HomeMy WebLinkAboutMinutes 08/30/11 PUBLIC HEARING
August 30, 2011
Present: Jon Stavney Chairman
Peter Runyon Commissioner
Sara Fisher Commissioner
Keith Montag County Manager
Robert Morris Deputy County Attorney
Kathy Scriver Deputy Clerk to the Board
This being a scheduled Public Hearing, the following items were presented to the Board of County
Commissioners for their consideration:
Resolution 2011 -110 Designating August 2011 as Child Support Month
Kristie Williamson, Health & Human Services
Ms. Williamson introduced the team members. She explained the goal of child support and medical
support orders. The county exceeded all the goals set by the state.
Chairman Fisher applauded the staff for their efforts and commitment. She believed it was important for
the public to recognize staff's dedication to making the world a better place.
Commissioner Runyon stated that their efforts were dually noted and appreciated.
Commissioner Runyon moved to approve the resolution designating August 2011 as Child Support Month.
Commissioner Fisher seconded the motion. The vote was declared unanimous.
Consent Agenda
Chairman Stavney stated the first item before the Board was the Consent Agenda as follows:
A. Approval of Bill Paying for the Week of August 29, 2011 (subject to review by the Finance Director)
Finance Department Representative
B. Approval of Payroll for September 8, 2011(subject to review by the Finance Director)
Finance Department Representative
C. Colorado Department of Public Health and Environment Contract Amendment for Task Orders No. 4 of
Master Contract for the Women Infants and Children Program
Jennie Wahrer, Health & Human Services
D. Amendment to Administration Service Agreement between Eagle County Government and CNIC Health
Solutions, Inc.
Lisa Ponder, Human Resources
E. US Department of Transportation, Federal Aviation Administration Grant Agreement Part I: Offer to
Acquire Aircraft Rescue and Firefighting Vehicle
Chris Anderson, Airport
F. First Amendment to Agreement for Professional Services between Eagle County, Colorado and Jviation,
Inc. for Master Planning Services Related to Eagle County Regional Airport
Chris Anderson, Airport
G. Grant Agreement AIP -3 -08- 0020 -48 Eagle County Regional Airport Rehabilitation Air Carrier Apron,
Phase I (Design)
1
08/30/2011
Rick Ullom, Project Management
H. Ratification of Road Project Agreement between Eagle County, State of Colorado, and the USDA Forest
Service, White River National Forest for Magnesium Chloride Supplies for the Stabilization and Dust
Suppression on Bark Beetle Haul National Forest System Roads
Brad Higgins, Road & Bridge
I. Participating Agreement between Eagle County and Groundskeeper, LLC for Work Associated with
Bellyache Ridge Hazardous Fuel Reduction Project, Phase III
Eric Lovgren, Wildfire Mitigation
J. Encroachment Easement Agreement between Eagle county and Vail Valley Medical Center for Expansion
of Right of Way at Edwards Medical Center
Ben Gerdes, Engineering
K. Construction Agreement between Eagle County B & B Excavating for Beard Creek and Berry Creek Roads
Sidewalk Improvements
Ben Gerdes, Engineering
L. Agreement between Edwards Metropolitan District, Vail Valley Medical Center and Eagle County for
Funding of Sidewalk Improvements along Beard Creek and Berry Creek Roads
Ben Gerdes, Engineering
M. Intergovernmental Agreement between Eagle County and the Edwards Metropolitan District for Beard
Creek and Berry Creek Roads Sidewalk Maintenance
Ben Gerdes, Engineering
N. Intergovernmental Agreement between Eagle County and the Berry Creek Metropolitan District for Beard
Creek and Berry Creek Roads Sidewalk Maintenance
Ben Gerdes, Engineering
O. Resolution 2011 -111 Authorizing the Placement of Colorado Department of Transportation Logos Signs
and Tourist Oriented Directional Signs within the Unincorporated Portions of Eagle County, Colorado
Kris Valdez, Planning
P. Resolution 2011 -112 Allowing LaFarge West, Inc. Aggregate Mining Operations to Proceed into Phase V
of the LaFarge Gypsum Ranch Sand and Gravel Pit, Pursuant to Special Use Permit ZS -00173 Approved
by the Board of County Commissioners on August 19, 2008 (Eagle County File No. PR -3410)
Bob Narracci, Planning
Lisa Ponder spoke about item D, the service agreement between Eagle County Government and CNIC
Health Solutions, Inc. CNIC processed all the insurance paperwork. She stated that fees had gone up slightly.
CNIC was reimbursed through listed per service costs and for a shared savings. They were also paid a certain
portion per employee.
