HomeMy WebLinkAboutR13-102 Wolcott PUD Zone Change and Preliminary Plan Approval 2
ti adoption co)Commissioner moved ado tion 0 a.
• o `� of the following Resolution: N N N
N
r N 0 � O
N `-- BOARD OF EAGLE COUNTY COMMISSIONERS N -
COUNTY OF EAGLE,STATE OF COLORADO
RESOLUTION NO.2013 - O
�C/ O
O c
O o 0
c o 0
S E $ °o APPROVAL OF THE ZONE CHANGE AND PRELIMINARY PLAN o . to of °
U in co: FOR THE WOLCOTT PLANNED UNIT DEVELOPMENT v ° `r
CD
v,w O FILE NO's. ZC-3881 and PDP-3830 w i- are 0
w H o- ix 0
WHEREAS,on or about June 19, 2012,the County of Eagle,State of Colorado,accepted for
filing an application submitted by Community Concepts Colorado, LLC (hereinafter"Applicant")to
rezone the herein described property,more particularly described in the legal description attached
hereto as Exhibit"A",located in unincorporated Eagle County from the Resource [R] and
Commercial Limited [CL] Zone Districts to the Planned Unit Development[PUD] Zone District, File
No.ZC-3881,as well as, approval of the Preliminary Plan for the Wolcott PUD, Eagle County File No.
PDP-3830.
WHEREAS,the Applicant requested approval of a Preliminary Plan for PUD which allows
the creation of a new unincorporated community of approximately 373 acres,inclusive of the
following components:
1) 577 residential units
2) 156,500 square feet of retail, office and service commercial uses
3) Approximately 138-acres of privately owned active and passive open space;which is 37%
of the total land area encompassed by the Planned Unit Development
4) Emergency service facilities
5) Water and Wastewater Treatment Facilities
6) Approximately 1.7 miles of the Eagle Valley Trail System
7) Managed public angling access to the Eagle River
8) Family Barn
9) Riverfront Park
v o c
0
to
10)Municipal and Community uses N o o T.'0
O
WHEREAS,at its public hearings held on September 13, 2012,September 20, 2012,October F. o o 8 o
3, 2012,October 17, 2012, November 7, 2012, December 5, 2012, December 19, 2012,January 2, z o a
2013,January 16, 2013,and February 20, 2013 the Eagle County Planning Commission,based on its s e . Y
findings,recommended approval of the proposed Zone Change and PUD Preliminary Plan by a vote
�o
of 4:3; and,
�
,4 L V T
WHEREAS,the Board of County Commissioners (hereinafter the"Board") of the County of N ° M
Eagle,State of Colorado,conducted public hearings for the Wolcott PUD Preliminary Plan and Zone .21 a N
Change on April 23, 2013,April 30, 2013, May 7, 2013, May 15,2013,May 20, 2013,June 26, 2013, F L y
and July 22, 2013; and,
This is a re-recording of the Board of Eagle County Eagle County, CO 201400179
Commissioners Resolution No. 2013-102 recorded Teak J Simonton 01/06/2014
October 21, 2013, at Reception No.201321302 (the Pgs: 168 11:00:29 AM
"Original Recording")to correct certain clerical errors. REC: $0.00
This recording fully replaces the Original Recording. DOC: $0.00
WHEREAS,based on the evidence,testimony, exhibits,and study of the Comprehensive
Plan for the unincorporated areas of Eagle County and the Wolcott Area Community Plan,
comments of the Eagle County Planning Department,comments of public officials and agencies,the
recommendation of the Eagle County Planning Commission,and comments from all interested
parties,the Board of County Commissioners of the County of Eagle,State of Colorado,finds as
follows:
That proper publication and public notice was provided as required by law for hearings before the
Eagle County Planning Commission,and the Board;and,
Pursuant to Eagle County Land Use Regulations,Section 5-240.F.3.e,Standards for review of a
Sketch Plan and Preliminary Plan for a PUD:
(1) Unified ownership or control. The title to all land that is part of a PUD IS owned or
controlled by one(1)person.
(2) Uses. The uses that may be developed in the PUD ARE those uses that are designated as uses
that are allowed, allowed as a special use or allowed as a limited use in Table 3-300,
'Residential, Agricultural and Resource Zone Districts Use Schedule", or Table 3-320,
"Commercial and Industrial Zone Districts Use Schedule",for the zone district designation in
effect for the property at the time of the application for PUD. Variations of these use
designations HAVE BEEN authorized pursuant to Section 5-240 F.3.f, Variations Authorized.
