HomeMy WebLinkAboutThe Arrabelle_Jan042019Eagle County Clerk & Recorder
RECEIVED
COLORADO JAN 092010
Department of Public
Health & Environment 6
PNL y
Dedicated to protecting and improving the health and environment of the people of Colorado
Eagle County Clerk Et Recorder
PO Box 537
Eagle, CO 81631
January 3, 2019
Dear Sir or Madam:
On January 4, 2019, the Air Pollution Control Division will begin a 30 -day public notice period for
Arrabelle at Vail Square, LLC - The Arrabelle. A copy of this public notice and the public comment
packet are enclosed.
Thank you for assisting the Division by posting a copy of this public comment packet in your office.
Public copies of these documents are required by Colorado Air Quality Control Commission
regulations. The packet must be available for public inspection for a period of thirty (30) days from
the beginning of the public notice period. Please send any comment regarding this public notice to
the address below.
Colorado Dept. of Public Health Et Environment
APCD-SS-B1
4300 Cherry Creek Drive South
Denver, Colorado 80246-1530
Attention: Clara Gonzales
Regards,
Clara Gonzales
Public Notice Coordinator
Stationary Sources Program
Air Pollution Control Division
Enclosure
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.cotorado.gov/cdphe
John W. Hickenlooper, Governor I Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
NO Air Pollution Control Division
•
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: Arrabelle at Vail Square, LLC - The Arrabelle - Eagle County
Notice Period Begins: January 4, 2019
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Arrabelle at Vail Square, LLC
Facility: The Arrabelle
675 Lionshead PL
Vail, CO 81657
Eagle County
The proposed project or activity is as follows: Installation of three boilers
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.0 due to the following reason(s):
• permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section
III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area)
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 16EA0321 have been
filed with the Eagle County Clerk's office. A copy of the draft permit and the Division's analysis are
available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web format https://www.colorado.Qov/pacific/cdphe/air-permit-public-notices. This page
also includes guidance for public participation
• Send an email to cd ph e.commentsapcd@state.co.us
• Send comments to our mailing address:
KC Houlden
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
COLORAPO
o.g,�.eof r.ar
x vaenno.,..ai
AIR POLLUTION CONTROL DIVISION PRELIMINARY ANALYSIS
PERMIT NUMBER: 16EA0321 DATE: December 28, 2018
APPLICANT: Arrabelle at Vail Square, LLC
ENGINEER: KC Houlden
CP SUPERVISOR: R K Hancock III, PE
PROJECT DESCRIPTION
The company listed above has applied for an air emission permit to construct and operate 3 boilers
for building heat facility located at 675 Lionshead Place, in Eagle County, Colorado.
SUMMARY OF EMISSIONS (tons/year)
The Division has determined that the above emission source will comply with all applicable
regulations and standards, and plans to issue an emission permit. A copy of the draft permit is
included in the public comment packet.
SOURCE CLASSIFICATION
The facility has the potential to emit (PTE) a total of 160.6 tons of Nitrogen Oxides (NOx) per
year. Because this source has a PTE greater than 100 tons per year of a criteria pollutant, this
source is classified as a major facility. Because the applicant is being issued a permit for over 50
tons of NOx per year in an attainment area, this source is required to undergo a public comment
process.
AIR
CONTROLLED
POTENTIAL TO
SOURCE
POLLUTANT
EMISSIONS
EMIT
Arrabelle
Permitted
NOx
21.5
21.5
boilers
Vail permitted
totals
NOx
82.4
82.4
Insignificant
source facility
NOx
86.6
86.6
totals
Facility total
NOx
190.5
190.5
The Division has determined that the above emission source will comply with all applicable
regulations and standards, and plans to issue an emission permit. A copy of the draft permit is
included in the public comment packet.
SOURCE CLASSIFICATION
The facility has the potential to emit (PTE) a total of 160.6 tons of Nitrogen Oxides (NOx) per
year. Because this source has a PTE greater than 100 tons per year of a criteria pollutant, this
source is classified as a major facility. Because the applicant is being issued a permit for over 50
tons of NOx per year in an attainment area, this source is required to undergo a public comment
process.
L R DO
'on trot Division
Aent of Public Health b Environment
CONSTRUCTION PERMIT
Permit number: 1 6 EA0 3 21 Issuance: I
Date issued:
Issued to: Arrabelle at Vail Square, LLC
Facility Name: Vail Ski Resort
Plant AIRS ID: 037/0076
Physical Location: 12345 South Highway 777, City
County: County
General Description: Hotel
Equipment or activity subject to this permit:
Facility
AIRS
Allowable Fuels
Equipment
point
Description
ID
Boiler 1
One (1) Make Unilux, Model: ZF2000W,
Serial Number: A1199 boiler. Design
051
Rated at 20 MMBTU per hour.
natural gas
Boiler 2
One (1) Make Unilux, Model: ZF2000W,
Serial Number: A1198 boiler. Design
Rated at 20 MMBTU per hour.
Boiler 3
One (1) Make Unilux, Model: ZF1000W,
Serial Number: A1197 boiler. Design
Rated at 10 MMBTU per hour.
THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR
QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL
ACT C.R.S. (25-7-101 et seq), TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS
DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS:
REQUIREMENTS TO SELF -CERTIFY FOR FINAL APPROVAL
1. YOU MUST notify the Air Pollution Control Division (Division) no later than fifteen days after
issuance of this permit by submitting a Notice of Startup (NOS) form to the Division. The
Notice of Startup (NOS) form may be downloaded online at
https://www.colorado.gov/pacific/cdphe/other-air-permitting-notices. Failure to notify the
Division of startup of -the permitted source is a violation of AQCC Regulation Number 3, Part B,
III.G.1 and can result in the revocation of the permit.