Commissioner Runyon wondered if this could be done in house.
Ms. Ponder stated that most big companies did not have their own claim administration.
Ben Gerdes spoke about the items J -N related to sidewalk project in Edwards. He explained that the
sidewalks were added to the interchange design project in 2007. Federal dollars were not available beyond the road
improvements. Partnerships were created in order to complete the sidewalks. The county paid for roughly half.
Berry Creek Metro and Edwards Metro had taken on the long -term sidewalk maintenance.
Brad Higgins spoke about Item H, the project agreements entailed work that was done above and beyond
that was called for in the schedule A. There would a $50,000 reimbursement.
2
08/30/2011
Commissioner Runyon stated that it was this board's policy to encourage local participation.
Commissioner Fisher moved to approve the Consent Agenda, Items A -P.
Commissioner Runyon seconded the motion. The vote was declared unanimous.
Citizen Input
Chairman Stavney opened and closed citizen Input, as there was none.
Commissioner Runyon moved to adjourn as the Board of County Commissioners and re- convene as the
Eagle County Liquor Licensing Authority.
Commissioner Fisher seconded the motion. The vote was declared unanimous.
Eagle County Liquor License Authority
Kathy Scriver, Clerk and Recorder's Office
Consent Agenda
Renewals
A. Fine Line Foods, Inc. d/b /a Fine Line Bar and Grill
#28- 68226 -0000
This is a renewal of a Hotel and Restaurant license in El Jebel. There have been no complaints or
disturbances in the past year. All the necessary fees have been paid. An Alcohol Management Plan is on
file in the Clerk's Office and proof of server training has been provided.
Other
B. Rancho Viejo, Inc. d/b /a Rancho Viejo Restaurante & Bar
#28- 20442 -0000
Rancho Viejo, Inc. has submitted a Permit Application/Report of Change. The applicant is requesting a
permit to change the trade name to Log Cabin Sports Bar & Grill.
C. Rink Productions, Inc. d/b /a Rink Productions
#26- 65945 -0000
Rink Productions, Inc. has submitted a Corporate Report of Change. The applicant is reporting that
Timothy C. Baker will be replacing Tony O'Rourke as the president /director. The background check/CBI
report indicated that Mr. Baker was of good moral character.
Commissioner Fisher moved that the Board approve the Liquor Consent Agenda for August 30, 2011
consisting of Items A -C.
Commissioner Runyon seconded the motion. The vote was declared unanimous.
APPLICANT: Eagle Valley Humane Society
REQUEST: Special Events Permit(s)
EVENT: Rancho Del Gumbo Music Festival
DATE OF EVENT: September 23, 24 and 25, 2011
REPRESENTATIVE: Char Quinn, Event Manager
LOCATION: 4199 Trough Road - Bond
STAFF REPRESENTATIVE: Kathy Striver
STAFF CONCERNS / ISSUES: None
3
08/30/2011
DESCRIPTION:
Eagle Valley Humane Society has requested (3) special event permit(s) for a 3 -day music festival being
held at Rancho Del Rio in Bond. The licensed area will be fully fenced with 6' privacy screened chain -link
fencing. The festival is an all age event. Smudge Enterprises of Longmont, CO will provide security as well as
privately hired off -duty law enforcement. Security will roam the license area to ensure that only wrist banded 21+
possess alcohol. Alcohol service will begin at 10 a.m. and end at 1:30 a.m. daily. At closing, the bar area will be
secured and monitored by security.
STAFF FINDINGS:
1. All fees have been paid.
2. Public notice was given by posting a sign in a conspicuous place on the premises, August 18, 2011, 11 days
prior to the hearing.
3. No protests have been filed in the Clerk's Office.
4. The applicant has provided an alcohol management plan and diagram.
5. The applicant has provided proof of server training.
6. The property owner has been granted a Mass Gathering permit and has worked directly with the Sheriff's
Office through the Limited Review process regarding traffic, parking, vehicular and pedestrian circulation.
DISCUSSION:
Ms. Scriver presented the request. Due to the recent hurricane on the east coast, Char Quinn was unable to
attend the meeting.
Marie Shipley spoke on behalf of the applicant. She believed the event was a great opportunity for the
Humane Society to raise money and provide help for animals. She explained that there would be extensive security
at the event due to the number of people expected to attend.
Chairman Stavney believed that the Humane Society had a good reputation for holding safe events.
Commissioner Fisher recommended that Ms. Scriver contact Smudge Enterprises and make sure that
everyone understood the safety issues.