(3) Dimensional Limitations. The dimensional limitations that shall apply to the PUD ARE those
specified in Table 3-340, "Schedule of Dimensional Limitations", for the zone district
designation in effect for the property at the time of the application for PUD. Variations of
these dimensional limitations HAVE BEEN authorized pursuant to Section 5-240 F.3.f,
Variations Authorized.
(4) Off-Street Parking and Loading. 0ff-street parking and loading provided in the PUD DOES
comply with the standards of Article 4, Division 1, 0ff-Street Parking and Loading Standards.
A reduction in these standards HAS BEEN authorized.
(5) Landscaping. Landscaping provided in the PUD DOES comply with the standards of Article 4,
Division 2, Landscaping and Illumination Standards. Variations from these standards HAVE
BEEN authorized.
(6) Signs. The Applicant HAS submitted a comprehensive sign plan for the PUD that is
determined to be suitable for the PUD and provides the minimum sign area necessary to direct
users to and within the PUD.
(7) Adequate Facilities. The Applicant HAS demonstrated that the development proposed in the
Preliminary Plan for PUD will be provided adequate facilities for potable water supply,sewage
disposal, solid waste disposal, electrical supply, fire protection and roads and will be
conveniently located in relation to schools, police and fire protection, and emergency medical
• services.
2
(8) Improvements. The improvements standards applicable to the development ARE as specified
• in Article 4, Division 6, Improvements Standards. Provided, however, portions of the
development WILL deviate from the County's road standards, so the development achieves
greater efficiency of infrastructure design and installation through clustered or compact forms
of development or achieves greater sensitivity to environmental impacts.
(9) Compatibility with Surrounding Land Uses. The PUD IS generally compatible with the
existing and currently permissible future uses of adjacent land and other lands, services or
infrastructure improvements that may be substantially impacted.
(10) Conformance with Comprehensive Plan. The PUD IS in substantial conformance with the
Eagle County Comprehensive Plan, Area Community Plans, and any applicable ancillary
County adopted documents pertaining to natural resource protection, affordable housing or
infrastructure management.
(11) Phasing. The Preliminary Plan for PUD DOES include a phasing'plan for the development as
approved by the Board of County Commissioners in the Resolution of approval and as attached
to the PUD Agreement as Exhibit"C".
(12) Common Recreation and Open Space. The PUD DOES comply with the common recreation
and open space standards set forth in the Eagle County Land Use Regulations.
(13) Natural Resource Protection. The PUD DOES consider the recommendations made by the
applicable analysis documents,as well as the recommendations of referral agencies as
• specified in Article 4,Division 4,Natural Resource Protection Standards.
Pursuant to Eagle County Land Use Regulations Section 5-280.B.3.e.Standards for
review of a Sketch and Preliminary Plan for Subdivision:
(1) Consistency with Comprehensive Plan. The PUD IS consistent with the Eagle County
Comprehensive Plan and the Future Land Use Map (FLUM) of the Comprehensive Plan.
(2) Consistent with Land Use Regulations. The proposed subdivision DOES comply with all of
the standards of this Section and all other provisions of these Land Use Regulations,
including,but not limited to,the applicable standards of Article 3,Zone Districts,and Article
4,Site Development Standards.
(3) Spatial Pattern Shall Be Efficient. The proposed subdivision IS located and designed to
avoid creating spatial patterns that cause inefficiencies in the delivery of public services, or
require duplication or premature extension of public facilities, or result in a "leapfrog"
pattern of development.
(4) Suitability for Development. The property proposed to be subdivided IS suitable for
development, considering its topography, environmental resources and natural or man-
141)
3
made hazards that may affect the potential development of the property, and existing and
• probable future public improvements to the area.
(5) Compatibility with Surrounding Uses. The proposed subdivision IS compatible with the
character of existing land uses in the area, and SHALL NOT adversely affect the future
development of the surrounding area.
Pursuant to Eagle County Land Use Regulations,Section 5-230.D.Standards for Zone Change:
1) Conformance with the Comprehensive Plan. The proposed change in zoning IS in
substantial conformance with the purposes, intents,goals and policies of the Comprehensive
Plan.
2) Compatible with Surrounding Uses. The proposed change in zoning IS compatible with the
type, intensity, character and scale of existing and permissible land uses surrounding the
subject property. Dimensional limitations of the proposed zone district, when applied, WILL
result in development that will be harmonious with the physical character of existing or
permissible uses surrounding the subject property.
3) Public Benefit. The proposed change in zoning DOES ADDRESS demonstrated community
needs or otherwise result in one or more particular public benefits that offset the impacts of
the proposed uses requested, including but not limited to: Affordable local resident housing;
childcare facilities;transportation efficiencies,public recreational opportunities;
• infrastructure improvements;preservation of lands of high conservation value,senior housing,
or medical facilities.
