Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR24-042 Approval of the Eagle Valley Land Trust PUD ZS 009380-2023 DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Commissioner chandler-Henrymoved adoption
of the following Resolution:
BOARD OF EAGLE COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 2024- 042
RESOLUTION FOR THE APPROVAL
OF THE EAGLE VALLEY LAND TRUST CONSERVATION CENTER PLANNED UNIT
DEVELOPMENT
Eagle County File No.ZS-009380-2023
WHEREAS,on or about August 17, 2023,the County of Eagle, State of Colorado, accepted for
filing Eagle County File No. PDA-009380-2023 (the"Application") submitted by Eagle Valley Land
Trust(hereinafter, the"Applicant"); and
WHEREAS,the Application requests an Amendment to Preliminary Plan for PUD(the"PUD
Amendment")of the the Edwards Nursery Planned Unit Development allowing for the renaming of the
PUD to Eagle Valley Land Trust Conservation Center Planned Unit Development and the addition of
various permitted uses and accessory uses on a 1.033 acre parcel located at 33601 U.S. Highway 6,
Edwards, CO,Parcel No. 2105-052-01-001 and legally described in Exhibit A(the"Property"); and
WHEREAS, in accordance with ECLUR Section 5-210.E-Notice of Public Hearings, notice
concerning the subject matter of the Application and setting forth the dates and times of meetings for
consideration of the Application by the Eagle County Planning Commission(the"Planning
Commission")was published in the Vail Daily and Eagle Valley Enterprise on April 11, 2024,mailed to
adjacent property owners on April 16,2024, and posted on the Property on April 16,2023; and
WHEREAS, at its public hearing held on May 1,2024,the Planning Commission,considered the
proposed PUD Amendment and associated Application and the statements and concerns of the Applicant,
the Eagle County Community Development Department, and other interested persons, and based upon its
findings,recommended approval with conditions thereof to the Eagle County Board of County
Commissioners (the"Board"); and
WHEREAS, in accordance with ECLUR Section 5-210.E-Notice of Public Hearings, notice
concerning the Application setting forth the dates and times of meetings for consideration of the
Application by the Board was published in the Vail Daily and Eagle Valley Enterprise on May 13,2024,
mailed to adjacent property owners on May 20, 2024, and posted on the Property on April 16, 2024;and
WHEREAS, at its public hearing on June 4, 2024,the Board considered the proposed amended
PUD Amendment, associated Application, and the statements and concerns of the Applicant,the Eagle
County Community Development Department, and other interested persons,and the recommendation of
the Planning Commission; and
WHEREAS, based on the evidence, testimony, exhibits, and review of the Comprehensive Plan
for the unincorporated areas of Eagle County and associated Future Land Use Map(the "FLUM"), as well
as the comments of the Eagle County Community Development Department, comments of public officials
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
and agencies,recommendation of the Planning Commission, and comments from all interested parties,the
Board, finds as follows:
1. THAT,proper publication and public notice was provided as required by the ECLUR and state law
for the hearings before the Planning Commission and the Board.
2. THAT,the Application complies with the standards in ECLUR Section 5-240.F.3.m-Amendment to
Preliminary Plan for PUD, as set forth below:
A. Modification.Pursuant to ECLUR Section 5-240.F.3.m(1),the Application allows for more
efficient development within,and the preservation of,the entire PUD. The proposed
modification,removal,or release of the existing PUD Guide is consistent with efficient
development and preservation of the PUD, as all of the uses except for the special events(101 -
400 people)are less impactful, including fewer loading/unloading trips, fewer public daily
vehicular trips, and less intensive use of the property with the removal of greenhouses and the
installation of landscaping. The addition of special events on the Property will have the same or
lesser impact on the Property,with the proposed off-site commercial shuttling/parking of event
attendees. The additional use within the PUD Guide of up to three(3)residential dwelling units
seeks to address the deficiency of housing in Eagle County generally, and the Applicant
specifically.
B. Adjacent Properties. Pursuant to ECLUR Section 5-240.F.3.m(2), the Application will not
affect, in a substantially adverse manner,either the enjoyment of land abutting upon or across the
street from the Property or the public interest. The public and adjoining property owners will not
experience substantially different impacts with the Applicant's utilization of the offices, as the
building footprint will initially remain the same. Retail activities will no longer occur on the
Property. The meeting space will be utilized by the Applicant's staff,but may also be offered to
outside users,as meeting space in the valley is limited. The outdoor space will allow for limited
plant propagation,but the intensity of the use will be decreased with the removal of the retail/
wholesale component. The loading and unloading of plant species for revegetation efforts in the
valley will continue,but to a far lesser extent than the prior commercial retail operation. The
creation of landscaped outdoor spaces,picnic areas,and quiet spaces through native plant areas,
in addition to gathering space for local youth, event and meeting space for conservation
collaborators,educational resources for local landowners, conservation programming,and the
scenic overlook will create a benefit,not a detriment, in creating a more aesthetic and less
impactful scenario for the adjacent property owners than that which currently exists.