Commissioner Runyon moved that the Local Liquor Licensing Authority approve the permit(s) for the
Eagle Valley Humane Society request for a permit for the Rancho Del Gumbo Music Festival being held at Rancho
Del Rio, 4199 Trough Road, Bond — CO, September 23 - 25, 2011 from 10 a.m. until 1:30 a.m.
Commissioner Fisher seconded the motion. The vote was declared unanimous.
Commissioner Fisher moved to adjourn as the Eagle County Liquor Licensing Authority and re- convene as
the Board of County Commissioners.
Commissioner Runyon seconded the motion. The vote was declared unanimous.
4
08/30/2011
Work Sessions (recorded)
Solar Options
Ken Whitehead, Solid Waste & Recycling and Adam Palmer, Planning
Vail Resorts Update
Kristin Kenney Williams, Director of Mountain Public Affairs
Chris Jarnot, Senior Vice President /CEO
Doug Lovell, Vice President /COO
John Garnsey, Co- President
Eagle County Liquor License Authority
Kathy Scriver, Clerk & Recorder
El Jebel Community Center
20 Eagle County Drive
El Jebel, Colorado
APPLICANT: DVT, Inc.
DBA: Downvalley Tavern
REPRESENTATIVE: Drew and Bonnie Scott, Owner(s)
LOCATION: 64 El Jebel Road — El Jebel
REQUEST: Modification of Premises
STAFF REPRESENTATIVE: Kathy Scriver
DESCRIPTION:
The applicant has requested a permit to modify the licensed premises. The applicant wishes to include a
grass area of approximately 4,200 square feet located adjacent to the restaurant /outdoor patio area. The area will
provide an outdoor venue for summer BBQs and pig roasts. The property owner must provide an approval prior to
any events.
STAFF FINDINGS:
1. The application is in order, all requirements have been met, and all fees are paid.
2. Public notice was given by posting a notice in a conspicuous place on the premises, August 19, 2011, 10
days prior to the hearing.
3. No protests have been filed in the Clerk's Office.
CONCERNS / ISSUES: None
DISCUSSION:
Ms. Scriver presented the request.
Mr. Scott stated that the fencing would be installed prior to each event. He believed the area would be easy
to enclose. They had not considered anything at this time.
Chairman Stavney asked if anything had been purchased.
Mr. Scott stated that he had not purchased anything yet. The fencing would be something that would be in
the ground 2 -3 ft. high and could not be removed during the event.
Commissioner Fisher asked about smoking.
Mr. Scott stated that they did not have a smoking issue.
5
08/30/2011
Commissioner Fisher spoke about a press release that went out of the Sheriff's Office regarding their last
visit. His establishment was one that served alcohol to a minor. She asked Mr. Scott to explain what happened.
Mr. Scott stated that he was in the kitchen. His manager/bartender served the minor. He was unhappy
about the situation and reiterated to staff that this should not have happened. Their policy was to ask for ID from
anyone under 30.
Commissioner Runyon believed that the fencing should look like a fence. He would like to see the details
of the proposed fencing.
Mr that he was willing to submit a new plan.
Mr. Scott stated
g p
Chairman Stavney concurred with Commissioner Runyon. He believed that the fencing should be
substantial.
Commissioner Fisher understood that the applicant had planned an event. She wondered if there were any
other events planned in the near future.
Mr. Scott stated that they had no other events planned except the one on the 18 of September.
Chairman Stavney believed that since this was a permanent modification and he was not comfortable
granting an approval with temporary looking fencing.
Mr. Scott stated that any permanent fencing would have to be approved by the property owners.
Commissioner Fisher encouraged the applicant to get something in writing from the landlord that
confirmed his verbal agreements with them and a modification of the alcohol management plan regarding security
and management of the outside area when in use.
Commissioner Fisher moved that the Local Licensing Authority table the request to modify the licensed
premises for DVT, Inc. d/b /a Downvalley Tavern until September 13, 2011.
Commissioner Runyon seconded the motion. The vote was declared unanimous.
VIS - 3325 — Seven Castles Creek Road Association
Greg Schroeder, Engineering
ACTION: The purpose of this Variance from Improvement Standards is for a permanent access to several
parcels in the Seven Castles Creek vicinity.
LOCATION: Approximately 4 miles east of Basalt on Frying Pan Road & Seven Castles Creek
FILE NO.: VIS - 3325, Variance from Improvement Standards
OWNER: Seven Castles Creek Road Association, USFS, Division of Wildlife
APPLICANT: Seven Castles Creek Road Association
REPRESENTATIVE: Tom Newland, Newland Project Resources, Inc.
