PAWLAK GEOITC`.HLAICAL, INC.
December 13, 1995
Revised April 15, 1995
Bob Nichols
c/o Dan Muse
417 Main Street, Suite A
Carbondale, Colorado 81623
5020 Road 154
Glenwuud Springs, CC) 81603
Fax 970 945-8454
Phnne 970 945.7988
Job No. 195 527
Subject: Subsoil Study for foundation Design and 'Percolation Test, Proposed
Residence, Lot 2, Ruedi Shores, Eagle County, Colorado.
Gentlemen:
As requested, Hepworth-Pawlak Geotechnieal, Inc. performed a subsoil study and
percolation test for foundations and septic disposal designs at the subject site. The study
was conducted in accordance with our agreement for geotechnical engineering services
to Bob Nichols dated November 15, 1995. The data obtained and our recommendations
based on the proposed construction and subsurface conditions encountered are presented
in this report.
Proposed Construction: The proposed residence will be a single story log structure
over a walkout basement level located in the building envelope shown on Fig. 1.
Basement floor will be slab -on -grade. Cut depths are expected to be about 8 feet.
Foundation loadings for this type of construction are assumed to be relatively light.
If building conditions or foundation loadings are significantly different from those
described above, we should be notified to reevaluate the recommendations presented in
this report.
Site Conditions: The site was vacant at the time of our field work. The lot is located
on a steeply sloping southwest facing hillside. An existing dirt road traverses the
northern portion of the site. The road was constructed using 2 to 3 foot cuts and fills.
Vegetation on the site consists of. scattered aspen and spruce trees with grasses and
weeds.
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating two exploratory pits at the approximate locations shown on Fig. I. The logs
of the pits are presented on Fig. 2. The subsoils encountered consist of medium stiff to
stiff sandy silt with gravel and scattered cobbles. About 3 feet of topsoil overlies the
sandy silt in Pit 1: The topsoil had been removed in the area of the Profile Pit for the
existing roadway. Results of swell consolidation testing performed on a relatively
undisturbed sample of the sandy silt with gravel, presented on Fig. 4, indicate low to
moderate compressibility under conditions of loading and wetting. No free water was
observed in the pits at the time of excavation' and the soils were moist.
fICN UUI LIIr aWI(2N UCU LCI-II IL.L^JU•.) Z- '+.J11r'I 1.J 7U IL-IG. 14U.UUU 1 .UU
Bob Nichols
December 13, 1995
Page 2
Foundation Recommendations; Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soil designed for an allowable soil bearing
pressure of 2,000 psf for support of the proposed residence. Footings adjacent to
downslopes steeper than 2:1 could have reduced bearing capacity and should be
evaluated at the time of construction. Footings should be a minimum width of
16 inches for continuous walls and 2 feet for columns. Topsoil, loose and disturbed
soils and existing rill encountered at the foundation bearing level within the excavation
should be removed and the footing bearing level extended down to the undisturbed
natural subsoils. Exterior footings should be provided with adequate cover above their
hearing elevations for frost protection. Placement of footings at least 42 inches below
the exterior grade is typically used in this area, For footings above steep slopes, the
frost depth should be measured perpendicular to the slope rather than vertically.
Continuous foundation walls should be reinforced top and bottom to span local
anomalies such as by assuming an unsupported length of at least 10 feet. Foundation
walls acting as retaining structures should .be designed to resist a lateral earth pressure
based on an equivalent fluid unit weight of at least 50 pcf for the on -site soil as backfitl.
The lateral pressure given assumes a flat backfill surface and no hydrostatic pressure.
For a 2:1 backslope, the design lateral pressure should be increased by 10 pcf. To
resist sliding, the coefficient of friction on the bottom of footings is 0.45 and the
passive pressure of fill placed around footings can be calculated based on an equivalent
fluid unit weight of 300 pcf. Fill placed around footings to resist passive pressure
should be compacted to at least 95 % of the maximum standard Proctor density.
Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support
lightly to moderately loaded slab -on -grade construction. To reduce the effects of some
differential movement, floor slabs should be separated from all bearing walls and
columns with expansion joints which allow unrestrained vertical movement. Floor slab
control joints should be used to reduce damage due to shrinkage cracking. The
requirements for joint spacing and slab reinforcement should be established by the
designer based on experience and the intended slab use. A minimum 4-inch layer of
free -draining gravel should be placed beneath basement level slabs to facilitate
drainage. This material should consist of minus 2-inch aggregate with less than 50%
passing the No. 4 sieve and less than 2% passing the No, 200 sieve.
All fill materials for support of floor slabs should be compacted to at. least 95% of
maximum standard Proctor density at a moisture content near optimum, Required fill
can consist of the on -site soils devoid of vegetation, topsoil and oversized rock.