C. Benefit.Pursuant to ECLUR Section 5-240.F.3.m(3),the Application is not being granted solely
to confer a special benefit upon any person. As the Applicant is a nonprofit 501(c)(3),the public,
other nonprofits agencies,taxing districts, and others benefit from EVLT's stewardship of the
Property and from the Applicant's public assistance in conservation and preservation tasks as a
land trust. Benefits to the public from this proposal include the creation of outdoor spaces to
include gathering space for local youth, event and meeting space for both the Applicant and the •
public, including being a facilitator of conservation collaborators, educational resources for local
landowners, a community gear library,conservation programming,plant propagation for
stewardship projects,and the scenic overlook at the northern end of the Property.
D. Amendment. Pursuant to ECLUR Section 5-240.F.3.m(4),the Application will not have the
• effect of extending vested rights as none was requested by the Applicant..
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
3. THAT,the Application complies with the standards in ECLUR Section 5-240.F.3.e- Standards for
Preliminary Plan for PUD,as set forth below:
A. Unified ownership or control. The Applicant owns all lands within the PUD. The Property is not
part of any Home Owner's Association or Property Owner's Association. The record before the
Board establishes that the standard for unified ownership or control is satisfied.
B. Uses. Pursuant to ECLUR Section 5-240.F.3.e(2),uses allowed within the PUD are consistent with
uses allowed in Table 3-300, "Residential,Agricultural and Resource Zone Districts Use
Schedule", and Table 3-320, "Commercial and Industrial Zone Districts Use Schedule"with
certain variations. The Application proposes Permitted Uses of administrative/offices,
educational programming, events and gatherings,open space and landscaping,parking/loading/
unloading Areas; Accessory Uses of residential units (up to 3), interpretive gardens,wildlife
viewing areas,plant propagation, and solar energy devices; and Temporary Uses of event tents
and construction trailers. The Applicant's requests for variations for educational programming,
with a basis of being a Public Facility, and residential,with a basis of Affordable Housing, are
supported by staff,as the educational programming is similar to public education, and the
residential will be small,units,both of which are uses very much needed in Eagle County. The
uses of parking/loading/unloading areas, landscaping, and open space are typical requirements
of developments, subdivisions,and/or PUDs, and these uses are therefore supported as uses
within the PUD. The uses of solar devices, event tents, and construction trailers are allowed with
the issuance of a building permit or through review by the fire department, and are therefore
supported as accessory and temporary uses within the PUD. The record before the Board
establishes that the standard for uses is satisfied. The PUD Guide is attached to this resolution as
Exhibit B.
C. Dimensional Limitations. Pursuant to ECLUR Section 5-240.F.3.e(3),the dimensional
limitations that shall apply to the PUD are those specified in the PUD Guide. The proposed
variation request to increase in the rear setback from five(5)feet to ten(10)feet is supported, as
this setback seeks to protect the northern boundary of the Property and obtains desired design
qualities. The original PUD approval allowed for a variation in the side yard setback from the
greater of 12.5' or half the building height to ten(10) feet. This variation is still appropriate. The
other dimensional limitations, as detailed in the PUD,are appropriate for the uses. The Variation
Schedule is attached to this resolution as Exhibit C.
D. Off-Street Parking and Loading.Pursuant to ECLUR Section 5-240.F.3.e(4), it has been
demonstrated that off-street parking and loading requirements within the PUD continue to
conform to the standards of ECLUR Article 4,Division 1, Off-Street Parking and Loading
Standards.As set forth in the Application and the staff report presented to the Board on June 4,
2024,the PUD will provide twenty-five(25)permanent surface parking spaces, including one(1)
accessible parking space, and this number exceeds the minimum parking space requirement of
seventeen(17)based on office and residential uses. The proposed uses in the PUD will reduce the
average daily parking demand, largely due to the deletion of the retail/wholesale component of
the prior use, and with the exception of the proposed special events or gatherings for 31 to 400
people,which will have a larger,but manageable, impact. In these circumstances,the Applicant
shall exercise off-site parking and commercial shuttling of guests to mitigate parking impacts per
the Parking and Event Management Plan,attached as Exhibit D.
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
E. Landscaping. Pursuant to ECLUR Section 5-240.F.3.e(5),a landscaping plan was provided in the
Application,along with additional language within the PUD Guide, Section 7.2,which is in
compliance with the standards of Article 4,Division 2,Landscaping and Illumination Standards.
The PUD Guide requires downcast and/or full cut-off exterior fixtures in compliance with dark
sky provisions.No changes to applicable landscaping or illumination standards are proposed by
the Application.
