HomeMy WebLinkAboutR03-089 FONSI Miller Ranch Road Water Line Interconnect Project File No. 1041-0048`Yl,~3 (~ Commissioner ~~ ~ moved adoption ~ ~ ,q of the following Resolution: 6~ BOARD OF COUNTY COMMISSIONERS COUNTY OF EAGLE, STATE OF COLORADO RESOLUTION N0.2003- f~ ACKNOWLEDGING A FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR THE CONSTRUCTION OF A MAJOR EXTENSION OF AN EXISTING DOMESTIC WATER SYSTEM AND THE EFFICIENT UTILIZATION OF A MUNICIPAL WATER PROJECT FOR THE MILLER RANCH ROAD WATER LINE INTERCONNECT PROJECT IN THE COMMUNITY OF EDWARDS, COLORADO File Number 1041-0048 WHEREAS, on or about March 27, 2003, the Eagle River Water and Sanitation District, (hereinafter "Applicant"), proposed to the Eagle County Department of Community Development at apre-application meeting a project for a Major Extension of an Existing Domestic Water Treatment System to serve the Edwards area, hereinafter referred to as the Miller Ranch Road Water Line Interconnect Project; and WHEREAS, the Applicant provided plans which would allow for construction as follows: The installation of approximately 1000 feet new water line, intended to create a connection between an existing dead end water line near the Berry Creek Middle School to the north and an existing water line adjacent to US Highway 6 across the Eagle River to the south. The line will be installed within and adjacent to the new Miller Ranch Road right-of--way, and will cross the Eagle River suspended beneath the new Miller Ranch Road Bridge. The project is not intended to support any new development, but will instead provide a beneficial loop in the water system, improving redundancy and fire flows in the area. SEE EXHIBIT "A", Water System Layout Plans, 2 pages, ATTACHED; and ~IINNNN~iA ~IN~Y~Y~~ 83436 .P C,~~ • Commissioner moved adoption o the following Resolution: BOARD OF COUNTY COMMISSIONERS COUNTY OF EAGLE, STATE OF COLORADO RESOLUTION N0.2003- ~' ACKNOWLEDGING A FINDING OF NO SIGNIFICANT IMPACT (FONSn FOR THE CONSTRUCTION OF A MAJOR EXTENSION OF AN EXISTING DOMESTIC WATER SYSTEM AND THE EFFICIENT UTILIZATION OF A MUNICIPAL WATER PROJECT FOR THE MILLER RANCH ROAD WATER LINE INTERCONNECT PROJECT IN THE COMMUNITY OF EDWARDS, COLORADO File Number 1041-0048 WHEREAS, on or about March 27, 2003, the Eagle River Water and Sanitation District, (hereinafter "Applicant"), proposed to the Eagle County Department of Community Development at apre-application meeting a project for a Major Extension of an Existing Domestic Water Treatment System to serve the Edwards area, hereinafter referred to as the Miller Ranch Road Water Line Interconnect Project; and WHEREAS, the Applicant provided plans which would allow for construction as follows: The installation of approximately 1000 feet new water line, intended to create a connection between an existing dead end water line near the Berry Creek Middle School to the north and an existing water line adjacent to US Highway 6 across the Eagle River to the south. The line will be installed within and adjacent to the new Miller Ranch Road right-of--way, and will cross the Eagle River suspended beneath the new Miller Ranch Road Bridge. The project is not intended to support any new development, but will instead provide a beneficial loop in the water system, improving redundancy and fire flows in the area. SEE EXHIBIT "A", Water System Layout Plans, 2 pages, ATTACHED; and • WHEREAS, in accordance with Section 6.03.01 of the Eagle County Land Use Regulations, an Applicant is required to obtain a Finding of No Significant Impact (FONSI) or a Permit prior to engaging in development in an azea or an activity that has been determined to