No preview available
HomeMy WebLinkAboutC24-401 Shaw Construction A133-2019 Exhibit ADocusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 8/27/2024 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 PresidentSam MeyerChair, Board of County CommissionersMatt Scherr Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Project Number: Project Name: Project Document Milestone: Client: City: Precon Manager: Architect: GSF: Edwards Freedom Park - Permit Reconciliation Set 08/09/2024 10169-90 Edwards Freedom Park - Permit 100% Construction Documents Edwards Eagle County Menedez and EVStudio JMN 50,090 Eagle County 100% Construction Documents Page 1 State: Estimate Date:9/13/2023 Colorado Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 2 Group GC's10 GENERAL CONDITIONS01 01.005 GENERAL CONDITIONS Additional Field Super Time 6.00 MONTH MONTH16,303.00 97,818 Monthly General Conditions 18.00 MONTH MONTH74,206.61 1,335,719 01.005 GENERAL CONDITIONS 50,090.00 sf 28.62 sf 1,433,537 01.520 GENERAL REQUIREMENTS Traffic Control 18.00 MONTH MONTH3,500.00 63,000 Construction Surveying & Staking 65,000.00 SSF SSF0.65 42,250 Haul Trash 5.00 EACH EACH600.00 3,000 Temporary Toilet 18.00 MONTH MONTH1,750.00 31,500 Mobile Equipment 18.00 MONTH MONTH5,500.00 99,000 Temp Power Set Up and Distribution 1.00 LS LS30,000.00 30,000 Volleyball Court Staging Area 1.00 LS LS10,000.00 10,000 01.520 GENERAL REQUIREMENTS 50,090.00 sf 5.56 sf 278,750 GENERAL CONDITIONS 50,090.00 34.18sf sf 1,712,287 GC's 50,090.00 34.18sf sf 1,712,28710 Sitework20 SITEWORK02 02.110 HAZARDOUS SOIL REMOVAL Hazardous Soil Removal - EXCLUDED 0.00 NIC NIC0.00 0 02.110 HAZARDOUS SOIL REMOVAL 50,090.00 sf 0.00 sf 0 02.220 SITE DEMOLITION Misc Site Demolition 1.00 LS LS55,260.00 55,260 02.220 SITE DEMOLITION 50,090.00 sf 1.10 sf 55,260 02.315 EXCAVATION & FILL Earthwork Sub Mob/GC's 1.00 LS LS164,708.00 164,708 Topsoil Stripping & Haul Off 1.00 LS LS48,735.00 48,735 Site Cut 1.00 LS LS72,917.00 72,917 Haul Off and Processing for Backfill 1.00 LS LS212,471.00 212,471 Final Grade 1.00 LS LS8,628.00 8,628 02.315 EXCAVATION & FILL 50,090.00 sf 10.13 sf 507,459 02.370 EROSION CONTROL Dust Control 1.00 EACH EACH10,000.00 10,000 Erosion Control - Installation 1.00 LS LS27,000.00 27,000 Erosion Control - Maintenance 18.00 MONTH MONTH3,500.00 63,000 Erosion Control - Monthly Inspections 18.00 MONTH MONTH500.00 9,000 Erosion Control - Stormwater Permit 1.00 EACH EACH575.00 575 Erosion Control - SWMP Plan Prep 1.00 EACH EACH2,000.00 2,000 Landfill Cleanup / Restoration 1.00 LS LS10,000.00 10,000 Street Cleanup 8.00 MONTH MONTH750.00 6,000 Water Utility Usage 8.00 MONTH MONTH1,000.00 8,000 02.370 EROSION CONTROL 50,090.00 sf 2.71 sf 135,575 02.510 WATER DISTRIBUTION Water Distribution 1.00 LS LS327,500.00 327,500 Flow Fill - EXCLUDED 0.00 NIC NIC0.00 0 Utility Encasements and Insulation 1.00 LS LS88,032.00 88,032 02.510 WATER DISTRIBUTION 50,090.00 sf 8.30 sf 415,532 02.530 SANITARY SEWER Sanitary Sewer 1.00 LS LS216,715.00 216,715 02.530 SANITARY SEWER 50,090.00 sf 4.33 sf 216,715 02.550 PIPED ENERGY DISTRIBUTION Gas Service - EXCLUDED 0.00 NIC NIC0.00 0 02.550 PIPED ENERGY DISTRIBUTION 50,090.00 sf 0.00 sf 0 02.580 SITE ELECTRICAL Light Pole Foundations - Excavation/Backfill and Concrete 15.00 EACH EACH2,000.00 30,000 Primary Conduit Install and Trench/Backfill 1.00 LS LS41,974.00 41,974 Transformer Vault Install 1.00 LS LS3,420.00 3,420 02.580 SITE ELECTRICAL 50,090.00 sf 1.51 sf 75,394 02.630 STORM DRAINAGE Storm Piping and Structures 1.00 LS LS264,662.00 264,662 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 3 Group 02.630 STORM DRAINAGE 50,090.00 sf 5.28 sf 264,662 02.720 BASE COURSES Class 6 Base Course at Asphalt - 12" Thick 1.00 LS LS163,472.00 163,472 Class 6 Base Course at Concrete - 6" Thick 0.00 Included Included0.00 0 02.720 BASE COURSES 50,090.00 sf 3.26 sf 163,472 02.740 ASPHALT PAVING Asphalt Paving - 4" Thick 533.00 TON TON210.00 111,930 Asphalt Paving - 4" Thick, Utility Patchback 20,775.00 SF SF6.00 124,650 Traffic Control & Barricades 40.00 DAY DAY1,500.00 60,000 02.740 ASPHALT PAVING 50,090.00 sf 5.92 sf 296,580 02.750 CONCRETE PAVING 6" Conc Paving, C&G, ADA Ramp, Site Stairs 1.00 LS LS160,002.00 160,002 Townhome Driveways 1.00 LS LS19,350.00 19,350 Trash Enclosure Foundation/Apron and Storage Shed Foundation 1.00 LS LS35,505.00 35,505 Generator Pad and Post Foundations 250.00 SF SF25.00 6,250 02.750 CONCRETE PAVING 50,090.00 sf 4.41 sf 221,107 02.760 PAVEMENT MARKING Striping and Site Signs 1.00 LS LS20,000.00 20,000 02.760 PAVEMENT MARKING 50,090.00 sf 0.40 sf 20,000 02.830 RETAINING WALLS Block Walls 600.00 SF SF85.00 51,000 Boulder Walls 1.00 LS LS3,360.00 3,360 Concrete Wall Between Housing Buildings 1.00 LS LS99,960.00 99,960 02.830 RETAINING WALLS 50,090.00 sf 3.08 sf 154,320 02.870 SITE FURNISHINGS Site Furnishings - ALLOWANCE 1.00 LS LS25,000.00 25,000 02.870 SITE FURNISHINGS 50,090.00 sf 0.50 sf 25,000 02.905 LANDSCAPE Boulders 15.00 EACH EACH567.00 8,505 Irrigation & Sleeving 1.00 LS LS47,763.00 47,763 Landscaping 1.00 LS LS218,580.00 218,580 Stone Features 5.00 EACH EACH4,947.00 24,735 02.905 LANDSCAPE 50,090.00 sf 5.98 sf 299,583 SITEWORK 50,090.00 56.91sf sf 2,850,659 MASONRY04 04.220 CONCRETE MASONRY UNITS CMU - Trash & Storage Shed Enclosure 1.00 LS LS36,449.00 36,449 04.220 CONCRETE MASONRY UNITS 50,090.00 sf 0.73 sf 36,449 MASONRY 50,090.00 0.73sf sf 36,449 METALS05 05.120 STRUCTURAL STEEL Generator Structure 1.00 LS LS41,650.00 41,650 05.120 STRUCTURAL STEEL 50,090.00 sf 0.83 sf 41,650 METALS 50,090.00 0.83sf sf 41,650 DOORS & WINDOWS08 08.360 OVERHEAD DOORS Trash Coiling Doors 2.00 SET SET15,000.00 30,000 08.360 OVERHEAD DOORS 50,090.00 sf 0.60 sf 30,000 DOORS & WINDOWS 50,090.00 0.60sf sf 30,000 Sitework 50,090.00 59.07sf sf 2,958,75820 Housing30 SITEWORK02 02.240 DEWATERING Dewater Excavations - EXCLUDED 0.00 NIC NIC0.00 0 02.240 DEWATERING 50,090.00 sf 0.00 sf 0 02.250 SHORING & UNDERPINNING Temporary Shoring - EXCLUDED 0.00 EACH EACH0.00 0 02.250 SHORING & UNDERPINNING 50,090.00 sf 0.00 sf 0 02.320 BUILDING EXCAVATION Foundation Excavation 1.00 LS LS19,960.00 19,960 Backfill w/ Process Material 1.00 LS LS86,540.00 86,540 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 4 Group Site Wall Excavation and Backfill w/ Processed Material 1.00 LS LS28,598.00 28,598 4" Gravel Layer Below Slab 1.00 LS LS24,422.00 24,422 02.320 BUILDING EXCAVATION 50,090.00 sf 3.18 sf 159,520 02.510 WATER DISTRIBUTION Fire Risers 5.00 EACH EACH5,000.00 25,000 02.510 WATER DISTRIBUTION 50,090.00 sf 0.50 sf 25,000 02.620 SUBSURFACE DRAINAGE 4" Perf. PVC Pipe 1.00 LS LS28,800.00 28,800 02.620 SUBSURFACE DRAINAGE 50,090.00 sf 0.57 sf 28,800 SITEWORK 50,090.00 4.26sf sf 213,320 CONCRETE03 03.310 CAST-IN-PLACE CONCRETE Anterro Foundations and SOG 1.00 LS LS151,413.00 151,413 Little Bear Foundations and SOG 1.00 LS LS241,015.00 241,015 03.310 CAST-IN-PLACE CONCRETE 50,090.00 sf 7.83 sf 392,428 CONCRETE 50,090.00 7.83sf sf 392,428 MASONRY04 04.210 BRICK MASONRY Brick Masonry 1.00 LS LS180,912.00 180,912 04.210 BRICK MASONRY 50,090.00 sf 3.61 sf 180,912 MASONRY 50,090.00 3.61sf sf 180,912 METALS05 05.120 STRUCTURAL STEEL Anchor Bolts and Embeds 20,640.00 GSF GSF0.75 15,480 05.120 STRUCTURAL STEEL 50,090.00 sf 0.31 sf 15,480 05.510 MISC. METALS Misc. Metals 20,640.00 GSF GSF1.00 20,640 05.510 MISC. METALS 50,090.00 sf 0.41 sf 20,640 05.720 METAL RAILING Vertical Picket Railings - Decks and Stairs 1.00 LS LS169,600.00 169,600 05.720 METAL RAILING 50,090.00 sf 3.39 sf 169,600 METALS 50,090.00 4.11sf sf 205,720 WOOD & PLASTICS06 06.001 FRAMING Rough Framing 1.00 LS LS545,114.00 545,114 06.001 FRAMING 50,090.00 sf 10.88 sf 545,114 06.002 SIDING Siding 1.00 LS LS548,240.75 548,241 06.002 SIDING 50,090.00 sf 10.95 sf 548,241 06.003 WRB Air Barrier 31,500.00 SF SF2.36 74,340 06.003 WRB 50,090.00 sf 1.48 sf 74,340 06.006 BALCONY Trex Decking 0.00 Included Included0.00 0 06.006 BALCONY 50,090.00 sf 0.00 sf 0 06.007 STAIRS Exterior Stair Stringers / Treads / Platforms 0.00 Included Included0.00 0 06.007 STAIRS 50,090.00 sf 0.00 sf 0 06.220 MILLWORK Millwork - EXCLUDED 0.00 NIC NIC0.00 0 06.220 MILLWORK 50,090.00 sf 0.00 sf 0 WOOD & PLASTICS 50,090.00 23.31sf sf 1,167,695 THERMAL/MOISTURE PROTEC'N07 07.120 WATERPROOFING Foundation Waterproofing 6,000.00 SF SF12.50 75,000 07.120 WATERPROOFING 50,090.00 sf 1.50 sf 75,000 07.210 BUILDING INSULATION Garage and Storage Batt Insulation 6,100.00 SF SF4.50 27,450 07.210 BUILDING INSULATION 50,090.00 sf 0.55 sf 27,450 07.260 VAPOR RETARDERS Stegowrap Vapor Barrier 6,100.00 SF SF1.50 9,150 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 5 Group 07.260 VAPOR RETARDERS 50,090.00 sf 0.18 sf 9,150 07.430 COMPOSITE PANELS AEP Metal Panels - Anterros 1.00 LS LS150,000.00 150,000 AEP Metal Panels - Little Bears 1.00 LS LS274,800.00 274,800 07.430 COMPOSITE PANELS 50,090.00 sf 8.48 sf 424,800 07.540 THERMO-PLASTIC ROOFING 60 Mil TPO Roof Membrane 1.00 LS LS199,806.00 199,806 07.540 THERMO-PLASTIC ROOFING 50,090.00 sf 3.99 sf 199,806 07.620 FLASHING & SHEET METAL Flashings & Sheet Metal 20,640.00 SF SF1.75 36,120 07.620 FLASHING & SHEET METAL 50,090.00 sf 0.72 sf 36,120 07.920 JOINT SEALANTS Joint Sealants 20,640.00 SF SF2.00 41,280 07.920 JOINT SEALANTS 50,090.00 sf 0.82 sf 41,280 THERMAL/MOISTURE PROTEC'N 50,090.00 16.24sf sf 813,606 DOORS & WINDOWS08 08.010 DOORS & FRAMES Garage Swing Door 