Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR83-081 zone change for Blue Lake2 70`'
SOOK
t t
PAGE9 Q
JOLT, .
RESOLUTION
OF THE DtC 0 53 PH $03
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 83- efl
IN RE THE MATTER OF THE APPLICATION OF BLUE LAKE
DEVELOPMENT CO. /ALAN A. STOREY FOR A ZONE CHANGE
FROM RESOURCE TO PLANNED UNIT DEVELOPMENT AND
P.U.D. PRELIMINARY PLAN APPROVAL RELATIVE TO THE
BLUE LAKE PLANNED UNIT DEVELOPMENT, FILE NOS.
ZC- 183 -83 AND PD- 207 -83 -P - FINDINGS AND ORDER
PROCEEDINGS
On or about May 10, 1983, Blue Lake Development
Co. /Alan A. Storey ( "Applicant ") submitted to the County of
Eagle, State of Colorado, an application requesting a zone
change from Resource to Planned Unit Development and Preliminary
Plan approval of a Planned Unit Development ( "P.U.D. ") relative
to the Blue Lake Planned Unit Development, File Nos. ZC- 183 -83
and PD- 207 -83 -P ( "proposed development" or "Blue Lake "), in
accordance with Section 2.06.13 of the Zoning Resolution of
Eagle County, Colorado, 1979, as amended, and Section 2.18 of
the Subdivision Regulations of Eagle County, Colorado, 1972, as
amended, as the same are set forth and incorporated in Chapter
II of the Eagle County Land Use Regulations, 1982, as amended
( "L.U.R. "). The proposed development is on an approximate
276.93 acre parcel of land generally located north of State
Highway No. 82 near the Garfield -Eagle County line in Sections
33 and 34, Township 7 South, Range 87 West of the Sixth
Principal Meridian, County of Eagle, Colorado, and more
particularly described in Exhibit "A" attached hereto and
incorporated herein by this reference.
The Applicant proposed a phased development of Blue
Lake consisting of an estimated 130 residential single
a
uv
family /mobile home units and 84 residential multi - family
dwelling units in phase one; 89 residential single family /mobile
home units and 84 residential multi - family dwelling units in
phase two; 66 residential duplex dwelling units and 38
residential single family units in phase three; a 1 -1/2 acre
commercial parcel; and open space areas for a future school site
and recreational purposes.
The Eagle County Planning Commission considered the
Applicant's request for zone change and P.U.D. preliminary plan
approval at its regular meetings of June 15 and July 6,
respectively, 1983, and at the conclusion thereof, recommended
approval.
The Applicant's zone change and P.U.D. preliminary plan
approval request was subsequently scheduled for public hearing
before the Board of County Commissioners of the County of Eagle,
State of Colorado ( "Board ") on July 13, 1983. At the conclusion
of the hearihng, the Board tabled its consideration of the
subject application to its regular meeting of August 10, 1983,
in order to further study and investigate the appropriateness
and availability of providing satisfactory secondary access to
the proposed development; possible measures to mitigate any
adverse impacts of the adjacent gravel operation on residential
uses within Blue Lake; the need for affordable housing and, if
warranted, the mechanism for ensuring the same; the inclusion of
the proposed development within a fire protection district; and
the adverse impacts, if any, the proposed development would have
on the local school and transportation systems. In addition,
the Board determined to schedule a public meeting in the E1
Jebel- Basalt area to informally discuss the proposed
development, which meeting was held August 4, 1983, at the
Basalt Town Office.
On August 10, 1983, the Board considered additional
information submitted by the Applicant and the Eagle County
-2-
Department of Community Development which specifically addressed
the issues previously raised by the Board. In addition, the
Eagle County Department of Community Development forwarded to
the Board its final recommendation of approval of the proposed
development conditioned upon the following revisions:
1. The Preliminary Plan and P.U.D. zoning be only for
the mobile home area, which includes 219 units, and the open
space areas proposed as a future school site and the
Southwest corner lowlands.