H-P 020"MCH
rIONUJU1 1,11f a 1 O.Yi VO IJ 1.0411 1 LL • JVJ ZP4 )-Q1+-A4 r1Nl 1.J JV 11 • 1J HU . VVV V . Vtl
Bob Nichols
December 13, 1995
Page 3
Underdrain System: Although free water was not encountered during our exploration,
it has been our experience in the area that local perched groundwater may develop
during tithes of heavy precipitation or seasonal runoff. Frozen ground during spring
runoff can create a perched condition. We recommend below grade construction, such
as retaining walls and basement areas, be protected from wetting and hydrostatic
pressure buildup by an underdrain system.
The drains should consist of drainpipe placed in the bottom of the wall backfill
surrounded above the invert level with free -draining granular material. The drain
should be placed at each level of excavation and at least 1 foot below lowest adjacent
finish grade and. sloped at a minimum 1 % to a suitable gravity outlet. Free -draining
granular material used in the underdrain system should contain less than 2% passing the
No, 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of
2 inches. The drain gravel backfill should be at least 1 'h feet. deep.
Site Grading. The risk of construction induced slope instability at the site appears low
provided the building is located as planned and cut and fill depths are limited. We
assuine the cut depths for the basement level will not exceed one level, about 10 to 12
feet. Fills should be limited to about g to 10 feet deep; especially at the downhill side
of the residence where the slope steepens. Embankment falls should he compacted to at
least 95% of the maximum standard Proctor density near optimum moisture content.
Prior to fill placement, the subgrade should be carefully prepared by removing all
vegetation and topsoil and compacting to 95% standard Proctor density. The fill should
be benched into the portions of the hillside exceeding 20% grade.
Permanent unretained cut and fill slopes should be graded at 2 horizontal to 1 vertical
or flatter and protected against erasion by revegetation or other means. The risk of
slope instability will be increased if seepage is encountered in cuts and flatter slopes
may be necessary. If seepage is encountered in permanent cuts, an investigation should
be conducted to determine if the seepage will adversely affect the cut stability. This
office should review site grading plans for the project prior to construction.
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
H-P GEOTECH
rlcNwUI bl I CILUi CM Qr,U LCl.11 1EA_ •JVJ—V4J_04J4 r1JJ1 1J hV 11^14 111U.VVV r.VJ
Bob Nichols
December 13, 1995
Page 4
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior .backfill should be adjusted to near optimum moisture and
compacted to at least 95 % of the maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas. Frce-draining wall backfill should be
capped with about 2 feet of the on -site, finer graded soils to reduce
surface water infiltration.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in ail directions, We
recommend a minimum. slope of 12 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement
and walkway areas. A swale may be needed uphill of the residence to
direct surface runoff around the house.
4) hoof downspouts and drains should discharge well beyond the limits of
all backfill.
Percolation Testing: The results of percolation tests conducted at the site are presented
in Table I. The test locations are shown on Fig. 1 and the log of the profile pit is
shown on Fig. 2. The percolation rates varied from 11 to 20 minutes per inch with an
average of about 15 minutes per inch. Based on our findings, the tested site is suitable
for a conventional infiltration septic system.
Lindtations: This report has been prepared in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
other warranty either expressed or implied. The conclusions and recommendations
submitted in this report are based upon the data obtained from the exploratory pits
excavated at the locations indicated on Fig. 1, the proposed type of construction and our
experience in the area. Our findings include interpolation and extrapolation of the
subsurface conditions identified at the exploratory pits and variations in the subsurface
conditions may not become evident until excavation is performed. If conditions
encountered during construction appear different from those described in -this report, we
should be notified at once so re-evaluation of the recommendations may be made.
H-P GEOTECH
FIGNIVVI 41Ira 'jiIar VcULC;i-I1 1CL•')U-j-74_- 44J4 1-1JjI 1J 7U 11.14 14U.UUU r .UCH
Bob Nichols
December 13, 1995
Page 5
This report has been prepared for the exclusive use by our client for design purposes.
We are not responsible for technical interpretations by others of our information. As
the project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
presented herein. We reconunend on -site observation of excavations and foundation
bearing strata and testing of structural fill by a representative of the soil engineer.
If you have any questions or if we may be of further assistance, please call our office.
Sincerely,
HEPWORTH - PAWLAK
io y A amson, Jr.,
Reviewed By:
b
J
Dania] E. Hardin, P.E.
JZA/kmklro
cc: Dan Muse - Architect
Attachments
M-P GEOTECH
:UT -IICAL, INC.
p0, RFGIS�
29707
"c:pwVI Lm aLuiat,, tic 1,cuti ILL JVJ.-7�i •J-44J•-F
I-INI 1J 7V 11 ° 1J III . VVV r . V f
LOT 3
4, !APPROXIMATE SCALFE
C� �" = 50I
/AEXISTING ',.... �., p•.3
! ROAD
'r.p..•,48 PROFILE PIT
BUILDING
WT 2
d
�t LOT
�► f
��► EASEMENTS
195 52r 1 GEPT IRTH- AWL cK LOCATION OF EXPLORATORY PITS Fig. I 1
I IUIJ UJUI U I I I OL LU L QI`. UGU 1,UU11 I L- L- . JIJ J-4.0 V--#r 1 F I I-J rU I L - L-P 14U . VdU I . VC
Y
Pit 1
Profile Pit
Q
0
WC= 15.8
43
Di}_ q 7
5
wc;:s.T
.�•
—200s 36
o
5
L,L= 30
ass
a
PI: 5
ca
10
10
Note: Explanation
of symbols is shown on Figure 3.