4.00 EACH EACH3,500.00 14,000 Storage Swing Door 8.00 EACH EACH3,500.00 28,000 Water Entry Swing Door 1.00 EACH EACH3,500.00 3,500 08.010 DOORS & FRAMES 50,090.00 sf 0.91 sf 45,500 08.360 OVERHEAD DOORS Sectional Overhead Doors - Insulated 4.00 EACH EACH5,500.00 22,000 08.360 OVERHEAD DOORS 50,090.00 sf 0.44 sf 22,000 08.740 ELECTRO-MECH. HARDWARE Unit Access Control - EXCLUDED 0.00 NIC NIC0.00 0 08.740 ELECTRO-MECH. HARDWARE 50,090.00 sf 0.00 sf 0 DOORS & WINDOWS 50,090.00 1.35sf sf 67,500 FINISHES09 09.250 GYPSUM WALL BOARD Garage and Storage Drywall 1.00 LS LS123,269.00 123,269 09.250 GYPSUM WALL BOARD 50,090.00 sf 2.46 sf 123,269 09.910 PAINTING Paint - Exterior Paint 24,700.00 SF SF3.50 86,450 Paint - Interior Paint - EXCLUDED 0.00 NIC NIC0.00 0 09.910 PAINTING 50,090.00 sf 1.73 sf 86,450 09.960 HIGH PERFORMANCE COATINGS Epoxy on Floors - Garages 0.00 Excluded Excluded0.00 0 09.960 HIGH PERFORMANCE COATINGS 50,090.00 sf 0.00 sf 0 FINISHES 50,090.00 4.19sf sf 209,719 SPECIALTIES10 10.430 EXTERIOR SIGNAGE Exterior Unit Signage 20.00 EACH EACH1,000.00 20,000 10.430 EXTERIOR SIGNAGE 50,090.00 sf 0.40 sf 20,000 10.550 POSTAL SPECIALTIES Postal Specialties - EXCLUDED 0.00 NIC NIC0.00 0 10.550 POSTAL SPECIALTIES 50,090.00 sf 0.00 sf 0 10.605 WIRE MESH PARTITIONS Wire Mesh Partitions - Storage 16.00 EACH EACH1,750.00 28,000 10.605 WIRE MESH PARTITIONS 50,090.00 sf 0.56 sf 28,000 SPECIALTIES 50,090.00 0.96sf sf 48,000 EQUIPMENT11 11.450 RESIDENTIAL APPLIANCES Unit Appliances ALLOWANCE 20.00 UNIT UNIT4,500.00 90,000 11.450 RESIDENTIAL APPLIANCES 50,090.00 sf 1.80 sf 90,000 EQUIPMENT 50,090.00 1.80sf sf 90,000 FURNISHINGS12 12.490 WINDOW TREATMENTS Window Coverings 1.00 LS LS22,000.00 22,000 12.490 WINDOW TREATMENTS 50,090.00 sf 0.44 sf 22,000 FURNISHINGS 50,090.00 0.44sf sf 22,000 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 6 Group SPECIAL CONSTRUCTION13 13.124 PORTABLE/MODULAR BUILDING Interior Seam Stitch of Units 24.00 UNIT UNIT5,000.00 120,000 Purchase of Modular Units - EXCLUDED 0.00 NIC NIC0.00 0 Storage Yard - Operation, and Transportation to Site 3.00 MONTH MONTH30,000.00 90,000 Structural Set & Stitch of Units 1.00 LS LS105,177.00 105,177 Transportation of Mods to Storage Yard 1.00 LS LS64,400.00 64,400 13.124 PORTABLE/MODULAR BUILDING 50,090.00 sf 7.58 sf 379,577 13.610 SOLAR COLLECTORS Solar Equip - EXCLUDED 0.00 NIC NIC0.00 0 13.610 SOLAR COLLECTORS 50,090.00 sf 0.00 sf 0 SPECIAL CONSTRUCTION 50,090.00 7.58sf sf 379,577 MECHANICAL15 15.100 PLUMBING Plumbing - Undergrounds, Risers, Roof Penetrations, Box to Box Connections, Fixture Testing 20.00 UNIT UNIT 10,100.00 202,000 15.100 PLUMBING 50,090.00 sf 4.03 sf 202,000 15.300 FIRE PROTECTION Design 1.00 LS LS17,707.00 17,707 Offsite Install 1.00 LS LS164,250.00 164,250 Onsite Install 1.00 LS LS80,250.00 80,250 15.300 FIRE PROTECTION 50,090.00 sf 5.23 sf 262,207 15.510 HVAC HVAC - Exterior Wall Caps 0.00 Included Included0.00 0 HVAC - Line Sets 0.00 Included Included0.00 0 HVAC - Test & Balance 0.00 Included Included0.00 0 HVAC - Unit Heaters in Garage and Storage 1.00 LS LS149,800.00 149,800 15.510 HVAC 50,090.00 sf 2.99 sf 149,800 MECHANICAL 50,090.00 12.26sf sf 614,007 ELECTRICAL16 16.010 ELECTRICAL Car Charging Station - Install Only 3.00 EACH EACH2,500.00 7,500 Electrical 1.00 LS LS451,278.00 451,278 Fire Alarm 1.00 LS LS46,373.00 46,373 Low Voltage ALLOWANCE 20.00 UNIT UNIT1,500.00 30,000 16.010 ELECTRICAL 50,090.00 sf 10.68 sf 535,151 ELECTRICAL 50,090.00 10.68sf sf 535,151 Housing 50,090.00 98.62sf sf 4,939,63530 GSB40 SITEWORK02 02.320 BUILDING EXCAVATION Foundation Excavation 1.00 LS LS19,960.00 19,960 Backfill w/ Processed Material 1.00 LS LS86,540.00 86,540 4" Gravel Layer Below Slab 1.00 LS LS24,422.00 24,422 02.320 BUILDING EXCAVATION 50,090.00 sf 2.61 sf 130,922 02.510 WATER DISTRIBUTION Fire Riser 1.00 EACH EACH7,500.00 7,500 02.510 WATER DISTRIBUTION 50,090.00 sf 0.15 sf 7,500 02.620 SUBSURFACE DRAINAGE 4" Perf. PVC Pipe 1.00 LS LS28,800.00 28,800 Underslab Drainage System - EXCLUDED 0.00 NIC NIC0.00 0 02.620 SUBSURFACE DRAINAGE 50,090.00 sf 0.57 sf 28,800 SITEWORK 50,090.00 3.34sf sf 167,222 CONCRETE03 03.310 CAST-IN-PLACE CONCRETE Basement Walls, Stemwalls, Cores 0.00 Included Included0.00 0 Continuous and Pad Footings 1.00 LS LS1,023,527.00 1,023,527 Elevator Pit 0.00 Included Included0.00 0 Polished Concrete 4,376.00 SF SF22.00 96,272 SOD 0.00 Included Included0.00 0 SOG 0.00 Included Included0.00 0 Stair Pan Fill 0.00 Included Included0.00 0 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 7 Group 03.310 CAST-IN-PLACE CONCRETE 50,090.00 sf 22.36 sf 1,119,799 CONCRETE 50,090.00 22.36sf sf 1,119,799 MASONRY04 04.210 BRICK MASONRY Brick Masonry 1.00 LS LS382,933.00 382,933 04.210 BRICK MASONRY 50,090.00 sf 7.64 sf 382,933 MASONRY 50,090.00 7.64sf sf 382,933 METALS05 05.120 STRUCTURAL STEEL Anchor Bolts and Embeds 29,450.00 GSF GSF0.75 22,088 Roof Screen Structure 1.00 LS LS29,225.00 29,225 Structural Steel 1.00 LS LS1,605,842.00 1,605,842 05.120 STRUCTURAL STEEL 50,090.00 sf 33.08 sf 1,657,154 05.510 MISC. METALS Level 1 Lobby Stair / Railings 0.00 Included Included0.00 0 Metal Pan Stairs / Landings and Railings 0.00 Included Included0.00 0 Misc. Metals 29,450.00 GSF GSF1.75 51,538 05.510 MISC. METALS 50,090.00 sf 1.03 sf 51,538 METALS 50,090.00 34.11sf sf 1,708,692 WOOD & PLASTICS06 06.105 ROUGH CARPENTRY Rough Carpentry 29,450.00 SF SF1.75 51,538 06.105 ROUGH CARPENTRY 50,090.00 sf 1.03 sf 51,538 06.410 CABINETS Millwork / Cabinets 1.00 LS LS477,331.00 477,331 06.410 CABINETS 50,090.00 sf 9.53 sf 477,331 06.415 COUNTER TOPS Counter Tops 0.00 Included Included0.00 0 06.415 COUNTER TOPS 50,090.00 sf 0.00 sf 0 WOOD & PLASTICS 50,090.00 10.56sf sf 528,868 THERMAL/MOISTURE PROTEC'N07 07.120 WATERPROOFING Waterproofing - Subcontract 11,000.00 SF SF12.50 137,500 07.120 WATERPROOFING 50,090.00 sf 2.75 sf 137,500 07.210 BUILDING INSULATION Insulation - Subcontract 29,450.00 SF SF3.50 103,075 07.210 BUILDING INSULATION 50,090.00 sf 2.06 sf 103,075 07.260 VAPOR RETARDERS Vapor Barriers - Subcontract 9,675.00 SF SF1.50 14,512 07.260 VAPOR RETARDERS 50,090.00 sf 0.29 sf 14,512 07.430 COMPOSITE PANELS AEP Panels at Storage Shed 0.00 Included Included0.00 0 AEP Panels at Trash / Generator 0.00 Included Included0.00 0 AEP Panels w/ Mineral Wool and Knight Wall Channels 1.00 LS LS788,313.00 788,313 07.430 COMPOSITE PANELS 50,090.00 sf 15.74 sf 788,313 07.540 THERMO-PLASTIC ROOFING 60 Mil TPO Roof Membrane 1.00 LS LS339,546.00 339,546 07.540 THERMO-PLASTIC ROOFING 50,090.00 sf 6.78 sf 339,546 07.620 FLASHING & SHEET METAL Flashings & Sheet Metal - Subcontract 29,450.00 SF SF0.75 22,088 07.620 FLASHING & SHEET METAL 50,090.00 sf 0.44 sf 22,088 07.810 APPLIED FIREPROOFING Spray Fireproofing ALLOWANCE 29,450.00 SF SF4.00 117,800 07.810 APPLIED FIREPROOFING 50,090.00 sf 2.35 sf 117,800 07.840 FIRESTOPPING Fire Safing - Subcontract 29,450.00 SF SF0.28 8,246 07.840 FIRESTOPPING 50,090.00 sf 0.16 sf 8,246 07.920 JOINT SEALANTS Joint Sealants - Subcontract 29,450.00 SF SF1.50 44,175 07.920 JOINT SEALANTS 50,090.00 sf 0.88 sf 44,175 THERMAL/MOISTURE PROTEC'N 50,090.00 31.45sf sf 1,575,255 DOORS & WINDOWS08 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 8 Group 08.005 DOOR BID Wood Doors and Hardware 94.00 EACH EACH4,677.18 439,655 08.005 DOOR BID 50,090.00 sf 8.78 sf 439,655 08.310 ACCESS DOORS Access Doors - Std 29,450.00 SF SF0.25 7,362 08.310 ACCESS DOORS 50,090.00 sf 0.15 sf 7,362 08.340 SPECIAL DOORS Elevator Smoke Doors - EXCLUDED 0.00 NIC NIC0.00 0 08.340 SPECIAL DOORS 50,090.00 sf 0.00 sf 0 08.410 STOREFRONT SYSTEMS Storefront Systems - Exterior 1.00 LS LS454,670.00 454,670 Steel Plate Shrouds at Exterior Windows 19.00 EACH EACH5,000.00 95,000 Storefront Systems - Interior Door Frames 0.00 Included Included0.00 0 Storefront Systems - Interior w/ Champagne Finish 1.00 LS LS150,151.00 150,151 08.410 STOREFRONT SYSTEMS 50,090.00 sf 13.97 sf 699,821 08.620 UNIT SKYLIGHTS Skylights ALLOWANCE 100.00 SF SF500.00 50,000 08.620 UNIT SKYLIGHTS 50,090.00 sf 1.00 sf 50,000 08.830 MIRRORS Mirrors - Framed 9.00 EACH EACH275.00 2,475 08.830 MIRRORS 50,090.00 sf 0.05 sf 2,475 DOORS & WINDOWS 50,090.00 23.94sf sf 1,199,314 FINISHES09 09.005 FINISHES SUPPORT Floor Prep 29,450.00 SF SF0.20 5,890 Floor Protection 29,450.00 SF SF0.35 10,308 09.005 FINISHES SUPPORT 50,090.00 sf 0.32 sf 16,198 09.110 METAL STUD FRAMING Drywall and Metal Frame 1.00 LS LS1,620,464.00 1,620,464 09.110 METAL STUD FRAMING 50,090.00 sf 32.35 sf 1,620,464 09.310 CERAMIC TILE Tile 1.00 LS LS101,993.00 101,993 09.310 CERAMIC TILE 50,090.00 sf 2.04 sf 101,993 09.510 ACOUSTICAL CEILINGS ACT Ceilings 0.00 Included Included0.00 0 Baffle Ceilings 0.00 Included Included0.00 0 09.510 ACOUSTICAL CEILINGS 50,090.00 sf 0.00 sf 0 09.640 WOOD FLOORING Stair Wood Finish 1.00 LS LS121,654.00 121,654 09.640 WOOD FLOORING 50,090.00 sf 2.43 sf 121,654 09.650 RESILIENT FLOORING LVT and Base 1.00 LS LS111,111.00 111,111 09.650 RESILIENT FLOORING 50,090.00 sf 2.22 sf 111,111 09.680 CARPET Carpet 1.00 LS LS67,123.00 67,123 09.680 CARPET 50,090.00 sf 1.34 sf 67,123 09.910 PAINTING Painting 29,450.00 SF SF6.00 176,700 Sealed Concrete 5,075.00 SF SF1.00 5,075 09.910 PAINTING 50,090.00 sf 3.63 sf 181,775 FINISHES 50,090.00 44.33sf sf 2,220,318 SPECIALTIES10 10.260 WALL & CORNER GUARDS Corner & Wall Guards - Subcontract 29,450.00 SF SF1.00 29,450 10.260 WALL & CORNER GUARDS 