F. Signs. Pursuant to ECLUR Section 5-240.F.3.e(6),the PUD Guide is in compliance with the
standards of Article 4,Division 3,Signs, as it establishes an allowance for an entry sign not to
exceed sixty-four(64) square feet,as well as an unlimited number of wayfinding signs to describe
species of plants not exceeding two (2)square feet each.
G. Adequate Facilities. Pursuant to ECLUR Section 5-240.F.3.e(7), facilities and infrastructure
requirements of potable water supply, sewage disposal, solid waste disposal, electrical supply, fire
protection, and roads,are currently provided and conveniently located in relation to schools,
police and fire protection, and emergency medical services as follows:
Roads. The Property is accessed by U.S. Highway 6, according to Colorado Department of
Transportation("CDOT")Access Permit#397111, and no new access permit is required as long
as traffic trips to the site do not increase by 20%of the existing traffic trips, or 400 daily traffic
trips. However, in order to ensure the PUD is served by adequate access and roads,Conditions of
Approval 1,2, and 3 are necessary. Condition of Approval 1 provides the Applicant shall submit
to CDOT a special use permit for the access enhancements proposed within the U.S. Highway 6
right-of-way. Per Condition of Approval 2,the Applicant shall submit to CDOT a special use
permit for the replacement of a waterline serving the residential units, if proposed in the future.
Per Condition of Approval 3, the Applicant shall conduct a traffic study and submit to CDOT an
access permit application for review and approval by CDOT regarding the residential units, if
proposed in the future.
Water Supply. Sewage and Wastewater: Water is provided by the Upper Eagle Regional Water
Authority("UPRWA"). Wastewater disposal is provided by the Eagle River Water and Sanitation
District("ERWSD").A conditional capacity to serve letter was provided in the Application,
indicating that all the proposed uses,excluding residential can and will be served by UERWA and
ERWSD. Per Condition of Approval 4, the Applicant must dedicate additional water rights for the
proposed residential use to ensure that the Application meets standards for water supply and
wastewater.
Solid Waste Disposal: The Applicant proposes that solid waste disposal will be provided by a
private contractor in a residential tote to accommodate daily trash.
Electrical Service: Holy Cross Energy provides electrical service to the Property currently,and
will continue to do so.
Natural Gas Service: XCel Energy provides natural gas service to the Property. However,the
Applicant proposes to cap this service in lieu of complete electrification of the site.
Emergency Services: The Eagle River Fire Protection District provides fire protection to the
Property. The Eagle County Health Service District provides paramedic service to the Property.
The Eagle County Sheriff's Office provides law enforcement service to the Property.
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Construction of a hammerhead turn-around within the existing parking lot to improve access and
maneuverability by emergency response and service vehicles will occur in Phase 1 of the
development. A fire hydrant is located immediately across State Highway 6, and would serve the
Property. There is adequate evidence that the Property will be served by emergency services.
Easement: The Property contains an easement along its southern border with U.S. Highway 6, for
the purpose of laying,constructing,maintaining, operating,repairing, altering, inspecting,
replacing,removing and/or changing the size of one or more pipelines(with valves,meters,
fittings,and related facilities) for the transmission of natural gas through,under, and across the
easement area. The Applicant proposes to construct landscaping, a driveway and a parking lot
over the entirety of this easement,which is allowed under the"1995 Right-of-Way and Easement
Agreement"approved August 10, 1995 and recorded in the Office of the Eagle County Clerk and
Recorder on October 5, 1995 at Reception#573655.
Schools: Although no immediate residential units are planned,the Property is close to several
schools, including Edwards Elementary School, Stone Creek Charter School,and Vail Christian
High School. Residential uses are subject to school dedication fees as set forth in ECLUR Section
4-700,upon application for a building permit for any residential unit on the Property.
Soils: The Colorado Department of Public Health and Environment indicates that the site should
develop a soils materials management plan to address any potential releases to ensure these
wastes are adequately addressed and remediated, if necessary,prior to beginning site construction
for the residential units.
H. Improvements.Pursuant to ECLUR Section 5-240.F.3.e(8),the improvements standards
applicable to the development, are specified in Article 4,Division 6, Improvements Standards,
and are not negatively impacted by the Application. The Property is developed and the
Application will have minimal impacts related to site improvements, including roadway, sidewalk
and trail,irrigation, drainage, excavation and grading, erosion control,utility and lighting,water
supply,and sanitary sewer standards as outlined below.