�''"��ffffI COLORADO
Air Pollution Control Division
De=m m d Rjbft Hex;th L Fnvr*n n"c
Page 1 of 7
DRAFT
2. Within one hundred and eighty days (180) after commencement of operation or issuance of this
permit, whichever is later, compliance with the conditions contained on this permit must be
demonstrated to the Division. It is the permittee's responsibility to self certify compliance with
the conditions. Failure to demonstrate compliance within 180 days may result in revocation of
the permit or enforcement action by the Division. Information on how to certify compliance
was mailed with the permit or can be obtained from the Division's website at
https://www.colorado.gov/pacific/cdphe/air-permit-self-certification. (Reference: Regulation
Number 3, Part B, III.G.2).
The owner or operator must develop an operating and maintenance (OEtM) plan, along with a
recordkeeping format, that outlines how the applicant will maintain compliance on an ongoing
basis with the requirements of this permit. Compliance with the O&M plan must commence
at startup. Within one hundred and eighty days (180) after commencement of operation or
issuance of this permit, whichever is later, the owner or operator must submit the OEtM plan to
the Division. Failure to submit an acceptable operating and maintenance plan could result in
revocation of the permit. Note that the Division may modify the monitoring requirements as
part of the Title V Operating Permit if this facility is subject to Title V permitting (Reference:
Regulation Number 3, Part B, III.G.7. ).
4. Within thirty (30) days after commencement of operation or issuance of this permit, whichever
is later, the AIRS ID number must be marked on the subject equipment for ease of
identification. (Reference: Regulation Number 3, Part B, III.E.) (State only enforceable)
EMISSION LIMITATIONS AND RECORDS
5. Emissions of air pollutants must not exceed the following limitations. Monthly records of the
actual emission rates must be maintained by the applicant and made available to the Division
for inspection upon request. (Reference: Regulation Number 3, Part B, II.A.4. )
Annual Limits:
Facility
Equipment
ID
AIRS
Point
Tons per Year
Emission
Type
PM
PM
PM2s
NO.
SO2
VOC
CO
Boiler 1,
051
-
-
21.5
-
18.1
Point
2, and 3
See "Notes to Permit Holder" for information on emission factors and methods used to
calculate limits.
Compliance with the annual limits must be determined on a rolling twelve (12) month total. By
the end of each month a new twelve month total is calculated based on the previous twelve
months' data. The permit holder must calculate actual emissions each month and keep a
compliance record on site or at a local field office with site responsibility for Division review.
The owner or operator must use the emission factors found in "Notes to Permit" to calculate
emissions and show compliance with the limits.The owner or operator must submit an Air
Pollutant Emission Notice (APEN) and receive a modified permit prior to the use of any other
method of calculating emissions.
PROCESS LIMITATIONS AND RECORDS
This source must be limited to the following maximum consumption, processing and/or
operational rates as listed below. Annual records of the actual process rate must be maintained
by the applicant and made available to the Division for inspection upon request. (Reference:
COLORADO
'J I Air Pollution Control Division
'�7*,entrEmcrKatPu6lHca?'f:hErt:�rormeni
Page 2 of 7
Regulation Numbisr 31 -Part t, it.AAFen Ttrue minor source at a true minor
facility. Otherwise, use monthly.
Process/Consumption Limits
Facility Equipment ID
AIRS Point
Process Parameter
Annual Limit
Boiler 1, 2, and 3
001
Consumption of natural gas
429.5 MMscf/yr total
Compliance with the yearly process limits must be determined on a rolling twelve (12) month
total. By the end of each month a new twelve-month total is calculated based on the previous
twelve months' data. The permit holder must calculate monthly process rates and keep a
compliance record on site or at a local field office with site responsibility, for Division review.
STATE AND FEDERAL REGULATORY REQUIREMENTS
7. Visible emissions must not exceed twenty percent (20%) opacity during normal operation of the
source. During periods of startup, process modification, or adjustment of control equipment
visible emissions must not exceed 30% opacity for more than six minutes in any sixty
consecutive minutes. Opacity must be determined using EPA Method 9. (Reference: Regulation
Number 1, II.A.1. I* 4.)
This source is subject to the odor requirements of Regulation Number 2. (State only
enforceable)
This source is subject to the New Source Performance Standards requirements of Regulation
Number 6, Part A , Subpart Dc , Standards of Performance for Small Industrial -Commercial -
Institutional Steam Generating Units including, but not limited to, the following:
[The requirements below reflect the rule language of 40 CFR Part 60 Subpart Dc published in
the Federal Register on 2/16/12. However, if revisions to this Subpart are published at a later
date, the owner or operator is subject to the requirements contained in the revised version of
40 CFR Part 60, Subpart Dc.]
a. Reporting and record keeping requirements. (Reference: 560.48c)
OPERATING Et MAINTENANCE REQUIREMENTS
10. The owner or operator must develop an operating and maintenance (OitM) plan, along with a
recordkeeping format, that outlines how the applicant will maintain compliance on an ongoing
basis with the requirements of this permit. Compliance with the O&M plan must commence
at startup. Within one hundred and eighty days (180) after commencement of operation or
issuance of this permit, whichever is later, the owner or operator must submit the OFtM plan to
the Division. Failure to submit an acceptable operating and maintenance plan could result in
revocation of the permit. Note that the Division may modify the monitoring requirements as
part of the Title V Operating Permit if this facility is subject to Title V permitting (Reference:
Regulation Number 3, Part B, III.G.7.).
