Loading...
HomeMy WebLinkAbout160 Red Rock Rd - 246510401003INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT EAGLE COUNTY ENVIRONMENTAL HEALTH DIVISION P.O. Box 179 - 500 Broadway • Eagle, CO 81631 Telephone: (970) 328-8755 COPY OF PERMIT MUST BE POSTED AT INSTALLATION SITE. PERMIT NO. 1939-99 BP NO, 12891 OWNER: SONNY D'ANNA PHONE 970-927-5042 MAILING ADDRESS: 314 SOPRIS CIRCLE. BASALT, CO 81621 APPLICANT: JOHN GALAMBOS PHONE: 970-704-9750 SYSTEM LOCATION: 160 RED ROCK RD., EMMA, CO TAX PARCEL NO. 2465-104-01-002 LICENSED INSTALLER: HUG14ES EXCAVATING, RANDY HUGHES LICENSE NO. 13-00 PHONE: 970-963-2004 DESIGN ENGINEER: HIGH COUNTRY ENGINEERING, ROGER NEAL PHONE NO. 970-945-8676 INSTALLATION HEREBY GRANTED FOR THE FOLLOWING: MININIUM REQUIREMENTS FOR A 5 BEDROOM RESIDENCE 1500 GALLON SEPTIC TANK, WITH AN ADDITIONAL 1000 GALLON DOSING TANK, 1377 SQUARE FEET OF ABSORPTION AREA. VIA A SAND MOUND SPECIAL REQUIREMENTS: INSTALL AS PER ENGINEER'S DESIGN DATED 1 1/30199. BE SURE TO MAINTAIN ALL SET BACK REQUIREMENTS, AND DO NOT INSTALL IN WET WEATHER. ENGINEER IS RESPONSIBLE FOR FINAL INSPECTION. DO NOT BACK FILL ANY PART OF THE INSTALLATION UNTIL THE ENGINEER HAS INSPECTED AND APPROVED THE SYSTEM. BUILDING CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL THE SEPTIC SYSTEM HAS BEEN APPROVED. ENVIRONMENTAL HEALTH APPROVAL: DATE FEBRUARY 11, 2000 CONDITIONS: 1. ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS, ADOPTED PURSUANT TO AUTHORITY GRANTED IN 25-10-104, 1973, AS AMENDED 2. THIS PERMIT IS VALID ONLY FOR CONNECTION TO STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING REQUIREMENTS. CONNECTION TO, OR USE WITH ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT, AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT. 3. CHAPTER IV, SECTION 4.03.29 REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM TO BE LICENSED. FINAL APPROVAL OF SYSTEM (TO BE COMPLETED BY INSPECTOR): NO SVSTENI SHALL BE DEEMED TO BE IN COMPLIANCE WITH THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS UNTIL THE SYSTEM IS APPROVED PRIOR TO COVERING ANY PORTION OF THE SYSTEM. INSTALLED ABSORPTION OR DISPERSAL AREA: 1377 SQUARE FEET (VIA SANTI M0121111 DESIGN 1 INSTALLED CONCRETE SEPTIC TANK: 1500 GALLONS IS LOCATED EAST DEGREES AND 20 FEET INCHES FROM THE SOUTH EAST CORNER OF THE HOUSE, INSTALLED CONCRETE DOSING TANK: 1000 GALLONS 1S LOCATED EAST DEGREES AND .2 FEET 6—INCHES FROM THE SEPTIC TANK. COMMENTS: ENGINEER'S FINAL CERTIFICATION AND AS-RunTT)RAwTNG RFcFTvFn 11F{'.FmRFR 77, mon . TATR SYSTEM IS LARGE ENOUGH TO ACCOMMODATE A FIVE BEDROOM RESIDENCE. ANY ITEM NOT MEETING REQUIREMENTS WILL BE CORRECTED BEFORE FINAL APPROVAL OF SYSTEM IS MADE. ARRANGE A RE -INSPECTION WHEN WORK IS COMPLETED. ENVIRONMENTAL HEALTH APPROVAL C O,// jj DATE: DECEMBER 28, 2000 t4X-5-1999 11:40A FROM:EAGLE COUN1Y ENV HEA 9703290349 TO:19787040287 Pse{B Incomplete Applications Will NOT Be Accepted (Site Plan MUST be attached) ISDS Permit # i r v 17 Building Permit # APPLICATION FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT ENVIRONMENTAL HEALTH OFFICE - EAGLE COUNTY P. 0. BOX 179 EAGLE, CO 81631 328-8755/927-3823 (El Jebel) ************x****x+**+�***++t*tix•rw*******x****t**xxx�r,�***t*+*+***#*f+**xx* * PERMIT APPLICATION FEE $150- 00 PERCOLATION TEST FEE $200.00 * * MAKE ALL REMITTANCE PAYABLE TO: "EAGLE COUNTY TREASURER" PROPERTY OWNER: �L NU DANK- MAILING ADDRESS: 3)� 7�� �S ��L � f,.�-T _ _ PHONE:APPLICANT/CONTACT PERSON: PHDN 97° "?°y�S7SQ LICENSED SYSTEMS CONTRACTOR: NE: COMPANY/DBA: ADDRESS: PERMIT APPLICATION IS FOR: (A NEW INSTALLATION ( ) ALTERATION ( ) REPAIR LOCATION OF PROPOSED INDIVIDUAL SEWAGE DISPOSAL SYSTEM: Legal Description: Tax Parcel Number: Physical Address: BUILDING TYPE: (Check applicable category) Residential/Single Family Residential/Multi-Family* ( ) Commercial/Induetrial* TYPE OF WATER SUPPLY: (Check applicable category) (x) Well ( ) Spring ( ) Surface ( ) Public Name of Supplier: Number of Bedrooms � _ Number of Bedrooms Type *These systems repuirp osign by a Registered Professional EncAn er SIGNATUR Date: f ****+*,�** +x**x**********,►*+f,�xx**,�**xx****xxx�rr*x*******,�***** **+*+�•r,r AMOUNT PAID: � �/ -- RECEIPT # : �'S� DATE : CHECK #: CASHIER: /1) Community Development Department (970)328-8730 FAX (970) 328-7185 TDD (970) 328-8797 Email: eccmdeva@vail.net http: pwww.eagle-county.com EAGLE COUNTY, COLORADO Date: February 11, 2000 TO: Hughes Excavating FROM: Environmental Health Division Eagle County Building P.O. Box 179 500 Broadway Eagle. Colorado 81631-0179 RE: Issuance of Individual Sewage Disposal System Permit No. 1939-99. Tax Parcel # 2465-104-01-002; Property Location: 160 Red Rock Rd., Emma, CO., D'Anna residence. Enclosed is your ISDS Permit No. 1939-99. It is valid for 120 days. The enclosed copy of the permit must be posted at the installation site. Any changes in plans or specifications invalidates the permit unless otherwise approved. Please note any special requirements that may have been added to the design by this department. Systems designed by a Registered Professional Engineer must be certified by the Engineer indicating that the system was installed as specified. Eagle County does not perform final inspections on engineer