Roadway Standards. The proposed improvements will not increase the daily traffic trips to/from
the Property.Direct access to U.S. Highway 6 is provided(CDOT Access Permit No. 397111)
and the proposed uses for the PUD are expected to decrease traffic impacts generated by the uses
allowed by the Edwards Nursery PUD in terms of vehicle trips per day and peak hour trip
generation.As the proposed development is not expected to generate more than four hundred
(400)vehicle trips per day,no traffic impact analysis is required to determine the need for
additional improvements on roadways affected by the proposed development. An existing trip
generation analysis indicates that the historic retail nursery generated 204 vehicles per day, while
projected or anticipated trip generation from proposed non-profit, administrative/office uses are
expected to generate 43 average vehicle trips per day, a decrease of 161 vehicle trips per day. Per
Condition of Approval 3,the Applicant shall conduct a traffic study and submit to CDOT an
access permit application for review and approval by CDOT regarding the residential units, if
proposed in the future.
Sidewalk and Trail Standards. An existing internal trail within the Property will be improved, and
additional concrete sidewalk built to connect uses on the Property, including the viewing
platform, greenhouse, existing shed,rain/infiltration gardens, and terraced amphitheater.
Additionally, a crosswalk will be built to link the Property to the Eagle River Preserve. As this
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
crosswalk is also part of the driveway for motor vehicles,it shall be paved and the Applicant shall
work with Eagle County Open Space and Natural Resources to determine the best location for
such crosswalk. As U.S. Highway 6 currently has a bike path between eight feet and ten feet wide
located along its north side, separated from the drive aisles,there is no requirement for the
Applicant to provide a bike path immediately adjacent to the Property,and this standard is
therefore met.
Drainage Standards. Stormwater runoff from all proposed development shall be managed so as to
comply with the following standards: (1)No Direct Discharge; (2)Minimize Directly-Connected
Impervious Areas; (3)Detain and Treat Run-off; (4) Conveyance of 100-year Storm Flow; and,
(5)Other Techniques. The Application contains a drainage plan for improvement with pervious
and impervious surfaces, with pervious pavers(grass pavers in northern section of Property and
gravel pavers in southern parking lot)meant to allow for infiltration of stormwater. The Applicant
will install two small detention areas in the northwestern portion of the Property. The Applicant
also proposes increased impervious surface by the outdoor amphitheater,but as there is no
permanent construction of buildings,the Application conforms to ECLUR Section 4-650.B.
Excavation and Grading Standard and Erosion Control Standards. The Applicant will
apply for grading permit(s)to repair the boulder retaining wall on the southern
boundary line of the Property, as well as to grade the site to install the parking lot,
drive aisles, amphitheater,and drainage features.
Utility and Lighting Standards: Utility and Lighting Standards are compliant with
ECLUR Article 4,Division 6 requirements.
Water Supply and Wastewater Supply Standards: ECLUR Section 4-680 Water Supply
Standards and ECLUR Section 4-690 Sanitary Sewage Standards are adhered to as the
PUD is served by UERWA and ERWSD for water and wastewater. A conditional capacity to
serve letter has been provided for all uses but residential, and Condition of Approval 4 requires
the Applicant to acquire additional water rights if residential use is added.
I. Compatibility with Surrounding Land Uses. Pursuant to ECLUR Section 5-240.F.3.e(9),the
PUD is compatible with existing and currently permissible future uses of adjacent land and other
lands, services or infrastructure improvements that may be substantially impacted. The Property
is surrounded by high density residential PUD,private open space,public open space,and light
industrial uses. The day-to-day activities proposed by the Applicant(nonprofit office activity,
irregular meetings by the Applicant and others in the community, educational programming, and
landscaping appreciation all represent a decrease in activity on the Property from the previous
retail/wholesale activities,and the special events will be carefully planned and the traffic
mitigated with off-site parking and commercial shuttling.
J. Consistent with the Comprehensive Plan. Pursuant to ECLUR Section 5-240.F.3.e(10),the
Application is in substantial conformance with the policies of the 2005 Eagle County
Comprehensive Plan,the 2017 Edwards Area Community Plan and related Future Land Use
Map,meeting goals of quality of life; growth policies and unlimited housing demand; community
and character; major economic drivers and services and infrastructure costs; water quality and
quantity;wildlife concerns; air quality; and protection of night sky. Specifically,the Application
is in substantial conformance with the master plan goals,policies,and objectives,while adhering
to the Future Land Use Map designation of Edwards Area Community Plan and Edwards Center
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Character Area,which encourages affordable housing units, climate-appropriate and
soil-stabilizing landscaping,public educational facilities, decreased air emissions, and protection
of night sky, all of which are supported and envisioned in the PUD. As the PUD allows for a
lesser impact than the previous plant nursery, the contemplated uses will positively contribute to
the community and to the area.
K.Phasing. Pursuant to Section 5-240.F.3.e(11),the PUD is in conformance with this standard,
proposing two (2)phases,as such:
Phase I Improvements: Phase I Improvements include the interior remodel and tenant finish to
allow for intended non-profit administration and office uses; exterior clean-up of site, including
removal of greenhouse structures, as well as removal of stored landscape contractor materials;
and regrading and surfacing the existing site entry and parking lot to address.parking
requirements and improve site drainage,while also addressing accessible access from the parking
lot to the administrative building.