4) Change of Circumstances. The proposal change in zoning DOES ADDRESS or respond to a
beneficial material change that has occurred to the immediate neighborhood or to the greater
Eagle County community.
5) Adequate Infrastructure. The property subject to the proposed change in zoning WILL BE
served by adequate roads, water,sewer and other public use facilities.
NOW,THEREFORE,BE IT RESOLVED by the Board of County Commissioners of the County
of Eagle,State of Colorado:
THAT, the application of Community Concepts Colorado for approval of a Zone Change and
for approval of a Preliminary Plan for the Wolcott Planned Unit Development be and is hereby
APPROVED, for the property, more particularly described in the legal description attached hereto
as Exhibit"A",located in unincorporated Eagle County; and,
f.tc fi 2013
THAT,the approved Wolcott PUD Guide, dated is attached hereto as Exhibit"B": and,
THAT,the approved Wolcott Planned Unit Development Agreement(the"PUD
Agreement"),dated together with all associated exhibits,is attached hereto as Exhibit
111 "C"; and, O tI 1 O r
4
THAT,a map showing the location of the proposed construction of a piped ditch and trail,
• referenced in condition 35 below, is attached hereto as Exhibit"D"; and,
THAT, this Resolution shall serve as an agreement binding the Wolcott Planned Unit
Development to the following conditions:
Standard Condition:
1) Except as otherwise modified by this development permit,all material representations made by
the Applicant in this application and in any public meeting shall be adhered to and considered
conditions of approval.
Wildlife:
2) Per the Division of Parks and Wildlife;the open space proposed south of Interstate-70 shall be
restricted with a seasonal closure to all human and domestic animal activity between December 1st
and April 15th with the following exceptions: i) roadways designed for emergency vehicular traffic
which may also accommodate non-motorized use; ii) ingress/egress to a potential buried water
tank location only by authorized personnel,and; iii)access to G.Jouflas`Resource'zoned lands
located adjacent to,and outside of the PUD Boundary.The adjacent G.Jouflas property is limited to
only uses-by-right in the Resource Zone District.Closure dates may be changed upon agreement of
the County,the developer,and the DPW based upon existing conditions,in particular,snow depths.
The Conservation Easement will include language that matches this condition.
Colorado Geological Survey:
• 3) Prior to Final Plat approval for development on the south side of Interstate-70,and immediately
following Preliminary Plan approval,a minimum of two inclinometers and a series of piezometers
shall be installed and monitored at least once per quarter until application for each respective Final
Plat.This data should be evaluated for global and post-development stability by the applicant's
geotechnical engineer and submitted for review with the Final Plat for each phase.To the extent
reasonably feasible,data from existing inclinometers and piezometers located south of the subject
property should likewise be collected on a quarterly basis.Based upon the data collected the road
alignments,lot location and lot configurations may need to be revised to avoid areas of instability.
4) Building envelopes shall be defined on lots south of Interstate-70,where slope gradients on any
portion of the lot exceed 25%in Planning Areas PA-1, PA-2, PA-3,and PA-4.
5)Written restrictions,within the PUD Guide and on the respective applicable Final Plat(s)shall be
clarified to exclude`active'recreational uses,uses that allow significant grading,or the construction
of occupied structures within Planning Areas PA-23,PA-24, PA-26,and PA-27.PA-25 is for active
recreation.Potentially,a future buried water storage tank may be required within one of the
following planning areas (PA-23, PA-24, PA-25, PA-26,and PA-27). In the event that a buried water
storage tank is required within one of these planning areas,then it shall be subject to site specific
hydraulic and geologic analyses.
6) Concurrent with each applicable Final Plat south of Interstate-70,grading plans shall be
evaluated for slope stability by a geotechnical engineer; a slope stability analysis shall be prepared
• for permanent and temporary cuts or fills greater than five feet in height,or in areas where grading
5
is proposed and existing slope gradients are 25%or greater; stormwater drainage plans shall be
• reviewed by the Applicant's Geotechnical Engineer.
7)Within Planning Area PA-2,which is a proposed large lot subdivision,the geotechnical
evaluation shall be done prior to issuance of building permits,grading permits,or driveway
permits.
8) Soil constraints relative to public improvements will require additional testing and evaluation;
these concerns shall be addressed prior to approval of each respective Final Plat. For individual
buildings,a site-specific soils and foundation investigation shall be required prior to building
permit issuance for every building.
Engineering Department:
9)Applicant will fully fund an Engineering Services Contract up to$200,000 for a US 6 Corridor
Access Control Plan as defined by CDOT.Project limits will include the western boundary at the
Town of Eagle to the eastern boundary at Squaw Creek Road and north to Landfill Road on SH131.
