TO THAT CERTAIN AGREEMENT
BETWEEN
THE COUNTY OF EAGLE, STATE OF COLORADO
AND JOHNSON, KUNKEL & ASSOCIATES, INC.
ENGINEERING SERVICES - ROAD, WATER & SEWER
IMPROVEMENTS - EAGLE COUNTY JUSTICE CENTER
THIS ADDENDUM is made and entered into this S1 day
of ) 1983, by and between the County of Eagle, State
of Colorado, a body corporate and politic, by and through its
Board of County Commissioners, hereinafter referred to as the
"Owner," and Johnson, Kunkel & Associates, Inc., hereinafter
referred to as the "Engineer."
W I T N E S S E T H:
WHEREAS, on or about July 21, 1983, the parties hereto
entered into an Agreement for the Engineer's design and
preparation of bid documents for a 700 foot road and utility
extension from the eastern boundary of Chambers Avenue to
service the Eagle County Justice Center, hereinafter referred to
as the "Primary Agreement;" and
WHEREAS, Article 4 of the Primary Agreement provided,
in part, that in the event the Owner requested Engineer in
writing to perform work over, above and beyond the Scope of Work
described in the Primary Agreement, then Engineer shall be paid
for such additional work as provided; and
WHEREAS, the Owner desires the Engineer to perform
additional work as described and subject to the terms and
conditions set forth hereinbelow, and Engineer has agreed to
perform the same.
NOW, THEREFORE, for and in consideration of the mutual
covenants, conditions, and promises contained herein, the
parties hereto agree hereby as follows:
6�L
■
ARTICLE 1. EXTENT OF AGREEMENT.
This Addendum is and shall be construed as an amendment
to the Primary Agreement between the parties hereto dated
July 21, 1983. All provisions of the Primary Agreement not
inconsistent with the provisions contained in this Addendum
shall remain in full force and effect, and shall control and
govern the interpretation, construction and enforcement of
the provisions contained in this Addendum. For purposes of
this Article 1, the Primary Agreement is by reference hereto
made a part of this Addendum the same as if fully written
herein.
ARTICLE 2. SCOPE OF WORK.
2.1 Engineer shall conduct, using generally
accepted engineering practices and procedures, periodic
field inspections of the construction of the 700 foot road
and utility extension from the eastern boundary of Chambers
Avenue to service the Eagle County Justice Center for the
purpose of ensuring that such road construction and utility
extension is in accordance and compliance with the
engineered plans and specifications prepared by Engineer
pursuant to the Primary Agreement.- The scheduling and
performance of such field inspections by Engineer shall be
coordinated with and conducted under the general supervision
and direction of the Construction Manager /General Contractor
for the Eagle County Justice Center, i.e. Kyburz
Construction, Inc., hereinafter referred to as "Kyburz."
2.1.1 In conjunction with the foregoing, Engineer
shall prepare periodic reports detailing the results of the
aforementioned field inspections, and the Engineer's
recommendations relative thereto. Three (3) copies of each
respective report shall be submitted to the Owner for
-2-
further distribution to Kyburz and the Architect for the
Eagle County Justice Center, W.C. Muchow and Partners, Inc.,
and Walker McGough Foltz Lyerla, P.S.
2.1.2 For purposes of this Paragraph 2.1, it is
anticipated that approximately fifteen (15) hours will be
required of Engineer to perform the aforementioned field
inspections and inspection reports.
2.1.3 If unusual conditions are encountered during
the field inspections which are the subject of this
Paragraph 2.1, Engineer shall immediately consult with
Kyburz, by and through its Project Manager, Dan Feeney, for
the purpose of determining the necessary corrective measures
which should be taken. Kyburz shall report such recommended
corrective measures to the Board for its approval and
implementation.
2.1.4 Engineer shall advise Kyburz as to any
further inspections and /or testing required to obtain such
information as Engineer deems necessary for a professional
interpretation of the adequacy of the subject road
construction and utility extension work under the provisions
of this Addendum, and shall perform such additional work as
authorized by the Board in writing after consultation with
Kyburz. The extent of additional inspection and /or testing
undertaken shall be consistent with the scope of work set
forth in this Addendum.
2.1.5 Any and all samples collected by Engineer for
purposes of this Addendum shall be properly labeled and
retained by Engineer. Within thirty (30) days from
completion of the scope of work specified herein, Engineer
shall deliver such samples to Kyburz for further disposition
or retention by the Board.
-3-
2.2 Engineer shall design one (1) additional fire
hydrant line extension in accordance with the general
recommendations and specifications provided by the Owner.
2.3 Engineer shall provide Kyburz with necessary
field design change information for fire hydrant line
extension.
2.4 Engineer shall provide as -built drawings of water
and sewer lines as required by the Town of Eagle and Eagle
Sanitation District.
ARTICLE 3. COMPENSATION.
3.1 The Owner shall pay Engineer for the
performance of the work specified in this Addendum an amount
not to exceed nine hundred ninety -two dollars and sixty -four
cents ($992.64) determined as follows:
a. Field inspections and
inspection reports at
the rate of $33.50 per
hour for 15 hours of
work .......................... $ 502.50
b. Fire hydrant design .............. 140.14
c. As -Built Drawings ................ 350.00
TOTAL: $ 992.64
3.2 Said amount of $992.64 shall not be exceeded
unless previously and expressly agreed to by the Owner in
writing. No additional costs, expenses and /or charges
entailed by Engineer in the performance of this Addendum
shall be reimbursed by the Owner unless expressly authorized
by the Owner in writing. All payments for work done herein
are contingent upon the satisfactory progress of the work
itself being satisfactory to the Owner.
3.3 The acceptance by Engineer of any final
payment made pursuant to this Addendum shall constitute a
full and complete release of the Owner from any and all
claims, demands and causes of action whatsoever which
-4-
Engineer, its successors or assigns have or may have against
the Owner under the provisions of this Addendum, except as
otherwise provided for herein.
ARTICLE 4. PAYMENTS.
Upon completion of the work specified herein, Engineer
shall submit an invoice for payment to the Owner. Payment
on Engineer's invoice shall be made within thirty (30) days
from the date of the Owner's acceptance and approval of the
work. If payment is not made within the time specified
herein, a minimum service charge of $5.00, or interest at
the rate of 1.5% per month or fraction thereof shall be
imposed on any remaining balance.
IN WITNESS WHEREOF, the parties hereto have executed
this Addendum on the day first above written.
COUNTY OF EAGLE, STATE OF COLORADO
By and Through its
ATTEST: BOARD OF TY COMMISSIONERS
By: By:
erk of th oard f David E. Mott, Chairman
County Commissioners
P.O. Box 850
Eagle, Colorado 81631
ATTEST:
Telephone: (303) 328 -7311
JOHNSON, KUNKEL & ASSOCIATES, INC.
By BY
itle :
P.O. Box 409
Eagle, Colorado 81631
Telephone: 328 -6368