designed systems. Your TCO will not be issued until our office receives this certification. Permit specifications are minimum requirements only, and should be brought to the property owner's attention. This permit does not indicate conformance with other Eagle County requirements. Please notify this office if you have not been contracted to perform this installation. If you have any questions, please feel free to contact the Environmental Health Division at 328- 8755. cc: files High Country Engineering, Roger Neal Community Development Department (970) 328-8730 FAX (970) 328-7185 7DD (970) 328-8797 Email: eccmdeva@vail.net http., /Iwww.eagle-county.com EAGLE COUNTY, COLORADO December 28, 2000 Sonny D'Anna 160 Red Rock Road Emma, CO 81621 Eagle County Building P.O. Box 179 500 Broadway Eagle, Colorado 81631-0179 RE: Final of ISDS Permit #1939-99, Tax Parcel #2465-104-01-002. Property location: 160 Red Rock Road., Emma, CO. Dear Mr. D'Anna: This letter is to inform you that the above referenced ISDS Permit has been inspected and finalized. Enclosed is a copy to retain for your records. This permit does not indicate compliance with any other Eagle County requirements. Also enclosed is a brochure regarding the care of your septic system. Be aware that later changes to your building may require appropriate alterations of your septic system. If you have any questions regarding this permit, please contact the Eagle County Environmental Health Division at (970) 328-8755. Sincerely, Janet Kohl Environmental Health Department Eagle County Community Development ENCL: Informational Brochure Final ISDS Permit cc: files April 19, 2000 Ray Merry Eagle County Environmental Health Department P. O. Box 179 Eagle, CO 81631 Re: ISDS for the D'Anna Residence, Lot 3 Red Rock Ranch PUD HCE File Number 99004.38 Dear Ray: On April 3, 2000 High Country Engineering personnel observed the construction of the ISDS located on Lot 3 Red Rock Ranch PUD. All of the components of the system had been installed, and only minor back[illing had taken place. A 1500 gallon septic tank and a 36'x46' gravel bed with inspection wells had been installed. The sewer pipe from the house was also installed, with cleanouts. At this time the dosing pump was not installed. The installation of the system is in conformance with the intent of the design. We are providing you with a drawing of the system as constructed with location of the final components shown. If you have any questions, or need additional information, please contact us. Sincerely, HIGH COU TRY ENGINEERING, INC. Roger D. Neal Principal Engineer cc: D'Anna 923 Cooper Avenue 141nverness Drive East, Ste B-144 Glenwood Springs, CO 81601 Englewood, CO 90112 phone 970 945-8676 • far 970 945-2555 phone 303 925-0544 • fax 303 925-0547 December 20, 2000 Ray Merry Eagle County Environmental Health Department P. O. Box 179 Eagle, CO 81631 Via Fax: 328-0349 Re: ISDS for the D'Anna Residence, Lot 3 Red Rock Ranch PUD HCE File Number 99004.38 Dear Ray: On December 20, 2000 High Country Engineering, Inc. personnel made a second site visit to the D'Anna residence located on Lot 3 Red Rock Ranch PUD. All of the components of ISDS system had been previously installed and inspected by H.C.E. This visit was to insure that the dosing pump was installed. The dosing pump was in fact installed and was visually inspected. The dosing pump installation conforms to the intent of the design. If you have any questions, or need additional information, please contact us. Sincerely, HIGH C;OU M RY ENGINEERING, INC. �5ep' �zz Eric P. Tuin, E.I. Project Engineer 923 Cooper Avenue 14 Inverness Drive East, Ste B-144 Glenwood Springs, CO 81601 Englewood, CO 80112 phone 970 945-8676 • far 970 945-2355 phone 303 925-0544 • far 303 925-0547 To simplify the design of small pressure distribution networks, Table 7- 13, and Figures 7-28, 7-29, and 7-30, may be used. Examples 7-2 and 7-3 illustrate their use. Other design methods may be equally suitable, however. TABLE 7-13 DISCHARGE RATES FOR VARIOUS SIZED HOLES AT VARIOUS PRESSURES (gpm) Pressure Hole Diameter (in.) t psi 1 0.43 0.74 1.15 1.66 2.26 2.95 2 0.87 1.04 1.63 2.34 3.19 4.17 3 1.30 1.28 1.99 2.87 3.91 5.10 4 1.73 1.47 2.30 3.31 4.51 5.89 5 2.17 1.65 2.57 3.71 5.04 6.59 Example 7-2: Desi n of a Pressure Distribution Network for a Trench Absorption Field Design a pressure network for an absorption field consisting of five trenches, each 3 ft wide by 40 ft long, and spaced 9 ft apart center to center. Step 1: Select lateral length. Two layouts are suitable for this system: central manifold (Figure 7-24) or end manifold (Figure 7-25). For a central manifold design, ten 20-ft laterals are used; for an end manifold design, five 40-ft laterals are required. The end manifold design is used in this example. Step 2: Select hole diameter and hdl e spacing for laterals. For this example, 1/4-in. diameter holes spaced every n. are used, although other combinations could be used. Post -It- Fax Note 7671 Date 1q j qj1 Per► C. To �' r�' From � i u ra^ k W C P -H {` CoMept. F!' COO EAT Fn Co. EaAlc l UU n Phoned r7 ,J� Phone+!'3z6_�SS Fax a555 Fax 328-a3,19 284 c�tech November 2, 1999 Sonny and Cheryl D'Anna 314 Sopris Circle Hepworth-Pawlak Geotechnical, Inc. 