50,090.00 sf 0.59 sf 29,450 10.350 FLAGPOLES Flagpoles - Subcontract 3.00 EACH EACH5,000.00 15,000 10.350 FLAGPOLES 50,090.00 sf 0.30 sf 15,000 10.410 DIRECTORIES Directories - Excluded 0.00 NIC NIC0.00 0 10.410 DIRECTORIES 50,090.00 sf 0.00 sf 0 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park - Permit Reconciliation Set Eagle County 08/09/2024 Group Group Description Takeoff Quantity Total Cost/Unit Total Amount 100% Construction Documents Page 9 Group 10.430 EXTERIOR SIGNAGE Exterior Signage - Allowance 1.00 LS LS10,000.00 10,000 10.430 EXTERIOR SIGNAGE 50,090.00 sf 0.20 sf 10,000 10.440 INTERIOR SIGNAGE Interior Signage - Life Safety Only 29,450.00 SF SF0.25 7,362 10.440 INTERIOR SIGNAGE 50,090.00 sf 0.15 sf 7,362 10.810 TOILET ACCESSORIES Toilet Accessories - Subcontract 9.00 EACH EACH2,500.00 22,500 10.810 TOILET ACCESSORIES 50,090.00 sf 0.45 sf 22,500 SPECIALTIES 50,090.00 1.68sf sf 84,312 EQUIPMENT11 11.450 RESIDENTIAL APPLIANCES Appliances ALLOWANCE 1.00 LS LS15,000.00 15,000 11.450 RESIDENTIAL APPLIANCES 50,090.00 sf 0.30 sf 15,000 EQUIPMENT 50,090.00 0.30sf sf 15,000 FURNISHINGS12 12.490 WINDOW TREATMENTS Window Coverings 20.00 UNIT UNIT1,200.00 24,000 12.490 WINDOW TREATMENTS 50,090.00 sf 0.48 sf 24,000 FURNISHINGS 50,090.00 0.48sf sf 24,000 CONVEYING SYSTEMS14 14.210 ELECTRIC ELEVATORS Electric Elevator 3.00 STOP STOP45,334.00 136,002 Registration, Reinspection, Cleandown, Barricades, etc.1.00 LS LS10,000.00 10,000 Temp Usage 6.00 MONTH MONTH4,500.00 27,000 14.210 ELECTRIC ELEVATORS 50,090.00 sf 3.45 sf 173,002 CONVEYING SYSTEMS 50,090.00 3.45sf sf 173,002 MECHANICAL15 15.100 PLUMBING Electrical Water Tank Domestic Water 1.00 LS LS542,156.00 542,156 VRF Mechanical 1.00 LS LS1,435,738.00 1,435,738 15.100 PLUMBING 50,090.00 sf 39.49 sf 1,977,894 15.300 FIRE PROTECTION Fire Protection 1.00 LS LS248,796.00 248,796 15.300 FIRE PROTECTION 50,090.00 sf 4.97 sf 248,796 MECHANICAL 50,090.00 44.45sf sf 2,226,690 ELECTRICAL16 16.010 ELECTRICAL Electrical 1.00 LS LS1,833,085.00 1,833,085 Car Charging Station - Install Only 2.00 EACH EACH2,500.00 5,000 Fire Alarm 1.00 LS LS84,760.00 84,760 Low Voltage - Hardwire Backbone, Cabling, Faceplates, etc.29,450.00 SF SF4.50 132,525 Low Voltage - WAP Cabling (WAPs provided by Owner)16.00 EACH EACH632.00 10,112 Security - Camera Cabling (Cameras provided/installed by Owner)36.00 EACH EACH368.00 13,248 Security - Access Control Card Readers, Cabling, and Programming ALLOWANCE 30.00 EACH EACH5,000.00 150,000 Audio Visual ALLOWANCE 0.00 Excluded Excluded0.00 0 ERRS ALLOWANCE 29,450.00 SF SF1.75 51,538 16.010 ELECTRICAL 50,090.00 sf 45.52 sf 2,280,268 ELECTRICAL 50,090.00 45.52sf sf 2,280,268 ALLOWANCES18 18.005 ALLOWANCES Weather Protection 1.00 LS LS150,000.00 150,000 Bullet Resistance Door/Window Frames and Glazing Upgrade 1.00 LS LS50,000.00 50,000 18.005 ALLOWANCES 50,090.00 sf 3.99 sf 200,000 ALLOWANCES 50,090.00 3.99sf sf 200,000 GSB 50,090.00 277.61sf sf 13,905,67240 CONFIDENTIAL: The information and data in this report are strictly confidential and are applied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Construction. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Estimate Totals Description Totals Rate Warranty Reserve: General Liability Insurance: Design Estimating Contingency: Project Total: Construction Contingency: Performance and Payment Bond: Subtotal: Subtotal: Running Subtotal: Running Subtotal: Subtotal: Running Subtotal: $ 587,909 $ 241,043 $ 150,941 $ 99,816 $ 238,584 Cost/SF 2.50 % 1.00 % 0.62 % 0.41 % 0.98 % $ 11.74 $ 4.81 $ 3.01 $ 1.99 $ 4.76 Subtotal: $ 469.48 $ 24,345,304 $ 25,169,644 $ 26,176,430 $ 16.55 $ 16.46 $ 522.59 $ 828,951 $ 824,341 $ 1,006,786 $ 26,176,430 $ 335,000 0.00 %$ 6.69 $ 522.59 BR and Security - ALLOWANCE $ 1,006,786 4.00 %$ 20.10Fee Edwards Freedom Park - Permit Reconciliation Set Eagle County 100% Construction Documents Page 9 08/09/2024 $ 23,516,352 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Freedom Park Modular Housing and GSB | 2024.07.15 Edwards Freedom Park Housing and General Service Building Permit Set Basis of Estimate Clarification 8/19/2024 General Items 1. A payment and performance bond is included. 2. Project to be fully tax exempt. 3. Key Exclusions: a. Building permit and/or plan review fees. b. Design fees or price escalation. c. Costs for changes required by Building Department Code Review or other jurisdictions having authority. d. Any cost for trash collection or removal related to any owner provided scopes, including but not limited to, Fixtures Furniture & Equipment (FF&E) installation or Owner Furnished Owner Installed (OFOI) items. e. Right of way permits. f. Demolition or abatement of any structure(s). g. Testing, removal, disposal or abatement of hazardous material. h. Third-party testing and inspection, unless specifically noted below. i. We have not included any legal, development, tap & meter fees, public improvement bonds, and LEED certification cost. j. FF&E (Furniture, Fixtures and Equipment.) k. Phasing or early turnover of housing units. Division 2-Site Work 1. Includes erosion control and erosion control maintenance. 2. Includes costs for cleanup and minimal restoration of landfill site used for temporary stockpiling of material for use as backfill 3. Earthwork assumes backfill to be of re-used on-site soils stockpiled from structural excavation hauled to county provided location 5 miles west of site. If existing soil is found to be unsuitable additional costs will be required to export all structural excavation and replace with new backfill. 4. Retaining wall at generator is assumed to be gravity type block walls. Retaining wall pricing and design is subject to change pending subcontractor design-build engagement. Any changes to retaining walls due to additional loading requirements or walls impacting building foundations are excluded. 5. All water services included as 1.5” purecore for housing, as indicated, and GSB, as is indicated as TBD. Fire flows may require upsizing which may result in a change order. 6. Irrigation backflow, master valve, and flow sensor installed in GSB. Landscaping may not be completed by the time housing units are ready to be turned over. 7. Irrigation meters and meter pits if required are by furnished, installed and paid for by Owner. 8. Irrigation tap development fees if required are by furnished, installed and paid for by Owner. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Freedom Park Modular Housing and GSB | 2024.07.15 9. Specified planting materials may not be available at time of install. Shaw reserves the right to provide approved substitutions. All plant/tree sizing is per the drawings. 10. Install only of primary electric and low voltage conduits. Materials to be provided by utility provider and paid by the Owner. 11. Install only of transformer vaults / pads. Materials to be provided by utility provider and paid by the Owner. 12. Key Exclusions: a. Temporary and permanent shoring for excavation nor for utility trenches b. Rental costs, permits, erosion control measures, perimeter fencing, site cleanup, security cameras at temporary stockpile location. c. Primary utilities (Xcel Energy, Century Link, Comcast, etc.,) planning, engineering, coordination and construction fees are by owner. d. Primary utility cable/wire and conduit/pipe is excluded; by utility and paid by owner. e. We have not included dewatering or treatment of contaminated ground water during earthwork. f. Chemical soil stabilization is excluded. g. Removal and disposal of any underground obstacles that may be found during construction that are not shown on the drawings are excluded. h. Excludes import of structural backfill, on-site soils assumed acceptable for re-use. i. Landscaping warranties and maintenance past (1) year are excluded. j. We exclude any additional topsoil import above required final grades. Landscaping areas and beds to receive soil/mulch required for planting only. k. Flowfill. l. Sewer use fees. m. Frost protection. Division 3-Concrete 1. All concrete is non-architectural. We exclude smooth form and/or decorative finishes on exposed concrete. Colored concrete (of any) to be provided per the drawings. 2. Key Exclusions: a. Exterior walkways tied into foundation walls b. Special inspections fees for Cast In-Place systems. c. Epoxy coated rebar is excluded unless specifically noted. d. Excludes fibermesh, corrosion inhibitor or any other concrete additives unless specifically noted. e. Coordination of unidentified or detailed penetrations at elevated decks. Division 4-Masonry 1. Belden Brick 4x16 at housing units and adjacent retaining wall veneer 2. Glen-Gery 2x16 at GSB 3. 6” CMU partially grouted standard grey block at storage and trash enclosure structures 4. Standard galvanized flashings are included. 5. Key Exclusions: Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Freedom Park Modular Housing and GSB | 2024.07.15 a. Material testing. b. Graffiti coatings. Division 5-Metal 1. Includes one (1) generator enclosure. 2. Cores stairs are supplied with prime coat. 3. Structural steel shall receive no paint finish where fireproofing to be applied. 4. Exposed structural steel shall receive paint finish if/where it may occur. 5. Shaw assumes all steel and steel members are readily available and meet the construction schedule including bar joists. 