Funds will be provided by the applicant at the time of Request for Qualification (RFQ) award,but no
earlier than March 2014,and be deposited into an Eagle County Escrow Account.If Eagle County
does not award the RFQ contract within 4 years of PUD approval,the Applicant will be released
from this condition.Eagle County will be fully responsible for the management of the US 6 Corridor
Access Control Plan Project.
10)A major vision for the Wolcott PUD is the relocation of US Hwy 6,and improvement to the
Interstate-70 Wolcott Interchange ramp improvement. Prior to approval of the first Final Plat,the
• CDOT shall approve,and the Federal Highway Administration (FHWA) shall concur with,the Minor
Interchange Modification Request(MIMR).CDOT shall approve the relocation of US Hwy 6.
11)As the applicant on the CDOT 1601 process and the associated Federal Highway Administration
(FHWA) Minor Interchange Modification Request(MIMR)process, Eagle County is obligated to
make the improvements identified in the approved Minor Interchange Modification Request
(MIMR) and System Level Traffic Study.Concurrent with application for the first Final Plat for PUD
which incorporates Phase I infrastructure,the Wolcott PUD should include all on-site
improvements and direct access requirements identified in the MIMR and System Level Traffic
Study.
12) The current PUD Guide and Allowable Use Table allow land uses that generate much higher
traffic than was analyzed in the November 2012 System Level.Any proposed changes in land use
that differ from the land uses that were analyzed in the November 2012 System Level Traffic Study
for Wolcott PUD will include a new traffic analysis to ensure compliance with the ECLUR.
13) Final engineering of the proposed roadways,intersections,and accesses depicted in the traffic
study and conceptual site plan has not yet been completed and will require Engineering
Department approval. However,the location and geometry of the proposed access points on US
Highway 6 has been completed. Engineering considerations may necessitate minor changes to the
Applicant's access geometry,but not access locations on US Highway 6.Approval of the traffic study
and improvement concepts does not constitute approval of any design variances implied in the
Applicant's proposal.Adequate sight distance must be provided at all locations. Design variances
have been discussed and approved in a separate discussion with the Board of County
•
Commissioners and duly noted as part of the record.
6
• 14) East/West Parking Access and Old Town intersection will be constructed as a two-way stop
control.After construction, should traffic operations at this intersection no longer meet a Level of
Service'D',the contingency plan will be a right-in,right-out.
15)The Applicant or Wolcott Metropolitan District agrees to comply with the terms and conditions
of the Colorado State Highway Access Code and be fully responsible for the design and construction
of a westbound right turn deceleration lane at the intersection of East Davis Way and U.S. Hwy 6 if
and when warrant volumes are ever met.
16) The Applicant agrees to construct a single lane roundabout at the intersection of Bellyache
Ridge Road and Sporting Clay as part of their Phase 1 infrastructure. Final design must meet all
County site development standards.
Fire Protection Districts:
17) The Eagle River FPD,and the Greater Eagle FPD recommend that fire hydrant locations be
included in the infrastructure construction plans.The Applicant shall further coordinate the
location of fire hydrants with the Districts to ensure adequate spacing and accessibility.Additional
fire hydrants shall be provided at the intersections of US Hwy 6,and W. Davis Way,Olde Town
Avenue,the access into Tract 203 (PA-32), E.Davis Way and Meadow Trail just outside the highway
right-of-way as labeled on the Preliminary Plan Engineering drawings.Additional fire hydrants
shall also be provided along Bellyache Ridge Road near Lots 119 and 120 (PA-5 and PA-6).
18)The Eagle River FPD,and the Greater Eagle FPD indicate that site specific information is not
presently available for Lots 118, 119, 120,or Tracts 202 and 203 (PA-5, PA-6,PA-19, PA-14, PA-17,
PA-21, PA-32).The Districts reserve the right for a more extensive review of each of these parcels
prior to their individual development.The Applicant has been informed that additional hydrants
may be warranted at that time depending on the size of the buildings,type of construction,and
accessibility for emergency vehicles.Site designs will also need to consider the accessibility and
routing of emergency vehicles.
19)The roadways for Preservation Way and Wolcott Lane shall be adjusted to provide a minimum
travel width for emergency vehicles of 20 feet. If the Applicant desires to maintain these roads for
one-way traffic,then a portion of the roadway may be striped for emergency use,or as a bicycle
lane.
20)The Eagle River FPD,and the Greater Eagle FPD indicate that the roadway widths for W./E.