COMPLIANCE TESTING AND SAMPLING
Initial Testing Requirements
11. There are no initial testing requirements.
COLORADO
��ddd Air Pollution Control Division
Cerfarmcrrt a(Publs Hcy:h & Err+�rorencn:
Page 3 of 7
AFT
Periodic TestingDeauirern s
12. There are no periodic testing requirements.
ADDITIONAL REQUIREMENTS
13. The AIRS ID number must be marked on the subject equipment for ease of identification.
(Reference: Regulation Number 3, Part B, III.E.) (State only enforceable)
14. A Revised Air Pollutant Emission Notice (APEN) must be filed: (Reference: Regulation Number
3, Part A, II.C.)
a. By April 30of the year following a significant increase in emissions. A significant
increase in emissions is defined as follows:
For any criteria pollutant:
For sources emitting less than 100 tons per year, a change in actual emissions of five
tons per year or more, above the level reported on the last APEN submitted; or
For volatile organic compounds (VOC) and nitrogen oxide (NOx) sources in an ozone
non -attainment area emitting less than 100 tons of VOC or nitrogen oxide per year, a
change in actual emissions of one ton per year or more or five percent, whichever is
greater, above the level reported on the last APEN submitted; or
For sources emitting 100 tons per year or more of a criteria pollutant, a change in
actual emissions of five percent or 50 tons per year or more, whichever is less, above
the level reported on the last APEN submitted; or
For sources emitting any amount of lead, a change in actual emissions, above the level
reported on the last APEN submitted, of fifty (50) pounds of lead
For any non -criteria reportable pollutant:
If the emissions increase by 50% or five (5) tons per year, whichever is less, above the
level reported on the last APEN submitted to the Division.
b. Whenever there is a change in the owner or operator of any facility, process, or
activity; or
C. Whenever new control equipment is installed, or whenever a different type of control
equipment replaces an existing type of control equipment; or
d. Whenever a permit limitation must be modified; or
e. No later than 30 days before the existing APEN expires.
15. This source is subject to the provisions of Regulation No. 3, Part C, Operating Permits (Title V
of the 1990 Federal Clean Air Act Amendments). The application for the Operating Permit is
due within one year of the earliest commencing operation of any piece of equipment covered
by this permit.
E, (COLORADO
(Air Pollution Control Division
V'4ptrmerna7PubL+: HPa::R B ErtArornent
Page 4 of 7
AFT
GENERAL TERMS AND DIT1
16. This permit and any attachments must be retained and made available for inspection upon
request. The permit may be reissued to a new owner by the Division as provided in Regulation
Number 3, Part B, 11.6 upon a request for transfer of ownership and the submittal of a revised
APEN and the required fee.
17. If this permit specifically states that final approval has been granted, then the remainder of
this condition is not applicable. Otherwise, the issuance of this construction permit is
considered initial approval and does not provide "final" approval for this activity or operation of
this source. Final approval of the permit must be secured from the APCD in writing in
accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3,
Part B, III.G. Final approval cannot be granted until the operation or activity commences and
has been verified by the APCD as conforming in all respects with the conditions of the permit.
Once self -certification of all points has been reviewed and approved by the Division, it will
provide written documentation of such final approval. Details for obtaining final approval to
operate are located in the Requirements to Self -Certify for Final Approval section of this
permit. The operator must retain the permit final approval letter issued by the Division after
completion of self -certification with the most current construction permit.
18. This permit is issued in reliance upon the accuracy and completeness of information supplied
by the applicant and is conditioned upon conduct of the activity, or construction, installation
and operation of the source, in accordance with this information and with representations
made by the applicant or applicant's agents. It is valid only for the equipment and operations
or activity(ies) specifically identified in this permit. If subsequent operations or testing at the
source indicate the information supplied to obtain this permit and relied upon in the creation
and issuance of this permit is inaccurate, the source must submit an application to modify the
permit to address the inaccuracy(ies). (Reference: Regulation Number 3, Part B III.E.)
By: By:
KC Houlden
Permit Engineer
Permit History
R K Hancock III, P.E.
Construction Permits Unit Supervisor
Issuance
Date
Description
Issuance #1
This Issuance
I Issued to Arrabelle at Vail Square, LLC
Notes to Permit Holder (as of date of permit issuance):
1) The production or raw material processing limits and emission limits contained in this permit
are based on the production/ processing rates requested in the permit application. These limits
may be revised upon request of the permittee providing there is no exceedence of any specific
emission control regulation or any ambient air quality standard. A revised air pollutant emission
notice (APEN) and application form must be submitted with a request for a permit revision.
(Reference: Regulation Number 3, Part B II.A.4.)
2) This source is subject to the Common Provisions Regulation Part II, Subpart E,Affirmative
Defense Provision for Excess Emissions During Malfunctions. The permittee must notify the
Division of any malfunction condition which causes a violation of any emission limit or limits
stated in this permit as soon as possible, but no later than noon of the next working day,
COLORADO
�tll Air Pollution Control Division
��dd ��nartt�err. of FLy;�Nrat!ri6E:irormc4c:
Page 5 of 7
t
I
followed by writ hotice t e i on ng ally -t a criteria set forth in Part H. EA
of the Common Provisions Regulation. See: https://www.cotorado.gov/pacific/cdphe/aqcc-
regs.
3) The emission levels contained in this permit are based on the following emission factors:
Point 051:
Emission Factors (lbs/MMScf)
Pollutant Uncontrolled I Controlled Source
NOx 100 100 AP42 1.4-1
CO 84 84 AP42 1.4-1
4) The following equipment is currently exempt from construction permitting requirements
and/or APEN reporting requirements based on information provided by the operator for the
Division's analysis:
AIRS ID
Facility ID
Description
Notes
037/0076/038
Arrabelle-
Cummins
APEN and
These units are exempt from
Backup
Model: GTA38
Permit
APEN reporting requirements
Generator
SN: 25307802
Exempt
because the emissions of NOx
Spark ignition
are below 2 tons per year
RICE
(Regulation Number 3, Part A,
II.D.1.a), and are therefore
also exempt from construction
permitting requirements
(Regulation Number 3, Part B,
II.D.1.a).
5) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated
with this permit is valid for a term of five years from the date it was received by the Division. A
revised APEN must be submitted no later than 30 days before the five-year term expires.
