Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR11-061 Tree Farm Sketch Plan 2-yr Extension EAGLE COUNTY. CO 201113213
TEAK J SIMONTON
•
° AEC: $0.00 DOC:01:58s97PM 07/14/2011
111111111111100111110111101
Commissioner ,.flJ- moved adoption
of the following Resolution:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OFF ' COLORADO
RESOLUTION NO. 2011 - C�
APPROVAL OF THE EXTENSION OF THE SKETCH PLAN
FOR THE TREE FARM PLANNED UNIT DEVELOPMENT
FILE NO. PR -3147
WHEREAS, on or about December 21, 2010, the County of Eagle, State of Colorado,
accepted for filing a request submitted by Woody Ventures, LLC, (hereinafter "Applicant ") for
approval of a two -year extension to the Sketch Plan for the Tree Farm Planned Unit
Development, (Eagle County File No. PDS- 1567); and,
WHEREAS, the Applicant requested the extension to the Sketch Plan for Planned Unit
Development for a proposed development consisting of 319 residential dwelling units totaling
392,819 square feet and 96,375 square feet of floor area for commercial and mixed uses,
including retail, restaurant, service, office, light industrial and recreational uses, on a 71.71 acre
site located at 401 Tree Farm Drive; and,
WHEREAS, notice of the extension request was not required by the Eagle County Land
Use Regulations, Section 5- 210.E; and,
WHEREAS, at its regular public hearing held on April 26, 2011, the Eagle County Board
of Commissioners (hereinafter "Board"), considered the proposed extension request; associated
plans, materials in support of the request and relevant review criteria; and the statements and
concems of the Applicant, the Eagle County Community Development and Engineering staff,
and other interested persons.
BASED ON THE EVIDENCE BEFORE IT, and with the modifications
imposed by the conditions hereinafter described, THE BOARD FINDS AS FOLLOWS:
•
Pursuant to the Eagle County Land Use Regulations, Section 5- 240.2.E (4) — Extension:
201113213 1 OF 3
1. Failure to obtain approval of the Preliminary Plan for PUD was beyond the applicant's
control (allowing reasonable time for the review process);
2. The Sketch Plan for PUD is not speculative in nature;
3. The Sketch Plan for PUD still complies with the LUR's and Comprehensive Plans; and
4. There is a reasonable likelihood the Preliminary Plan for PUD will be developed in the next
two years.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, subject to the conditions set forth below, which shall be applicable and in
addition to all previously approved conditions, the request for a two (2) year extension, beyond
the current expiration date of September 1, 2011, for the Sketch Plan for Planned Unit
Development for the Tree Farm PUD (Eagle County File No. PDS -1567) be and is hereby
approved:
1. Except as otherwise modified by this development permit, all material
representations made by the Applicant in this application and in public meeting shall
be adhered to and considered conditions of approval.
THE BOARD further finds, determines and declares that this Resolution is necessary for
the health, safety and welfare of the inhabitants of the County of Eagle, State of Colorado.
MOVED, READ AND ADOPTED by the Board of County Commissioners of the
County of Eagle, State of Colorado, at its regular meeting held the day of
2011, nunc pro tunc the twenty -sixth day of April, 2011.
2
COUNTY OF EAGLE, STATE OF
COLORADO, by and Through Its
ATTEST: BOARD OF _ •UNTY COM SIONERS
cif tiro"
•
Teak J. Simonto * •
Jon :ey
Clerk to the Board of "� Cha u' an
County Commissioners
Peter F. Runyon
Commissioner
Sara J. Fisher
Commissioner
Commissioner % seconded adoption of the foregoing resolution. The roll having
been called, the vote was a. follows:
Commissioner Jon Stavney
Commissioner Peter F. Runyon
Commissioner Sara J. Fisher
This Resolution passed by / vote of the Board of County Commissioners of the County
of Eagle, State of Colorado.
3