Olde Town Avenue,W./E.Woodson lane,and W./E.Bentley Lane are adequate provided that the
Applicant includes a 60 foot long, 6 foot wide Emergency Access pullout on the left hand side of
each roadway at the mid-block. Each pullout may be raised with a mountable curb and shall have a
hardscape surface.
21)The parking lots on Tract 204 (PA-10) as shown on the Preliminary Plan Engineering drawings
shall be interconnected with hardscape surfaces to allow emergency vehicles to travel between the
parking lots.From west to east,the 1st, 3rd,and 6th access shall be modeled and adjusted as
necessary to provide sufficient ingress/egress for a 75 foot Quint single-axel fire truck.The
Applicant shall provide evidence that sufficient width is also available for the Quint outrigger.
7
22)The Eagle River FPD and the Greater Eagle FPD indicate that if a restaurant or similar building
is to be constructed on Open Space 516 (PA-21)per the Preliminary Plan Engineering drawings,
then emergency access will be required to accommodate a District tool truck and ambulance.The
maximum grade of the emergency access shall not exceed 10%without approval by the Districts
and the access shall be equipped with a hammerhead or modified hammerhead turnaround.A
standpipe shall be extended from Preservation Way down to the restaurant which allows a District
truck to pump fire protection water down to the firefighting team.
23)The Eagle River FPD and the Greater Eagle FPD indicate that Davis Loop will be converted to a
dead-end road.As such,the road shall have a minimum travel width for emergency vehicles of 20
feet and be equipped with a hammerhead or modified hammerhead turnaround.
24) The Applicant or Metropolitan District will be responsible for implementation of the Snow
Management Plan. The Snow Management Plan has been revised in accordance with the
Engineering Department memorandum dated February 1, 2013.
25) The Eagle River FPD and the Greater Eagle FPD indicate that all commercial,brownstones,and
multi-family buildings shall be equipped with automatic fire sprinkler systems. Standpipe systems
may also be required for buildings three or more stories tall.The requirement for standpipes shall
be individually assessed by the District at the time of building permit application.
26)The Eagle River FPD and the Greater Eagle FPD indicate that a reduction in required fire-flow of
up to 50%is allowed by the Districts when the building is provided with an automatic fire sprinkler
system.The resulting fire-flow shall not be less than 1,500 gallons per minute for the prescribed
duration as specified in Table B105.1 of the International Fire Code.The potable water storage
tanks shall reserve the same quantity for potable water for fire protection use. Based on the
Preliminary Potable Water Study,it appears that the maximum non-sprinkled rate would be 3,500
gallons per minute for three hour duration. By using automatic fire sprinkler systems in the
commercial,brownstone,and multi-family buildings,this requirement can be reduced to 1,750
gallons per minute for two hour duration.The equivalent fire protection storage would be 210,000
gallons.Also,the water used to supply the automatic fire sprinkler systems does not have to be
stored in addition to the 210,000 gallons,but instead may be drawn from the average daily use
storage.
Wildfire Mitigation:
27) Per the Wildfire Mitigation Manager;the Wildfire Hazard Assessment and Vegetation
Management Plan provided with the application calls for neighborhood specific wildfire mitigation
hazard evaluations in Planning Areas No. 1 and No.3 as development plans are finalized.Since
these two areas represent the portions of the PUD most at risk from negative wildfire impacts,it
will be important for the developer to look beyond site-clearing for defensible space and fire
resistant building construction.Vegetative fuel treatments (aka`fuel breaks')shall be identified
with each respective Final Plat for development in these areas.All wildfire mitigation measures
shall be accomplished in concert with the conservation easement values.
28) Per the Wildfire Mitigation Manager;as indicated during the Wolcott PUD Sketch Plan process,
an important element in the design of Planning Area PA-3 and Planning Area PA-1 is adherence to
Section 4-620.J.1.h.,Dual Access of the Eagle County Land Use Regulations.Any proposal for
development that requires access by a Rural Cul-de-Sac shall be required to obtain a variance from
• Section 4-620.J.1.h., Dual Access,as provided herein.The first final plat that creates building lots
8
within PA-1 or PA-3 shall include design drawings for an emergency access connection to PA-4,or if
• possible, directly to Bellyache Ridge Road.The emergency access route should exit PA-1 and/or PA-
3 at the southernmost location that is physically practical.This design shall be subject to review by
Eagle County and the relevant emergency service providers. Planning Area PA-2 shall include a
secondary emergency access connection to Bellyache Ridge Road.
Conservation Easements:
29)The applicant shall use its best efforts to ensure that the G.Jouflas riverfront parcel located
adjacent to the west side of the proposed PUD boundary be included in a Conservation Easement or
subject to restrictive covenant upon approval of the first Final Plat for the Wolcott PUD which
incorporates Phase I infrastructure.The Conservation Easement or restrictive covenant will protect
and preserve the existing values and uses of the property including open space,wetlands,and horse
pasture.Approval of this PUD and any final plat shall not be withheld on the basis of this condition
as this property is not in the applicant's control.
