Loading...
HomeMy WebLinkAbout183 Lynns Ct - 239122204014 - 1831-98ISINDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT EAGLE COUNTY ENVIRONMENTAL HEALTH DIVISION P.O. Box 179 - 500 Broadway • Eagle, CO 81631 Telephone: (970) 328-8755 COPY OF PERMIT MUST BE POSTED AT INSTALLATION SITE. PERMIT NO. 1831-98 BP NO. 12278 OWNER: SCOTT AND LISA MILLS PHONE: 970-927-4866 MAILING ADDRESS: 41 SAGEWOOD CT, BASALT, CO 81621 APPLICANT: MARC ANDERSON PHONE: 303-499-4866 SYSTEM LOCATION: 183 LYNN'S COURT, EL JEBEL, CO TAX PARCEL NO. 2391-223-04-001 LICENSED INSTALLER: WALTER'S COMPANY, ED WALTER LICENSE NO. 33-98 PHONE: 970-945-2851 DESIGN ENGINEER: JEFF RUPPERT, STRAWBALE DESIGN, ENGINEERING AND BUILDING SERVICES. JEFF RUPPERT PHONE NO. 303-499-1334 INSTALLATION HEREBY GRANTED FOR THE FOLLOWING: 1000 GALLON SEPTIC TANK 1500 SQUARE FEET OF ABSORPTION AREA VIA 47 INFILTRATOR UNITS AS PER ENGINEER'S DESIGN SPECIAL REQUIREMENTS: INSTALL AS PER ENGINEER'S DESIGN REVISIONS DATED 11/2/98. INSTALL A CLEANOUT BETWEEN THE TANK AND THE HOUSE, AND INSPECTION PORTS IN EACH TRENCH. RAKE ALL TRENCH SURFACES TO PREVENT SMEARING OF SOILS. AND DO NOT INSTALL IN WET WEATHER. CALL ENGINEER FOR FINAL INSPECTION PRIOR TO BACKFILLING ANY PART OF THE INSTALLATION. BUILDING CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL SEPTIC SYSTEM IS APPROVED. ENVIRONMENTAL HEALTH APPROVAL. it I frrDATE: DECEMBER 7,1998 CONDITIONS: 1. ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS, ADOPTED PURSUANT TO AUTHORITY GRANTED IN 25-10-104, 1973, AS AMENDED. 2. THIS PERMIT IS VALID ONLY FOR CONNECTION TO STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING REQUIREMENTS, CONNECTION TO OR USE WITH ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT. 3. CHAPTER IV, SECTION 4.03.29 REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM TO BE LICENSED. FINAL APPROVAL OF SYSTEM (TO BE COMPLETED BY INSPECTOR): NO SYSTEM SHALL BE DEEMED TO BE IN COMPLIANCE WITH THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS UNTIL THE SYSTEM IS APPROVED PRIOR TO COVERING ANY PORTION OF THE SYSTEM. INSTALLED ABSORPTION OR DISPERSAL AREA: 1500 SQUARE FEET (VIA 47 FQ-'16 TNFTT.TR A TL)R JJNITS� INSTALLED SEPTIC TANK: 1000 GALLONS IS LOCATED _ DEGREES AND 40 FEET FROM TNF CT.F.ANQUT NEAR THE HOUSE COMMENTS: ENGINEER AS —BUILT DRAWTNG RFCF.TVFD 7-20-99 ANY ITEM NOT MEETING REQUIREMENTS WILL BE CORRE AL APPROVAL OF SYSTEM IS MADE. ARRANGE A RE -INSPECTION WHEN WORK IS COMPLETED. ENVIRONMENTAL HEALTH APPROVAL DATE: JULY 20. 1999 v Incomplete Applications Will NOT Be Accepted (Site Plan MUST be attached) ISDS Permit # 1�3 / —1 Building Permit # _I'Pt APPLICATION FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT ENVIRONMENTAL HEALTH OFFICE - EAGLE COUNTY P. 0. BOX 179 EAGLE, CO 81631 328-8755/927-3823 (El Jebel) * PERMIT APPLICATION FEE $150.00 PERCOLATION TEST FEE $200.00 * * * MAKE ALL REMITTANCE PAYABLE TO: "EAGLE COUNTY TREASURER" PROPERTY OWNER: Ste'- % L[ 5,a / / /LL 5 MAILING ADDRESS: 41 SSG,FWmy c 1 . )3AASAIJT. Lo PHONE: qq'o 9q 4S6fo APPLICANT/CONTACT PERSON: /7A2G �jyPt 1-504 PHONE: 3d3 41q-/3 -, LICENSED SYSTEMS CONTRACTOR: W w j PHONE: COMPANY/DBA: ADDRESS: PERMIT APPLICATION IS FOR: X) NEW INSTALLATION ( ) ALTERATION ( ) REPAIR LOCATION OF PROPOSED INDIVIDUAL SEWAGE DISPOSAL SYSTEM: Legal Description: C°T 14-, TIC 5yvP+1T. 1%PW /%A-rd, View �v&otvjSjcV Tax Parcel Number: -g�371 - -7-,;�-3 -C Si-acl Lot Size: 2.to6o a.c i Physical Address: s G-r. EL U Go BUILDING TYPE: (Check applicable category) 00 Residential/Single Family Number of Bedrooms 3 ( ) Residential/Multi-Family* Number of Bedrooms ( ) Commercial/Industrial* Type TYPE OF WATER SUPPLY: (Check applicable category) ( ) Well ( ) Spring ( ) Surface (x) Public Name of Supplier: Af9ew 04I-ref, (fit *These systems re design b Register P ofessional Engin er SIGNATUR Date: ifLAge, AMOUNT PAID: � � RECEIPT # : �H O-1q DATE: I CHECK #: CASHIER: Community Development Department (970) 328-8730 FAX (970) 328-7185 TDD (970) 328-8797 Email: eccmdeva@vail.net http. //www.eagle-county.com July 20, 1999 Scott and Lisa Mills 41 Sagewood Ct. Basalt, CO 81621 EAGLE COUNTY, COLORADO Eagle County Building P.O. Box 179 500 Broadway Eagle, Colorado 81631-0179 aPJ�22�� RE: Final of ISDS Permit #1831-98, Tax Parcel #2391-223-04-001. Property location 183 Lynn's Ct., El Jebel, CO. Dear Mr: & Mrs. Mills: This letter is to inform you that the above refereiiced ISDS Permit has been inspected and finalized. Enclosed is a copy to retain for your records. This permit does not indicate compliance with any other Eagle County requirements. Also enclosed is a brochure regarding . the care of your septic system. Be aware that later changes to your building may require appropriate alterations of your septic system. If you have any questions regarding this permit, please contact the Eagle County Environmental Health Division at (970) 328-8755. Sincerely, Janet Kohl Environmental Health Department Eagle County Community Development ENCL:Informational Brochure Final ISDS Permit cc: files Community Development Department (970) 328-8730 FAX (970) 328-7185 TDD (970) 328-8797 Email: eccmdeva@vail.net http: //www.eagle-county.com EAGLE COUNTY, COLORADO Date: December 7, 1998 TO: Walter's Company Eagle County Building P.O. Box 179 500 Broadway Eagle, Colorado 81631-0179 FROM: Environmental Health Division RE: Issuance of Individual Sewage Disposal System Permit No. 1831-98. Tax Parcel # 2391-223-04-001. Property Location: 183 Lynn's Court, El Jebel, CO., Mills residence. Enclosed is your ISDS Permit No. 1831-98. It is valid for 120 days. The enclosed copy of the permit must be posted at the installation site. Any changes in plans or specifications invalidates the permit unless otherwise approved. Systems designed by a Registered Professional Engineer must be certified by the Engineer indicating that the system was installed as specified. Eagle County does not perform final inspections on engineer designed systems. Your TCO will not be issued until our office receives this certification. Permit specifications are minimum requirements only, and should be brought to the property owner's attention. This permit does not indicate conformance with other Eagle County requirements. If you have any questions, please feel free to contact the Environmental Health Division at 328- 8755. cc: files Strawbale Design, Engineering and Building Services, Jeff Ruppert J}rlly7; 1999 - Eagle County ,g e8men`tal Health Eagle, CO a i.� Re: Septic Insipection at IULy a rt, El Jebel (M' ence) 4� H Official: C� Tht letter is re g the on -site ihsogftp,prior to back -firing, of the septic system , fie above desr� oje t. `- 0 1AVe verified that the system is installed per our spec&cations in the d ' submitted and approved by your department. y y q regarding system, give anytime g mould you have an questions re ardin this s stem ve us a call an ime Burin business hours_ Sincerely �,\��U►Oi�REG a,,,���//// i eff Rupp E.' u x 3 � O § W • C9 - - - CO .. - �" N O O O 3 m O VA o 7ME CORRESPONDENCE to a W =U - O 0 L 3 m o � o, 43 SEPTIC DESIGN -------�--�-- Lot 14, The Summit, Aspen Mountain View Subdivision a Filing No. 3, Eagle County, Colorado ,4 Prepared for Scott and Lisa Mills 41 Sagewood Ct. Basalt, CO 81621 Introduction The project plan is to construct a three -bedroom single family residence on this site. A conventional plumbing system will be installed. The location of the proposed septic system will be to the south of the proposed structure approximately 100 feet. The ground surface has a slope down of approximately 5 degrees 'to the south where the proposed septic system shall be installed. There are no trees at the location of the proposed system. This design is based on standard flow numbers from