Please refer to the most recent annual fee invoice to determine the APEN expiration date for
each emissions point associated with this permit. For any questions regarding a specific
expiration date call the Division at (303)-692-3150.
6) This facility is classified as follows:
Applicable Status
Requirement
Operating Permit True minor source at a major facility for NOx
PSD Minor Source
7) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can
be found at the website listed below:
http: / /www. ecf r. Qov/ cgi-bin /text-
idx?,p=EtSID=2a3fbebe8f5c2f47006ad49ae4b4c080Ftmc=trueFttpl=/ecfrbrowse/Title40/40tab_02
.til
Part 60: Standards of Performance for New Stationary Sources
NSPS 60.40c -60.48c Subpart Dc
® COLORADO
Air Pollution Control Division
A&
` 'Jws� artmcait of Pu61:c Hea::h 6 fri.•acrrners:
Page 6 of 7
8) The permit holderequiro p &estroceTstime for this permit. An invoice for
these fees will be issued after the permit is issued. Failure to pay the invoice will result in
revocation of this permit. The permit holder must pay the invoice within 30 days of receipt of
the invoice (Reference: Regulation Number 3, Part A, VI.B.).
9) Unless specifically stated otherwise, the general and specific conditions contained in this
permit have been determined by the Division to be necessary to assure compliance with the
provisions of Section 25-7-114.5(7)(a), C.R.S.
10) Each and every condition of this permit is a material part hereof and is not severable. Any
challenge to or appeal of a condition hereof must constitute a rejection of the entire permit
and upon such occurrence, this permit must be deemed denied ab initio. This permit may be
revoked at any time prior to self -certification and final authorization by the Division on grounds
set forth in the Colorado Air Pollution Prevention and Control Act and regulations of the AQCC
including failure to meet any express term or condition of the permit. If the Division denies a
permit, conditions imposed upon a permit are contested by the applicant, or the Division
revokes a permit, the applicant or owner or operator of a source may request a hearing before
the AQCC for review of the Division's action. (Reference: Regulation Number 3, Part B III.F.)
11) Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollutant
Emission Notice (APEN) must pay an annual emission fee. If a source or activity is to be
discontinued, the owner must notify the Division in writing requesting a cancellation of the
permit. Upon notification, annual fee billing will terminate.
12) Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention
and Control Act or the regulations of the AQCC may result in administrative, civil or criminal
enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil
penalties), -122.1 (criminal penalties), C.R.S.
COLORADO
IIAir Pollution Control Division
^enarmentcf Pu`�icHra:!ts6i{a7rcrvnen;
Page 7 of 7
IS11
�t
351279
h�
I!ar
Boiler APEN —Form APCD-220
Air Pollutant Emission Notice (APEN) and
Application for Construction Permit
TM
All sections of this APEN and application must be completed for both new and existing facilities, including APEN
updates. An application with missing information may be determined incomplete and may be returned or result in
longer application processing times. You may be charged an additional APEN fee if the APEN is filled out
incorrectly or is missing information and requires re -submittal.
This APEN is to be used for boilers, hot oil heaters, process heaters, and similar equipment. If your emission unit
does not fall into one of these categories, there may be a more specific APEN for your source (e.g. paint booths,
mining operations, engines, etc.). In addition, the General APEN (Form APCD-200) is available if the specialty
APEN options will not satisfy your reporting needs. A list of all available APEN forms can be found on the Air
Pollution Control Division (APCD) website at: www.cotorado.pov/cdphe/apcd.
Do not complete this form for the following source categories:
Heaters or boilers with a design capacity less than or equal to 5 MMBtu/hour that are fueled solely by
natural gas or liquid petroleum gas (LPG).
Heaters or boilers with a design capacity less than or equal to 10 MMBtu/hour used solely for heating
buildings for personal comfort that is fueled solely by natural gas or liquid petroleum gas (LPG).
More information can be found in the APEN exempt/permit exempt checklist:
https: //www.colorado.gov/pacific/cdphe/apen-or-air-permit-exemptions.
This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration
of the five-year term, or when a reportable change is made (significant emissions increase, increase production,
new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements.
Permit Number: �f�0321 AIRS ID Number: 037 / 0076 OCJ
[Leave blank unless APCD has already assigned a permit N and AIRS ID]
Section 1 - Administrative Information
Company Name':
Arrabelle at Vail Square, LLC
Site Name:
The Arrabelle
Site Location:
The Arrabelle
675 Lionshead PI, Vail Co 81657
Mailing Address:
(include Zip Code)
390 Interlocken Cresent, Suite 1000
Broomfield, CO 80021
E -Mail Address:
KFerris2@vailresorts.com
Site Location
County: Eagle
NAICS or SIC Code: 7011
Permit Contact: Kate Ferris
Phone Number: 303-504-5898
'Please use the full, legal company name registered with the Colorado Secretary of State. This is the company name that will
appear on all documents issued by the APCD. Any changes will require additional paperwork. \
r
Iia•
Permit Number: AIRS ID Number: 037 /0076
[Leave blank unless APCD has already assigned a permit # and AIRS ID] IaI
I;f, r
Section 2- Requested Action
❑✓ NEW permit OR newly -reported emission source
-OR-
❑ MODIFICATION to existing permit (check each box below that applies)
❑ Change fuel or equipment ❑ Change company name ❑ Add point to existing permit
❑ Change permit limit ❑ Transfer of ownership? ❑ Other (describe below)
-OR-
F1 APEN submittal for update only (Please note blank APENs will not be accepted)
- ADDITIONAL PERMIT ACTIONS -
❑ Limit Hazardous Air Pollutants (HAPS) with a federally -enforceable limit on Potential To Emit (PTE)
❑ APEN submittal for permit exempt/grandfathered source
Additional Info & Notes:
a For transfer of ownership, a completed Transfer of Ownership Certification Form (Form APCD-104) must be submitted.