1. PROJECT DESCRIPTION
A. SUMMARY:
Seven Castles Creek Road Association is a Colorado Nonprofit Corporation consisting of eight property
owners that use Seven Castle Creek Road for residential access. In August of 2007, a debris flood occurred
on the adjacent Seven Castle Creek drainage that sent substantial mud and debris through the channel and
dislodged a bridge that was the primary access for the property owners. After the flooding event, a
sustainable solution was sought after for access, as the drainage is prone to similar flooding events. This
application seeks to obtain a variance from improvement standards on the "west side" access that does not
cross the creek, thus avoiding the challenges associated with constructing a new bridge that can withstand
the sporadic and violent debris flooding.
B. CHRONOLOGY:
6
08/30/2011
August 2007 — Flooding on Seven Castles Creek dislodges the main access bridge. Homeowners must use the "west
side" access to get to and from their homes.
August 2007 — Homeowners apply for a temporary special use agreement on CDOW lands for access to road. This
application is for a one year use.
October 2010 — The road association members meet with Eagle County, Basalt & Rural Fire Protection District,
DOW, and USFS to move forward with a Variance Application to the County as a first "public process" as
necessary within the USFS and DOW public processes.
May 2011 — Eagle County receives a Variance from Improvement Standards application from the Road
Association.
• C. SITE DATA:
Surrounding Land Uses / Zoning:
East: Private (Rural Resource Zoning) _
West: USFS — White River National Forest, Private _
North: USFS — White River National Forest, Private
South: USFS — White River National Forest, State (Division of Wildlife) _
Existing Zoning: Rural Resource/PUD _
Proposed Zoning: Rural Resource/PUD
Proposed No. of Dwelling 8 primary and 8 potential accessory dwelling units
Units: _
Total Area: NA _
Water: Individual Well
Sewer: Individual Septic _
Access: Frying Pan Road _
2. STAFF REPORT
A. REFERRAL RESPONSES
The referral notice was distributed on July 5, 2011 and Adjacent Property Owners Letters were distributed
on August 4, 2011. The following section referenced the comments of all responses to Eagle County prior
to the date of this writing:
Eagle County Engineering Department — Please refer to attached referral response letter dated July 26,
2011.
Xcel Energy — Email response dated July 6, 2011, offering no objections. (See attached)
B. STAFF DISCUSSION:
Section 4 -600 of the ECLUR defines the purpose of improvement standards as the minimum design criteria
and standards for infrastructure development in unincorporated Eagle County. The criteria and standards
are intended to protect and promote the public health, safety and welfare of the residents and visitors of
Eagle County.
The applicant has been using the "west" access since the flooding incident. A temporary use from the
Division of Wildlife was issued, but expired in August 2008, as it is a one year use. The homeowners have
been actively working with both the Division of Wildlife and the US Forest Service on obtain and securing
a permanent access. In meetings with the DOW, USFS, and Eagle County, both the DOW and USFS
determined that they would like to see the applicants acquire approval from Eagle County as a first step,
and then they can follow through with the necessary public processes from DOW and USFS.
7
08/30/2011
The Applicant is proposing access to 8 existing residential lots with the possibility of 8 future accessory
dwelling units that would generate approximately 160 vehicle trips per day. The proposed ADT
corresponds with the Eagle County roadway functional classification of Rural Minor Collector, Type V.
The ECLUR Improvement Standards set the geometric dimensions for the design of each classification of
roadway. In order to achieve the desired design the applicant is requesting the following Variances from
Improvement Standards:
1. Dual Access. ECLUR Section 4- 620.J.1.h:
With the exception of properties proposed to be served from the public roadway system by
driveways or by urban cul- de- sacs, two (2) points of ingress / egress to the public roadway system
shall be provided, such that in the event a road within the subdivision becomes impassable, all
properties will continue to have access to a public roadway system. Both points of access should
be open available for daily use. In the event that this is not possible, and at a minimum, there
shall be provided a secondary emergency point of ingress / egress equipped with emergency
breakaway barriers capable of accommodating emergency response vehicles commonly operated
by the Local Fire Authority Having Jurisdiction for all new development or redevelopment.
Secondary emergency access points must be kept free of obstruction, and must be maintained to
assure year round use. Depending upon the length of the road, the wildfire hazard rating, the
number of units proposed, the topography and the recommendation of the Local Fire Authority
Having Jurisdiction, the Board of County Commissioners may, at their discretion, grant a variance
from this required improvement standard
The Applicant has cited the following conditions that they contend represent a hardship to the Applicant if
a variance to the Dual Access requirement is not granted:
1. The Dual Access Requirement is requested due to geographic conditions of the area.
2. The only way to meet the dual access would be to construct a bridge over the Creek and associated
floodplain.