the Eagle County Land Use Regulations for -Individual Disposal Systems. Field Investigation A backhoe profile hole 'was excavated near the proposed area for the leach field. Examination of the profile hole revealed a 12" layer of topsoil underlain by of sandy clay. See the percolation test report submitted with this design by Hepworth-Pawlak Geotechnical, Inc. An average percolation rate of 40 min/inch was found and is used for this design. ' We will use the 60 min/in. percolation rate for design and we would like to use infiltrator chambers for the leaching system. Using this percolation rate we apply an LTAR of 0.45 gpd/sf. No groundwater was encountered in the profile hole at the time of the observation. The report recommended that a standard infiltration system is suitable for this site. - Design Equations and Parameters V/ 1. Average Daily Flow. = 75 gals./person/day * 6 persons * 1.5 = 675 gals./day maximum flow. DAtE 2. A=675/0.45 =1500 sf (Trench System) t'ersbn - 3. Using the Infiltrator EQ-36 Chamber we are allowed 31.93 sf per chamber of area. nnE Dividing 1500 sf by 31.93 we need 47 chambers (See the attached letter from the State of Colorado verifying these assumptions). CORRE5FONDENCE 4. The distribution of effluent will be serial through all of the trenches. See, the attached site plan for the trench layout. oo ° 5. Eagle County Health Department regulations require that the bottom of the trenches for w¢=U the leach fields be maintained 4 feet above bedrock or groundwater. No sign of EDgroundwater was observed during the percolation test, therefore this system will be 1 below existing grade, but above 3.5 feet in depth since our profile hole was 7.5_feet deep. 6: Fill placed over the leach field can be material from the site that is to be excavated from the system area. This fill should not be mechanically compacted. Vegetation should be replanted over the system to reduce erosion and encourage evapo-transpiration. 7. Inspection ports shall be installed at the end of each trench and a clean -out shall be installed at the beginning of the leach field.. 8. The distribution lines shall be standard infiltrator chambers. Installation shall be performed in accordance with the specifications of Infiltrator Systems, Inc. 9. A minimum 1-foot of ground "cover should be placed on top of the chambers. 10. The finished surface of the field should be graded to provide runoff of surface water. The Owner is responsible for erosion protective measures and maintenance as necessary. 11. A minimum 1/8"/ft. slope is required for the sewer line from the residence to the septic system. A 1000 gal septic tank shall be used. This tank and all other components of this system shall conform to the specifications set forth in the Eagle County Land Use Regulations for Individual Disposal Systems. All minimum distances between components of the septic system and pertinent ground features described in these regulations shall also be maintained. - , 12. A final inspection of the system shall be performed by the engineer prior, to back -filling. If there are any questions concerning this design or when we can be of further assistance; please call. Sincerely, `\\``ptiu�mnt+rgr,,j�f�i ,o� 40 •"EOis'tj �•,,,%, Jef R eA P.- 4 � • y. y HEPWORTH-PAWLAK GEOTECHNICAL, INC. September 28, 1998 Strawcrafters Attn: Sarah Francis 3450 Ash Avenue Boulder, Colorado 80303 5020 Road 154 Glenwood Springs, CO 81601 Fax 970 945-8454 Phone 970 945-7988 Job No. 198 608 Subject: Subsoil Study for Foundation Design and Percolation Test, Proposed Mills Residence, Lot 14, Filing 3, Aspen Mountain View, Lynn's Court, Eagle County, Colorado Dear Ms. Francis: As requested, Hepworth-Pawlak Geotechnical, Inc. performed a subsoil study and percolation testing for foundation and septic disposal designs at the subject site. The study was conducted in accordance with our proposal