Section 3 - General Boiler Information
General description of equipment and purpose: Three boilers vented through common duct; building heat
Manufacturer: Unilux Model No.: ZF2000W, ZF1000W Serial No.: A1199, A1198, A1197
Company equipment Identification No. (optional): Boiler 1 & 2 (ZF2000W), Boiler 3 (ZF1000W)
For existing sources, operation began on. December 2007
For new, modified, or reconstructed sources, the projected start-up date is:
❑✓ Check this box if operating hours are 8,760 hours per year; if fewer, fill out the fields below:
Normal Hours of Source Operation: hours/day days/week weeks/year
Seasonal use percentage: Dec -Feb: 40 Mar -May: 20 June -Aug: 20 Sept -Nov: 20
Are you reporting multiple identical boilers on this APEN? ❑✓ Yes ❑ No
If yes, please describe how the fuel usage will be measured for each boiler (i.e., one meter for all boilers
or separate meters for each unit):
One meter measures fuel use for entire building.
Three boilers are treated as single emission point
F �\
---. _.--- ------- ----- '---"-- -1� ��j'�-'
Form APCD 220 Boiler APEN � Revision 8/2015 �, Qo. �1\ 2 I AM- W COLORADO
Permit Number: AIRS ID Number: 037 /0076 / I;
[Leave blank unless APCD has already assigned a permit # and AIRS ID]10
I� `
Section 4 - Stack Information
Geographical Coordinates
(Latitude/Longitude or UTM)
Operator
P
Discharge Height
Above Ground Level
Temp.
Flow Rate .
Velocity
Stack ID No.
(Feet)
(.Fj
{ACF_L,�
t/sec )
>80
Indicate the direction of the stack outlet: (check one)
❑✓ Upward ❑ Downward
❑ Horizontal ❑ Other (describe):
Indicate the stack opening and size: (check one)
P� Circular Interior stack diameter (inches):
❑ Square/ rectangle Interior stack width (inches):
❑ Other (describe):
Section 5 - Fuel Consumption Information
❑ Upward with obstructing raincap
B1 &2: 32 inch, B3 20 inch
Interior stack depth (inches):
Design Input Rate
(MMBTU/hr)
Actual Annual Fuel Use
(Specify Units)
Requested Annual Permit Limit
(Specify Units)
20 (Boilers 1 & 2)
61,647 MMBtu/yr (3 boilers)
10 (Boiler 3)
From what year is the actual annual fuel use data? 2014
Fuel consumption values entered above are for: ❑ Each Boiler ✓❑ All Boilers ❑ N/A
Indicate the type(s) of fuel used:
❑/ Pipeline Natural Gas (assumed fuel heating value of 1,020 BTU/SCF)
❑ Field Natural Gas Heating value: BTU/SCF
❑ Ultra Low Sulfur Diesel (assumed fuel heating value of 138,000 BTU/gallon)
❑ Propane (assumed fuel heating value of 2,300 BTU/SCF)
❑ Coal Heating value: BTU/lb Ash Content: Sulfur Content:
❑ Other (describe): Heating value (give units):
31f you are reporting multiple identical boilers on one APEN, be sure to clarify if the values in this section are on an individual
boiler basis, or if the values represent total fuel usage for multiple boilers.
'Requested values will become permit limitations. Requested limit(s) should consider future process growth.
51f fuel heating value is different than the listed assumed value, please provide this information in the "Other" field.
...�_... _.----- --- -----_- COLORADO
Form APCD-220 - Boiler APEN - Revision 8/2015 3 1 A AW ,,,'�=
I!a I
Permit Number: AIRS ID Number: 037 /0076 /
Q1
[Leave blank unless APCD has already assigned a permit a and AIRS ID] I;tkt
I;; t
Section 6- Criteria Pollutant Emissions Information
Attach all emission calculations and emission factor documentation to this APEN form.
Is any emission control equipment or practice used to reduce emissions? ❑ Yes ❑✓ No
If yes, please describe the control equipment AND state the overall control efficiency (% reduction):
Pollutant Control Equipment Description Overall Control Efficiency
(% reduction in emissions)
TSP (PM)
PM,o
PMz.s
SOX
NOX
CO
VOC
Other:
From what year is the following reported actual annual emissions data? 2014
Use the following table to report the criteria pollutant emissions from source:
(Use the data reported in Section 5 to calculate these emissions.)
' Requested values will become permit limitations. Requested limit(s) should consider future process growth.
6Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank.
COLORADO
Form APCD-220 - Boiler APEN - Revision 8/2015 4 1 •V ==" =
Uncontrolled
Emission
-Actual
Req ested`-An�nua{t Permit
Emission
Factor
ual E'iss ons
Emission Limit(s)
Pollutant
Source
(AP -42, Mfg-
_ y' "
Uncontrolled
Controlled'
Uncontrolled Controlled
(Specify -tor Units)
etc)
(Tons/year)
(Tons/year)
(Tons/year) (Tons/year)
TSP (PM)
7.6 Ib/MMscf
AP -42
0.23
0.23
PM,
7.61b/MMscf
AP -42
0.23
0.23
PM,.,
7.6 lb/MMscf
AP -42
0.23
0.23
SOX
0.6 lb/MMscf
AP -42
0.02
0.02
NO,
100 lb/MMscf
AP -42
3.02
3.02
CO
841b/MMscf
AP -42
2.54
2.54
VOC
5.5 lb/MMscf
AP -42
0.17
0.17
Other:
' Requested values will become permit limitations. Requested limit(s) should consider future process growth.
6Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank.