3. The high cost of constructing such a bridge is a main reason why the Road Association is
relocating access to the temporary road alignment.
4. A representative of the Basalt & Rural Fire Protection District has inspected the proposed road in
the field and has stated that the road as proposed will be serviceable in the event of an emergency.
5. The road will have an all- weather surface that will be plowed.
2. Emergency Vehicle Turnaround Areas. ECLUR Section 4- 620.D.10.d:
Emergency vehicle turnaround areas shall be required on rural cul -de -sacs at the initial 1, 000 foot
mark and at 1, 000 foot intervals for the remaining length of road. The Local Fire Authority
Having Jurisdiction may recommend an alternative spacing plan for the turnaround areas. The
turnaround areas shall be constructed in accordance with Section 4- 620.D.11, Vehicle
Turnarounds.
The Applicant has proposed 4 Emergency Vehicle Turnarounds along the 0.3 mile roadway. These
turnarounds are spaced at approximately 200 feet intervals and are located where practical and near a curve
with limited sight distance. Additionally, there are three driveway locations that have existing pullouts that
are spaced at approximately 200 feet intervals.
3. Road Design Standards. ECLUR Section 4 -620:
The proposed road is estimated to carry an average of 160 vehicle trips per day. This volume corresponds
to the Eagle County Rural Minor Collector, Type V standard. This road would have 10 -foot paved driving
lanes with 3 -foot gravel shoulders on each side.
8
08/30/2011
The Applicant has requested variances to geometric road design standards as listed in the table below. The
variances are shown in bold underline type. In addition, they are requesting a variance from the maximum
road speed. The ECLUR recommends a design speed for this type of road of 20mph. The Applicant is
proposing a design speed of 10mph.
•
Standard Eagle County Standard Proposed Variance Request
Structural Section 3" Hot Bituminous Pavement 6" Aggregate Base Course
8" Aggregate Base Course
Lanes 2 1 with inter - visible pullouts
ROW Width 50' 30'
40' at pullouts
Minimum Lane Width 10' 10'
Minimum Shoulder Width 2' 2'
Design Speed 20 mph 10 mph
Maximum Grade 8% 8%
Rural Cul -de -Sac Dual Access to Public Roadway Utilization of a Rural Cul -de-
Required (Section 4- 620.J.1.h) Sac that conforms to the
standards in Section 4- 620.D.10
Eagle County Comprehensive Plan
As the proposed variance is for an existing road accessing existing residences, there is no direct impact per
the comprehensive plan.
C. STAFF FINDINGS:
Section 4 -600 of the ECLUR defines the purpose of improvement standards as the minimum design criteria
and standards for infrastructure development in unincorporated Eagle County. The criteria and standards
are intended to protect and promote the public health, safety and welfare of the residents and visitors of
Eagle County.
Further, Section 4- 610.A.2 of the ECLUR states:
Standards Are Not Inflexible. These design criteria and standards provide a certain level of
performance, however, they are not inflexible. If an alternate design, procedure, or material can
be show to provide performance and /or environmental sensitivity which reflects community values
equal to or better than that established by these standards, said alternative may be recommended
for approval by the County Engineer. In evaluating the proposed alternate the County Engineer
shall follow the procedures in Section 5 -260. G., Variance From Improvement Standards. The
County Engineer's evaluation shall consider whether the alternative will provide for an equivalent
level of public safety and whether the alternative will be equally durable so that normally
anticipated user and maintenance costs will not be increased.
However, we must also consider that the Board of County Commissioners has adopted Resolution No.
2009 -115 in response to numerous and substantial public safety concerns recommending strict enforcement
of the ECLUR Improvement Standards with the opportunity for the applicant to appeal to the board for a
Variance to these Standards.
It is the opinion of the Engineering Department that if the BoCC finds that a Variance to Improvement
Standards is justified, the sub - standard geometric features of the proposed road can be mitigated.
Board of County Commissioners Findings
The Board of County Commissioners must make the following finding in order to approve or deny this file:
(ECLUR 5- 260.G.2.)
9
08/30/2011
Findings for Variance from Improvement Standards Request
In determining whether to approve, approve with conditions, or disapprove the application for
Variance from Improvement Standards, the Board of County Commissioners shall balance the
hardships to the applicant of not granting the Variance against the adverse impact on the health,
safety, and welfare of persons affected, and the adverse impact on the lands affected. In approving
or approving with conditions that are necessary to ensure compliance with the terms of this
Subsection, these Regulations, and the Comprehensive Plan.