2. Additional restrictions need to be developed to
include: initial sales price on lots and houses to be
offered by the developer; controlled resales on these lots
and homes for a 3 year period; and initial occupants need to
be owners except that employers in the Aspen /Basalt /El
Jebel /Carbondale area will be allowed to purchase up to 5
units to be rented to their employees - (These restrictions
should be finalized at Final Plat).
3. The phasing plan for the mobile home area should
remain in effect, with 130 units in Phase I and 89 units in
Phase II. Phase I needs to be 66% built and occupied before
any work on Phase II can be commenced.
4. The access through Mr. Crawford's land should be
pursued, even if it involved Eagle County's use of its
condemnation powers. This access is key to the E1 Jebel
street system and should be the primary access into the
property. The developer will have to pay for all
condemnation costs, if that alternative is used. The
developer should also work with the County Engineer to
determine intersection design and off -site road improvements
on El Jebel Road, if required.
5. The commercial tract should remain in Phase II of
the development.
-3-
l
� 3
6. At Final Plat, finalized construction details
including a time specific schedule on water and sewer
installation and necessary guarantees to know when and how
these utilities will be provided. Water and sewer should be
stubbed out to each lot.
7. At Final Plat, there needs to be more specific
information on what type of trailers will be allowed in the
project and what type will not. We would like this to be
simple and clearly defined.
8. At Final Plat, additional information on
landscaping requirements for individual lots.
Notice of the public hearings before the Eagle County
Planning Commission and the Board was duly published as provided
by law, and mailed to adjacent property owners.
In addition to the evidence summarized hereinabove, the
Board, during the public hearing process, further received oral
evidence in the form of unsworn testimony and informational
statements, and written evidence in the form of letters,
statements, comments, recommendations, reports, studies,
petitions, and other documentation. Such evidence was submitted
by the Applicant; County planning staff members; various groups
and governmental entities; and members of the general public
including residents of surrounding communities, adjacent
property owners, ranchers, businessmen, professionals,
developers, and environmentalists. The evidence was weighed
accordingly based upon the probative value place thereon by the
Board, and the following findings are based on the record as a
whole. References to the record are for convenience only and do
not necessarily compile all portions of the record on which the
findings are based.
IE41
FINDINGS
Based upon the evidence received during the public
hearing process, the Boardy hereby finds, determines and
declares:
1. That with the imposition of the conditions set
forth hereinbelow, the Applicant has demonstrated a present
community need for affordable housing as proposed by the
Applicant in those portions of Phase One and Phase Two of
the proposed development designated for residential single
family /mobile home units, in accordance and consistent with
Section 2.14.04 of the L.U.R. and the Eagle County Master
Plan, 1980, as amended.
2. That the Applicant has not demonstrated a present
community need for the other residential and commercial uses
proposed on the remaining land included with the Blue Lake
development.
3. That the proposed development as submitted by the
Applicant envisions one comprehensive and integral
development plan with the various phases therein being
interrelated. As such, the proposed development should only
be considered in its entirety and not in a piecemeal
fashion.
4. That taking into consideration the proposed
development as a whole, and the overriding need for
affordable housing, the Board deems it necessary and
warranted to approve the requested zone change and P.U.D.
preliminary plan for those portions of the proposed
development designated for residential single family /mobile
home units; and consistent with Paragraph 2 hereinabove, to
approve a zone change from Resource to P.U.D. for the
remaining land within the proposed development, the land
uses of which will presently be designated in general terms
-5-
as set forth hereinbelow, and which will be subject to a
more specific land use designation by the Board at such
future time the Applicant can demonstrate a community need
therefor.