6. Key Exclusions: a. Steel mock-ups. b. Bridge shoring or temporary bracing c. ASTM certifications per specifications; we will provide fabricator QA/QC information and special inspections in lieu of ASTM. d. Grinding of welds Division 6-Wood & Plastics 1. Housing scope and pricing provided by Shaw Self Perform Services LLC as a stipulated sum to Shaw Construction LLC which includes, but is not limited to: a. Parapet framing and chase wall framing b. Balcony framing and decking c. Stair stringers and precast treads d. Exterior soffits e. Exterior fiber cement siding/trim f. Wood Framing 2. Velvet traceless plastic laminate faced cabinets per spec 3. Quartz and Plam Countertops as specified 4. Key Exclusions: a. Lumber material as “FSC”. b. Fire rated lumber not specifically indicated in the drawings. Division 7-Thermal & Moisture Protection 1. Includes cold fluid applied foundation wall waterproofing as GMX or equal. 2. Roofing as specified 3. Key Exclusions: a. Mold resistant sealants and coatings. b. Low VOC waterproofing systems are excluded. c. Electronic vector mapping is excluded. d. Custom or non-standard sealant colors. e. Custom color flashings. Flashings to match bronze finish from previous phases. f. Foundation insulation at inside face of walls. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Freedom Park Modular Housing and GSB | 2024.07.15 Division 8-Doors & Windows 1. Includes hollow metal flat panel doors and frames at Little Bear storage entries, Anterro garage entry doors, and water entry room at Anterro building 2. General Service Building (GSB) doors and hardware as specified 3. Includes standard speed overhead doors at trash enclosure 4. Includes residential grade overhead doors at Anterros 5. Special warranties on glazing are excluded. 6. Exterior storefront pricing is based upon Arcadia manufacturer: a. 2” x 4-1/2” center glazed system for 1” glazing in dark bronze anodized b. Thermally broken doors with 4-1/2” top rails, 10” bottom rails, 5-3/4” stiles with standard continuous hinges or butt hinges. Von Duprin QEL panics with pulls or Adams Rite Dead Latch, standard construction cores, LCN closers or Stanly auto operators c. 1” overall tempered Solarban 70 over clear insulated unit with black spacer d. 2-1/4” x 7” curtain wall included at Stair 104 location 7. Interior storefront as Wilson manufacturer with a champagne finish 8. Interior door frames not located at storefront locations to be welded metal frames 9. Key Exclusions: a. Elevator smoke curtains/doors b. Impact testing. c. Temporary doors and/or locks. d. Fire rated storefront or glazing. e. Excludes Auto-Operators, not shown. Division 9-Finishes 1. Includes one layer ceiling drywall in Anterro garages and Little Bear storage. 2. Included one layer drywall at any furred walls as indicated in Anterro garages and Little Bear storage. 3. Fire taping of drywall in Anterro garages and Little Bear storage only. 4. Broom finish concrete in Little Bear storage and Anterro garages. 5. Includes all GSB finishes per the plans/specs. 6. Includes Fiber Reinforced Panels where indicated. 7. Key Exclusions: a. Any level 5 finishes. b. Epoxy grouts and/or epoxy thinset. c. Additional substrates above and beyond what is detailed in the plans. Division 10-Specialties 1. An interior signage allowance is included for code related signage. 2. Toilet accessories as specified for the GSB. 3. Three total flagpoles 4. Key Exclusions: a. Medicine cabinets. b. Fire extinguishers. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Freedom Park Modular Housing and GSB | 2024.07.15 c. Recessed corner guards Division 11-Equipment 1. Includes allowance for unit kitchen appliances 2. Included allowance for appliances at the GSB 3. Key Exclusions: a. Parking control equipment. b. Commercial laundry equipment. c. Outdoor kitchen equipment Division 12-Furnishings 1. Includes 2” faux wood cordless blinds at all housing unit windows. Blinds are pre-finished; painting is excluded. 2. Includes 3% Draper manual roller shades for GSB with fascia and end caps 3. Key Exclusions: a. Blinds at any unit entry nor balcony doors. b. Sub-countertops. Division 13 – Modular Construction 1. Transportation of modular units from Buena Vista to storage yard set on cribbing. 2. Transportation of modular units from storage yard to jobsite is included. 3. Includes interior seam and stich of units with all required MEP&FS tie-ins and patching finishes above tubs. 4. Includes structural setting and stitching of modular units. 4. Key Exclusions: a. Exclusion of the furnish of all modular boxes. Work is to be performed by others and paid for by County. b. Warranty of factory-built items in modular boxes to be covered by Fading West. c. Final coat of interior paint. d. Furnish and install of unit entry doors. e. Supply of exterior insulation for seam stitching. f. Supply of crush plates that modular boxes bear on. Division 14-Conveying System 1. We have included (1) electric, machine room-less elevator: a. Three Stop Elevator has 3,500 lb. capacity with a speed of 100 FPM. b. Based upon Schindler 3100 elevator c. Standard manufacturer cab laminate wall finishes with carpet finish and painted entrance foors/frames 2. Key Exclusions: a. Electromagnetic interference shielding for the elevators. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Freedom Park Modular Housing and GSB | 2024.07.15 b. Registration with State of Colorado Division of Oil and Public Safety. c. Trash chutes. d. Access control. e. Sight guards. f. Remote diagnostic and visualization systems. Division 15-Mechanical 1. A design build fire protection system is included. It is designed to meet NFPA 13 for the GSB and NFPA 13R for housing. 2. Includes a complete VRF mechanical system for the GSB 3. Condensers for housing units provided by modular fabricator. 4. Testing and air balancing is included however a certified third-party report is excluded. 5. Pipe exposed to freezing conditions and hot water pipe to be insulated only. 5. Key Exclusions: a. Fire pump(s). b. Return air duct/registers as indicated by AEC / VE effort. c. Any duct and exterior wall sealing for housing units by modular fabricator. d. Duct cleaning during construction to meet any LEED certifications. e. Snowmelt systems. f. Fire dampers unless indicated g. A radon mitigation system for housing nor GSB. h. Tap/Development Fees, Water Meter and/or Vault, and Gas Meter/Primary Regulators. i. Third party building commissioning. j. Air filters, above and beyond drawings and specifications. Division 16-Electrical 1. Includes complete base electrical scope, including but not limited to light fixtures (as specified), fire alarm, telecom system, Area of Refuge and elevator lobby communication system, access control system, CCTV system, and WIFI system. 2. Conduit and power for five car charging stations is included. Electric car charging stations and equipment is not included. Conduit and pull string only included for future car charging station indicated. 3. Telecom, Data and Cable TV scope includes the following only: a. Category 6 structured cabling system per E2.0, E2.1, and E2.2. Distribution based on upon free air cable in support hangers where possible. b. 16 each Wireless Access Points (WAP) locations each with 2 CAT6A cables (WAPs not shown on drawings) i. 4 locations in the Basement ii. 6 locations at level 1 iii. 6 locations at level 2 iv. Installation of Owner WAP devices c. Camera cabling at 36 locations each with 2 CAT6A cables d. Emergency Responder Radio Communication System allowance 4. Key Exclusions: a. Audio / Visual systems other than cable shown on drawings Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Freedom Park Modular Housing and GSB | 2024.07.15 b. All power and lighting not shown on electrical drawings. c. Supply/install of security cameras; by Owner d. WiFi and cellular signal booster systems. e. Phones and phone equipment. Insurance / Contingency / Fee •General Liability insurance is provided by Shaw. •Payment and Performance Bond is included. •Escalation is excluded. Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Current Drawings Drawing No.Drawing Title Revision Drawing Date Received Date Set Architectural A-101 BASEMENT LEVEL SITE PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-102 SITE PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-103 BASEMENT FLOOR PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-104 FIRST FLOOR PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-105 SECOND FLOOR PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-106 ROOF PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-107 STORAGE SHED & TRASH ENCLOSURE 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-108 BASEMENT REFLECTED CEILING PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-109 FIRST FLOOR REFLECTED CEILING PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-110 SECOND FLOOR REFLECTED CEILING PLAN 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-201 EXTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-202 EXTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-203 EXTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-301 BUILDING SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-302 BUILDING SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-303 BUILDING SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-304 BUILDING SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-305 WALL SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-306 WALL SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-307 WALL SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-308 WALL SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-309 WALL SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-310 WEST STAIR FLOOR PLANS & SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-311 EAST STAIR FLOOR PLANS & SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-312 WALL SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-313 WALL SECTIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-315 SKYLIGHTS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-401 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-402 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-403 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-404 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-405 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-406 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 1 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Drawing No.Drawing Title Revision Drawing Date Received Date Set A-407 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-408 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-409 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-410 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-411 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-412 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-413 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-414 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-415 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-416 INTERIOR ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-417 INTERIOR ELEVATIONS C&R/MV WORKSTATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-418 INTERIOR ELEVATIONS SECURITY DESK 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-501 ROOF & WALL ASSEMBLIES 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-502 WALL & FLOOR ASSEMBLIES 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-503 DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-504 DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-505 DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-506 INTERIOR DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-507 INTERIOR DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-508 DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-509 DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-510 U.L. ASSEMBLIES 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-511 U.L. ASSEMBLIES 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-512 DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-513 WORKSTATION DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-514 SECURITY DESK DETAILS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-601 SCHEDULES 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-602 SCHEDULES 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-603 SCHEDULES 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-604 STOREFRONT ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-605 STOREFRONT ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) A-606 STOREFRONT ELEVATIONS 0 06/14/2024 06/14/2024 Architectural (06/14/24) Civil C0 EXHIBIT DRAWING - PROJECT LIMIT LINES 0 06/14/2024 06/14/2024 Civil (06/14/24) C1.0 CIVIL COVER SHEET & NOTES 0 06/14/2024 06/14/2024 Civil (06/14/24) C1.1 EXISTING CONDITIONS PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C1.2 DEMOLITION PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C2.0 OVERALL SITE PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 2 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Drawing No.Drawing Title Revision Drawing Date Received Date Set C2.1 ROAD PLAN & PROFILE 0 06/14/2024 06/14/2024 Civil (06/14/24) C2.2 GRADING PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C2.3 GRADING PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C2.4 SIGNAGE & STRIPING PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C2.5 TURNING MOVEMENTS 0 06/14/2024 06/14/2024 Civil (06/14/24) C3.0 STORM PLAN & PROFILES 0 06/14/2024 06/14/2024 Civil (06/14/24) C3.1 SUBDRAIN PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C4.0 OVERALL UTILITY PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C4.1 WATER PLAN & PROFILE 0 06/14/2024 06/14/2024 Civil (06/14/24) C4.2 WATER PLAN & PROFILE 0 06/14/2024 06/14/2024 Civil (06/14/24) C5.1 SEWER PLAN & PROFILE 0 06/14/2024 06/14/2024 Civil (06/14/24) C5.2 SEWER PLAN & PROFILE 0 06/14/2024 06/14/2024 Civil (06/14/24) C6.1 SHALLOW UTILITY PLAN 0 06/14/2024 06/14/2024 Civil (06/14/24) C7.1 EROSION CONTROL PLAN 1 07/15/2024 07/15/2024 Civil (06/14/24) C8.1 GRADING DETAILS 0 06/14/2024 06/14/2024 Civil (06/14/24) C8.2 STORM DRAINAGE DETAILS 0 06/14/2024 06/14/2024 Civil (06/14/24) C8.3 WATER DETAILS 0 06/14/2024 06/14/2024 Civil (06/14/24) C8.4 SEWER DETAILS 0 06/14/2024 06/14/2024 Civil (06/14/24) C8.5 EROSION CONTROL DETAILS 0 06/14/2024 06/14/2024 Civil (06/14/24) C9.0 TOPOGRAPHIC SURVEY 0 06/14/2024 06/14/2024 Civil (06/14/24) Electrical E1.0 LEGEND, SPECS & DETAILS 0 06/14/2024 06/14/2024 Electrical (06/14/24) E1.1 LEGEND, SPECS, DETAILS & ONE-LINE 0 06/14/2024 06/14/2024 Electrical (06/14/24) E1.2 PANEL SCHEDULES, DETAILS & ONE-LINE 0 06/14/2024 06/14/2024 Electrical (06/14/24) E2.0 BASEMENT POWER & SYSTEMS PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) E2.1 1ST FLOOR POWER & SYSTEMS PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) E2.2 2ND FLOOR POWER & SYSTEMS PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) E2.3 ROOF POWER & SYSTEMS PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) E3.0 BASEMENT LIGHTING SYSTEMS PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) E3.1 1ST FLOOR LIGHTING SYSTEMS PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) E3.2 2ND FLOOR LIGHTING SYSTEMS PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) E4.0 SITE POWER & LIGHTING PLAN 0 06/14/2024 06/14/2024 Electrical (06/14/24) General G-001 TITLE SHEET 0 06/14/2024 06/14/2024 General (06/14/24) G-002 BUILDING & ZONING CODE DATA/ANALYSIS 0 06/14/2024 06/14/2024 General (06/14/24) G-003 FRONTAGE INCREASE CALCS. BLDGS. ON SAME LOT DIAG.0 06/14/2024 06/14/2024 General (06/14/24) G-004 PARKING ANALYSIS 0 06/14/2024 06/14/2024 General (06/14/24) Housing Units - Antero Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 3 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Drawing No.Drawing Title Revision Drawing Date Received Date Set A-G000.L COVER SHEET 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-G001 GENERAL NOTES, LEGENDS & ABBREVIATIONS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-G002 CODE SUMMARY 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-G005 LIFE SAFETY PLANS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A050 ASSEMBLIES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A051 ASSEMBLIES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A052 ASSEMBLY LISTINGS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A053 ASSEMBLY LISTINGS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A110 FOUNDATION PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A111 GARAGE REFLECTED CEILING PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A120 FLOOR PLANS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A121 FLOOR PLANS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A140 ROOF PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A200 EXTERIOR ELEVATIONS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A300 SITE BUILDING SECTION 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A310 WALL SECTION 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A601 DOOR SCHEDULE AND ELEVATIONS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A800 RATED ASSEMBLY AND GARAGE DETAILS(LOCAL)0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A810 FOUNDATION & MATE LINE DETAILS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A820 ROOF DETAILS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A830 PORCH DETAILS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A840 AWNING DETAILS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-A850 MATERIAL TRANSITIONS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-E000 ELECTRICAL LEGENDS & NOTES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-E101 ELECTRICAL GARAGE LEVEL FLOOR PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-E102 ELECTRICAL GROUND LEVEL FLOOR PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-E201 1-LINE DIAGRAM & CALCS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-E601 ELECTRICAL SCHEDULES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-M000 MECHANICAL LEGENDS & NOTES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-M101 MECHANICAL GARAGE LEVEL FLOOR PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-M102 MECHANICAL GROUND LEVEL FLOOR PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-P000 PLUMBING LEGEND & NOTES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-P101 PLUMBING FLOOR PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-P501 PLUMBING DETAILS & SCHEDULES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-S000 STRUCTURAL GENERAL NOTES 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-S100 FOUNDATION PLAN 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-S101 FRAMING PLAN - LEVEL 1 