COLORADO
Form APCD-220 - Boiler APEN - Revision 8/2015 4 1 •V ==" =
Permit Number:
AIRS ID Number: 037 /0076 /
[Leave blank unless APCD has already assigned a permit # and AIRS ID]
Section 7 - Non -Criteria Pollutant Emissions Information
Does the emissions source have any uncontrolled actual emissions of non -criteria E] Yes [✓ No
pollutants (e.g. HAP- hazardous air pollutant) equal to or greater than 250 lbs/year?
If yes, use the following table to report the non -criteria Dollutant (HAP) emissions from source:
CAS
Number
Chemical Name
Uncontrolled
Overall Emission Emission Factor
Control Source
Efficient Factor
Efficiency (specify units) (AP -42, Mfg. etc)
Uncontrolled Controlled
Actual Actual
Emissions Emissions('
(lbs/year) (lbs/ ear
y )
6Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank.
Section 8 - Applicant Certification
I hereby certify that all information contained herein and information submitted with this application is complete,
true and correct.
Rob Whittier Director - Environmental Sustainability and Compliance
Name (please print) Title
Check the appropriate box if you want:
❑✓ Copy of the Preliminary Analysis conducted by the Division
(] Draft permit prior to public notice
Draft of the permit prior to issuance
(Checking any of these boxes may result in an increased fee and/or processing time)
This notice is valid for five (5) years unless a significant change is made, such as an increased production,
new equipment, change in fuel type, etc. A revised APEN shall be filed no less than 30 days prior to the
expiration date of this APEN form.
Send this form along with $152.90 to:
Colorado Department of Public Health and
Environment
Air Pollution Control Division
APCD-SS-B1
4300 Cherry Creek Drive South
Denver, CO 80246-1530
For more information or assistance call:
Small Business Assistance Program
(303) 692-3175 or (303) 692-3148
Or visit the APCD website at:
https://www.colorado.gov/cdphe/apcd
Telephone: (303) 692-3150
Form APCD-220 - Boiler APEN - Revision 8/2015
DO
I AKEOW
0
a
M
Permit Number:AIRS ID Number: 037 / 0076 O
[Leave blank unless APCD has already assigned a permit N and AIRS ID]
Section 1 - Administrative Information Arra �� of Yat• S
%� � Q U Qr{ , I.L'G
Company Name':
I!,; r
Site Name:
Vail Mountain Ski Area/The Arrabelle
Site Location:
The Arrabelle
675 Lionshead PI, Vail Co 81657
' Boiler APEN - Form APCD-220
1'+•I
Air Pollutant Emission Notice (APEN) and
(Include Zip Code)
,. Application for Construction Permit
All sections of this APEN and application must be completed for both new and existing facilities, including APEN
updates. An application with missing information may be determined incomplete and may be returned or result in
KFerris2@vailresorts.com
longer application processing times. You may be charged an additional APEN fee if the APEN is filled out
incorrectly or is missing information and requires re-submittal.
This APEN is to be used for boilers, hot oil heaters, process heaters, and similar equipment. If your emission unit
does not fall into one of these categories, there may be a more specific APEN for your source (e.g. paint booths,
mining operations, engines, etc.). In addition, the General APEN (Form APCD-200) is available if the specialty
APEN options will not satisfy your reporting needs. A list of all available APEN forms can be found on the Air
Pollution Control Division (APCD) website at: www.colorado.gov/cdphe/apcd.
Do not complete this form for the following source categories:
- Heaters or boilers with a design capacity less than or equal to 5 MMBtu/hour that are fueled solely by
natural gas or liquid petroleum gas (LPG).
- Heaters or boilers with a design capacity less than or equal to 10 MMBtu/hour used solely for heating
buildings for personal comfort that is fueled solely by natural gas or liquid petroleum gas (LPG).
More information can be found in the APEN exempt/permit exempt checklist:
https: / /www.colorado. gov/ pacific/cdphe/apen-or-air-permit-exemptions.
This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration
of the five-year term, or when a reportable change is made (significant emissions increase, increase production,
new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements.
Permit Number:AIRS ID Number: 037 / 0076 O
[Leave blank unless APCD has already assigned a permit N and AIRS ID]
Section 1 - Administrative Information Arra �� of Yat• S
%� � Q U Qr{ , I.L'G
Company Name':
V.-dI S m. t Res@09, ine &a "all Re"
Site Name:
Vail Mountain Ski Area/The Arrabelle
Site Location:
The Arrabelle
675 Lionshead PI, Vail Co 81657
Mailing Address:
(Include Zip Code)
390 Interlocken Cresent, Suite 1000
Broomfield, CO 80021
E -Mail Address:
KFerris2@vailresorts.com
V_AA -1 Izz Iif ftr K -C-
44 ou IdIn
Site Location
County: Eagle
NAICS or SIC Code: 7011
Permit Contact: Kate Ferris
Phone Number: 303-504-5898
'Please use the full, legal company name registered with the Colorado Secretary of State. This is the company name that will
appear on all documents issued by the APCD. Any changes will require additional pape or Mk.
3�432�
Ilan
I�Lt
Permit Number: AIRS ID Number: 037 /0076
Ilr
[Leave blank unless APCD has already assigned a permit #and AIRS ID]
I;c r
Section 2- Requested Action
✓❑ NEW permit OR newly -reported emission source
-OR-
❑ MODIFICATION to existing permit (check each box below that applies)
❑ Change fuel or equipment ❑ Change company name ❑ Add point to existing permit
❑ Change permit limit ❑ Transfer of ownership' ❑ Other (describe below)
-OR -
❑ APEN submittal for update only (Please note blank APENs will not be accepted)
- ADDITIONAL PERMIT ACTIONS -
F1 Limit Hazardous Air Pollutants (HAPs) with a federally -enforceable limit on Potential To Emit (PTE)
❑ APEN submittal for permit exempt/grandfathered source
Additional Info ft Notes:
' For transfer of ownership, a completed Transfer of Ownership Certification Form (Form APCD-104) must be submitted
Section 3 - General Boiler Information
General description of equipment and purpose: Three boilers vented through common duct; building heat
Manufacturer: Unilux Model No.: ZF2000W, ZF1000W Serial No.: A1199, A1198, A1197
Company equipment Identification No. (optional): Boiler 1 & 2 (ZF2000W), Boiler 3 (ZF1000W)
For existing sources, operation began on: December 2007
For new, modified, or reconstructed sources, the projected start-up date is:
❑o, Check this box if operating hours are 8,760 hours per year; if fewer, fill out the fields below:
Normal Hours of Source Operation:
hours/day days/week weeks/year
Seasonal use percentage: Dec -Feb: 40 Mar -May: 20 June -Aug: 20 Sept -Nov: 20
Are you reporting multiple identical boilers on this APEN? Q✓ Yes n No
If yes, please describe how the fuel usage will be measured for each boiler (i.e., one meter for all boilers
or separate meters for each unit):
One meter measures fuel use for entire building.