ORDER
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, based upon the testimony and evidence presented
at the public hearing, and the Findings of the Board of County
Commissioners relative thereto as set forth in this Resolution,
the Board hereby approves the application of the Blue Lake
Development Co. /Alan A. Storey for a zone change from Resource
to Planned Unit Development and Preliminary Plan approval of a
Planned Unit Development relative to the Blue Lake Planned Unit
Development, File Nos. ZC- 183 -83 and PD- 207 -83 -P, as follows:
1. For Phase One and Phase Two of the proposed
development as specifically identified in Exhibit "B"
attached hereto and incorporated herein by this reference,
the Board approves the requested zone change and P.U.D.
preliminary plan for 219 residential single family /mobile
home units, and open space and recreational purposes as
proposed by the Applicant in its application and the
subsequent statements made and evidence presented on its
behalf during the public hearing process; subject, however,
to the conditions set forth hereinbelow.
2. For the remaining land within the proposed
development identified in Exhibit "B" as Phase Three, the
Board approves a zone change from Resource to P.U.D. with
general land use classifications designated thereon as
commercial for the 1 -1/2 acre parcel requested by the
Applicant for commercial purposes, and residential for the
remaining land within Phase Three. Phase Three shall not be
IFi�
further developed until such time the Applicant proves to
the satisfaction of the Board at a public hearing that the
requested development is necessary in order to provide land
for a demonstrated community need, and is otherwise in
conformance with the requirements of Section 2.14.04 of the
Eagle County Land Use Regulations, 1982, as amended. The
Board specifically reserves the right to consider the
proposed future development of Phase Three based upon the
evidence presented at such public hearing and, if approved,
to designate specific densities and uses consistent with the
general land use classifications identified herein, and
further, to impose any reasonable conditions upon the
development of the same as deemed appropriate by the Board
in accordance with the P.U.D. preliminary plan criteria set
forth in Section 2.06.13 of the Eagle County Land Use
Regulations, 1982, as amended.
THAT, the Board hereby imposes the following conditions
on its preliminary plan approval of Phase One and Phase Two of
the Blue Lake Planned Unit Development, which conditions shall
be fully complied with to the satisfaction of the Board prior to
final plat approval thereof:
1. The Applicant shall submit additional written
restrictions to ensure the future availability of affordable
housing within Phase One and Phase Two of the proposed
development. For those lots and dwelling units to be
offered by the Applicant, such written restrictions shall
address, by way of example only, the initial sales price;
the method for controlling the resale price for a three year
period; and provision for restricting occupancy thereof to
the record property owner with the exception that employers
in the Aspen /Basalt /E1 Jebel /Carbondale area may purchase a
maximum of five dwelling units for rental to their
employees.
-7-
j
4w�
2. The Applicant shall provide detailed final
construction drawings, plans and specifications regarding
the installation of the proposed water and sewer
improvements for Phase One and Phase Two of the proposed
development. Such detailed final construction drawings,
plans and specifications shall include, by way of example
only, a specific time schedule for the completion of such
utility improvements; necessary guarantees identifying the
person or entity responsible for such utility improvements
and ensuring that the same is completed in accordance with
the specified time schedule; and provision for the stub out
of such utility improvements to each individual lot within
Phase One and Phase Two of the proposed development prior to
the paving of proposed roads which will be adversely
impacted thereby.
3. The Applicant shall submit additional information
identifying with specificity the type(s) of mobile home or
trailer which will be permitted on the lots within Phase One
and Phase Two of the proposed development.
4. The Applicant shall submit additional detailed
information outlining the landscaping requirements to be
imposed on the individual lots within Phase One and Phase
Two of the proposed development.
THAT, the Board further imposes the following
restrictions on the development of Phase One and Phase Two of
the Blue Lake Planned Unit Development, which restrictions shall
be continuing in nature, and remain in effect subsequent to
final plat approval unless formally revised or modified by the
Board:
1. The phasing plan for development of Phase One and
Phase Two of the proposed development shall be as agreed to
M
n;
by the Applicant during the preliminary plan process. In
this respect, 66% of Phase One, or a minimum of 87 units,
shall be constructed and occupancy permits issued prior to
final plat approval of Phase Two.