for geotechnical engineering services to you dated July 23, 1998. The data obtained and our recommendations based on the proposed construction and subsurface conditions encountered are presented in this report. Evaluation of potential geologic hazard impacts on the site are beyond the scope of this study. Proposed Construction: The proposed residence will be a 2,000 square foot two story post and beam structure located on the site as shown on Fig. 1. Ground floors are proposed to be slab -on -grade. Cut depths are expected to be about 3 feet. Foundation loadings for this type of construction are assumed to be relatively light and typical of the proposed type of construction. The septic disposal system is proposed to be located downhill and south of the residence. If building conditions or foundation loadings are significantly different from those described above, we should be notified to re-evaluate the recommendations presented in this report. Site Conditions: The site is located at the end of the cul-de-sac of Lynn's Court. The ground surface in the building area slopes moderately down to the south. The lot is vegetated with grass, weeds and sagebrush with small stands of scruboak. Abandoned irrigation ditches cross the lot. Subsurface Conditions: The subsurface conditions at the site were, evaluated by excavating two exploratory pits in the building area and one profile pit in the septic disposal area at the approximate locations shown on Fig. 1. The logs of the pits are presented on Fig. 2. The subsoils encountered, below about 1 foot of topsoil, consist of slightly sandy to sandy clay. Results of swell -consolidation testing performed on Strawcrafters September 28, 1998 Page 2 relatively undisturbed samples of the clay, presented on Fig. 3, indicate low compressibility under existing moisture conditions and light loading and a low to moderate expansion potential when wetted. Results of a swell -consolidation test performed on a sample of sandy silty clay showed low compressibility under light loading and a low collapse potential (settlement under constant load) when wetted. The samples were moderately compressible under increased loading after wetting. No free water was observed in the pits at the time of excavation and the soils were slightly moist to moist. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and the nature of the proposed construction, we recommend spread footings placed on the undisturbed natural soil designed for an allowable soil bearing pressure of 3,000 psf and a minimum dead load pressure of 800 psf for support of the proposed residence. The footing subgrade should be evaluated at the time of construction for more expansive clay layers. If encountered the more expansive clay layers should be removed and the footings lowered to bear.on the lower less expansive clays. Footings should be a minimum width of 16 inches for continuous walls and 2 feet for columns. Loose and disturbed soils encountered at the foundation bearing level within the excavation should be removed and the footing bearing level extended down to the undisturbed natural soils. Exterior footings should be provided with adequate cover above their bearing elevations for frost protection. Placement of footings at least 42 inches below the exterior grade is typically used in this area. Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining structures should be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 55 pcf for the on -site soil as backfill. Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support lightly loaded slab -on -grade construction. The clays could be expansive and heave when wetted, causing distress to lightly loaded slabs -on -grade. A common method of construction to reduce the risk of slab heave is to construct floors over a crawlspace. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A H-P GEOTECH Strawcrafters September 28, 1998 Page 3 - minimum 4 inch layer of free -draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2 inch aggregate with less than 50% passing the No. 4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95 % of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on -site soils devoid of vegetation and topsoil. The slab subgrade should be evaluated for potentially expansive clay soils at the time of construction. Underdrain System: Although free water was not encountered during our exploration, it has been our experience in mountainous areas with clayey subsoils that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can also create a perched condition. We recommend below -grade construction, such as retaining walls, crawlspace and basement areas, be protected from wetting and hydrostatic pressurebuildup by an underdrain system. Typically, building with slab -on -grade near the ground surface does not require perimeter underdrains. If drains are needed they should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free -draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1 % to a suitable gravity outlet. Free - draining granular material used in the underdrain system should contain less than 2 % passing the No. 200 sieve, less than 50 % passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 11/2 feet deep. Surface Drainage: The following drainage precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. Drying could increase the expansion potential of the soils. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95 % of the maximum standard Proctor density in pavement and slab areas and to at least 90 % of the maximum standard H-P GEOTECH Strawcrafters September 28, 1998 Page 4 Proctor density in landscape areas. Free -draining wall backfill should be capped with about 2 feet of the on -site, sandy clay soils to reduce surface water infiltration. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in pavement and walkway areas. 4) . Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation should be located at least 5 feet from the building. Consideration should be given to the use of xeriscape to limit potential wetting due to irrigation. Percolation Testing: Percolation tests were conducted on September 11, 1998 to evaluate the feasibility of an infiltration septic disposal system at the site. One profile pit and three percolation pits were dug at the locations shown on Fig. 1. The test holes (nominal 12 mcfi diameter by 12. inch:deep) were hand dug at the bottom of shallow backhoe pits and were soaked with water one day prior to testing. The soils exposed in the percolation holes are similar to those exposed in the Profile Pit shown on Fig. 2 and consist of topsoil overlying sandy clay to the pit deptW=2-6, t,,,,_No free water was observed in the profile pit at the time of excavation. The percolation test results are presented in Table H. Based on the subsurface conditions encountered and the . percolation test results, the tested area should be suitable for a conventional infiltration septic disposal system. The"average-percolation rate was 40 minutes per inch. Limitations: This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either expressed or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the locations indicated on Fig. 1, the proposed type of construction and our experience in the area. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory pits and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered . during construction appear different from those described in this report, we should be notified at once so re-evaluation of the recommendations may be made. H-P GEOTECH Strawcrafters September 28, 1998 Page 5 This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend on -site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. If you have any questions or if we may be of further assistance, please let us know. Sincerely, HEPWORTH - PAWLAK GEOTECHNICAL, INC. Louis E. Eller Reviewed By: Dane LEE/ksm attachments H-P GEOTECH PIT 1 PIT 2 PIT 3 ELEV. = 93' ELEV. = 90' ELEV. = 87' 0 0 we=ss LL=33 DD=117 P1=18 y WC=9.6 i li �- DD=96 5-200=95 5 I wC=7.9 s o WC=10.8 DD-93 a, (D DD-95-200=85 O 0 10 10 LEGEND: TOPSOIL; sandy silt and clay, organic, stiff, slightly moist, dark brown. CLAY (CL); sandy, very stiff to hard, slightly moist to moist, reddish brown, medium plasticity, slightly calcareous with depth. 2" Diameter hand driven liner sample. NOTES: 1. Exploratory pits were excavated on September 10, 1998 with a Case 580 backhoe. 2. Locations of exploratory pits were measured approximately by pacing from features on the site plan provided. 3. Elevations of the exploratory pits were obtained by interpolation between contours on the site plan provided 4. The exploratory pit locations and elevations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries between material types and transitions may be gradual. 6. No free water was encountered in the pits at the time of excavating. Fluctuations in water level may occur with time. 7. Laboratory Testing Results: WC = Water Content ( % ) DD = Dry Density ( pcf ) -200 = Percent passing No. 200 sieve LL = Liquid Limit ( % ) PI = Plasticity Index ( % ) 198 608 HEPWORTH — PAWLAK LOGS OF EXPLORATORY PITS Fig. 2 GEOTECHNICAL, INC. 0 c 0 C 1 v a x W I 2 c _0 �N N 3 n. E 0 U 4 3 b, 2 c 0 c 1 0 n x W I 0 c 0 .N N 0 1 o. E 0 U 0) Moisture Content = 10.8 percent Dry Density = 95 pcf Sample of: Sandy Clay From: Pit 1 at 5.5 Feet Expansion upon wetting 0.1 1.0 10 100 APPLIED PRESSURE — ksf Moisture Content = 9.9 percent Dry Density = 117 pcf Sample of: Sandy Clay From: Pit 2 at 1 Foot upon wetting 4Expansion t j I I F. I I fl - 0.1 1.0 10 100 APPLIED PRESSURE — .ksf 198 608 HEPWORTH - PAWLAK SWELL -CONSOLIDATION TEST RESULTS Fig. 3 GEOTECHNICAL, INC. Moisture Content = 7.9 percent Dry Density Weight = 93 Prf Sample of: Sandy Silty Clay From: Pit 2 at 5 Feet 0 1 2 Compression upon wetting c 3 •N0 n 0 4 U 5 6 7 8 0.1 1.0 10 100 APPLIED PRESSURE — ksf 198 608 HEPWORTH — PAWLAK GEOTECHNICAL, INC. SWELL —CONSOLIDATION TEST RESULTS Fig. 4 U Z J Q Z 2 U W F— W Q CL 20 a W 2 U) J D U) LN�yLJ LLL H L0 LU —1 a M L= H0 m a J LL 0 CC Ca cG G 'D VJ co a U o ? J cYi "p U N Q a co co co m U I U cn > , > > c c c CO — co cO a > _ W H O a ¢ a U F Z y O � U U F- X (0 f J Z r a O W s W J J ... LU w y N w LA Lti oC y O y OO a a Z 0 Z� Z N O H Q O W C M a o w a Oi r Z W r^ M W T Pl1 j�W" W V J N Z .... O 2 U VJ _ o a m N N W N .— LO Q 0 C7 U O J W J vai s r N ', HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE II PERCOLATION TEST RESULTS JOB NO. 198 608 HOLE NO. HOLE DEPTH (INCHES) LENGTH OF INTERVAL (MIN) WATER DEPTH AT START OF INTERVAL (INCHES) WATER DEPTH AT END OF INTERVAL (INCHES) DROP IN WATER LEVEL (INCHES) AVERAGE PERCOLATION RATE (MIN./INCH) P-1 40 15 13 12 1 30' 12 11 1/4 3/4 11 114 10 1 /2 3/4 10 1/2 10 1/2 10 9 1/2 112 9 1/2 9 1/2 9 8 1/2 1/2 8112 8 1/2 P-2 35 15 7 6 1 /4 3/4 0 6 1/4 5 3/4 1/2 5 3/4 5 1/2 1/4 5 1/2 5 1/4 1/4 5 1/4 5 1/4 5 4 314 1/4 4 314 4 1/2 1/4 P-3 42 15 11 1/2 10 1 1/2 r 10 9 1 9 8 1/4 314 8 1/4 7 1/2 3/4 7 112 6 3/4 3/4 6 3/4 6 1/4 1/2 6 1/4 5 3/4 1/2 5 314 5 1/4 1/2 NOTE: Percolation tests were performed on September 11, 1998. The average percolation rates are based on the last 3 readings of each test. The clay in P-2 was harder than the clay in the other two percolation holes. STATE OF C0TL_0f<A 0 ••� ?aW 5hwayder, Fxeµtlive Diretmor Of G ,, - 4 t,-diuced to protecting and improvtrig the heath and env;eonment v; :he pcbpfe 0(Ceilc,,.;c0 4309 Cherry Creek of, s_ l.