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-S102 FRAMING PLAN - LEVEL 2 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 4 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Drawing No.Drawing Title Revision Drawing Date Received Date Set A-S301 FOUNDATION DETAILS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-S401 FRAMING DETAILS 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) A-S402 FRAMING DETAILS PORCH 0 07/01/2024 07/01/2024 Housing Units - Antero (07/01/24) Housing Units - Little Bears LB-G000.M COVER SHEET 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-G001 GENERAL NOTES, LEGENDS & ABBREVIATIONS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-G002 CODE SUMMARY 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-G004 RES-CHECK 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-G005 LIFE SAFETY PLANS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-G008 FIRE SEPARATION SECTION 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-G101 ACCESSIBILITY PLAN 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A001 GENERAL NOTES 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A050 ASSEMBLIES 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A051 ASSEMBLIES 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A052 LISTED ASSEMBLIES 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A053 LISTED ASSEMBLIES 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A054 LISTED ASSEMBLIES 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A110 FOUNDATION PLAN & REFLECTED CEILING PLAN 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A120 FLOOR PLAN & REFLECTED CEILING PLAN 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A121 FLOOR PLAN & REFLECTED CEILING PLAN 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A140 ROOF PLAN 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A200 EXTERIOR ELEVATIONS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A300 BUILDING SECTION 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A310 WALL SECTION 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 5 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Drawing No.Drawing Title Revision Drawing Date Received Date Set LB-A601 OPENING SCHEDULES AND ELEVATIONS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A602 DOOR DETAILS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A603 WINDOW DETAILS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A800 RATED DETAILS & EXTERIOR STAIR SECTION 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A810 FOUNDATION & MATE LINE DETAILS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A820 ROOF DETAILS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-A901 CASEWORK ELEVATIONS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-E000 ELECTRICAL LEGENDS & NOTES 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-E101 ELECTRICAL FLOOR PLANS 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-E201 1-LINE DIAGRAM & CALCS 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-E601 ELECTRICAL SCHEDULES 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-M000 MECHANICAL LEGENDS & NOTES 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-M101 MECHANICAL FLOOR PLANS 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-M601 MECHANICAL SCHEDULES & DETAILS 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-P000 PLUMBING LEGENDS & NOTES 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-P101 PLUMBING FLOOR PLAN 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-P201 PLUMBING WASTE / VENT ISO 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-P202 PLUMBING DOMESTIC ISO 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-P501 PLUMBING DETAILS 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-P601 PLUMBING SCHEDULES 0 05/10/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-S000 STRUCTURAL GENERAL NOTES 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-S100 FOUNDATION PLAN 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-S101 FRAMING PLAN - LEVEL 1 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 6 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Drawing No.Drawing Title Revision Drawing Date Received Date Set 24) LB-S102 FRAMING PLAN - LEVEL 2 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-S301 FOUNDATION DETAILS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-S401 FRAMING DETAILS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-S402 FRAMING DETAILS 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) LB-S403 FRAMING DETAILS PORCH 0 05/03/2024 07/15/2024 Housing Units - Little Bears (05/03/ 24) IRRIGATION IR1 IRRIGATION PLAN, NOTES AND SCHEDULE 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) IR2 IRRIGATION DETAILS 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) LANDSCAPE HD-1 HARDSCAPE DETAILS 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) HD-2 HARDSCAPE DETAILS 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) HS-0 COVER/GENERAL NOTES 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) HS-1 OVERALL HARDSCAPE PLAN 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) HS-2 HARDSCAPE ENLARGEMENTS 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) LD-1 LANDSCAPE DETAILS 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) LS-1 OVERALL LANDSCAPE PLAN 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) LS-2 LANDSCAPE PLAN ENLARGEMENT 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) LS-3 LANDSCAPE PLAN ENLARGEMENT 0 06/14/2024 06/14/2024 Landscape & Irrigation (06/14/24) Mechanical M1.0 MECHANICAL LEGEND, SPEC'S & SEQUENCE 0 06/14/2024 06/14/2024 Mechanical (06/14/24) M1.1 MECHANICAL SCHEDULES 0 06/14/2024 06/14/2024 Mechanical (06/14/24) M1.2 MECHANICAL SCHEDULES 0 06/14/2024 06/14/2024 Mechanical (06/14/24) M1.3 MECHANICAL DETAILS 0 06/14/2024 06/14/2024 Mechanical (06/14/24) M2.0 BASEMENT & STORAGE HVAC PLAN 0 06/14/2024 06/14/2024 Mechanical (06/14/24) M2.1 1st FLOOR HVAC PLAN 0 06/14/2024 06/14/2024 Mechanical (06/14/24) M2.2 2nd FLOOR HVAC PLAN 0 06/14/2024 06/14/2024 Mechanical (06/14/24) M2.3 ROOF HVAC PLAN 0 06/14/2024 06/14/2024 Mechanical (06/14/24) Plumbing P1.0 PLUMBING LEGEND, SPEC'S & SEQUENCE 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P1.1 PLUMBING DETAILS 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P2.0 SUB-FLOOR WASTE & VENT PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P2.1 BASEMENT WASTE & VENT PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P2.2 FIRST FLOOR WASTE & VENT PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 7 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Drawing No.Drawing Title Revision Drawing Date Received Date Set P2.3 SECOND FLOOR WASTE & VENT PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P2.4 ROOF WASTE & VENT PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P3.0 BASEMENT DOMESTIC WATER PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P3.1 FIRST FLOOR DOMESTIC WATER PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) P3.2 SECOND FLOOR DOMESTIC WATER PLAN 0 06/14/2024 06/14/2024 Plumbing (06/14/24) Structural S1.1 GENERAL NOTES LEGEND & SHEET INDEX 0 06/14/2024 06/14/2024 Structural (06/14/24) S1.2 SPECIAL INSPECTIONS 0 06/14/2024 06/14/2024 Structural (06/14/24) S2.1 FOUNDATION PLAN 0 06/14/2024 06/14/2024 Structural (06/14/24) S2.2 FIRST FLOOR FRAMING PLAN 0 06/14/2024 06/14/2024 Structural (06/14/24) S2.3 SECOND FLOOR FRAMING PLAN 0 06/14/2024 06/14/2024 Structural (06/14/24) S2.4 ROOF FRAMING PLAN 0 06/14/2024 06/14/2024 Structural (06/14/24) S2.5 ANCILLARY BUILDINGS 0 06/14/2024 06/14/2024 Structural (06/14/24) S3.1 FOUNDATION DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S3.2 FOUNDATION DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S4.1 FRAMING DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S5.1 STEEL DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S5.2 STEEL DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S5.3 STEEL DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S5.4 STEEL DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S6.1 CURTAIN WALL & MISC. DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S6.2 BRACE FRAME & DETAILS 0 06/14/2024 06/14/2024 Structural (06/14/24) S7.1 COLUMN SCHEDULE 0 06/14/2024 06/14/2024 Structural (06/14/24) S7.2 COLUMN SCHEDULE 0 06/14/2024 06/14/2024 Structural (06/14/24) S7.3 COLUMN SCHEDULE 0 06/14/2024 06/14/2024 Structural (06/14/24) Shaw Construction Printed on Thu Aug 15, 2024 at 08:52 am MDT Job #: 10169 Edwards Freedom Park 410 Miller Ranch Road Edwards, Colorado 8162 Page 8 of 8 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Edwards Freedom Park – 8/21/24 Allowances Log •Builders Risk and Site Security; $335,000 o Policy to cover 12 months for Housing (runs passed anticipated duration due to extension difficulties if needed) for a value of roughly $100,000; policy is anticipated to be anywhere from $75,000 to $100,000 o Policy to cover 21 months for GSB (runs passed anticipated duration due to extension difficulties if needed) for a value of $40,000 o Site security cameras are anticipated to run anywhere from $6,000 - $11,000 per month. Value accounts for 21 month total duration for a value of $195,000 •Weather Conditions: $150,000 o Anticipated costs associated with weather conditions included, but are not limited to, ground thaw machines and fuel, snow removal, temporary heat equipment and fuel