D. BOARD OF COUNTY COMMISSIONERS OPTIONS:
1. Approve the [VARIANCE] request without conditions if it is determined that the petition will not
adversely affect the public health, safety, and welfare and the proposed use is attuned with the
immediately adjacent and nearby neighborhood properties and uses and the proposal is in compliance
with both the Eagle County Land Use Regulations and with the guidelines of the Eagle County
Comprehensive Plan (and/or other applicable master plans).
2. Deny the [VARIANCE] request if it is determined that the petition will adversely affect the public
health, safety, and welfare and/or the proposed use is not attuned with the immediately adjacent and
nearby neighborhood properties and uses and the proposal is not in compliance with both the Eagle
County Land Use Regulations and with the guidelines of the Eagle County Comprehensive Plan
(and/or other applicable master plans).
3. Table the [VARIANCE] request if additional information is required to fully evaluate the petition.
Give specific direction to the petitioner and staff.
4. Approve the [VARIANCE] request with conditions and/or performance standards if it is
determined that certain conditions and/or performance standards are necessary to ensure public, health,
safety, and welfare and/or enhances the attunement of the use with the immediately adjacent and
nearby neighborhood properties and uses and the proposal is in compliance with both the Eagle County
Land Use Regulations and with the guidelines of the Eagle County Comprehensive Plan (and/or other
applicable master plans).
SUGGESTED CONDITIONS:
1. Except as otherwise modified by these conditions, all material representations of the Applicant in
this application and all public meetings shall be adhered to and considered conditions of approval.
2. All conditions as detailed in the Engineering Department memorandum dated July 26, 2011 shall
be adhered to.
DISCUSSION:
Mr. Schroeder presented the request. In August 2007, flooding on Seven Castles Creek Road dislodged the
main access bridge on the east side of the property, and since then the homeowners have been forced to use the
west side access to get to and from their homes. The homeowners have been actively working with both the DOW
and US Forest Service to obtain and secure a permanent access. The applicant was proposing access for the 8
existing residential lots with the possibility of 8 future accessory dwelling units that would generate approx. 160
vehicle trips per day. The property was zoned Rural Resource. The dual access standard required two points of
access from any residential area to a public road. The applicant was requesting a variance from this standard as it
was not cost effective. The Fire Protection District inspected the road and believed it was a serviceable road in the
event of an emergency. Not having a dual access would require an emergency turn around points. He presented
the two suggested conditions.
Tom Newland presented some photos of the east access area and former bridge. The temporary
access /west side was the road they would like to use as permanent access. They did not plan on doing any cut or
10
08/30/2011
fill or widening of the existing temporary road access. Their intent was to simply place the pullouts and al l weather
surface to make the road serviceable. He spoke about changing the entrance to Frying Pan Road to eliminate the
need to bring the road across the adjacent property owner's property.
Commissioner Fisher asked if the Silver's adjacent property owners would use the same entrance.
Mr. Newland stated that they already had an existing paved access and the two would be right next to each
other.
Chairman Stavney opened public comment.
Bernard Silver, adjacent property owner thanked the applicant for their considerations. He agreed with the
relocation of the road but asked that there be a 100 ft. setback for the trash receptacles to the west side of the culvert
to preserve the views. If the two roadways were to join at the Frying Pan apron, they would have no objections.
Commissioner Fisher understood the trashcan issue. She stated that the board could add the condition but it
would also need to be approved by the local trash hauler.
Commissioner Runyon asked it the applicant had proposed a pedestrian bridge for emergency access.
Mr. Newland stated that there was an old stage road out of the subdivision heading west that could be used
in the event of an emergency.
Commissioner Runyon believed that this was a reasonable solution.
Commissioner Fisher wondered if there were larger animals being housed at any of the residences. She
thought that getting horses safely out should be considered as well.
Chairman Stavney proposed a condition regarding the trash area meeting the 150 ft. request from the
Frying Plan Road and that the applicant work with staff and DOW and Silver's to secure an easement from the
DOW or negotiate an easement on the Silver's property.
Commissioner Runyon moved to approve file no. VIS -3325 — Seven Castles Creek Road Association with
the proposed conditions
Commissioner Fisher seconded the motion. The vote was declared unanimous.
Transportation Planning/Roaring Fork Transportation Authority Bus Rapid Transit
Dan Blankenship, RFTA Executive Director and Greg Schroeder, Engineering
Chairman Stavney noted that the board was aware of the challenges that RFTA faced from a
regulatory standpoint adhering to the bounds of their grant from the Federal Government. The board
directed staff to review what made the most sense for the future.