195 527
HEPWORTH-PAWLAK
Lags of Exploratory Pits
Fig. 2
GEOTECHNiCAL, Inc.
nt!VUUf-111 dWLdK UtUTtL11 ILL-OUJ'74D-04D4 myr 1J jo
LEGEND:
11 --1a IVU . UUG r . U1j
1' TOPSOIL; organic sandy silt, soft, moist, dark brown.
GRAVEL AND SILT (GM-ML); sandy, scattered cobbles, medium
b denselmedium stiff, moist, reddish brown.
0 2 inch diameter hand driven liner sample.
Disturbed bulk $ample.
NOTES;
1. Exploratory pits were excavated on November 22, 1995 with a rubber -tired
backhoe.
2. Locations of exploratory pits were measured approximately by pacing from
features shown on the site plan provided.
3. Elevations of exploratory pits were not measured and logs of exploratory pits
are drawn to depth.
4. The exploratory pit locations and elevations should be considered accurate
only to the degree implied by the method used.
5. The lines between materials shown on the exploratory pit logs represent the
approximate boundaries between material types and transitions may be
gradual.
6. No free water was encountered in the pits at the time of excavating.
Fluctuations in water level may occur with time.
7. Laboratory Testing Results:
WC=Water Content (%)
DD=Dry Density (pcf)
-200=Percent passing No. 200 sieve
LL=Liquid Limit (%)
PI=Plasticity Index (%)
195 527 I GEDTOGNMICA W cK Legend and Notes Fig. 3
t, I f 1 i--Awl u P, V G U .1 G L- 1 I I L L • U c f ., :J 'i J Q '+ J -F
r-I fj I 1J .Z)u 11 • I 14U . VVG I- . IV
LU U I 1, I I I OI W! U M V U U U U U I I
1-It, 1 L J _J V J. 1- 1 4J 1 Y U . V 11 V I . .L 1
.. , ..malaiiOM'Aft am
Q
z
Li
z
LU
LU
„�rw �,i, sit roil i _� • vvv �-r� v ► •y nNl 1J 'V it 1 f iqu . VVo i . 1L
P ;
1
HEI'WORTH-PAWL.A►K GEOTECHNICA1L., INC. Job No. 195 527
PERCOLATION TEST RESULTS
TARILE 11
HOLE No.
HOLE DEPTH
(FICHES)
LENGTH OF
INTERVAL
(MIN)
WATER
DEPTH AT
BYAeRT OF
INTERVAL
NCHEB(INCHES)
WATER
DEPTH AT
END OF
INTERVAL
DROP W
WATER
LEVEL
(INCHES)
AVERAGE
PERCOLATION
RATE
(MIMANCH)
P-i
50
is
10114
9112
3l4
20
A 112
$112
1
8 112
7 314
314
7 314
7
314
7
6114
314
P-2
48
15
wabsr added
10112
8 314
1 314
11
8 3/4
7 112
1 114
7 112
8
1 112
10
8112
1 112
8112
7
1 V2
7
5 314
1 114
P-3
51
14B
water added
9
7 314
1 114
14
7 314
8142
1 114
9
7 314
1 114
7 314
8 114
1 112
0114
5 U2
314
5 V2
4112
1
Nobs: Pwoolation loot holn wer+s hand dug at Un bottom of shallow bagkhoe Fibs and soaked on November 27,1995. 'Toots
wate performed on November 20, INS.
15b4-yb 'Tax1FL4/1-Uo3-Uo-U1J
Lot#2 Ruedi Shores NIC#OLS G ,
JOB NAME - 0375 McLaughlin Rd. M 1 MLtd JOB 'NO.
Basalt, CO
JOB LOCATION
BILL TO
DATE STARTED G
Iq
DATE COMPLETED
DATE BILLED
Ll
"L,
7
,kal
9— & o Y P
,. - ---
11
' .. xll� - j
IH/7�1
-7� "6
yj,�
Ad4C 7'�'
11A
J B COST SUMMARY
G
�m �
��
TOTAL SELLING PRICE
TOTAL MATERIAL
1
TOTAL LABOR
INSURANCE
SALES TAX
MISC. COSTS
TOTAL JOB COST
GROSS PROFIT
LESS OVERHEAD COSTS
% OF SELLING PRICE
NET PROFIT
JOB FOLDER Product 278 Q8 NEW ENGLAND BUSINESS SERVICE, INC., GROTON, MA 01471 ,SOB FOLDER Printed in U.S.A.
7iLA
oi_C'`�Te 9