5020 County Road 154 Glenwood Springs, Colorado 81601 Phone: 970-945-7988 Fax:970.945-8454 hpgeo@hpgeotech.com Basalt, Colorado 81621 Job No. 199 746 Subject: Percolation Testing, Proposed Residence, Lot 3, Red Rock Ranch, Red Rock Road, Eagle County, Colorado Dear Mr. & Mrs. D'Anna: As requested by Eric Tuin with High Country Engineering, we observed a profile pit and performed percolation testing for design of an infiltration septic disposal system at the subject site. Hepworth - Pawlak Geotechnical Inc., previously performed a subsoil study for design of foundations at the site dated September 30, 1999, Job No. 199 746. One profile pit and six percolation holes were dug at the locations shown on Fig. 1. Two sites were tested. Percolation tests P-4 thru P-6 were at the preferred site, and tests P-1 thru P-3 were at the alternate site. The test holes (nominal 12 inch diameter by 12 inch deep) were hand dug at the bottom of shallow backhoe pits and were soaked with water one day prior to testing. The soils exposed in the percolation holes are similar to those exposed in the Profile Pit shown on Fig. 2 and consist of relatively dense, slightly silty'.sandy gravel with cobble and boulders. The soils are similar to 'Iff3ose encountered in our previous borings at the site. The percolation test results, presented in Table I, indicate average percolation rates ranging from about S'/z to 20 minutes per inch. The average rates were determined from the last 3 readings at each test location. The 20 min/in rate (P-6) was in a near surface clay soil zone. Based on the subsurface conditions encountered and the percolation test results, the test areas should be suitable for a conventional infiltration septic disposal system. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH - PA INC. David A. Young, P.IS 0 ;• -216 ' Rev. By: DEH ��.c�'•. u 3 yq .''w� DAY/ksm ��� t�s`'•-.......••' G���. attachments ���i S��NALEN ���% cc: High Country Engineeftfill Xttn: Eric Tuin Galambos/Muir Architects - Attn: Rich Pacvek IFlo] �� APPROXIMATE SCALE 1" = 60' RFp Rppk ROgO ftft 1 BARN _ BUILDING J P1 ENVELOPE 1 0 P3 I < \ J P2 \ BORING 3 J \0 / PROPOSED J 1 DRIVEWAY ACCESS LEACHFIELD /' -Z — _ LOCATION #1 f P4 ~J PRO ITf 1 ��• / 1 �P5 1 / \ 1 1 IRRIGATION \ f DITCHES / $ORING 2 (TYPICAL) \ o � / APPROXIMATE \BORING 1 LOCATION \ ENIVELOPE OF EXISTING WELL / V \0� 0 APPROXIMATE LOCATION OF NEW WATER WELL 0 APPROXIMATE LOCATION OF EXISTING WELL LOT 3 LOT 5 BENCH MARK; ' CONCRETE BASE OF ELECTRIC BOX, SSUMED ELEVATION = 100.0'. PROPOSED LEACHFIELD LOCATION #2 (PREFERRED) LOT BOUNDARIES LOT 4 LEGEND • BORING DRILLED FOR PREVIOUS STUDY, 199745 ■ PIT EXCAVATED FOR THIS STUDY Q PERCOLATION TEST HOLE 199 746 I HE WOR NI P WLA I LOCATION OF PERCOLATION TESTING I Fig. 1 I PROFILE PIT ELEV. = 104.4' 0 r_, 0 Gf°' r Ar .� 1 1 10 10_ LEGEND: EjTOPSOIL; sandy silty clay, organic, slightly moist, brown. M GRAVEL (GM —GP); sandy, slightly silty, with cobbles and boulders, dense, slightly moist, brown. Disturbed bulk sample. a, m u_ I r a 41 O NOTES: 1. The exploratory profile pit was excavated on October 22, 1999 with a backhoe. 2. Location of the exploratory profile pit was measured approximately by pacing from features shown on the site plan provided. 3. Elevation of the exploratory profile pit was measured by instrument level and refers to the Bench Mark shown on Fig. 1. The log of the exploratory profile pit is drawn to depth. 4. The exploratory profile pit location and the elevation should be considered accurate only to the degree Implied by the method used. 5. The lines between materials shown on the exploratory profile pit log represent the approximate boundaries between material types and transitions may be gradual. 6. No free water was encountered in the pit at the time of excavating. Fluctuations in water level may occur with time. The previous study borings were dry when checked on October 22, 1999.W ha allv� &-U mM" 40 uab-t (} U 199 746 1 H E WO - PAWLAK I LOG. OF EXPLORATORY PROFILE PIT Fig. 2 HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 PERCOLATION TEST RESULTS JOB NO. 199 746 Page 1 of 2 HOLE NO. HOLE DEPTH (INCHES) LENGTH OF INTERVAL (MIN) WATER DEPTH AT START OF INTERVAL (INCHES) WATER DEPTH AT END OF INTERVAL (INCHES) DROP M WATER LEVEL (INCHES) AVERAGE PERCOLATION RATE (MIN.IINCH) P-1 23 10 water added water added water added water added water added 7 3 114 3 314 5 112 6 114 3 112 2 314 6 3 3 6 114 3 113 3 6 4 114 1 314 6 4 2 4 2 112 1 112 P-2 25 10 water added 7 5 2 11 5 3 114 1 314 6 314 5 114 1 112 5 114 3 112 1 314 7 6 1 6 5 1 5 4 1 4 3 114 314 P-3 26 10 water added water added 8 6 314 1 114 11 6 314 4 112 2 114 8 6 314 1 114 6 314 4 314 2 8 314 7 314 1 7 314 6 314 1 6 314 5 314 1 5 314 5 314 NOTE: Percolation holes In bottom of backhoe pits were hand dug and pre-soaked on October 25, 1999. Percolation tests performed on October 26, 1999 by Hepworth- Pawlak Geotechnical, Inc. The average percolation rate was based on the last 3 readings of each test. HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE I PERCOLATION TEST RESULTS JOB NO. 199 746 Pace 2 of 2 HOLE NO. HOLE DEPTH INNCHES) LENGTH OF INTERVAL (MIN) WATER DEPTH AT START OF INTERVAL (INCHES) WATER DEPTH AT END OF INTERVAL (INCHES) DROP IN WATER LEVEL (INCHES) AVERAGE PERCOLATION RATE (MINANCH) P-4 27 10 water added water added water added 9 6 3 5 112. 