Three boilers are treated as single emission point
---------
COLORADO
Form APCD-220 - Boiler APEN - Revision 8/20156' 2 AMLV ,,,�Z
Permit Number:
AIRS ID Number:
[Leave blank unless APCD has already assigned a permit # and AIRS ID]
Section 4 - Stack Information
Geographical Coordinates
(Latitude/Longitude or UTM)
037 /0076 /
Operator
P
Discharge Height
Temp.
Flaw Rate
Velocity
Stack ID No.
Above Ground Level
(.F)
(ACFM)
(ft/sec)
(Feet)
>80
Indicate the direction of the stack outlet: (check one)
❑✓ Upward ❑ Downward
❑ Horizontal ❑ Other (describe):
Indicate the stack opening and size: (check one)
❑v Circular Interior stack diameter (inches):
❑ Square/ rectangle Interior stack width (inches):
❑ Other (describe):
Section 5 - Fuel Consumption Information
❑ Upward with obstructing raincap
131&2: 32 inch, 133 20 inch
Interior stack depth (inches):
Design Input Rate
(MMBTU/hr)
Actual Annual Fuel Use'
(Specify Units)
Requested Annual Permit Limit
(Specify Units)
20 (Boilers 1 & 2)
61,647 MMBtu/yr (3 boilers)
10 (Boiler 3)
From what year is the actual annual fuel use data? 2014
Fuel consumption values entered above are for: ❑ Each Boiler ❑� All Boilers ❑ N/A
Indicate the type(s) of fuel useds:
❑ Pipeline Natural Gas (assumed fuel heating value of 1,020 BTU/SCF)
❑ Field Natural Gas Heating value: BTU/SCF
❑ Ultra Low Sulfur Diesel (assumed fuel heating value of 138,000 BTU/gallon)
❑ Propane (assumed fuel heating value of 2,300 BTU/SCF)
❑ Coal Heating value: BTU/lb Ash Content: Sulfur Content:
❑ Other (describe): Heating value (give units):
'If you are reporting multiple identical boilers on one APEN, be sure to clarify if the values in this section are on an individual
boiler basis, or if the values represent total fuel usage for multiple boilers.
'Requested values will become permit limitations. Requested limit(s) should consider future process growth.
slf fuel heating value is different than the listed assumed value, please p e t information in the "Other" field.
COLORADO
Form APCD-220 - Boiler APEN - Revision 8/2015 Ed J J�J6 J 3 i
XWgiL.leurM
t�
Permit Number:
AIRS ID Number: 037 /0076 /
[Leave blank unless APCD has already assigned a permit N and AIRS ID]
Section 6- Criteria Pollutant Emissions Information
Attach all emission calculations and emission factor documentation to this APEN form.
Is any emission control equipment or practice used to reduce emissions? ❑ Yes ✓❑ No
If vPS_ nlParp dt-grriha tha rnntrnl aniHnmant AMI) ctnta tha n%mrnif rnntrnl nff;�;an— Ix
Pollutant Control Equipment Description
Overall Control Efficiency
(% reduction in emissions)
TSP (PM)
Actual Annual Emissions
PM10
Uncontrolled Controlled'
(Tons/year) (Tons/year)
PMz.5
TSP (PM)
sox
AP -42
NOX
0.23
CO
PM,
VOC
AP -42
Other:
0.23
From what year is the following reported actual annual emissions data? 2014
Use the following table to report the criteria pollutant emissions from source:
(Use the data reported in Section 5 to calculate these emissions.)
Pollutant
Uncontrolled
Emission
Factor
(Specify Units)
Emission
Factor
Source
(AP -42, Mfg.
etc)
Actual Annual Emissions
Requested Annual Permit
Emission Limits 4
( )
Uncontrolled Controlled'
(Tons/year) (Tons/year)
Uncontrolled Controlled
(Tons/year) (Tons/year)
TSP (PM)
7.6 Ib/MMscf
AP -42
0.23
0.23
PM,
7.6 lb/MMscf
AP -42
0.23
0.23
PM,.,
7.6 lb/MMscf
AP -42
0.23
0.23
so.
0.6 lb/MMscf
AP -42
0.02
0.02
NO.
100 lb/MMscf
AP -42
3.02
3.02
CO
84 lb/MMscf
AP -42
2.54
2.54
VOC
5.5 lb/MMscf
AP -42
0.17
0.17
Other:
4 Requested values will become permit limitations. Requested limit(s) should consider future process growth.
6Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank.
ft ]j.V
awICOLORAoo
Form APCD-220 - Boiler APEN - Revision 8/2015 4 AW� d^
w+msm.Wedwi
Permit Number:
AIRS ID Number: 037 /0076 /
[Leave blank unless APCD has already assigned a permit # and AIRS ID]
Section 7 - Non -Criteria Pollutant Emissions Information
Does the emissions source have any uncontrolled actual emissions of non -criteria ❑ Yes No
pollutants (e.g. HAP- hazardous air pollutant) equal to or greater than 250 lbs/year?