usage, concrete blankets, temporary window openings for dry in, building tenting/heating, concrete admixes, winter excavation/backfill requirements, etc. •Site Furnishings: $25,000 o Supply / install of furnishings shown on Furniture Schedule. ▪Bench A – 2 total ▪Bench B – 1 total ▪Table A – 7 total; may be owner scope ▪Chair A – 28 total; may be owner scope ▪Trash Receptacle A – 2 total; may be owner scope ▪Bike Rack – 5 total •Low Voltage for Housing Units: $30,000 o Install of any conduit / backbone cable from building demarc location to unit media boxes o Install of cat6 / RG6 from media boxes to data outlets in units including data outlet terminations o Media boxes and raceways to data outlets assumed by Modular •Fireproofing: $117,800 o Spray applied Fireproofing at structural steel members to be identified by design team. •Skylights and Curbs: $50,000 o 1 each at 3’ x 5’ o 1 each at 2’-6” x 5’ o 1 each at 6’-6” x 11’-2” •Exterior Signage; $30,000 o $1,000 for each housing unit to cover Building Signage and Unit Door Signage o $10,000 for GSB Building Signage and/or Monument Sign •Corner & Wall Guards for GSB: $29,450 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Page 2 of 2 •Residential Appliances: $90,000 o Supply and install of refrigerators, microwaves/hoods, dishwashers, ranges, laundry, and garbage disposals (if disposals not provided by modular) •GSB Appliances: $15,000 o Supply and install of kitchen dishwasher, hood, range, and refrigerator o Supply and install of sheriff’s break room refrigerator o Supply and install of lab freezer, install of existing lab refrigerator supplied by Owner o Supply and install of kitchenette refrigerator •Access Control: $150,000 o Matrix card reader supply / install for 30 locations o Matrix head end equipment and cabling from card readers to equipment o Programming of card reader locations •Emergency Responder Radio System: $51,538 o Full system install if deemed required after initial testing with equipment. Testing is included. •Bullet Resistance Door/Window Frames and Glazing Upgrades: $50,000 o Any upgrades / change to storefront framing / doors and glazing at Sheriff vestibule entry door/sidelite, Sheriff’s Workstations window, and Sheriff’s Break Room window that may be required to accept bullet resistant glazing Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Current Specifications Number Description Revision Issued Date Received Date Set 00 - Procurement and Contracting Requirements 01 - General Requirements 010000 General Requir ements0 EFP Specifications 03 - Concrete 03300 Imprinted Concr ete Sidewalks0 EFP Specifications 04 - Masonry 042000 Unit Masonry0 EFP Specifications 05 - Metals 055213P ipe and Tube Railings0 EFP Specifications 07 - Thermal and Moisture Protection 071113 Bituminous Damppr oofing0 EFP Specifications 071413 Hot Fluid-Applied Rubberized Asphalt Waterpr oofing0 EFP Specifications 072100 Ther mal Insulation0 EFP Specifications 072600V apor Retar ders0 EFP Specifications 072727W ater Resistive Vapor Per meable Air Bar rier0 EFP Specifications 074213 Metal Wall Panels0 EFP Specifications 075423 Ther moplastic-P olyolefin Roofing0 EFP Specifications 077000R oof and Wall Specialties and Accessories0 EFP Specifications 08 - Openings 081113 Hollow Metal Doors and Frames0 EFP Specifications 081125 Interior Aluminum Doors, Door Frames, and Glazing Frames0 EFP Specifications 081213 Hollow Metal Frames0 EFP Specifications 081416 Flush Wood Doors0 EFP Specifications 084113 Aluminum-F ramed Entrances and Stor efr onts0 EFP Specifications 084313 Aluminum-F ramed Stor efr onts0 EFP Specifications 085653 Security Windows0 EFP Specifications 087100 Door Har dware0 EFP Specifications 087101 Door Har dware Index0 EFP Specifications 088000 Glazing0 EFP Specifications 09 - Finishes 092900 Gypsum Board0 EFP Specifications 093013 Ceramic Tiling0 EFP Specifications 096813T ile Carpeting0 EFP Specifications Shaw ConstructionP rinted on Thu Aug 15, 2024 at 08:53 am MDT Job #: 10169 Edwar ds Freedom Park 410 Miller Ranch Road Edwar ds, Colorado 8162 Page 1 of 3 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Number Description Revision Issued Date Received Date Set 097700 Special Wall Surfacing0 EFP Specifications 099123 Interior Painting0 EFP Specifications 22 - Plumbing 220513 Common Motor Requir ements for Plumbing Equipment0 EFP Specifications 220516 Expansion Fittings and Loops for Plumbing Piping0 EFP Specifications 220519 Meters and Gages for Plumbing Piping0 EFP Specifications 220523 General-Duty Valves for Plumbing Piping0 EFP Specifications 220529 Hangers and Supports for Plumbing Piping and Equipment0 EFP Specifications 220548V ibration and Seismic Contr ols for Plumbing Piping and Equipment0 EFP Specifications 220553 Identification for Plumbing Piping and Equipment0 EFP Specifications 220719 Plumbing Piping Insulation0 EFP Specifications 221116 Domestic Water Piping0 EFP Specifications 221119 Domestic Water Piping Specialties0 EFP Specifications 221123 Domestic Water Pumps0 EFP Specifications 221316 Sanitary Waste and Vent Piping0 EFP Specifications 221319 Sanitary Waste Piping Specialties0 EFP Specifications 221413F acility Storm Drainage Piping0 EFP Specifications 221423 Storm Drainage Piping Specialties0 EFP Specifications 221429 Sump Pumps0 EFP Specifications 223300 Electric Domestic Water Heaters0 EFP Specifications 224500 Emer gency Plumbing Fixtur es0 EFP Specifications 224713 Drinking Fountains0 EFP Specifications 23 - Heating, Ventilating, and Air Conditioning (HV AC) 230513 Common Motor Requir ements for HVAC Equipment0 EFP Specifications 230529 Hangers and Supports for HVAC Piping and Equipment0 EFP Specifications 230548V ibration and Seismic Contr ols for HVAC0 EFP Specifications 230553 Identification for HVAC Piping and Equipment0 EFP Specifications 230593T esting, Adjusting, and Balancing for HVAC0 EFP Specifications 230713 Duct Insulation0 EFP Specifications 230719 HVAC Piping Insulation0 EFP Specifications 230923 Dir ect-Digital Contr ol System for HVAC0 EFP Specifications 230993 Sequence of Operations for HVAC Contr ols0 EFP Specifications 232300R efrigerant Piping0 EFP Specifications 233113 Metal Ducts0 EFP Specifications 233300 Air Duct Accessories0 EFP Specifications 233346 Fle xible Ducts0 EFP Specifications 233713 Diffusers, Registers, and Grilles0 EFP Specifications Shaw ConstructionP rinted on Thu Aug 15, 2024 at 08:53 am MDT Job #: 10169 Edwar ds Freedom Park 410 Miller Ranch Road Edwar ds, Colorado 8162 Page 2 of 3 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Number Description Revision Issued Date Received Date Set 237219F ix ed-Plate Air -to -Air Ener gy -R ecovery Equipment0 EFP Specifications 237223P ack aged Air -to -Air Ener gy -R ecovery Units0 EFP Specifications 238126 Split-System Air -Conditioners0 EFP Specifications 238129V ariable Refrigerant Flow HVAC Systems0 EFP Specifications 238216 Air Coils0 EFP Specifications 238219F an Coil Units0 EFP Specifications 238239 Unit Heaters0 EFP Specifications 26 - Electrical 260010 SUPPLEMENT AL REQUIREMENTS FOR ELECTRICAL0 EFP Specifications 260519L OW -V OLTA GE ELECTRICAL POWER CONDUCTORS AND0 EFP Specifications 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS0 EFP Specifications 260529 HANGERS AND SUPPOR TS FOR ELECTRICAL SYSTEMS0 EFP Specifications 260533R aceway and Box es for Electrical Systems0 EFP Specifications 260553 IDENTIFICA TION FOR ELECTRICAL SYSTEMS0 EFP Specifications 260923 LIGHTING CONTROL DEVICES0 EFP Specifications 262213L OW -V OLTA GE DISTRIBUTION TR ANSFORMERS0 EFP Specifications 262413 SWIT CHBO ARDS0 EFP Specifications 262416P ANELBO ARDS0 EFP Specifications 262726W iring Devices0 EFP Specifications 263213 Engine Generators0 EFP Specifications 263353 STA TIC UNINTERRUPTIBLE POWER SUPPLY0 EFP Specifications 263600 TR ANSFER SWIT CHES0 EFP Specifications 264113 LIGHTNING PROTECTION FOR STRUCTURES0 EFP Specifications 265119 LED INTERIOR LIGHTING0 EFP Specifications 265619 LED EX TERIOR LIGHTING0 EFP Specifications 32 - Exterior Improvements 32 8423 Under gr ound Sprinklers0 EFP Specifications 32 9300 Plants0 EFP Specifications 33 - Site Utilities 330000 Site Utilities0 None Shaw ConstructionP rinted on Thu Aug 15, 2024 at 08:53 am MDT Job #: 10169 Edwar ds Freedom Park 410 Miller Ranch Road Edwar ds, Colorado 8162 Page 3 of 3 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 APPLICATION AND CERTIFICATE FOR PAYMENT Shaw Invoice # :G702 To Owner :Eagle County 500 Broadway P.O. Box 850 Eagle, CO 81631 Project :Edwards Freedom Park Application No. :Distribution to : Owner Period From :Architect Period To :Contractor From Contractor :Shaw Construction 300 Kalamath Street Denver, CO 80223 Via Architect : CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief, the work covered by this Application for Payment has been completed in accordance with the Contract Documents. That all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet is attached. 1. Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,176,430.00 CONTRACTOR:Shaw Builders LLC2. Net Change By Change Order . . . . . . . . . . . . . . . . . . . . . . . .$0.00 3. Contract Sum To Date (Line 1 + 2) . . . . . . . . . . . . . . . . . . . . . .$26,176,430.00 4. Total Completed and Stored To Date . . . . . . . . . . . . . . . . . (Column G on G703) $0.00 By:____________________________________ Date:______________ 5. Retainage :State of:County of: a.0.00%of Completed Work $0.00 Subscribed and sworn to before me this day of Notary Public: b . 