2. The Applicant shall diligently pursue the
acquisition of sufficient access through adjacent land
presently owned by Mr. Floyd Crawford for use as primary
access to the proposed development and for the purpose of
providing an integrated and interconnecting roadway system
with the E1 Jebel area. In the event the Applicant's
efforts are to no avail, the Board shall assist in the
condemnation of the same. In conjunction with the
acquisition of the foregoing access, the Applicant and the
Eagle County Engineer shall jointly determine intersection
design and other off -site road improvements, including
striping and paving, as deemed necessary to mitigate the
adverse impacts, if any, the proposed development will have
on the E1 Jebel Road. Costs associated with the
acquisition, including condemnation, of the aforementioned
access and such off -site road improvements to E1 Jebel Road
shall be solely borne by the Applicant, or pursuant to a
cost sharing program between the Board and the Applicant as
the Board deems reasonable and warranted taking into
consideration the interests of the general public to be
served thereby.
THAT, all provisions of the subject application, as
subsequently modified by the Applicant during the preliminary
plan process, which are not inconsistent with this Resolution
are hereby incorporated herein by this reference as if fully set
forth at length.
THAT, this Resolution is necessary to preserve the
public welfare, health and safety.
.®
d
{ i
MOVED, READ AND ADOPTED by the Board of County
Commissioners of the County of Eagle, State of Colorado, at its
regular meeting held the �5'z�day of November, 1983, nunc rho
tunc August 10, 1983.
ATTEST
C er` o th oar o
County Commissioners
COUNTY OF EAGLE, STATE OF COLORADO
By and Through its
BOARD OF COUNTY COMMISSIONERS
BE
via E. Mott, Chairman
W. Keith Troxel, CoAmissioner
1
Dain WIiiiams, Commissioner
-10-
EXHIBIT "A
LEGAL DESCRIPTION
BLUE LAKE PLANNED UNIT DEVELOPMENT
A tract of land located in Lots 4, 5, 6, 10, 11, 12 and 13
and the NW1141NW114 of Section 34, and in Lots 5, 9, 10, the
SE1 /4/N'r71/4/NEl/4, the S1 /2 /NE1 /4 and the NW1 /4 /SE1 /4 of Section
33, Township 7 South, Range 87 West of the Sixth Principal
Meridian, Eagle County, Colorado, being more particularly described
i
as follows, to wit:
Beginning at the Southwest Corner of said Lot 11, Section 34
whence a brass cap found in place and properly marked for the
Southeast Corner of said .Section 33 bears S22 037'42 "w 970.663 feet
distant; thence S00 032'37 "E 129.94 feet along the easterly line of
said Lot 13 to a Point on the Northerly right of wav line of said
State Highway 82; thence following said right of way- line the
following courses and distances:
N72 010133 "W 186.92 feet; thence
S89 023'27 "W 63.20 feet; thence
N72 010133 "W 1205.51 feet: thence
leaving said highway right of wav N1'0°34'13 "E 79.84 feet; thence
615.72 feet on the arc of a curve to the right having a radius of
2141.43 feet, the chord of which bears N24 048127 "E 613.60 feet:
thence N33 002140 11E 140.00 feet; thence N27 °37'15 "W 485.31 feet;
thence N45 000100 "w 113.14 feet; thence N90 °00'00 "W 35.00 feet;
thence N40 050'01 "W 214.11 feet; thence N22 °04'04 "W 159.7.0 feet;
thence N64 158'59 "W 413.82 feet; thence N86 °16'51 "W 200.42 feet;
thence N00 °00'01 "E 1669.29 feet to a point on the northerly line