Phase II Improvements: Phase II Improvements include the regrading of portions of the northern
two-thirds of the Property to create outdoor program spaces,to address drainage and stormwater
management issues, and to improve existing conditions for driveway access along the east
boundary of the Property; and
Landscaping and the creation of outdoor program/event space,to include renovation and/or
reconstruction of existing retaining wall systems;creation of new drainage and stormwater
management/water quality systems; creating hardscapes using porous paver materials; creation
of planters and interpretive garden/landscape bed spaces; creation of an overflow parking area;
as well as the design and construction of a potential elk viewing platform structure.
The Phase I improvements are appropriate to address the most urgent concerns, such as access to
the Property, site drainage, and exterior clean-up of the southern one-third of the Property closest
to U.S. Hwy 6. The Phase II improvements are necessary for the Applicant's use of the Property,
but also serve as a public benefit, in the landscaping and creation of outdoor spaces. The Phasing
Plan is attached as Exhibit E to this resolution.
L.Common Recreation and Open Space. Pursuant to ECLUR Section 5-240.F.3.e(12),the PUD is
in compliance with this standard. The Board did not require dedication of private or public open
space within the Edwards Nursery PUD in 1996. The Application proposes in the PUD Guide up
to three(3)residential units, for an anticipated eight(8)occupants. According to the formula of
ten(10)acres of open space dedication for each one thousand(1,000)residents of the Property,
the Applicant would dedicate 0.08 acres or 3,485 square feet. ECLUR Article 2 states that 'open
space': "means any specifically designated or dedicated land area that may be used for park,
agricultural,recreation or conservation opportunities. Construction within open space is limited
to foot paths,bridges, irrigation structures, erosion protection devices,underground utilities,
outdoor recreation facilities, and similar type uses. Ownership of open space may be deeded to a
property owner's association, dedicated to the public, or protected in other forms deemed
acceptable to the Board of County Commissioners. Indoor recreation facilities shall not be
included in open space."The Applicant proposes a landscape plan that incorporates a `wild'
approach, and the proposal anticipates the redevelopment and preservation of much of the
northern portion of the Property in excess of 3,485 square feet for native plantings,Rain Gardens
and Infiltration Gardens. Therefore,the conservation and preservation efforts on the site,together
with the native plantings in a park-like setting,meet the intent of this section.
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
M.Natural Resource Protection.Pursuant to ECLUR Section 5-240.F.3.e(13),the Application is in
compliance with this standard. Article 4-4 of the ECLUR includes recommendations and
requirements for wildlife protection, geologic hazards, hillside development,wildfire hazards,
wood burning controls,ridgeline protection,and environmental impact reports. Based on the
developed nature of the Property,these are not applicable, and the Property does not contain
substantive natural resources.
NOW,THEREFORE,BE IT RESOLVED by the Board of County Commissioners of the
County of Eagle, State of Colorado:
THAT, the Amendment to a Planned Unit Development for the Eagle Valley Land Trust
Conservation Center(formerly Edwards Nursery PUD),File No. PDA-009380-2023 is hereby approved,
with the following conditions:
1. Following approval of the PUD Amendment, the Applicant shall apply for and receive a special use
permit from the Colorado Department of Transportation for the widening of the existing access;
2. The Applicant shall apply for and receive a special use permit from the Colorado Department of
Transportation for the reclamation of the street cut for the waterline replacement, if the Applicant
proposes construction of the residential units.
3. Prior to development of the accessory residential uses on the Property,the Applicant shall conduct a
traffic study to determine the traffic impacts of such housing, and shall thereafter submit to the
Colorado Department of Transportation an access permit application; for review and approval.
4. Accessory residential uses may be permitted only upon approval from the Eagle River Water and
Sanitation District and the Upper Eagle Regional Water Authority. In order to exercise this accessory
use, the Applicant shall complete the District's and the Authority's water rights dedication process,
and the Applicant shall obtain an Ability to Serve letter from the authority specific to residential uses
prior to issuance of a building permit.
5. Except as otherwise modified by this development permit, all material representations made by the
Applicant in this Application and in public meetings shall be adhered to and considered conditions of
approval.
THAT, the approved Amended PUD Guide for the Eagle Valley Land Trust Conservation Center
PUD,dated June 4, 2024, is attached hereto as Exhibit B; and,
THAT,the Board directs the Department of Community Development to provide a copy of this
Resolution to the Applicant.
THAT,the Board hereby finds, determines and declares that this Resolution is necessary for the
health, safety and welfare of the citizens of Eagle County.