Mr. Schroeder spoke about proposed development impacts, existing and future background traffic, and
present intersection conditions. The traffic counts indicated that the El Jebel Road and Hwy 82 intersection was the
busiest intersection within the county and would not handle long -term traffic levels. The partners included Eagle
County, Pitkin County, CDOT, town of Basalt, Crown Mountain, RFTA, Crawford Properties, and Sopris Village
Subdivision. The county was undertaking an intersection feasibility study to determine the best long -term options.
$25,000 was funded through the capital improvement - funding program. He spoke about some of the existing
intersection deficiencies. Crown Mountain presented a roundabout concept. However, this option could still cause
traffic to back up on Hwy 82. He presented some preliminary options but noted that they had not had the chance to
look at the operational analysis, or impacts these options might have. Option A was to develop a roundabout,
which would require some reconfiguration of the proposed park n ride. Option B was similar to option A, but had
additional lineage. Option C was a T- configuration as compared to a roundabout and rerouting Valley Road to the
south, and reconfiguration of Sopris Village Drive. The last configuration was to install a roundabout, making East
Valley Road a left turn and adding another T- intersection.
Chairman Stavney wondered if there were any options for West Valley Road.
Mr. Schroeder stated that these were preliminary options. In the upcoming weeks, a consultant would
further review the options.
Commissioner Runyon stated that he noticed that with all the options there was no interface with CDOT. It
seemed as though there would be no changes to Hwy 82.
11
08/30/2011
Mr. Schroeder stated that one of the challenges of putting roundabouts on main line 82 is it would slow the
overall operations.
Commissioner Runyon believed this might be an application for a significantly larger diameter roundabout.
He believed there may be other possible options.
Chairman Stavney wondered if any options were considered using the existing parking lot at the
community center for a roundabout and that there be shared parking with RAFT on the other side.
Mr. Schroeder stated that this option would be considered.
Dan Blankenship stated that RFTA had executed their grant application and funds were available. They
were eager to begin the process of constructing the project and having it up and running by 2013. It was critical for
them to get through these processes and get the required building permits. Any delays could mean a loss of
funding. They were concerned with changes to the project that could increase the costs and put the project in
jeopardy in terms of funding. He presented their goals for transit success and explained why bus rapid transit was
necessary.
Chairman Stavney wondered if there would be a way to plan this part of the site better that would not
change the total cost.
Mr. Blankenship believed timing was critical. It was important to note that any additional cost above the
46 million would come out of the local side of the equation. He believed their project was lean. They had been
vigilant about the cost and would like to deliver the project that they promised voters. It was a complicated process
and they hoped to get cooperation from all the jurisdictions they serve.
Chairman Stavney asked Mr. Schroeder if he and CDOT were a part of review process for the locations
proposed by RFTA.
Mr. Schroeder stated that there were some meetings attended by some of the Planning Department but he
was not directly involved with the initial discussions.
Mr. Blankenship stated that they were in contact with CDOT due to the location of the down valley station.
They did an analysis internally and CDOT was part of the review process. They believed their proposal was ideal
from a transit standpoint.
Commissioner Fisher believed that the plan did not consider pedestrian traffic crossing Valley Road.
Mr. Blankenship stated that re- routing Valley Road would be an advantage. He wondered if there was a
way for them to move forward without precluding the other options and wondered whether the other options were
so imminent that it would be a waste of funds for them to move forward.
Chairman Stavney believed there was a potential synergy for the park n ride being placed near the
Crown Mountain and County facilities.
Mr. Blankenship believed that was a big consideration due to the timing and when these facilities would be
built.
Chairman Stavney stated that the county was working towards solving the traffic circulation and to some
degree the pedestrian safety.
Commissioner Runyon stated that he had always been a supporter of the BRT but believed that RFTA was
not allowing time to address the intersection issues.
Mr. Blankenship stated that they'd been through a planning process and they would like to deliver the
project they promised the voters. He didn't think that was being contrary. They were merely requesting a time
table.
Chairman Stavney believed that RFTA was furthest along by years and he believed it was a fair question.
He wondered if it would jeopardize RFTA's funding if they re- located the park and ride and BRT station to the
other side of the access road.
Mr. Blankenship was uncertain about the funding or how the change would affect the budget. The
proposed site was believed to be the best location for the park and ride. They were trying to be efficient about how
they sent this out to bid. They could pull the park n ride lot out of the construction bid documents and move
forward without it, then come back in the future when things were resolved.