6 3 112 2 112 8 4 114 3 314 8 314 7 1 314 7 4 314 2 114 9 7 112 1 112 7 112 5 112 2 5 112 3 112 2 P-5 25 10 water added water added 8112 6114 2114 8 112 6 114 4 112 1 314 4 112 2 112 2 7 314 .6 112 1 114 6 112 5 114 1 114 5 114 4 114 1 4 114 3 1 114 5 314 4 112 1 114 P-6 (clayey soils) 25 10 8 314 8 314 20 8 7 114 314 7 114 6 114 1 6 114 5 314 112 5 314 5 114 112 5 114 4 314 112 NOTE: Percolation holes in bottom of backhoe pits were hand dug and pre-soaked on October 25, 1999. Percolation tests performed on October 26, 1999 by Hepworth- Pawlak Geotechnical, Inc. The average percolation rate was based on the last 3 readings of each test. NOV-15-99 ICON 07:35 AM HIGH COUNTRY ENGINEERING FAX NO. 970 945 2555 P. 02 &3'd 'Yd.LOi ftworth-pawlsk Geotechnical, Inc. 3020 Comlyy Road 154 Glenwood SPrIhgs, Colorado 81601 Phone: 970-M.7M Fax: 970-945•8434 hp;eo Upseotech,com November 12, 1999 Sonny and Cheryl D'Anna 314 Sopris Circle Basalt, Colorado 81621 . Job No. 199 746 Subject; Comments Regarding Groundwater Conditions, proposal Residence, ISDS System, Lot 5, Red Rock Ranch, Red Rock Road, Engle County, Colorado Dear Mr, & Mrs. D'Anna,- As requostcd by Eric Tuin with Nigh Country Engineering, we arc providing cornmenJs regarding groundwater conditions at the site for design of the proposed XSDS system. Hepworth-kawbk Geotechnical, Inc previously performd a subsoil study for foundation design and percolation testing at the site submitting OUT findings under Job No. 199 746 in reports elated September 34 and November 2, 1999, respectively. We understand Eagle County is concerned about potential shallow groundwater and its iMpact on a conventional leach field septic disposal system at the site. Our previous borings and pits encountered no groundwater and slightly moist subsoils to the maximum depth investigated of 10 feet. We did not observe indications of seasonal shallow groundwater in the backhoe excavated profile pit. In addition, we have discussed water levels in the existing wells on the lot with Wayne Shelton of Shelton Drilling (970-927-4182), Mr. Shelton stated the free water levels in the weals have been measured between about 25 to 30 feet, If you have any questions or Deal further assistance, please call our office. Sincerely., HEPWORTH - "LA%W01Wft9NCAL, INC. !d` V tl— David A. 'Y'oung, P�� Rev. By; DEH DAYlltsm cc: High Country Engineering - Ann, Eric Tuin Galambos/Muir Architects - Attn: Rich Pacvek 20/n `a HoRiOM d-H 20:ZT 666T-zT--AQN NOV-15-1999 MON 08:31AM ID:EAGLE COUNTY ENV HEALTH PAGE:2 �-�Ptech Hepworth- PawlakGeotechnical, Inc. 5020 County Road 154 Glenwood Springs, Colorado 81601 Phone: 970-945-7988 Far:970-945.9454 hpgeo@Izpgeotech.com SUBSOIL STUDY FOR FOUNDATION DESIGN PROPOSED RESIDENCE AND BARN LOT 3, RED ROCK RANCH RED ROCK ROAD, EMMA EAGLE. COUNTY, COLORADO .IOB NO. 199 746 SEPTEMBER 30,1999 PREPARED FOR: SONNY AND CHERYL VANNA 314 SOPRIS CIRCLE BASALT, COLORADO 81621 HEPWORTH - PAWLAK GEOTECHNICAL, INC. September 30, 1999 Sonny & Cheryl D'Anna 314 Sopris Circle Basalt, Colorado 81621 Job No. 199 746 Subject: Report Transmittal, Subsoil Study for Foundation Design, Proposed Residence and Barn, Lot 3, Red Rock Ranch, Red Rock Road, Emma, Eagle County, Colorado. Dear Mr. & Mrs.-D'Anna: As requested, we have conducted a subsoil study for the proposed residence and barn at the subject site. Subsurface conditions encountered in the exploratory borings drilled in the proposed building areas consist of about 1 foot of topsoil and i to 1 %z feet of stiff clay overlying relatively dense slightly silty sandy gravel with cobbles and possible boulders. Groundwater was not encountered in the borings at the time of drilling. The proposed residence can be founded on spread footings placed on the natural gravel subsoils beneath the topsoil and clay and designed for an allowable bearing pressure of 3,000 psf. The report which follows describes our exploration, summarizes our Endings, and presents our recommendations. It is important that we provide consultation during design, and field services during construction to review and monitor the implementation of the geotechnical recommendations. If you have any questions regarding this report, please contact us. Sincerely, ORTH - PAWLAK G OTECHNiCAL, INC. 0 Jordy . A m n, Jr., P. . Rev. y: D H TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY ........................................ I PROPOSED CONSTRUCTION ............................................ I SITE CONDITIONS..................................................... 2 FIELD EXPLORATION ................ .................................. 2 SUBSURFACE CONDITIONS ............................................. 2 DESIGN RECOMMENDATIONS .......................................... 3 FOUNDATIONS.................................................... FOUNDATION AND RETAINING WALLS ............................ 4 FLOORSLABS ................................................... 5 UNDERDRAIN SYSTEM ..... . . ... . ........................... I .... 6 SURFACE DRAINAGE ............................................ 