ECO Trails/Eagle Valley Trail:
30)The segment of the Eagle Valley Trail required by the Wolcott PUD shall adhere to the approved
route depicted in Exhibit J to the PUD Agreement,the"Wolcott Eagle Valley Trail and River Access
Plan",with minimal deviation as necessary to accommodate proper engineering design.
31) On property owned by Applicant within the Wolcott PUD Boundary,Applicant shall be
responsible for the cost and preparation of any and all studies,clearance reports,and construction
permits necessary or required by law to allow construction of the Eagle Valley Trail,as more fully
discussed in the PUD Agreement.
The Applicant agrees to provide or fund the preparation of the required studies, clearance reports
and permits in order for Eagle County to apply for necessary permits on behalf of the Wolcott PUD
for construction of the Segments I and II of the Eagle Valley Trail across BLM property,as more fully
discussed in the PUD Agreement.
The Applicant agrees to provide or fund the preparation of the required studies,clearance reports
and permits in order for Eagle County to apply for necessary permits on behalf of the Wolcott PUD
for construction of Segment III of the Eagle Valley Trail across CDOT property,as more fully
discussed in the PUD Agreement.
Eagle County will apply for a permit on the Applicant's behalf for Applicant to construct the western
end of the trail across CDOT property. Eagle County will pay the cost of any additional or further
studies necessary for the trail from the western boundary of the PUD to the Highway 131 guardrail.
Applicant agrees to cooperate fully and provide pertinent study or clearance information for the
Wolcott PUD to Eagle County to facilitate the permit application.
Approval of the first Wolcott PUD Final Plat shall not be withheld or prevent the Applicant from
developing and constructing subsequent phases of the project if CDOT or BLM deny trail
construction on their respective properties.
32) Segments I and II of the Eagle Valley Trail (the"Trail") shall be constructed to meet regional
trail construction standards outlined in the Eagle Valley Regional Trails Plan and the Eagle County
Land Use Regulation documents. Necessary retaining walls and railings should be similar in design
9
to existing trail system boulder walls,mechanically stabilized earth walls (mse) and steel railings.
• The Trail shall be constructed in accordance with the materials described in the construction plans,
or any revisions or addendums thereto. In the event the Applicant desires Eagle County to consider
and accept possible substitutions or'equivalent items',materials or construction for the Trail,
application for such acceptance shall be submitted to Eagle County,together with complete data
substantiating compliance of the proposed substitution with the construction plans.Substitutions
must be approved in writing by Eagle County.Substitutions not properly approved shall be
considered defective work.
Eagle County recognizes that Applicant will preserve a portion of the existing Highway 6 for use as
the trail and Applicant has no control over prior specifications or construction of the existing
highway. Eagle County reserves the right to inspect the highway section of trail and require asphalt
patching or crack sealing as needed prior to acceptance of the trail.
33) Eagle County shall approve the preliminary and final construction plans of Segments I, II and III
of the Eagle Valley Trail in its sole discretion. Eagle County shall have the right to inspect and
approve the completed construction of the Eagle Valley Trail,in its sole discretion.
34) Within the Wolcott PUD,the Applicant shall construct and dedicate the Eagle Valley Trail to the
public of Eagle County. As with other sections of the Eagle Valley Trail, Eagle County will hold the
easement,own the Eagle Valley Trail and be responsible for perpetual management and
maintenance of the Eagle Valley Trail.The Final Plat(s) for PUD,the PUD Guide,and the PUD
Agreement must reflect the public trail dedication of the Eagle Valley Trail,and the management/
maintenance responsibilities for the Trail.The Eagle Valley Trail easement shall be a minimum of
20 feet in width as a standard,with exceptions made where physically necessary,and shall
incorporate all construction items directly associated with the Eagle Valley Trail.
35) The Applicant shall cause G.Jouflas Ranches,LLC to execute an easement agreement acceptable
to Eagle County and shall further cause G.Jouflas Ranches,LLC, CJC Properties Limited Partnership,
or assigns,and/or Wolcott Valley Land Investors,LLC,to execute a ditch and trail improvement
agreement,acceptable to Eagle County,for purposes of Eagle Valley Trail construction east of the
east end of the Wolcott PUD (see ditch location on attached Exhibit"D"). The signed easement
agreement and the ditch and trail improvement agreement,acceptable to Eagle County,and signed
by G.Jouflas Ranches, LLC, CJC Properties Limited Partnership,or assigns,and/or Wolcott Valley
Land Investors, LLC shall be provided to the County by the Applicant within fourteen days of the
closing of the sale of real property within the Wolcott PUD/development by CJC Properties Limited
Partnership and G.Jouflas Ranches, LLC to Wolcott Valley Land Investors,LLC. The County and the
Applicant acknowledge that Eagle Springs Golf Club,Inc.is also a party to the ditch and trail
improvement agreement and that the agreement has already been signed by Eagle Springs Golf
Club, Inc.as of the date of this resolution.
