HomeMy WebLinkAboutMinutes 02/24/2025 PUBLIC HEARING
February 24, 2025
Present: Jeanne McQueeney Chairman
Tom Boyd Commissioner
Matt Scherr Commissioner
Ben Morris Senior Assistant County Attorney
Kathy Scriver Deputy Clerk to the Board
This being a scheduled Public Hearing,the following items were presented to the Board of County
Commissioners for their consideration:
Planning File - Eagle County Room
1.VIS-009472-2024 Diamond Star Ranch Variance from Improvement Standards
Julie Pranger, Engineering
Executive Summary: On August 22, 2024, Eagle County received an application for a Variance from
Improvement Standards from Bart Johnson on behalf of the owners forty-eight(48)properties in the Diamond
Star Ranch community. Forty-four(44)of the parcels are developable and four(4)of the parcels are developable
per County zoning but dedicated open space per the private covenants. The Application requests a Variance from
Improvement Standards to certain road and access standards for the Properties. Staff visited the Ranch and drove
the road network on August 9,2023 and reviewed the Application materials and referral agency comments to
consider hardships to the Applicants and adverse impacts on the health, safety, and welfare of the persons and
lands affected. Staff is able to make a positive finding of conformance to the standards with the addition of two
conditions for approval. Therefore, staff recommends approval with conditions.
Project Name: Diamond Star Ranch Variance from Improvement Standards
File Number: VIS-009472-2024
Applicants: Diamond Star Ranch Owners Association, Inc.
Representative: Bart Johnson,Esquire
Staff Engineer: Julie Pranger,PE, CFM
Recommendation: Approve with Conditions
Though subdivision of the Ranch does not necessitate approval from the Board of County Commissioners
("BoCC")under SB-35,Eagle County Land Use Regulation("ECLUR") standards such as access,roads,
driveways,geologic hazards, and hillside development are applicable to the properties and are reviewed for
compliance before a development permit may be issued. The internal road system of Diamond Star Ranch does
not comply with County road and access standards.For Eagle County to issue future development permits,the
road system must be improved to county standards or a VIS for the roads must be granted by the BoCC.
The VIS process established by the ECLUR exists to balance the hardships to the Applicants of not granting the
VIS against the adverse impact on the health, safety, and welfare of persons affected and the adverse impact on
the lands affected. The existing access throughout the Ranch does not meet all County standards for geometric
road design(width, surface,radius, etc.) or a rural cul-de-sac. The Applicants seek this VIS to establish legal,
1
02/24/2025
conforming access to the Properties so current and future owners may apply for and receive development permits
from the County.
Julie Pranger, staff engineer,reviewed the Variance from Improvement Standards (VIS)review process
and stated that the application had gone through the 21-day referral process. Diamond Star Ranch was a
subdivision of approximately 7,368 acres,with 48 conforming, legal lots,44 development parcels, and four open
space parcels.
Bart Johnson, a representative for the applicant, explained that one of the owners discovered during a
building permit application that some of the ranch roads did not meet county standards. He emphasized that while
not meeting all standards,the roads were designed for safety. He highlighted the voluntary dedication of acres to
remain undeveloped and the existing gravel road system, advocating for its preservation instead of paving. He
expressed acceptance of the proposed conditions with some hesitation with regard to Condition#1.
Condition #1: The VIS will serve primary single-family homes, accessory dwelling units, customary
accessory residential uses, and Agriculture and Customary Accessory Agricultural Buildings on the Properties
and does not extend to any other traffic generating uses.
Condition #2: The Manual on Uniform Traffic Control Devices Sign WJ-5 shall be placed on either side
of the section of switchbacks at approximately Stations 134+00 and 169+50 on Royal Elk Drive prior to issuance
of any development permits.
He noted that while the ranch offered horseback rides and picnics,there was an office on-site and wanted
to make sure that these activities did not conflict with the variance as conditioned.
Commissioner Scherr asked if the HOA provided the services.
Mr. Johnson explained that the property management was a large undertaking with many staff members
overseeing the operations,the HOA essentially provided services for the owners.
Ben Morris, staff attorney, asked Mr. Johnson if he would classify the uses as accessory uses.
Mr. Johnson stated that they classified them as accessory residential uses or accessory agricultural.
Ms. Pranger presented her review of the surrounding land uses, zoning, and existing conditions. She
noted that the VIS would serve up to 44 primary dwelling units and 44 ADUs,with access off US Hwy 6. The
variance affects approximately 10 miles of roadways, covering about five roads, all privately owned and
maintained by the HOA. The applicant proactively obtained acceptance letters from both Eagle River Fire
Protection District and Greater Eagle Fire Protection District. Ms. Pranger showed a map that highlighted the
topography and geographic constraints and explained that not granting the variance would limit development to
the existing 13 dwelling units on the 7,000 acres and prevent establishment of uses by right on the undeveloped
parcels. She presented that potential adverse impacts to the land included massive retaining walls, a lot of cut and
fill, and visual impacts. Regarding the current road configuration, staff found it adequate to maintain life safety
and met Land Use Regulations in terms of zoning. Both responding Fire Districts accepted the proposed 16' road
width, and existing bridges could remain in place without widening unless a site-specific crash pattern related to
the width of the bridge was found. The second variance request pertained to emergency vehicle turnaround areas
requiring rural cul-de-sacs. Royal Elk Road is approximately 10 miles long and would require 50 turnarounds.
Staff recommended approval of the variances,with Condition#2 requiring signage to be placed on either side of
the section of switchbacks on Royal Elk Drive before issuance of any development permits.
Commissioner Boyd wanted to confirm that the fire departments had been on the property.
Powell Laster,Ranch Manager for Diamond Star Ranch, stated that Hugh Fairfield and Fire Marshal
Randy Cohen,both with Greater Eagle Fire Protection,had visited Diamond Star Ranch many times for various
reasons.
Chairman McQueeney opened public comment.
Jeffrey Ashby, a resident of the property, expressed his support for the application,believing it to be
extremely responsible.
2
02/24/2025
Chairman McQueeney closed public comment.
Commissioner Scherr acknowledged that the applicant would experience hardship and that it would be
contrary to some of the county's open space values.
Commissioner Boyd agreed with Commissioner Scherr and emphasized that the roadway standards were
intentionally designed to be flexible for situations like this. He supported a motion to approve with conditions.
Chairman McQueeney believed there would be an undue hardship to the applicant if the VIS were not
approved.
Commissioner Boyd moved to approve File No.VIS-009472-2024 with two conditions, incorporating
staff's findings and the recommended conditions because this application, as conditioned, meets the standards for
approval of a Variance from Improvement Standards.
Commissioner Scherr seconded the motion. The vote was declared unanimous.
S� OF EAG1,.
There being no further business: a �� ,the meeting was adjourned until February 25,2025.
• `o
,e°Qa DO p�m r�
Attest: LV
Clerk to the Board Chairmah'
3
02/24/2025