6 LIMITATIONS......................................................... 7 FIGURE 1 - LOCATION OF EXPLORATORY BORINGS FIGURE 2 - LOGS OF EXPLORATORY BORINGS FIGURE 3 - LEGEND AND NOTES FIGURE 4 - SWELL -CONSOLIDATION TEST RESULTS H-P GEOTEOH PURPOSE AND SCOPE OF STUDY This report presents the results of a subsoil study for a proposed residence and barn to be located on Lot 3, Red Rock Ranch, Eagle County, Colorado. The project site is shown on Fig. 1. The purpose of the study was to develop recommendations for the foundation design. The study was conducted in accordance with our agreement for geotechnical engineering services to Sonny and Cheryl D'Anna dated September 17, 1999. A field exploration program consisting of exploratory borings was conducted to obtain information on subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification, compressibility or swell and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation. This report summarizes the data obtained during this study and presents our conclusions, design recommendations and other geotechnical engineering considerations based on the proposed construction and the subsoil conditions encountered. PROPOSED CONSTRUCTION The proposed residence will be a one and two story woodframe structure with a partial basement level. Ground floor will be slab -on -grade. Grading for the structure is assumed to be relatively minor with cut depths between about 4 to 8 feet. We assume relatively light foundation loadings, typical of the proposed type of construction. if building loadings, location or grading plans change significantly from those described above, we should be notified to re-evaluate the recommendations contained in this report. H-P UEOTECH -2- SITE CONDITIONS The site was vacant at the time of our field work. The ground surface is relatively flat with a slight slope down to the northwest. There is about 1 to 2 feet of elevation difference across the lot. Vegetation consists primarily of grass and weeds with cottonwood trees on the northern side of the lot adjacent to Red Rock Road. There is scrub brush in the proposed barn location. FIELD EXPLORATION The field exploration for the project was conducted on September 21, 1999. Three exploratory borings were drilled at the locations shown on Fig. 1 to evaluate the subsurface conditions. The borings were advanced with 4 inch diameter continuous flight augers powered by a truck -mounted Longyear BK-S 1 HD drill rig. The borings were logged by a representative of Hepworth-Pawlak Geotechnical, Inc. Samples of the subsoils were taken with 13/s inch and 2 inch I.D. spoon samplers. The samplers were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoils. Depths at which the samples were taken and the penetration resistance values are shown on the Logs of Exploratory Borings, Fig. 2. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Fig. 2. The subsoils consist of about 1 foot of topsoil and i to V/2 feet of stiff clay overlying relatively dense, slightly silty sandy gravel containing cobbles and possible M-P GEoiECH -3- boulders. Drilling in the dense gravel with auger equipment was difficult due to the cobbles and boulders and drilling refusal was encountered in the deposit. Laboratory testing performed on samples obtained from the borings included natural moisture content and density. Results of swell consolidation testing performed on a relatively undisturbed drive sample, presented on Fig. 4, indicate low compressibility under existing moisture conditions and light loading and a low expansion potential when wetted under a constant light surcharge. The sample showed high compressibility upon increased loading after wetting. No free water was encountered in the borings at the time of drilling and the subsoils were slightly moist tom i DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsoil conditions encountered in the exploratory borings and the nature of the proposed construction, we recommend the building be founded with spread footings bearing on the natural granular soils below the topsoil and clay soils. The design and construction criteria presented below should be observed for a spread footing foundation system_ 1) Footings placed on the undisturbed natural granular soils should be designed for an allowable soil bearing pressure of 3,000 psf. Based on experience, we expect settlement of footings designed and constructed as discussed in this section will be about i inch or less. 2) The footings should have a minimum width of 16 inches for continuous walls and 2 feet for isolated pads. 3) Exterior footings and footings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 36 inches below exterior grade is typically used in this area. H-P GEQTECH -4- 4) Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 10 feet. Foundation walls acting as retaining structures should also be designed to resist lateral earth pressures as discussed in the "Foundation and Retaining Walls" section of this report. 