Mike Hurns, Project Manager stated that they were at 100% plans and 100% funding. If there were
changes made, they would have to start over. He believed a better way to go about this was to build what was
proposed and then re- design it later.
Commissioner Runyon believed that the worst -case scenario would be moving it in the future. Option A
would provide more parking and work well with RFTA's plans.
Mr. Hurns believed the phase approach was the best solution to everyone's issues.
Chairman Stavney appreciated RFTA's willingness to work with everyone.
12
08/30/2011
Mr. Blankenship stated that they were committed to working with the county and other partners.
Commissioner Fisher stated that sitting on the RFTA board had been educational. The BRT location was a
big part of the discussion. She wondered if there was a better solution before moving forward with the parking lot
that RFTA considered using the community center parking lot as temporary parking as it offered some connectivity.
Davis Spare, Crown Mountain planner stated that they understood the dilemma. They were trying to
convene a site planning session for Crown Mountain. They were waiting for their design concepts from their traffic
engineer. They would be happy to invite RFTA to participate in those conversations.
Robert Hubble, CEO of Crawford properties stated that parking was in great demand especially during the
ski season. The current park n ride exceeded 150 cars. He supported the idea of shared parking with the community
center.
Cedar Drive Improvement District
Greg Schroeder, Engineering
Mr. Schroeder stated that the county had received a petition for formation of a Local Improvement District
(LID). The request was for $155,000 that would be paid back over 10 years. He presented the timeline. He
explained the Federal Hazard Elimination Grant program process. The grant funds projects to improve the safety of
high accident locations. The grant was administered by CDOT. Eagle County applied for the $1.3 million dollar
grant, 90% of the improvements would be funded by the grant and 10% would be funded locally. The grant
required perpetual maintenance of the improvements. The county required a special, local, or metropolitan
improvement district formation. He explained the Federal Hazard Elimination Grant process. He showed a map of
the road and explained the current condition of the road. He spoke about the financial impact on the county. The
petition was requesting $155,000 for the 28 parcels listed in the petition. The money would be paid to the county in
10 -year assessments of $15,500. The petition received by the board had 17 yes votes and there were still 11 people
that had not signed.
Carl Hanlan spoke on behalf of the Cedar Drive homeowners. He spoke about the last HOA meeting in
early August. There was a limit to the money that could be spent on design. He spoke about the split in the road
and the various road standards that would apply. Transaction costs were very different for special districts.
Commissioner Fisher opened public comment.
Robi Garcy requested that the votes be proportionate to the financial obligation.
Bob Meyers believed that the local improvements district was not based upon the number of properties and
the number of votes. It was based on the value of the properties.
Mr. Hanlan stated that any amendment to the LID would require the board's approval.
Jerome Osentowski signed on because he would like to see some improvements to some dangerous areas
on the lower road.
Robb Janssen wondered if there was damage caused by a rockslide, or mudslide, would the homeowners be
responsible for the repairs.
Chairman Stavney stated that the LID as it was formed could not fund those repairs and create more of a
burden on the homeowners. However, the metro district board could vote to make an assessment.
Mr. Hanlan stated that there was a maintenance component.
John Katzinburger, 32 -year resident spoke. He sees this as a significant burden and a reduction in his
property value. He believed that any fatalities on the road had likely been operator error. He did not believe that
making the road wider and smoother might not make it safer. He questioned the county's responsibility for its
portion of the road.
Mr. Schroeder explained that there were many county roads that were not maintained by Eagle County. As
subdivisions are built associations are formed such as metropolitan district, or special districts that take on the
maintenance of these roads.
Mr. Morris believed it was important to note the difference between the construction of a road and the
maintenance of a road. He explained that the county did not build roads. New roads were typically built as a part
of a new development and paid for by metropolitan districts. He believed this was one heck of a good deal and the
road improvements would benefit everyone living on the road.
13
08/30/2011
Janet Lightfoot stated that they were in the process of finding out the total costs including the application
for a variance.
Chairman Stavney closed public comment.
Chairman Stavney stated that he understood the concerns. He believed this was an important first step.
Commissioner Fisher believed this was a stepping- stone. She understood the expense but believed any
road improvements would increase the homeowner's property value in the future. It was not feasible for the county
to pay for the road improvements. She was proud of the homeowners for stepping up. She encouraged the
homeowners to work collaboratively.
Commissioner Runyon moved to table the file until September 13, 2011 and direct staff to form a
resolution approving the Cedar Drive Local Improvement District and accepting the petition.
Commissioner Fisher seconded the motion. The vote was declared unanimous.
There being no further business before the Board, the mee ` g ' . s adjourned un September 6, 2011.