0.00%of Stored Material $0.00 My Commission expires: Total Retainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Total in Column I on G703) $0.00 6. Total Earned Less Retainage . . . . . . . . . . . . . . . . . . . . . . . . (Line 4 less Line 5 Total) $0.00 ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information, and belief, the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. 7. Less Previous Certificates For Payments . . . . . . . . . . . . . . . (Line 6 from prior Certificate)$0.00 8. Current Payment Due . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0.00 9. Balance To Finish, Plus Retainage . . . . . . . . . . . . . . . . . . . (Line 3 less Line 6) $26,176,430.00 AMOUNT CERTIFIED $0.00 (Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Continuation Sheet that are changed to conform with the amount certified.) CHANGE ORDER SUMMARY Additions Deductions ARCHITECT: Total changes approved in previous months by Owner $0.00 $0.00 Total Approved this Month $0.00 $0.00 By:____________________________________ Date:______________ TOTALS $0.00 $0.00 This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.Net Changes By Change Order $0.00 EXHIBIT 7Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 CONTINUATION SHEET Page 1 of 2 G703 Application and Certificate for Payment, containing Contractor's signed certification, is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. Application No. : Application Date : To : Invoice # :Contract : A B C D E F G H I Item No. Description of Work Scheduled Value Work Completed Materials Presently Stored Total Completed and Stored To Date % Complet e Balance To Finish Retainage From Previous Application This Period In Place (D+E)(Not in D or E)(D+E+F)(G / C)(C-G) 01000 General Conditions 1,712,287.00 0.00 0.00 0.00 0.00 0.00%1,712,287.00 0.00 02220 Site Demolition 55,260.00 0.00 0.00 0.00 0.00 0.00%55,260.00 0.00 02315 Site - Excavation & Fill 507,459.00 0.00 0.00 0.00 0.00 0.00%507,459.00 0.00 02316 Housing - Building Excavation 159,520.00 0.00 0.00 0.00 0.00 0.00%159,520.00 0.00 02317 GSB - Building Excavation 130,922.00 0.00 0.00 0.00 0.00 0.00%130,922.00 0.00 02370 Erosion Control 135,575.00 0.00 0.00 0.00 0.00 0.00%135,575.00 0.00 02505 Site Utilities 896,909.00 0.00 0.00 0.00 0.00 0.00%896,909.00 0.00 02506 Housing - Utilities 53,800.00 0.00 0.00 0.00 0.00 0.00%53,800.00 0.00 02507 GSB - Utilities 36,300.00 0.00 0.00 0.00 0.00 0.00%36,300.00 0.00 02720 Base Courses 163,472.00 0.00 0.00 0.00 0.00 0.00%163,472.00 0.00 02740 Asphalt Paving 296,580.00 0.00 0.00 0.00 0.00 0.00%296,580.00 0.00 02750 Concrete Paving 221,107.00 0.00 0.00 0.00 0.00 0.00%221,107.00 0.00 02760 Pavement Markings 20,000.00 0.00 0.00 0.00 0.00 0.00%20,000.00 0.00 02830 Retaining Walls 154,320.00 0.00 0.00 0.00 0.00 0.00%154,320.00 0.00 02905 Landscape 299,583.00 0.00 0.00 0.00 0.00 0.00%299,583.00 0.00 03310 Housing - CIP Concrete 392,428.00 0.00 0.00 0.00 0.00 0.00%392,428.00 0.00 03311 GSB - CIP Concrete 1,119,797.00 0.00 0.00 0.00 0.00 0.00%1,119,797.00 0.00 04210 Housing - Masonry 180,912.00 0.00 0.00 0.00 0.00 0.00%180,912.00 0.00 04211 GSB - Masonry 382,933.00 0.00 0.00 0.00 0.00 0.00%382,933.00 0.00 04220 CMU Trash & Storage Shed 36,449.00 0.00 0.00 0.00 0.00 0.00%36,449.00 0.00 05120 Generator Structure 41,650.00 0.00 0.00 0.00 0.00 0.00%41,650.00 0.00 05121 Housing - Steel Railings & Misc. Metals 205,720.00 0.00 0.00 0.00 0.00 0.00%205,720.00 0.00 05122 GSB - Structural Steel & Misc. Metals 1,803,692.00 0.00 0.00 0.00 0.00 0.00%1,803,692.00 0.00 06000 Housing - Framing 545,114.00 0.00 0.00 0.00 0.00 0.00%545,114.00 0.00 06001 Housing - Siding 548,241.00 0.00 0.00 0.00 0.00 0.00%548,241.00 0.00 06002 Housing - WRB 74,340.00 0.00 0.00 0.00 0.00 0.00%74,340.00 0.00 06105 GSB - Rough Carpentry 51,538.00 0.00 0.00 0.00 0.00 0.00%51,538.00 0.00 06410 GSB - Cabinets & Countertops 477,331.00 0.00 0.00 0.00 0.00 0.00%477,331.00 0.00 07120 Housing - Waterproofing 75,000.00 0.00 0.00 0.00 0.00 0.00%75,000.00 0.00 07121 GSB - Waterproofing 137,500.00 0.00 0.00 0.00 0.00 0.00%137,500.00 0.00 07210 Housing - Building Insulation 27,450.00 0.00 0.00 0.00 0.00 0.00%27,450.00 0.00 07211 GSB - Building Insulation 103,075.00 0.00 0.00 0.00 0.00 0.00%103,075.00 0.00 07260 Housing - Vapor Barrier 9,150.00 0.00 0.00 0.00 0.00 0.00%9,150.00 0.00 07261 GSB - Vapor Retarder 14,512.00 0.00 0.00 0.00 0.00 0.00%14,512.00 0.00 07430 Housing - Composite Panels 424,800.00 0.00 0.00 0.00 0.00 0.00%424,800.00 0.00 07431 GSB - Composite Panels 788,313.00 0.00 0.00 0.00 0.00 0.00%788,313.00 0.00 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 07540 Housing - TPO Roofing 199,806.00 0.00 0.00 0.00 0.00 0.00%199,806.00 0.00 07541 GSB - TPO Roofing 339,546.00 0.00 0.00 0.00 0.00 0.00%339,546.00 0.00 07620 Housing - Flashing & Sheet Metal 36,120.00 0.00 0.00 0.00 0.00 0.00%36,120.00 0.00 07621 GSB - Flashing & Sheet Metal 22,088.00 0.00 0.00 0.00 0.00 0.00%22,088.00 0.00 07840 GSB - Firestopping 8,246.00 0.00 0.00 0.00 0.00 0.00%8,246.00 0.00 07920 Housing - Joint Sealants 41,280.00 0.00 0.00 0.00 0.00 0.00%41,280.00 0.00 07921 GSB - Joint Sealants 44,175.00 0.00 0.00 0.00 0.00 0.00%44,175.00 0.00 08010 Housing - Doors & Hardware 45,500.00 0.00 0.00 0.00 0.00 0.00%45,500.00 0.00 08011 GSB - Doors & Hardware 447,017.00 0.00 0.00 0.00 0.00 0.00%447,017.00 0.00 08360 Trash Coiling Doors 30,000.00 0.00 0.00 0.00 0.00 0.00%30,000.00 0.00 08361 Housing - Overhead Doors 22,000.00 0.00 0.00 0.00 0.00 0.00%22,000.00 0.00 08410 GSB - Storefront Systems 604,821.00 0.00 0.00 0.00 0.00 0.00%604,821.00 0.00 09110 GSB - Metal Stud Framing 1,620,464.00 0.00 0.00 0.00 0.00 0.00%1,620,464.00 0.00 09250 Housing - Gypsum Wall Board 123,269.00 0.00 0.00 0.00 0.00 0.00%123,269.00 0.00 09310 GSB - Flooring 418,079.00 0.00 0.00 0.00 0.00 0.00%418,079.00 0.00 09910 Housing - Painting 86,450.00 0.00 0.00 0.00 0.00 0.00%86,450.00 0.00 09911 GSB - Painting 181,775.00 0.00 0.00 0.00 0.00 0.00%181,775.00 0.00 10605 Housing - Wire Mesh Partitions 28,000.00 0.00 0.00 0.00 0.00 0.00%28,000.00 0.00 10350 GSB - Flagpoles 15,000.00 0.00 0.00 0.00 0.00 0.00%15,000.00 0.00 10440 GSB - Interior Signage 7,362.00 0.00 0.00 0.00 0.00 0.00%7,362.00 0.00 10810 GSB - Toilet Accessories 24,975.00 0.00 0.00 0.00 0.00 0.00%24,975.00 0.00 12490 Housing - Window Treatments 22,000.00 0.00 0.00 0.00 0.00 0.00%22,000.00 0.00 12491 GSB - Window Treatments 24,000.00 0.00 0.00 0.00 0.00 0.00%24,000.00 0.00 13124 Housing - Modular Transport, Set, & Stitch 379,577.00 0.00 0.00 0.00 0.00 0.00%379,577.00 0.00 14210 GSB - Elevators 173,002.00 0.00 0.00 0.00 0.00 0.00%173,002.00 0.00 15100 Housing - Plumbing 202,000.00 0.00 0.00 0.00 0.00 0.00%202,000.00 0.00 15101 GSB - Plumbing 542,156.00 0.00 0.00 0.00 0.00 0.00%542,156.00 0.00 15300 Housing - Fire Protection 262,207.00 0.00 0.00 0.00 0.00 0.00%262,207.00 0.00 15301 GSB - Fire Protection 248,796.00 0.00 0.00 0.00 0.00 0.00%248,796.00 0.00 15510 Housing - Mechanical 149,800.00 0.00 0.00 0.00 0.00 0.00%149,800.00 0.00 15511 GSB - Mechanical 1,435,738.00 0.00 0.00 0.00 0.00 0.00%1,435,738.00 0.00 16000 Housing - Electrical 505,151.00 0.00 0.00 0.00 0.00 0.00%505,151.00 0.00 16001 GSB - Electrical 2,078,730.00 0.00 0.00 0.00 0.00 0.00%2,078,730.00 0.00 16002 Site Electrical 75,394.00 0.00 0.00 0.00 0.00 0.00%75,394.00 0.00 18001 Site Furnishings Allowance 25,000.00 0.00 0.00 0.00 0.00 0.00%25,000.00 0.00 18002 Housing - Exterior Signage Allowance 20,000.00 0.00 0.00 0.00 0.00 0.00%20,000.00 0.00 18003 Housing - Residential Appliances Allowance 90,000.00 0.00 0.00 0.00 0.00 0.00%90,000.00 0.00 18004 Housing - Low Voltage Allowance 30,000.00 0.00 0.00 0.00 0.00 0.00%30,000.00 0.00 18005 GSB - Applied Fireproofing Allowance 117,800.00 0.00 0.00 0.00 0.00 0.00%117,800.00 0.00 18006 GSB - Unit Skylights Allowance 50,000.00 0.00 0.00 0.00 0.00 0.00%50,000.00 0.00 18007 GSB - Wall & Corner Guards Allowance 29,450.00 0.00 0.00 0.00 0.00 0.00%29,450.00 0.00 18008 GSB - Exterior Signage Allowance 10,000.00 0.00 0.00 0.00 0.00 0.00%10,000.00 0.00 18009 GSB - Residential Appliances Allowance 15,000.00 0.00 0.00 0.00 0.00 0.00%15,000.00 0.00 18010 GSB - Access Control Allowance 150,000.00 0.00 0.00 0.00 0.00 0.00%150,000.00 0.00 18011 GSB - ERRS Allowance 51,538.00 0.00 0.00 0.00 0.00 0.00%51,538.00 0.00 18012 GSB - Weather Protection Allowance 150,000.00 0.00 0.00 0.00 0.00 0.00%150,000.00 0.00 18013 GSB - Bullet Resistance Upgrade Allowance 50,000.00 0.00 0.00 0.00 0.00 0.00%50,000.00 0.00 18014 BR and Security Allowance 335,000.00 0.00 0.00 0.00 0.00 0.00%335,000.00 0.00 19102 General Liability Insurance 238,584.00 0.00 0.00 0.00 0.00 0.00%238,584.00 0.00 19200 Warranty Reserve 99,816.00 0.00 0.00 0.00 0.00 0.00%99,816.00 0.00 19500 Performance & Payment Bond 150,941.00 0.00 0.00 0.00 0.00 0.00%150,941.00 0.00 19600 Construction Contingency 587,909.00 0.00 0.00 0.00 0.00 0.00%587,909.00 0.00 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 19601 Design Estimating Contingency 241,043.00 0.00 0.00 0.00 0.00 0.00%241,043.00 0.00 19900 Fee 1,006,786.00 0.00 0.00 0.00 0.00 0.00%1,006,786.00 0.00 Grand Totals $26,176,430.00 $0.00 $0.00 $0.00 $0.00 0.00%$26,176,430.00 $0.00 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713 Docusign Envelope ID: 79A56DCC-32E3-4CBE-A0D4-8146178F0713