5) The topsoil, clays and any loose or disturbed soils should be removed and the- footing bearing level extended down to relatively dense natural granular soils. If water seepage is encountered, the footing areas should be dewatered before concrete placement. b) A representative of the geotechnical engineer should observe all footing excavations prior to concrete placement to evaluate bearing conditions. FOUNDATION AND RETAINING WALLS Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a slight amount of deflection should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of 50 pcf for backfill consisting of the on -site granular soils. Cantilevered retaining structures which are separate from the residence and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of 40 pcf for backfill consisting of the on -site granular soils. Backfill should not contain vegetation, topsoil, clay soils or oversized rock. All foundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The pressures recommended above assume drained conditions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain should be provided to prevent hydrostatic pressure buildup behind walls. H-P GEOTECH 367E Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum standard Proctor density at a moisture content near optimum. Backfill in pavement and walkway areas should be compacted to at least 95% of the maximum standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall, since this could cause excessive lateral pressure on the wall. Some settlement of deep foundation wall backfill should be expected, even if the material is placed -correctly, and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of 0.50. Passive pressure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 350 pcf. The coefficient of friction and passive pressure values recommended above assume ultimate soil strength. Suitable factors of safety should be included in the design to limit the strain which will occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against the sides of the footings to resist lateral loads should be compacted to at least 95% of the maximum standard Proctor density at a moisture content near optimum. FLOOR SLABS The natural on -site gravel soils, exclusive of topsoil and clay, are suitable to support lightly loaded slab -on -grade construction. The upper clay coils have variable settlement/heave potential and should be removed from the building area. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free - draining gravel should be placed beneath basement level slabs to facilitate drainage. This H-P GEOTECH material should consist of minus 2 inch aggregate with at least 50% retained on the No. 4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on -site gravels devoid of vegetation, topsoil, clay and oversized rock. UNDERDRAIN SYSTEM Although free water was not encountered during our exploration, it has been our experience in the area that local perched groundwater may develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below -grade construction, such as retaining walls and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains should consist of drainpipe placed in the bottom of the wall backfilI surrounded above the invert level with free -draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent !•finish grade and sloped at a minimum 1 % to a suitable gravity outlet. Free -draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least l'/z feet deep. SURFACE DRAINAGE The following drainage precautions should be observed during construction and maintained at all times after the residence and barn have been completed: i) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. H-P GEOYECH -7- 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 6 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in paved areas. Free -draining wall backfill should be capped with about 2 feet of the on -site finer graded soils to reduce surface water infiltration. 4) Roof downspouts and drains should discharge well beyond the limits of all backfi 11. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnicai engineering principles and practices in this area at this time. We make no warranty either expressed or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory borings drilled at the locations indicated on Fig. 1, the proposed type of construction and our experience in the area. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory borings and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications H-P GEQTECH -8- to the recommendations presented herein. We recommend on -site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. Sincerely, Jordy Z. Adamson, J ., P. ��0 29707 Reviewed by: sSZONAL. Ea r Daniel E. Hardin, P.E. JZA/sd cc: Galambos/Muir Architects, LLC - Attn: Rich Pavicek Martin Design - Attn: Chris Gamache H-P GEoTEcH LEGEND; TOPSOIL; sandy silty clay, organic, firm, slightly moist, brawn. 0 CLAY (CL); silty. slightly sandy, stiff to very stiff, slightly moist, reddish brown. o GRAVEL (GP —GM); sandy, slightly silty, with cobbles and possible boulders, dense, slightly moist, brown, subrounded to rounded rock. hRelatively undisturbed drive sample; 2—inch I.D. California liner sample. Drive sample; standard penetration test ( SPT ), 1 3/8—inch I.D. split spoon sample, ASTM D -- 1585. 39/i2 Drive sample blow count; indicates that 39 blows of a 140--pound hammer falling 30 inches were required to drive the California or SPT sampler 12 inches. TPractical rig refusal. NOTES: i. Exploratory borings were drilled on September 21, 1999 with a 4—inch diameter continuous flight power auger. 2. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan provided. 3. Elevations of exploratory borings were not measured and the logs are drawn to depth. 4. The exploratory boring locations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory boring logs represent the approximate boundaries between material types and transitions may be gradual. 8. No free water was encountered in the borings at the time of drilling. Fluctuation in water level may occur with time. 7. Laboratory Testing Results, WC = Water Content ( % ) DD = Dry Density ( pcf ) 199 746 1 HEO EC LAICAL ZINC LEGEND AND NOTES - Fig. 3 GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) i inch = 40 ft. CD O Ctl CU ('7 L n a� 3 3 7D nD ro i 3 i cc m i 0 0 rn m i 0 a Y cn 0 cn SITE PLAN 160 EXISTING CONTOURS ONLY SHOWN BACK TO DOSING TANK ROM DOSING TANK LATERAL PIPE LAYOUT _S rYP. BED OF 1 1/2" SCREENED ROCK, 12" THICK SEE NOTES FOR MIN. BASE AREA 4 1 o 12" M I N 24" MIN DISTRIBUTION LATERAL- (TYP. ) TOPSOIL SLOPE TO DRAIN 0 SCALE: 1 " = 2000' T8S, R87W, 6TH PM BASALT QUADRANGLE 4" X 4 TREATED ELEC. JCT. BOX POST RISER(S) TO GROUND SURFACE CAULK/SEAL WELL d` INLET d v I n z i N "ALARM' a 2" AIR VENT 2" FEEDER LINE TO FIELD, SLOPED AT 1/8' PER FT. MIN. SHALL DRAIN BACK TO TANK AFTER EACH PUMP CYCLE. QUICK DISCONNECT OR UNION a "ON" � COIL AND TIE AN ADDITIONAL 10' OF WEIGHT WIRE FOR PUMP ° REMOVAL d "OFF" SUBMERSIBLE WASTEWATER PUMP ° 40 O O SET PUMP APPROX. 8" OFF FLOOR 4 NOTES: I. SWITCHES TO BE MERCURY FLOAT TYPE. 2. FLOAT SWITCH DIMENSIONS ARE BASED ON A COPELAND 1000 GAL. TANK. (CISTERN) 3. DOSING TANK SHALL BE OF WATERTIGHT CONSTRUCTION. 4. ALARM SHALL BE BOTH AUDIBLE AND VISIBLE, LOCATED WITHIN THE HOUSE AND ON A CIRCUIT SEPARATE FROM THE PUMP. 5. PUMP SHALL BE CAPABLE OF AT LEAST 50 GPM ® 10 FT. OF HEAD. (ELEVATION DIFFERENCE AND PIPE LENGTHS SHALL BE FIELD MEASURED BY CONTRACTOR AND REFERRED TO ENGINEER FOR VERIFICATION OF PUMP PARAMETERS.) 6. FIELD WILL BE DOSED AN AVERAGE OF 3 TIMES PER DAY AT 369 GALLONS PER DOSE, GIVEN THE FLOAT SWITCH ARRANGEMENT ABOVE. DOSING TANK ARRANGEMENT N.T.S. FILTER FABRIC SLOPE TO DRAIN 4 101 SAND FILL - SEE NOTES FOR MINIMUM BASE AREA SECTION A — A. 14. T. S. EXISTING GROUND SURFACE a M -QENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE EAGLE COUNTY REGULATIONS OF INDIVIDUAL SEWAGE DISPOSAL SYSTEMS, EVEN THOUGH ALL SUCH REQUIREMENTS ARE NOT SPECIFICALLY NOTED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS. 2. 5 BEDROOMS * 2 PERSONS/BEDROOM * 75 GALLONS/PERSON/DAY IS: 750 GALLONS/DAY AVERAGE FLOW DESIGN FLOW = 1.5 * 750 GALLONS/DAY = 1125 GPD (Q) SEPTIC TANK: 1125*1.25 = 1406 GALLONS USE 1500 GALLON SEPTIC TANK, WITH BAFFLES MINIMUM ABSORPTION BED AREA: A =—Q-Ft = 11 5 20 = 1006 SQUARE FEET. 5 5 ***EAGLE COUNTY REQUIRES A 130% INCREASE IN BED SIZE IF NOT IN TRENCHES, THEREFORE: 1006 SF * 1.3 = 1308 SQUARE FEET PLUS AN INCREASE FOR A GARBAGE GRINDER OF * 1.053 = 1377 S.F. 3. SAND FILL SHALL MEET THE FOLLOWING CRITERIA: 100% SHALL PASS THE #4 SIEVE (6.4 MM). <10% SHALL PASS THE #200 SIEVE (0.13 MM) AND SHALL HAVE A UNIFORMITY COEFFICIENT LESS THAN 5 (D60/D10<5). CONCRETE SAND AND MASONRY SAND WILL BOTH GENERALLY MEET THESE CRITERIA. 4. CLEAN OUTS ARE REQUIRED AT ALL BENDS AND AT LEAST EVERY 100 FEET ALONG THE HOUSE SEWER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL COMPONENTS OF THIS SYSTEM PRIOR TO THE ABSORPTION AREA WATER TIGHT TO PREVENT INFILTRATION. 6. TOPSOIL COVER MAY BE VARIED (WITH 1 FOOT MINIMUM) TO ALLOW LANDSCAPING. 7. INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS POINTS TO WITHIN ONE-HALF FOOT OF FINAL GRADE. 8. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES MEET THOSE REQUIRED. 9. PROVIDE POSITIVE DRAINAGE OF SURFACE WATER AWAY FROM SAND BED AREA USING DRAINAGE SWALES AS NECESSARY. 10. SOILS AND PERCOLATION INFORMATION FROM REPORTS BY HP GEOTECH, JOB # 199 746, DATED OCTOBER 27, 1999. SOILS ENGINEER MUST APPROVE NATIVE MATERIAL AT BED BOTTOM. 11. THIS DRAWING DOES NOT CONSTITUTE AN ISDS PERMIT. PERMIT MUST BE OBTAINED FROM APPROPRIATE CITY OR COUNTY OFFICIALS. 12. THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM. 13. BASE MAP INFORMATION PROVIDED BY GALAMBOS/MUIR ARCHITECTS, LLC. VIA. ELECTRONIC FILE, OCTOBER 27, 1999. TOPOGRAPHY INFORMATION DIGITIZED FROM SCHMUESER GORDON MEYER INC. PLAN OF RED ROCK RANCH P.U.D. DATED JANUARY 31, 1991. 14. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE PERCOLATION RATE FOR THE BED AT ANY DEPTH DEEPER THAN THE GEOTECHNICAL ENGINEER'S PERCOLATION TESTS. C� 46' (MIN.) GRAVEL BED PLAN- N. T. S. ASBUILT 4/3/00 m 0 a w w U J U 0 :2 w w V > r w cn 0 w w 0 � o J 0 L� I— z w 0 V) o v) Z N F-- O o > v7 ~ a J - o z w _ Q � w cl� - w > w 0 G✓ w 0 - 0 > U w X w J U' 0 < U w w Of J LJ w w G: w w rn rn w o v Q i N O N Z 00 0 I < m z d o N Z w w of I Q C� r� w r- w W Y < _j Z V Q Lu a L a:� W W c0 c�00�0 001A t . Co o a a Q o O U C Cl) _ � F- Q W Cr. ®� O Q � 8 w Q w 0 Z PROJECT NO. 99W4.38 SHEET 1 OF 1 M CL CL. w w v Hcwks i GENERAL NOTES w 1. ALL CONSTRUCTION SHALL BE 1N ACCORDANCE WITH THE EAGLE COUNTY , REGULATIONS OF INDIVIDUAL SEWAGE DISPOSAL SYSTEMS EVEN THOUGH sic, .. 