�berato;y 6u;lding C.ilwodo80 ?2-1530 rtz 4210E.11thAvenve I 3) 01-2000 Denver, Colorado &)220-077 6 " 18-74 ` 003) 691.4700 II qq tt,, filJ�i `2 �3� _ -- - T4,k41orad0 Depanr,�enL of.Pubiic He-auch and E,Ylronment Kay 3.7, 1996 Mr. Jim Bransfield District Manager Infiltrator Syste7rs Inc. 1087 South Dawning Street Denver, co 80209 Deal: Jim: z hay°e reviewed the literature and your to the ln:�iltx-ator Equalizer 36 �:alculaticns with restect chamber. The Fqualizer 36 is hereby approved for use in Colorado in provisions cf Section vIZz.C. of t r✓ accrwrc�anye with the Gui,dali.r.es sewage Disposal Systems, On Individual X cDneur with your calculations regarding the absorptive az•ea --- equivalence for the Equalizer 35 chamber. the bottom area for each chamber unlit is As per your caZcu.latians provides 24.99 square fee Of absorptive area in a trench applica'ti.on and Z0.�1 square feet in a bed system. Sidewall ld area wo add feet for & total absorptive area of 31-93 an additional 6.94 ,square square feet per. Equalizer 36 'Utlit in a trench system. ;1G additional credit availabla for sidewall in bed designs, woulc: .,e Therefore, the Division hereby approves the Equalizer- 36 cha r,ber for. !Ise in Colorado at an equivalency of 1.3 square tie+�t unit ir. a _c renh configuration and 20, a squa7'e feet Per unit in a bed configuration. These fi!;ures are sled_ i.cations presented in our letter based on the design, equz.va' ency ayprovals arc: S, b eci-, t� tpe far. Eptanc+Hof same aid local health agencies. Since3,y,. Thomas R..-nnett ISDS Prom-nm. Locrdinat0r K4: tonal Health Agencies Zo -d VZ0-1_tr6(OL6) s1. Lauuni-] aLuC1 e_19;77-0 86-90-AQN zo Q - C 1831 -98 Tax# 251+-444-Q4-qI JOB. NAME Lot #14, The Summit MILLS Lrf Aspen Mt. View 183 Lynn's Court, El Jebel J013 NO. LOCATION W DATE ST7ED fIlll DATE COMPLETED DATt BILLED W, ME a W1011,11,11M 9, IN -2 WE 111 11111111111,101 N-2111111 iml L 51 w Mow WE 2pa "If -a ii P 111 no mm, I III! I -I _JO COST SUMMARY KII VA I TOTAL SELLINGPIRICE INE■ TOTAL MATERIAL SINE 0 P oll 10, 0� 05 TOTAL LABOR r4j", a, Fig M SIN4 I P R M F11 011W I SIN FPI -I SIN I M'm --ME i TOTAL JOB COST GROSS PROFIT®� LESS OVERHEAD COSTS % OF SELLING PRICE JOB FOLDER Product 277 JOB FOLDER Printed In USA. r i i F t ` � \� 171 T r . �g thchr t' Quid Power Lie 9r • U' y Evstuag Edge Of 6ul-17e Sac Favemnt Exfbtkig 6tU&ert r Proposed 6iberi EVension llna-r Driveway Proposed R2 Tc p Wall Around Fig Side Of Power Transforme• And At Culvert Inlet � Edge Of Proposed Driveway Fiff 510pe cat 510pe 5ROUc.DEA raSvaULVEQ 4" AB.G. B n?ICA L DRIkE WA Y 5EC nOM 2 ORiGINAG SCALE k60 PLAP AV TE5 L Connect Waterk e To 5ubdvfsion Water afpkg 2. Septic Tank And Wetbld Desigr To Be Submitted To Eagle County burUV Department For I5D5 Permit Prior To Construction 3. Mantan Separation Between Water, Telephone, And 6a5 Lines As Req&ed 4. There Is A 10'-0" Ut4 Ememmt AbV Each Sick Of A# Loffirs 5. 10'--O" Eq estrbn bbsernent On - lbrth Lot Line 6. Revegetabon Will Be Compatdble With The Site. La dscapmg WIll 67ploy Xerbcape Desi n P *ks, Using kb*e And Drought-�2esistar�t 1/ar�ties. Z On -Site devotion 92=8" (Mouse 5lab-On-6raab) is Equivalent To 100'-O" Shown in EvUbg Sections And Plans. B. Provide Positive Dranage AmV From Hasse; DowrW4 Daring Fyd bra ing Operations. A 517FKAN ORIGINAL ✓SALE• F = W-O" existing Water Valve i�rexisting Re I-ty -aat �vicfirvn Tc%nhnru� DAr�lacfirl \l � t \ Existing Driveway \ -. i 1 Existing Brush Line Exisfing Haw 6Wrrne - - - - - - - __l ` misting Fence To Reman f-- -� ��/ �, �vhne Ga9►-age � • Proposed residence (OrrSite S ad e elevation Famoa b0lae►-d Drdn Dkected Away From -We tknd Proposed Lown and Lax'smaping Perc Test Locations Existing f4laaraabned Irrgatlon Lateral �P, Proposed Septic Teak And Leech field Exristing Electric Ma&k LOT 14 ION Exb fing Power Pole 2.650 A6. Existing Utility Easement - 5E715A6k'5 Front 25'--0" 5kbs 12-6" I near- 12'-6" \ rZo 17,0.0 \ L CO 0) sue.. U IL i� 42 O Ct� C� C4 CD o LL L 0 � L x 4S o v L o � � v _o U Ch 4� 43 O v zI- VA ZE 1015196 vmb7 MIE SITE PLAN Of 10 I