36) No motorized vehicles are allowed on the Eagle Valley Trail other than County-authorized
maintenance vehicles or emergency service vehicles. Five motorized trail crossings are approved
with the Preliminary Plan subject to final design approval by Eagle County. The five crossings are
for Eagle Springs Golf Club, River Recreation Area Riverpark Hall,the G.Jouflas Property Access
Crossing as shown on"Wolcott Eagle Valley Trail and River Access Plan",to the Holland Creek
Metropolitan District water intake and pump house,and to the Jouflas Family barn. The Holland
Creek Metropolitan District intake and pump house,as well as,the Jouflas Family barn are located
outside of,and to the west of the Planned Unit Development boundary. A sixth crossing depicted as
11111
10
"Eagle County Eagle River Recreation Ramp"is subject to final review and approval by the BLM and
• Eagle County.
NWCCOG:
37) The applicant shall provide a copy of the State of Colorado NPDES Stormwater Permit for
Construction sites to the Eagle County Engineer prior to site disturbance.
Bureau of Land Management:
38) The Applicant should be advised that the adjacent public land has current permits for livestock
grazing.Under Colorado statutes,it is the owners'responsibility to construct,and maintain in good
condition,a lawful fence protecting their property in order to recover any damages from trespass
livestock.Should any fence construction be considered along a BLM boundary,the fence standards
should allow for easy passage by big game,i.e.:less than 42"in height with a 12"kick space
between the top two wires.
39)A portion of the development abuts a BLM parcel which includes the Wolcott Post Office and a
portion of the Eagle River,including the riparian corridor and floodplain.The Wolcott Post Office
holds a perpetual right-of-way from the BLM and access must be maintained until such time that
the Post Office relinquishes its right-of-way. ECO Trails has an application pending for a trail right-
of-way across this parcel.There are two parking areas along US Hwy 6 within the BLM parcel,and
social trails extending down to the river to provide public access for fishing. Because of the
realignment of US Hwy 6,the public parking area is lost.Similar public access and parking must be
provided.BLM parcels adjacent to urban-type parks and urban interfaces are often difficult for the
BLM to manage.If the Post Office is moved and public access to the parcel is guaranteed,the BLM
would be open to discussions of a change in ownership for this parcel with Eagle County.
40) The BLM is not aware of the location of utilities for power,telephone,etc.to the property.If
utilities are proposed that would cross public land,the utility company will have to obtain right-of-
way from the BLM Colorado River Valley Field Office.An environmental assessment is required as
part of the right-of-way permitting process.
41)The Applicant shall prepare an all-inclusive Living with Wildlife Manual and distribute to all
future property owners within the Wolcott PUD.This is intended to educate future property
owners regarding permitted recreational and hunting uses on BLM lands adjacent to the Wolcott
PUD Boundary,as well as,wildlife values, Conservation Easements and riparian land restrictions,
and domestic pet management within the PUD Boundary.
Eagle County Planning Commission Additional Conditions:
42) In the event that the applicant does not secure all necessary CDOT approvals to realign US
Highway 6,then this PUD Preliminary Plan;which is premised upon relocating US Highway 6,will
become null and void,and the applicant will need to submit a redesigned Sketch Plan and
Preliminary Plan that does not include realignment of US Highway 6. Likewise,the companion
Zone Change and 1041 Permit applications will become null and void in the event that the applicant
does not secure all necessary CDOT approvals to realign US Highway 6.
•
11
•
1041 Permit Conditions Applicable to the PUD and which is the Developer's Responsibility
43) All appropriate Federal,State and Local permits shall be secured by the Applicant prior to site
disturbance.
44)Water conservation measures have been incorporated into enforceable building codes within
the Wolcott PUD Guide and will be implemented in concert with the ERWSD. The raw water system
shall incorporate flow measurement to establish a baseline of the raw water necessary to irrigate.
This data will be used to continually seek efficiencies in the raw water irrigation system.
45) In the event that Eagle County develops a regional air quality monitoring network,the Wolcott
Metropolitan District will agree to provide a location and assistance with monitoring device
operations.
