Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR00-068 final release of collateral for Western Slope UtilitiesY
6
Commissioner moved adoption
of the foll Resolution:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 2000-
FINAL RELEASE OF COLLATERAL
AND
TERMINATION OF THE WARRANTY PERIOD
FOR
WESTERN SLOPE UTILITIES
WHEREAS, on or about April 20, 1998, pursuant to C.R.S. §30-
28 -137, the Board of County Commissioners of the County of Eagle,
State of Colorado (Board) granted Road Cut Permit #2485 (Permit)
to Western Slope Utilities (Western Slope) for work at 136 Juniper
Lane, Eby Creek Mesa Subdivision; and
WHEREAS, in order to guarantee the faithful completion of
certain public improvements required under the Permit, the Board
accepted as collateral an Assignment of Certificate of Deposit No.
100001136, Colorado Community First National Bank, in the amount of
$1,750.00; and
WHEREAS, Western Slope has represented to the Board, and
members of the County staff have corroborated those representa-
tions, that the improvements have satisfactorily survived the two -
year warranty period; and
WHEREAS, Western Slope has applied for a full release of its
collateral;
WHEREAS, based upon the written recommendations of the
Engineering Department, attached hereto as exhibit "A ", the Board
finds that the improvements have satisfactorily survived the two -
year warranty period, and the full release of the Assignment of
Certificate of Deposit No. 100001136, Colorado Community First
National Bank, in the amount of $1,750.00 is appropriate.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, the Board hereby authorizes the full and final release
of collateral as said Assignment of Certificate of Deposit No.
100001136 in the amount of $1,750.00. and the termination of the
warranty period for Western Slope.
0
THAT, the Board hereby authorizes Colorado Community First
National Bank to release the security represented by the Assignment
of the Certificate of Deposit Number 100001136 in the amount of
$1,750.00.
THAT, this document shall be recorded in the Records of the
Eagle County Clerk and Recorder, which shall be evidence that the
warranty period for Western Slope has been successfully completed
and that the obligations under Road Cut Permit # 2485 are complete.
THAT, the County will not be accepting maintenance responsi-
bilities for those improvements associated with this Road Cut
Permit.
MOVED, READ AND ADOPTED by the Board of County Commissioners
of the County of Eagle, State o Colorado, at its regular meeting
held the day of ti . -G 1,r_ 2000.
'; O
-7
ATTEST:
1`
°
Clerk to the Board of "` f Tom 1 C. Stone
County Commissioners Chairman
v
Commissioner ° �� ; , seconded adoption of
foregoing resolution, The roll having been called, the vote wa
follows:
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
.BOARD OF COUNTY COMMISSIONERS
Commissioner
the
s as
Commissioner Tom C. Stone `, r
Commissioner Michael L. Gallagher
Commissioner Johnnette Phillips
This Resolution passed by 'firm %� '.; -- vote of the Board of
County Commissioners of the County of Eagle, State of Colorado.
nlr \r \western slope - release of collateral
Mfchaer" L" (1allaghe
Commissioner
d
MEMORANDUM
EAGLE COUNTY ENGINEERING
TO: Nancy Lewis, Attorney's Office
FROM: Karen A. Filter, Public Works Inspector
DATE: 3/6/00
RE: Permit #2485 for Construction in the Public Way of Eagle
County
The requested correction at 136 Juniper in Eby Creek Subdivision
has been completed, inspected and approved for collateral release,
represented by a letter of credit in the amount of $1750.00.
cc: Helen Migchelbrink, acting Eagle County Engineer
Chrono / file