[Remainder of page left intentionally blank]
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
MOVED,READ AND ADOPTED by the Board of County Commissioners of the County of
Eagle, State of Colorado, at its regular meeting held the 2nd day of July 2024,nunc pro
tunc to the 4th day of June,2024.
p-- DocuSigned by:
f�'��f�L COUNTY OF EAGLE, STATE OF
COLORADO,By and Through Its
cotc.R% BOARD OF COUNTY COMMISSIONERS
ATTEST:
DocuSigned by: DocuSigned by:
LP-lit/La OebritAA, By: Aug
S
F9D02F240890440... 81E7920718E0173.
Clerk to the Board Matt Scherr
Chair
EDocuSigned by:
CMAr'a28c84AA7A.
Jeanne McQueeney
Commissioner
DocuSigned by:
', I, /I', ktI/l4
ElFFO3l...
Kathy Chandler-Henry
Commissioner
Commissioner McQueeney seconded adoption of the foregoing resolution. The roll having
been called,the vote was as follows:
Commissioner Scherr Aye
Commissioner McQueeney Aye
Commissioner Chandler-Henry Aye
This resolution passed by a 3/0 vote of the Board of County Commissioners of the County of
Eagle, State of Colorado.
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Exhibit A
PDA-009380-2023- Eagle Valley Land Trust Conservation Center Planned Unit
Development Legal Description:
Lot 1, Edwards Nursery Planned Unit Development, County of Eagle, State of Colorado
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Exhibit B
Eagle Valley Land Trust
Conservation Center PUD
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
11 EAGLE
VALLEY
LAND
TRUST
Conservation Center PUD
Planned Unit Development Guide
Amended and Restated Edwards Nursery Planned Unit Development Guide
Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Table of Contents
1.0 Introduction
1.1 Purpose and Intent of the PUD
1.2 General Information and Historical Context
Page 12
2.0 Property Legal Description and PUD Boundary
3.0 PUD Governance
4.0 Control Over Use
5.0 Control Over Location and Scale
6.0 Uses and Development Standards
6.1 Permitted Uses
6.2 Accessory Uses
6.3 Temporary Uses and Structures
6.4 Development Standards
6.4.1 Lot Size and Coverage Limits
6.4.2 Setbacks
6.4.3 Maximum Building Height
6.4.4 Parking Standards
7.0 Design Principles and Standards
7.1 Architectural Principles and Standards
7.2 Landscape Principles and Standards
7.3 Master Sign Program
7.4 Exterior Lighting
8.0 Access and Circulation
9.0 Parking and Event Management Plan
10.0 Open Space Plan
11.0 Sustainability Measures
11.1 Alternative Energy Production
11.2 Water Efficiency
11.3 On-Site Recycling and Composting
12.0 Minor Modifications and Amendments
12.1 Minor Modifications
12.2 Major Amendments
EAGLE 541( Conservation Center PUD Guide Adopted June 2024
TRUST
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
13.0 Definitions
14.0 PUD Enforcement
15.0 Appendices Page 13
15.1 Appendix A: Eagle Valley Land Trust Conservation Center PUD Events and Parking
Management/Operations Plan
•
® EAGLE
Tttir RUST Conservation Center PUD Guide Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
1.0 Introduction
1.1 Purpose and Intent of the PUD
The purpose of the Eagle Valley Land Trust Center for Community Conservation Planned
Unit Development(PUD) is to allow for the thoughtful and sustainable development and use page 14
of a 1.033-acre parcel of land located at 33601 U.S. Highway 6, in Edwards, Colorado, for '
non-profit administration and office uses, outdoor education and training, and events, and
residential uses in support of the Eagle Valley Land Trust, a 501-C3 organization focused on
land conservation and stewardship within Eagle County.
Additionally, the intent of the Eagle Valley Land Trust Center for Community Conservation
PUD Guide (the "PUD Guide") is intended to clearly establish all permitted uses by right, as
well as those uses which shall be permitted temporarily or via the special use permit or limited
review process within Eagle County Government jurisdiction. The PUD Guide also
establishes all development standards that will control the placement, bulk, mass, and height
of any future improvements within the PUD.
1.2 General Information and Historical Context
The Eagle Valley Land Trust Conservation Center Planned Unit Development (formerly the
"Edwards Nursery PUD") is located on an iconic and highly visible property in the heart of
Edwards, Colorado. Situated at the foot of the Lake Creek Valley along the U.S. Highway 6
corridor and bordering the Eagle River Preserve Open Space, this one-acre parcel has been
operated for decades as a retail nursery. Known and beloved by the larger community as the
"Wildflower Farm," this property has a rich history and a unique place in the fabric of the
Edwards area.
Edwards Nursery PUD
In 1997,Eagle County approved the Edwards Nursery Planned Unit Development(Eagle
County File No. PDP-341-95-S/P; ZC-268-95), a single lot PUD established for the sole
purpose of permitting the development of a retail nursery operation (Eagle County
Resolution No. 96-101). The Edwards Nursery PUD Guide was a narrowly crafted land
use and development control document specific to retail nursery operations and
development of the site.
