Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR07-008 West Lake Creek Drive Final Release
Commissioner
of the follow in
EAGLE COUNTY, CO
TEAK J SIMONTON
Pgs: 4 02:22:44PM r.:.2/r.:.1/2r.:.r.:.7
REC: $0.00 DOC: $ "" "" """"
11111111111111111111111111
200702735
moved adoption
esoIution:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 2007--.000
FINAL RELEASE OF COLLATERAL
AND
TERMINA TION OF THE WARRANTY PERIOD
FOR
CONSTRUCTION IMPROVEMENTS AGREEMENT FOR THE
RELOCATION OF WEST LAKE CREEK DRIVE
File No. G-00015
~tV
WHEREAS, the County Commissioners of Eagle County, Colorado (hereinafter
"Board") entered into a Construction Improvements Agreement dated July 8,2003 (hereinafter
"Agreement") with S. Robert Levine ("Owner") as a condition of the construction of the public
road improvements for the relocation of West Lake Creek Drive; and
WHEREAS, both the Owner and the Engineering Department state that the work
required under the Agreement is complete and acceptable and the Engineering Department
recommends full release of the collateral and the termination of the Construction Improvements
Agreement, see Exhibit "A" attached hereto and incorporated herein by this reference. Based
upon recommendations of the County staff, THE BOARD FINDS that the Owner's obligations
under the Agreement have been satisfied.
WHEREAS, the warranty period required by the Construction Improvements Agreement
for the relocation of West Lake Creek Drive has ended.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, the Board hereby authorizes the full and final release of collateral and the
termination of the Construction Improvements Agreement for the relocation of West Lake Creek
Drive.
THAT, this document shall be recorded in the records of the Eagle County Clerk and
Recorder, which shall be evidence that the warranty period for the relocation of West Lake Creek
Drive has been successfully completed and that the Owner's obligations under the Agreement are
complete.
THAT, the cash collateral held by the Treasurer be released and a warrant in the amount
of $106,450.32 be issued to the Owner.
THAT, Eagle County accepts West Lake Creek Drive for maintenance and inclusion in
the Eagle County Road Inventory.
MOVED, READ AND ADOPTED by the Board of County J;<:p1missioners of the
County of Eagle, State of Colorado, at its regular meeting held the ~ay of January 2007.
By:
Teak J. Simonton
Clerk to the Board of
County Commissioners
'" OUNTY OF EAGLE, STATE OF
LO 0, By and Through Its
OUNTY COMMISSIONERS
..,
Peter F. Runyon
Commissioner
By: dua 9~
Sara J. Fisher
Commissioner
Commissioner ~~ seconded adoption of the foregoing resolution.
having been called, the vote was as follows:
The roll
Commissioner Menconi
Commissioner Runyon
Commissioner Fisher
This Resolution passed by :3/ {;
sioners of the County of Eagle, State of Colorado.
vote of the Board of County Commis-
G:VKS\resolutions\fmal release lake creek. DOC
File G- 2004-15
MEMORANDUM
EAGLECOUNTYENGThffiE~NG
TO: Janice Scofield
Eagle County Attorney's Office
~
FROM: Mike Gruber
Engineering Department
j!1/i/&
DATE: January 17,2007
RE: File No. G-00015, Construction Improvements Agreement, Relocation of West Lake
Creek Drive
Authorization of the Final Collateral Release, Termination of the Warranty Period and
the Construction Improvements Agreement
Mountain Construction & Management Co., LLC, the construction manager for the owner,
submitted a request for an inspection, reduction of the collateral, and the start of the warranty period
in a letter to Mike Gruber, Eagle County Engineering Department dated September 3, 2004. The
construction was completed on September 8, 2004. The warranty was not started at this time
pending the submittal of acceptable as-built drawings required by the Construction Improvements
Agreement. In January 2007, acceptable as-built drawings were finalized and recorded in the
Survey Plat file of the Eagle County Engineering Department.
Inspections were conducted at various times after the September 8, 2004 date and indicate the
improvements are complete, have survived the two-year warranty period and are acceptable per the
terms and conditions of the Construction Improvements Agreement.
I recommend termination of the Agreement and release of the remaining collateral in the amount of
$106,450.32 used to secure the Construction Improvements Agreement.
These improvements entail the construction for the realignment of a County road. County
maintenance has been ongoing and shall remain in effect for this road.
# # #
pc: Greg Schroeder, Acting County Engineer
Chrono/File
COLLATERAL RELEASE SUMMARY
West lake Creek Drive Relocation
Final Release of Collateral
January, 2007
COMPLETED FIRST RELEASE COMPLETED FINAL RELEASE
ORIGINAL AMOUNT
ITEM DESCRIPTION COLLATERAL % AMOUNT % AMOUNT REMAINING
1 Tree Removal & Grub $9,450.00 100% $9,450.00 $0.00 $0.00
2 Toosoil Removal/Stockoile $23,082.50 100% $23,082.50 $0.00 $0.00
3 Culvert Installation $5,493.50 100% $5,493.50 $0.00 $0.00
4 Create Access/Haul Road into Meadow $3,650.00 100% $3,650.00 $0.00 $0.00
5 Build New Road, Improve Ridoe Road & Reveoetation $150,325.00 75% $112,743.75 25% $37,581.25 $0.00
6 Final Grade & Drainaoe $12,800.00 0% $0.00 100% $12,800.00 $0.00
7 Ridae Road Culvert Installation $3,027.00 100% $3,027.00 $0.00 $0.00
8 Lower Lake Creek Road to Match New $19,300.00 100% $19,300.00 $0.00 $0.00
9 Geo-mat Road $8,950.00 100% $8,950.00 $0.00 $0.00
10 Tonsoil all new Roadwavs $36,500.00 100% $36,500.00 $0.00 $0.00
11 Road base Entire New Roadway $77,760.00 90% $69,984.00 10% $7,776.00 $0.00
12 Guardrail $38,000.00 100% $38,000.00 $0.00 $0.00
13 Reclaim Existing West Lake Creek Drive $25,000.00 75% $18,750.00 25% $6,250.00 $0.00
14 Qualitv Control $22,000.00 75% $16,500.00 25% $5,500.00 $0.00
Total West lake Creek Drive Relocation $435,338.00 $365,430.75 $69,90725 $0.00
IMPROVEMENTS COMPLETED $435,338.00
10% RETAINAGE $43,533.80
FIRST RELEASE $328,887.68
FINAL RELEASE $106,450.32
ORIGINAL COLLATERAL $435,338.00
FIRST RELEASE $328,887.68
FINAL RELEASE $106,450.32
REMAINING COLLATERAL $0.00