be of State interest; and WHEREAS, in accordance with Sections 6.03:03(1) and 6.04 of the Eagle County Land Use Regulations, the Director of Community Development (hereinafter "Director"), has reviewed the Applicant's proposal, and all relevant support materials, and, having considered applicable Permit Application Approval Criteria, has determined that the construction of the proposed project, without mitigation, is unlikely to have any significant adverse impact to the County (see Determination of a Finding of No Significant Impact, attached as Exhibit `B"); and WHEREAS, notice of the Director's Determination of a Finding of No Significant Impact (FONSI) was given to all proper agencies, departments and the County's legal newspaper as required by Eagle County Land Use Regulations, Section 6.03.03(3); and WHEREAS, in accordance with Section 6.03.03(4)(a) of the Eagle County Land Use Regulations, the 14 day period during which a Request for Reconsideration of the Director's Determination of a Finding of No Significant Impact (FONSI), by the Boazd of County Commissioners or any affected party, elapsed on May 22"d, 2003; and WHEREAS, in accordance with Chapter II, Article 3, Section 3.310.I.2, WaiveY PYOVlslon of the Eagle County Land Use Regulations, the Applicant also requested a waiver from the requirement for a Special Use Permit by the Boazd of County Commissioners, as such application for Special Use would serve no further legitimate planning, zoning or other land use objective. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of the County of Eagle, State of Colorado: THAT, a Finding of No Significant Impact (FONSI) for the Miller Ranch Road Water Line Interconnect Project has been granted by the Director of Community Development. THAT, the Boazd of County Commissioners hereby directs the Depazlrnent of Community Development to provide a copy of this Resolution to the Applicant. THAT, the Applicant's request for waiver of the Special Use Permit requirements in accordance with Section 3-310.I.2 of the Eagle County Land Use regulations is hereby granted. 2 • • MOVED, READ AND ADOPTED by the Board of County Commissioners of the County of Eagle, State of Colorado, at its regular meeting held the~~~ day of 2003. COUNTY OF EAGLE, STATE OF o~ ~~~ c COLORADO, By and Through Its ~y ~~ BOARD OF COUNTY COMIVIISSIONERS ~ ~ ATTEST: ,, / '~ ~~/,~d~~/~ O/ LORP~O By , ~ .~i~ ~ By: Teak J. Simonton ~%~ Michael L. Gallagher, Chairman Clerk to the Board of County Commissioners Commissioner ~ ~~~~~ seconded adoption of the foregoing resolution. The roll having been called, the vote was as follows: Commissioner, Michael L. Gallagher ~~~~~ Commissioner, Tom C. Stone Commissioner, Arn M. Menconi This Resolution passed by )~; /,~,,~.~~~~ vote of the Board of County Commissioners of the County of Eagle, State of Colorado. Arn M. Menconi, Commissioner EXHIBIT CEMETERY BRIDGE/SCHOOL WATER MAlN s -= E>~a WATER 5N8 ~ BISTALL B'x 8'x 8' TEE ' ~~ ~TURE ~ TRACT F .~ a 1 ~ , ~~i.~ ~~T SCHOOL. FACILITY EIOS1MrG to' 0>P . WATER sore . ~ ~ ,r ~ + ~ I s ~\ ~\ ~ `\ ® fNATER MAIN DIP a N \ PROPOSm EA~,Ir ~ \~ >tae~ ENCRDACFRffNT ~`•~ \ ~ oasTUao cAS MAw w • ~ ~ SCAI.~ 1' ~ 80' ~' ~ ~,~ o ROAD R,or~ ~ ~ PROPOSED EA5E11FN7' \~ \ 13.7 QdCrt0Apfll~rT .`~ ~~ Q EiDS71ND (z) ~• olA. ~. a~ ~ ` ~ ~' \ TING e' P~1C ~ ~ smart MAw ~ ~ ~s ~ S~S- \ ~ ~ ~ R1:710VE CAP d~ ~.OTYDFF VALUE: CONNECT TD F7GS79d® 8' DIP. --~ • __ _ __ - _ _ _ _ - - - - - - 1 ~~ PROPOb$D}8 WATER MNN '" ~_ ` "'Q' I { \ (COY BRIDCE~ 1 ` ~~ I = - \ ~ ~ ~ \\ I ~ _ EXHIBIT A `_ ,~ ~ Pa e 1 EDWARDS 8U9NESS CENTER P,O. 80X 97 b C~ EDWARDS, COLORADO 81632 # (970) 926-3373 FAX (970) 926-3390