Development standards such as maximum lot coverage and gross floor area for all
structures constructed on the property were so specific that the PUD was amended within
a year of approval to adjust lot coverage maximums,allowable square footage for the main
retail building and other, ancillary outbuildings, the timing of sanitary sewer construction,
as well as the placement of buildings on the property after the property owner discovered
that his original development plan would not meet his needs.
Following an amendment to the PUD approved in 1998 (Eagle County File No. PDA-
00012; Eagle County Resolution No. 98-108), the property was developed, with a retail
building and certain accessory structures such as green houses and storage buildings central
EAGLE
�� LAND
TRUST Conservation Center PUD Guide Adopted June 2024
TRUST
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
to the proper operations of the nursery.The Edwards Nursery PUD operated successfully
and in conformance with the approved Edwards Nursery PUD for over twenty years.
2.0 Property Legal Description and PUD Boundary
Lot 1,Edwards Nursery PUD;Located in Section 5,Range 82 West of the Principal Meridian, page 15
County of Eagle, State of Colorado.
3.0 Governance
This Eagle Valley Land Trust Conservation Center PUD Guide shall replace and repeal the
Edwards Nursery PUD Guide in its entirety and shall supersede the Eagle County Land Use
Regulations (ECLURs) as amended from time to time. Where this PUD Guide is silent with
regard to regulation, the provisions of the ECLURs shall apply.
In the event of conflict between the provisions of this PUD Guide and the provisions of the
ECLURs or any other resolutions or regulations of Eagle County, the provisions of this PUD
Guide shall prevail and govern the development of the PUD.
4.0 Control Over Use
After the effective date of approval of this PUD Guide,any existing building or other structure
may be used enlarged,reconstructed,removed, structurally altered,converted or relocated for
any purpose permitted or required by the provisions of this PUD Guide and for no other
purposes.
•
Such use, change, extension, enlargement, reconstruction, removal, structural alteration,
conversion or relocation shall be subject to all other standards and requirements set forth or
referred to in the standards and requirements of this PUD Guide. In the event of conflict
between the provisions of this PUD Guide and the provisions of the ECLURs or any other
resolutions or regulations of Eagle County,the provisions of this PUD Guide shall prevail and
govern the development of the PUD.
5.0 Control Over Location and Scale
After the effective date of approval of this PUD Guide, the location and scale of all future
buildings and structures shall be in conformity with all standards and requirements set forth
or referred to in the standards and requirements of this PUD Guide.
6.0 Permitted Uses and Development Standards
6.1 Permitted Uses
Uses that will be permitted 'by right' with no further review requirements by Eagle
County and which are primary to the proper functioning and intent of the PUD
include:
• Non-Profit Administration
VAEALLEYGLE
TLAND
RUST Conservation Center PUD Guide Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
• Office
• Education
• Events and Gatherings
o Small (0 - 30 people)*
o Medium (31 - 100 people)*
o Large (101 - 400 people)* Page 16
• Parking and Loading
• Open Space and Landscaping
• EV Charging Station(s)
* All events, gatherings, and meetings that cannot be parked within the PUD will require
compliance with the Eagle Valley Land Trust Conservation Center PUD Events and Parking
Management/Operations Plan (Appendix A).
6.2 Accessory Uses
Accessory uses are those uses located or conducted within the PUD which are clearly
incidental, subordinate, secondary and devoted to the principal use — nonprofit
administration and office uses - and which are customarily found in conjunction with
the principal use. The following uses shall be treated as accessory uses by right within
the PUD so long as all development standards are adhered to:
• Residential (Maximum 3 units) *
• Enclosed Storage
• Interpretive/Demonstration Gardens
• Wildlife Viewing Areas/Patios
• Indoor (greenhouse) and Outdoor Propagation
• Solar Energy Device
• Structure-integrated or Ancillary Ground-Mounted Solar Energy System
• Solar Thermal System
• Small Scale Wind Turbine
* Accessory residential uses may be permitted only upon approval from the Eagle River Water and
Sanitation District and the Upper Eagle Regional Water Authority. In order to exercise this
accessory use, the Applicant shall complete the District's and the Authority's water rights
dedication process, and the Applicant shall obtain an Ability to Serve letter from the Authority
specific to residential uses prior to issuance of a building permit.
6.3 Temporary Uses and Structures
Temporary uses and/or structures proposed from time to time within the PUD shall
be permitted for no more than six (6) months and, like accessory uses, shall be
incidental,subordinate,secondary and devoted to the principal use.With the exception
of construction trailers that may be required for multi-month,permitted construction
activity, other temporary uses are expected to have a duration not to exceed seven (7)
calendar days unless specifically approved in writing by the Eagle County Community
Development Director on a case-by-case basis.