8 � _ : ALL SUCH REQUIREMENTS 1 REMENTS ARE NOT SPECIFICALLY Fi CALtY 'NOTED -0N THE a Q w w j A RESPONSIBLE R U H DRAWINGS. THE CONTRACTOR SHALL BE FOR SUCH cn SPECIFIC ICDETAILS AS ARE REFERRED TO I N THE ABOVE I MENTIONED � >- Gra x 4 SPE IE ` \ - REGULATIONS,Of # ._;m. r o. s. 2. 5 BEDROOMS * 2 PERSONS/BEDROOM 75 GALLONS/PERSON/DAY I S : yr c E `� , , .., w_ o `�.;:;;_,. 750 GALLONS/DAY AVERAGE FLOW R ! ,. _,.__ra.......�..__.. _ d___...�.. DESIGN FLAW 1.5 750 GALLONS/DAY 1125 GPD (0)�: 71 SEPTIC TANK 5*1 = 40 GALLONS Y 112 25 1 6 GALL z Lia Q r;4 USE 1500 GALLON SEPTIC TANK W TH BAFFLES v} •,_� ; • ' � , ��;'i .t;� .. , , - ;� 1; .: MINIMUM ABSORPTION BED AREA: — — * y, A - F - 1125 � 1006 SQUARE FEET. _ , > : 5 5w CD EAGLE COUNTY REQUIRES A-130% INCREASE IN BED SIZE IF NOTLj . _ ,,r„• e.,,,�-.,� �!�<r , A..-, ,l : ,,, . ,�,-:. IN TRENCHES THEREFORE: 1006 SF * 1.3 - 1 308 SQUARE.. FEET.. s; csa6 PLUS AN INCREASE FOR A GARBAGE GRINDER OF * t .053 1 377 S. F : v 1 „ , , �4. ,: .,-.: -.- -��..'E 3. SAND FILL SHALLMEETTHE FOLLOWING CRITERIA. � 0 w 1 fl0% SHALL PASS THE #4 SIEVE of BARN BUILDING ,_,� .m=.� ��;.�.: ,. �.�... •,-_.�� Y_,nr_.. .__ . ,� �.: � . ,r <10% SHALL PASS THE #200 SIEVE 0.13 MM AND SHALL HAVE A' ENVELOPE , . UNIFORMITY FORM I ?Y COEFFICIENT i C I ENT LESS THAN 5 D60 D10 5LLj fF �. ( f ) o -� k , , GENERALLY T THESE ,., CONCRETE SAND AND MASONRY SAND WILL BOTH GENER LL MEET C S a 0 .,> CRITERIA. G'� %{ , R _. + ,. _ � REQUIRED AT L BENDS AND AT LEAS EVERY 100 Uj _ � <r.� ,. _.,.. r .. � 4, CLEAN OUTS ARE EQU AL i r._ . �r .._.. w _. FEE? ALONG THE HOUSE SEWER. a , DRIVEWAY _., ._ 5, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL COMPONENTS OF THIS SYSTEM PRIOR TO THE ABSORPTION AREA WATER w ,I IViWY TIGHT TO PREVENT INFILTRATION. I g � SCALE: 1" = 200Q' 6. TOPSOIL COVER MAY BE VARIED (WITH 1 FOOT MINIMUM) TO ALLOW w �- LANDSCAPING. T8S, R87W, 6?H PM ABANDONED DITCH BASALT QUADRANGLE 7, INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS POINTS ?O WITHIN ONE-HALF FOOT OF FINAL GRADE. rn 0) 1500 GALLON _ F F� a 9 8. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG SEPTIC TANK - AS ALL MINIMUM DISTANCES AND SLOPES MEET ?HOSE REQUIRED, `� ( `j BUILDING ENVELOPE (MINIMUM) �- �� 9. PROVIDE POSITIVE DRAINAGE OF SURFACE WATER AWAY FROM SAND, BED T 4 X 4-- -ELEC. JCL BOX AREA USING DRAINAGE SWAL'ES AS NECESSARY ' I TREATED cv POST 10, SOILS AND PERCOLATION INFORMATION FROM REPORTS BY HP GEOTECH, .a \ 2" AIR VENT JOB # 199 746, DATED OCTOBER 27, 1999. SOILS ENGINEER MUST APPROVE ti RISER() TO �%Jl 70� NATIVE MATERIAL AT BED BOTTOM. W � CM/N Mi(y \� EXISTING ELL ' ) .�� GROUND SURFACE 11. THIS DRAWING DOES NOT CONSTITUTE AN ISDS'PERMIT PERMIT MUST BE F�0 � 4 ^„ _ ;OBTAINED FROM APPROPRIATE CITY OR COUNTY OFFICIALS. L — \ W 6 �` -CAULK SEAL WELL FEEDER LINE TO s 20' �7 FIELD, SLOPED AT ON. INLET 1 /8' PER FT. MIN. BACKWASH 12, THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. B OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS f DOSING TANK / SHALL DRAIN BACK OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM. 4 REQUIRED / a TO TANK AFTER PROPOSED 5 BEDROOM o EACH PUMP CYCLE. 13, BASE MAP INFORMATION PROVIDED BY GALAMBOS/MU1R ARCHITECTS, LLC. 3� HOUSE 5100 S.F.t 2" SCH 40 PVC ___ VIA. ELECTRONIC FILE OCTOBER 27, 1999. TOPOGRAPHY INFORMATION / SLOPED TO DRAIN r0' DIGITIZED FROM SCHMUESER GORDON MEYER INC. PLAN OF RED ROCK RANCH �C �M P U D DATED JANUARY 31 1991 cn I < 4 cV W Q ry Q C C w f— J , LLJ LL' Y Q BACK TO DOSING TANK. 4 14. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE PERCOLATION RATE FOR N "ALARM" THE BED AT ANY DEPTH DEEPER THAN THE GEOTECHNICAL ENGINEER'S QUICK DISCONNECT PERCOLATION TESTS. 's OR UNION PROPERTY LINE \ a r ;5 04 \ „ON" COIL AND TIE AN ADDITIONAL 10' OF 575 LOT RANCH P.U,D WEIGH? p REMOVOR PUMP AL � RED ROCK ®^ 3.0 ACRES f \ a SUBMERSIBLE WASTEWATER PUMP i G OFF" �1 f� z' a: jp LL a I SET PUMP APPROX. O 8" OFF FLOOR G'3 no NOTE: m 1, SWITCHES TO BE MERCURY FLOAT TYPE. j 2. FLOAT SWITCH DIMENSIONS ARE BASED ON A COPELAND 1000 GAL. TANK. (CISTERN) 3, DOSING TANK SHALL BE OF WATERTIGHT CONSTRUCTION. 4. ALARM SHALL BE BOTH AUDIBLE AND VISIBLE, LOCATED WITHIN THE HOUSE AND ON A CIRCUIT SEPARATE FROM THE PUMP.33 5. PUMP SHALL BE CAPABLE OF AT LEAST 50 GPM @ 10 F?. OF HEAD: � i (ELEVATION DIFFERENCE AND PIPE LENGTHS SHALL BE FIELD MEASURED BY CONTRACTOR AND REFERRED TO ENGINEER FOR VERIFICATION OF PUMP PARAMETERS.) 6. FIELD WILL BE DOSED AN AVERAGE OF 3 TIMES PER DAY AT 369 GA I DOSE, GIVEN THE FLOAT SWITCH ARRANGEMENT ABOVE r A00 DOSING TANK ARRANGEMENT' ,If I U I N.T.S. 7 1 N c SITE PLA, GRAPHIC SCALE EXISTING CONTOURS ONLY SHOWN R"s I -Jo , r � (rN FEET 1 inch = 40 ft.r.# , Co 3 46' (MIN.) Cn I I Q I - 4 0 Q I a. DRILL 1/4"0 HOLES 48" TO SEPTIC TANK Q 1-1j2" PVC LATERALS � _ ON CENTER FOR ENTIRE 3 TYP Q 0 9 s LENGTH OF ALL LATERALS 7 < Ft- 6' TYP. � Op �- �- 0 PVC M AN I � " L.; PIPE (SOLID) BED OF 1 1/2" SCREENED —� c `� FILTER FABRIC ROCK, 12" THICK ./~ SEE NOTES FOR MIN. TOPSOIL EXISTING GROUND SLOPE 3'x 2" TEE S�OF BASE AREA SLOPE TO SLOPE TO SURFACE n a S E 23 4 RAIN DRAIN � 4 - � HOLES ON BOTTOM i 46 // /// /// /// /// /// O O 0 O OF LATERAL gEgE€ \� 23 \\. � 12 MIN \i\\ dl� L a U LLJ rr (j) w < w Z l - is