HomeMy WebLinkAboutConsent No. 2025-01 First Partial Collateral Release and Commencement of Warranty Period_Cordillera Valley Club File No. PDF-009123-2020Co unty, ounty, CO Docusign Envelope ID: F74AE3DF-EFC5-4363-BC2D-D1AE344D926B Eagle02500924 Regina O'Brien 01/21/2025 Pgs: 5 04:18:03 PM REC: $0.00 DOC: $0.00 BOARD OF COUNTY COMMISSIOINERb COUNTY OF EAGLE, STATE OF COLORADO CONSENT NO.2025-01 AUTHORIZING THE FIRST PARTIAL RELEASE OF COLLATERAL AND COMMENCEMENT OF THE WARRANTY PERIOD FOR CORDILLERA VALLEY CLUB FILING 10 FILE NO. PDF-009123-2020 WHEREAS, pursuant to C.R.S. § 30-28-137, the Board of County Commissioners of the County of Eagle, State of Colorado ("County") entered into a Subdivision and Off -site Improvements Agreement dated July 20, 2021 (the "SIA") with Cordillera Valley Club Land Company, LLC, a Colorado limited liability company ("Subdivider") for the Cordillera Valley Club Filing 10 Subdivision ("the Subdivision"); and WHEREAS, Subdivider provided collateral in the form of a letter of credit in the amount of $85,052.00, which represented 100% of the estimated cost of the Subdivision Public Improvements in collateral to be held by the County; and WHEREAS, Subdivider has represented to the County that the Subdivision Improvements required under the SIA have been completed and the Subdivider has requested a partial release of collateral and commencement of the two-year warranty period; and WHEREAS, based upon the written recommendations of the County Engineer set forth in Exhibit A attached hereto and incorporated herein, and the recommendation of the County Attorney, THE COUNTY FINDS that certain Subdivision Improvements associated with the Subdivision appear to be completed as of November 6, 2023, and a partial reduction in the collateral and the commencement of the warranty period is warranted; and WHEREAS, pursuant to Resolution 95-35, the Chair of the Board of County Commissioners, or in their absence, the Chairman Pro Tern, has the authority to approve partial releases of collateral and to approve commencement of the warranty period under an SIA once recommended for approval by the County Engineer and the County Attorney; and WHEREAS, based upon the recommendation of the County Engineer attached, hereto as Exhibit A, and the recommendation of the County Attorney, THE COUNTY FINDS that commencement of the warranty period under the SIA is warranted. NOW, THEREFORE, BE IT AUTHORIZED BY THE COUNTY OF EAGLE, STATE OF COLORADO: THAT, based on the recommendation of the County Engineer and the County Attorney, the Chair of the Board hereby authorizes this partial release of collateral in the amount of $76,546.80, thereby reducing the required collateral to $8,505.20, which represents the collateral for the Subdivision Improvements for the Subdivision to be held for the two-year warranty period under the SIA. Docusign Envelope ID: F74AE3DF-EFC5-43B3-BC2D-D1AE344D926B THAT, the date of completion of the Subdivision Improvements of the Subdivision is November 6, 2023, as established by the Eagle County Engineering Department, and this partial release of collateral does commence the warranty period for said Subdivision Improvements, which period shall begin on November 6, 2023, and end on November 6, 2025. THAT, this partial release of collateral does not represent the County's acceptance of the work purportedly completed by the Subdivider; and THAT, this partial release of collateral shall not in any way abrogate the rights of the County in enforcing the Subdivider's performance of its outstanding obligations under the SIA; and THAT, this partial release is contingent upon the Subdivider substituting collateral in the form of a revised letter of credit or a cash deposit, in a form acceptable to the