of the SE1 /4 /NW1 /4 /NE1 /4 of said Section 33; thence N89 042143 "E
44 80.71 feet along the northerly line of the SE1 /4 /NW1 /4/NE1/4 of
said Section 33 to the Northeast Corner of the SEl /4 /NW1 /4 /NEl /4
of said Section 33; thence S00 °38'47 "W 662.75 feet along the
easterly line of the SE1 /4 /NW1 /4 /NEl /4 of said Section 33 to a
point on the northerly line of the Sl /2/NE1/4 of said Section 33;
thence N89 039'06 "E 1373.74 feet along the northerly line of the
S1 /2/NE1/4 of said Section 33 to the Southwest Corner of the
NW1 /4/NW1/4 of said Section 34; thence N00 036'45 "E 1322.61 feet
along the westerly line of the NW1 /4 /Nw1/4 of said Section 34 to
the Northwest Corner of Said Section 34; thence S88 030130 "E
1317.87 feet along the northerly line of said Section 34 to the
Northeast Corner of the NS-7c /4 /NT,-j1 /4 of said Section 34; thence
S00 026'34 "W 1321.88 feet along the North -South centerline of the
Northwest One - Quarter of said Section 34 to the center of the
Northwest One - Quarter of said Section 34, also being the North-
east Corner of said Lot 4; thence S00 034'35 "W 428.63 feet along
the easterly line of said Lot 4 to a point on the northerly line
of said Lot 5 of Section 34; thence S09 053'43 "E 240.06 feet to
the Northeast Corner of said Lot 5 of Section 34; thence
S01 013'47 "E 450.35 feet; thence N84 016'29 "E 92.60 feet along a
fence; thence S00 °11'23 "E 2164.94 feet along a fence to a fenco
corner on the southerly line of Lot 10, Section 34; thence aloha
the southerly line of Lot 10 and Lot 11 S89 052104 "W 1335.68 Fee *_
- 2 -
to the point of beginning.
Said tract of land contains 245.661 acres, more or less.
EXCEPT that portion conveyed to Colorado Ute Electric Association
Inc. by Deeds recorded September 12, 1980 in Book 309 at Page 123
and in Boo], 309 at Page 180, Eagle County Records.
Also including a parcel of land located in Lots 5 and 10, the
Northwest One- Quarter of the Southeast One- Quarter (NW-',SE-',), and
the South One -Half of the Northeast One- Quarter (S,NE4) of Section
33, Township 7 South, Range 87 West of the Sixth Principal
Meridian, Eagle County, Colorado, being more particularly described
as follows, to wit:
Beginning at a point on the Northerly right of way line of Colorado
Highwav No. 82 whence a brass cap found in place and properly
marked for the Southeast Corner of said Section 33 bears S50 059'58 "E
2280.85 feet; thence N00 000'01 "E 1515.00 feet; thence S86 °16'51 "E
200.42 fet°:; thence S64 °58'59 "E 413.82 feet; thence S22 °04'04 "E
159.70 fee thence S40 050'01 "E 214.11 feet; thence S90 °00'00 "E
35.00 feet; thence S45 °00'00 "E 113.14 feet; thence S27 036'16 "E
485.31 feet; thence S33 002140 "w 140.00 feet; thence 615.72 feet on
the arc of a curve to the left having a radius of 2141.43 feet;
ti;e chcrd of which bears; S2. °48'26 "W 613.60 feet; thence
S16 °34'13"68 79.84 feet to the Northerly right of way line of
Colorado Highwav No. 82; thence N72 010'33 "w 796.68 feet along said
northerly right of way line to the point of beginning.
Said parcel of land contains 31.2789 acres, more or less.
EXHIBIT "B"
BLUE LAKE
'IU!,
Olanned Unit Development
!i-ANDSWING/ RECREATION/
PHASING PLAN ` /�`/ / . I %j �; r i
A
�P SPACE
EI EN
V
OL E L E
PHASE I
SE
P 7H
DESIGNATED
r
OPEN SPACE
7,
ON
RK:/SCHOO