46) The Wolcott PUD Guide has articulated wood burning restrictions within the PUD boundary by
stating that wood burning devices be limited to three (3) areas of public gathering,such as the Inn,
riverside restaurant, or outdoor fire pit and not allowed within individual residences. Also,Best
Management Practices for dust control shall be incorporated into a dust suppression plan
submitted for review and approval to Eagle County and enforceable with any grading permits
within the Wolcott PUD property.
• 47) The scope of the Stormwater Infrastructure Maintenance and Monitoring Plan shall be
expanded to become a Water Quality Monitoring and Mitigation Plan or a separate plan shall be
prepared to incorporate monitoring ground and surface water quality,aquatic life and riparian
health.Said Plan shall include provisions to gather data prior to, during and after site disturbance
for the purpose of quickly identifying and eliminating impacts to surface and ground water as well
as for detecting and correcting adversarial impacts or trends caused by development and urban
runoff.Additional details,including the funding,monitoring and implementation mechanisms of
this plan by the Wolcott Metropolitan District shall be incorporated and submitted to Eagle County
for review and approval prior to site disturbance. Eagle County reserves the right to suspend the
issuance of building permits within the Wolcott PUD,in its sole discretion,if there is a failure to
monitor water quality and submit reporting to Eagle County as detailed in said Plan.
48) Installation of any raw water diversion infrastructure shall be timed in consultation with CPW,
generally between August 15th and September 30th to avoid critical periods of fish reproduction and
survival.
49) The Riparian Management&River Access Plan has been revised to include enforcement
provisions along with additional detail regarding funding and implementation by the Wolcott
Metropolitan District.
50) Per the CPW,any in-stream or associated bank work shall incorporate Best Management
Practices for sediment control into the design and utilize these practices during construction. Any
work during construction should not increase turbidity levels to concentrations exceeding those
contained in the applicable discharge permit approved by the Water Quality Control Division.
0
12
51) Harrington Penstemon populations were identified on the Southern Hillside; additional
evaluation to determine mitigation measures such as avoidance and/or relocation shall be required
prior to application for Final Plat for Planning Area PA-3.
52) Eagle County shall issue no building permits for vertical construction within the Wolcott PUD,
with the exception of building permits for the water and wastewater treatment facilities,until such
time that State/Federal Permits for the realignment of US Highway 6 have been issued,and the
highway improvements have been collateralized.
53) The PUD Guide, PUD Agreement, Riparian Management Plan, Housing Plan,Snow Management
Plan,Table of Variances, Intergovernmental Agreement for River Parcel and the Wolcott PUD Eagle
Valley Trail and River Access Plan were approved by the County,in its sole discretion,in the form
attached to the PUD Agreement.
54) The Applicant shall comply with all terms, conditions and requirements of the PUD Agreement.
THAT, the following documents shall be completed prior to application for the first Final
Plat which incorporates Phase I infrastructure:
1) Forms of conservation easements for meadow and south parcel
2) Forms of management plans for conservation easements for meadow and south parcel
• 3) Form of Public Trail Easement for south parcel
4) Form of conservation easement for river parcel
5) Form of management plan for river parcel
6) Easement Agreement with G.Jouflas as described in Condition 35 above
7) Ditch Improvement Agreement as described in Condition 35 above
THAT,the Applicant acknowledges that the Eagle County Landfill has been in operation
since the 1960's and is projected to continue operations well past the year 2100.
THAT,the Board of County Commissioners APPROVES the System Level Traffic Study for
Wolcott dated November 27, 2012 (the"SLS"),which SLS may be subject to further adjustment as
provided in Section 5.1.E of the PUD Development Agreement.
THAT,the Board of County Commissioners directs the Planning Department Director to
enter this zoning map amendment on the Official Zone District Map,and to provide a copy of this
Resolution to the applicant.
THAT,the Board hereby finds,determines and declares that this Resolution is necessary for
the health,safety and welfare of the inhabitants of the County of Eagle,State of Colorado.
•
13
• COUNTY OF EAGLE,STATE OF
COLORADO, By and Through Its
/` sp,GL e c BOARD OF COUNTY COMMISSIONERS
of °c
ATTES • i su �lip s a
t� 4(4—
Clerk to the Bo. d of ,_ ___....-. Sara J. Fisher
County Commissioners Chair••In
'es5`'. vi•
�/`
i't !J) ian H. Ryan
�� C // /
_40,,
Kathy C i� dler-Henry .
Commissioner
Commissioner seconded adoption of the foregoing resolution. The roll
having been called,the vote was as follows:
• Commissioner Fisher
Commissioner Ryan or
Commissioner Chandler-Henry
This resolution passed by WO vote of the Board of County Commissioners of the County
of Eagle,State of Colorado.