County Attorney. APPROVED by the Chair of the Board of County Commissioners of the County of Eagle, State of Colorado, pursuant to Eagle County Resolution 95-35, this 13th day of 7anuary .2025. COUNTY OF EAGLE, STATE OF COLORADO, by and Through Its CHAIR TO THE BOARD OF COUNTY COMMISSIONERS I Signed by:'ll SC. '.. '^^ By: 81E7B1nZ18E0979 Matt Scherr, Chair INCH 11 xK�lil�lfy%�I��IT;`►1 �l`I Signed by: By. SOL" Beth Oliver, County Attorney EAGLE COUNTY ENGINEER gned by: DaeuSi C "S By. o�o�ceo42447CC Ben Gerdes, County Engineer Docusign Envelope ID: F74AE3DF-EFC5-43B3-BC2D-D1AE344D926B MEMORANDUM EAGLE COUNTY ENGINEERING TO: Tracy Stowell, Eagle County Attorney's Office FROM: Taylor Ryan, Engineering Department DATE: December 6, 2024 RE: Subdivision Improvements Agreement - Cordillera Valley Club Filing 10 - Eagle County File No. PDF-009123 - Authorization for the First Partial Collateral Release and Start of the Warranty Period A Subdivision and Off -Site Improvements Agreement (SIA) for the Cordillera Valley Club Filing 10 Final Plat, File No. PDF-9123, ("the Agreement'l was executed on July 20, 2021, to collateralize the Public Improvements for the Cordillera Valley Club Filing 10 development. Jeff Townsend with Resort Concepts requested a final inspection of the improvements on November 6, 2023. The required improvements were approved following that inspection. Upon review of the documentation, additional documents were required before starting the warranty period, including approval of the work by the developer's engineer of record. The additional documentation was received on August 12, 2024, and subsequently accepted by the Eagle County Engineering Department for the partial release of collateral and commencement of the warranty period. The Engineer's Estimated Cost of the Public Improvements and the total collateral held under the Agreement was: Public Improvements = $85,052.00 The Eagle County Engineering Department recommends a reduction of the Public Improvements collateral in the total amount of $76,546.80 from the $85,052.00 collateral held. A total collateral balance of $8,505.20 shall be retained. The remaining collateral retains the 10% of Public Improvements which are to be retained by the County for a period of two (2) years, as stated in Section 2.3 Subdivision Improvements Agreement. This inspection and consent to collateral release do start the warranty period anticipated to end two -years from the date of the final inspection which was on November 6, 2023. The Warranty Period will end on November 6, 2025. cc: Ben Gerdes, County Engineer Docusign Envelope ID: F74AE3DF-EFC5-43B3-BC2D-D1AE344D926B Attachment: Exhibit A EXHIBIT COSTS FOR SUBDIVISION IMPROVEMENTS Docusign Envelope ID: F74AE3DF-EFC5-43B3-BC2D-DIAE344D9266 CORDILLERA VALLEY CLUB, EDWARDS CO Public Improvements ENGINEER'S ESTIMATED COST February 17, 2021 Quantity Engineers Esihnatc Item Description Unit Cost Cost 1 Mobilization I L.S. S3,500.00 $3,500.00 2 Traffic Control I L.S. S4,000.00 $4,000.00 3 Erosion Control I L.S. $4,000.00 $4,000.00 4 Asphalt Saw Cut & Rotomill 350 LF $15.00 $5,250.00 5 Top Soil Removal & Replacement 80 CY $4.50 $360.00 6 Project Excavation (Cut, Fill & Compaction) 100 CY $15.00 $1,500.00 7 Concrete Curb & Gutter w/4" CL6 449 LF $32.00 $14,368.00 8 Valley Pans & Curb Return Apron 1546 SF $7.00 $10,822.00 9 Road Pavement Replace - (4" Asp, 12" CL6, SG Comp) 214 SY $58.00 $12,412.00 10 Modify Ex 4' Dia Sewer Manhole for Connector 1 EA $4,000.00 $4,000.00 11 CDOT Type 13 Double Inlet w Connections 1 EA $11,000.00 $11,000.00 12 18" ADS-N12 Storm Sewer 50 LF $120.00 $6,000.00 13 8" Nominal Size Riprap 34 CY $40.00 $1,360.00 14 Water Service Line Trenching & Sackful 162 LF $40.00 $6,480.00 TOTAL $85,052.00 I of