If yes, use the followinR table to report the non -criteria Dollutant (HAP) emissions from source -
CAS
Chemical Name
Number
Overall Uncontrolled
Emission Emission Factor
Control Source
Efficiency Factor (AP -4z Mfg. etc)
(specify units)
Uncontrolled Controlled
Actual Actual
Emissions Emissions'
(lbs/year) (lbs/year)
6Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank.
Section 8 - Applicant Certification
I hereby certify that all information contained herein and information submitted with this application is complete,
true and correct_
Ken Colonna Vice President of Health and Safety
Name (please print) Title
Check the appropriate box if you want: W
❑ Copy of the Preliminary Analysis conducted by the Division CI
❑ Draft permit prior to public notice
❑ Draft of the permit prior to issuance
rs�
(Checking any of these boxes may result in an increased fee and/or processing time)
This notice is valid for five (5) years unless a significant change is made, such as an increased production, e
new equipment, change in fuel type, etc. A revised APEN shall be filed no less than 30 days prior to the
expiration date of this APEN form. o -a
Send this form along with $152.90 to:
Colorado Department of Public Health and
Environment
Air Pollution Control Division
APCD-SS-BI
4300 Cherry Creek Drive South
Denver, CO 80246-1530
Telephone: (303) 692-3150
Form APCD-220 - Boiler APEN - Revision 8/2015
For more information or assistance call:
Small Business Assistance Program
(303) 692-3175 or (303) 692-3148
Or visit the APCD website at:
httpe.—/Iw*PN.colorado.gov/cdDhe/apcd
COLORADO
r\�
CONSTRUCTION PERMIT - PUBLIC COMMENT INFORMATION SHEET
Notice periods begin on Thursdays. The deadline to submit to Clara is COB Tuesdays.
General Information:
Date December 28, 2018 Company Name Arrabelle at Vail
Square, LLC
Permit Number 16EA0321 Facility Name The Arrabellc
Source ID 037-0076 Review Engineer KC Houlden
County Eagle Review Engineer Phone 303.691.4092
Red Tag? r"" yes
Supervisor Signature Required:
Permit Type Construction Permit
Facility Information:
Facility Type/Description Hotel
Facility Location 675 Lionshead P1
Vail, CO 81657
Reasons for Public Comment (check all that analv):
J;,
Permitted emissions are greater than 25 tpy in a nonattainment area, OR
Permitted emissions are greater than 50 tpy in an attainment area, OR
Permitted emissions of lead are greater than 200 lb per year
Notice lanUta&e.-
permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section X. C. 1.a (25
tpy in a non -attainment area and/or 50 tpy in an attainment area)
Source is subject to 40 CFR Part 61 (not common)
Notice lam tg rhe:
the source is subject to Federal National Emission Standards for Hazardous Air Pollutants
�-
Source is subject to MACT (except for area source MACTs with no control standards, or MACTs
that are not yet adopted by Colorado)
Notice lam ztyZe:
the source is subject to control requirements under a Federal Maximum Available Control Technology
requirement for major sources
�—
Permit includes new synthetic minor limits (HAP, PSD/NANSR) Note: pubcom no longer
required for TV syn minor limits
Notice lanVta��e.-
the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
�--
The preliminary analysis indicates a possible odor violation (not common)
Notice language.-
an rage.the
thepreliminary analysis indicates a possible odor violation
�—
Other — edit the language below to describe your situation
Notice langua
the Division has determined that public comment is warranted because:
enter a description of the reason for ublic comment
ver August 22, 2018 Submit this sheet to admin staff
CONSTRUCTION PERMIT - PUBLIC COMMENT INFORMATION SHEET
O&G: note that approval of alternative controls in the nonattainment area requires public notice as per
XII.D.2.b.(ii). If you have this situation, check the "other" box and edit the description as appropriate.
ver August 22. 2018 Submit this sheet to admin staff
CONSTRUCTION PERMIT - PUBLIC COMMENT INFORMATION SHEET
Description of Project/Activity:
`1
Installation of three boilers
Company Contact:
Name Jon Kimchi
Email jkimchi@vailresorts.com
Mailing address is not required if an email is entered above.
Company Click here to enter text.
Mailing Address Line 1 Click here to enter text.
Mailing Address Line 2 Click here to enter text.
City, ST ZIP Click here to enter text.
Other Notices:
Additional Interested Parties:
This is not common. Use this only if someone has requested specifically to receive notice for this particular
permit. List the name and email (or mailing address if no email is available):
File Location: 1:' Construction Permit Public Notice\I6EAO21 '
Multiple Permits: For more detailed info on multiple permits, see
I:\j
Public Notice TemplateslCPUVlultiplePermitsOneNotice.pdf
I this notice needs to address multiple permits, list all of the other perinits covered here:
Permit No. 7Facility AIRS (000/0000) Permit No. I Facility AIRS (000/00
ver August 22, 2018 Submit this sheet to admin staff
Date Sent/
Comments:
All Permits
r' County Clerk l70 Applicant
EPA
NA Leave as NA — EPA now notified via separate process
None Supervisor signature required for selecting a
Newspaper:
newspaper:
Dates (to be
Date Published:
filled in by
Ending Date:
Admin sta
Additional Interested Parties:
This is not common. Use this only if someone has requested specifically to receive notice for this particular
permit. List the name and email (or mailing address if no email is available):
File Location: 1:' Construction Permit Public Notice\I6EAO21 '
Multiple Permits: For more detailed info on multiple permits, see
I:\j
Public Notice TemplateslCPUVlultiplePermitsOneNotice.pdf
I this notice needs to address multiple permits, list all of the other perinits covered here:
Permit No. 7Facility AIRS (000/0000) Permit No. I Facility AIRS (000/00
ver August 22, 2018 Submit this sheet to admin staff