® EAGLE
LAND Conservation Center PUD Guide Adopted June 2024
LAND
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
The following uses shall be treated as temporary uses by right within the PUD so long
as all development standards and time limitations are adhered to:
• Temporary Construction Trailer Associated with Valid Building or Grading
Permit
• Event Tents (1-7 days from set up to tear down prior to and after events) Page 17
6.4 Development Standards and Dimensional Limitations
The PUD will be developed as a single parcel with no further subdivision or phasing.
As such, all development standards and dimensional limitations will be calculated
based on the total parcel size of 1.033 acres, or 44,997 sq. ft.
6.4.1 Lot Size and Coverage Limitations:
Minimum Lot Area: 1.033 Acres / 44,997 sq. ft.
Maximum Lot Coverage: 40% (17,999 sq. ft.)
Maximum Impervious Coverage: 60% (26,998) sq. ft.)
6.4.2 Setbacks:
Setback Measurement and Permissible Encroachment(s):
All permanent structures requiring a building permit shall be located within the
setbacks established herein. Setbacks shall be measured as follows:
• Setbacks shall be measured from the property boundary lines established on a
survey produced by a professional land surveyor licensed in the State of
Colorado to the outside surface of the exterior face of all permanent structures
requiring a building permit.
• Roof overhangs/eave lines may encroach into required front, side, and rear
setback areas a maximum of eighteen (18") inches.
Placement of Structures within Setbacks:
So long as permanent structures permitted by building permit are located within the
required setback dimensions, which, together with prescribed building height
maximum, form a building envelope; and so long as those same structures comply
with all separations required by current fire and/or building codes in effect at the time
of the establishment of the permanent, permitted structure, those structures may be
located and configured anywhere within Building Envelope.
Projections:
Every part of a required yard shall be unobstructed from ground level to the sky
except for permitted projections of architectural features, as follows:
a. Patios,Walks, Steps and Portable Play Equipment. Patios,walks, at-grade
steps and portable play equipment may project into a required yard without
restriction.
EAGLE
�� LAND V TRUST Conservation Center PUD Guide Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
b. Fire Escapes and Individual Balconies. Fire escapes and individual balconies
not used as passageways may project eighteen (18) inches into any required side
yard or four (4) feet into any required front or rear yard.
c. Roof Overhangs, Stairways and Decks. Roof overhangs, stairways and decks
greater than thirty (30) inches in height may project eighteen (18) inches into any
required front,side or rear yard.Decks that are less than thirty(30)inches in height Page 18
may project into any required front, side or rear yard without limitation.
Roof overhangs and eave lines may extend beyond the Building Envelope line no more
than eighteen (18") inches to allow for flexibility when locating permanent structures
within the PUD.
The following illustration is provided to demonstrate the intent of this PUD Guide
related to setbacks, height, and bulk controls which form a building envelope within
which all permanent structures are permitted:
Building Envelope
F„ I i
MAXIMUM I ti--`� „e
BUILDING i '�I p•.o
HEIGHT I en I hlasc� Z I "�+� y, I lids
I pi©P
I I BACK
1 MAXIM UM I
LOT!COVE RAG E
I
00.0._
Figure 1:Illustration of Setback Interpretation and Intent for Eagle Valley Land
Trust Conservation Center PUD
Setbacks:
Setbacks shall be measured from the property line.
Front: 50 feet
Side: 10 feet
Rear: 10 feet
EAGLE
® R TRUST
Conservation Center PUD Guide Adopted June 2024
RUBT
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
6.4.3 Maximum Building Height:
Maximum Building Height: 35 feet
Building height shall be calculated by measuring from the existing or finished grade
(whichever is more restrictive) around a structure, to the following: Page 19
• The midpoint of each primary, sloping roof form on each building elevation;
or
• The top of each primary roof form on each building elevation.
6.4.4 Parking Standards:
Space Requirements:
• Non-Profit/Office/Administrative: 1 space per 250 sq. ft.
• Residential:
1 Bedroom/Studio: 2 spaces per unit
2 Bedroom: 2.5 spaces per unit
Parking Stall Dimensions:
Standard: 10 feet x 20 feet
ADA Accessible: 10 feet x 20 feet (plus 5-foot passenger
loading and access strip for total of 15
feet wide space) *
*ADA accessible spaces will be provided in accordance with applicable requirements of the
Eagle County Land Use Regulations, as amended from time to time, at the time of
construction of parking spaces)
7.0 Design Principles and Guidelines
More intent and less details
7.1 Architectural Principles and Guidelines
Design for future buildings, sheds: the following themes,principles,and guidelines shall
apply to the design and construction of all new or remodeled structures requiring a building
permit:
• Use simple forms and massing reflective of local vernacular.Maintain a traditional,
simplistic forms and massing reminiscent of historic ranching structures found in the
Eagle River Valley and which are expressed in the existing log structure within the PUD.
• Additional buildings or remodels of existing structures shall maintain and enhance the
character and scale established by the existing log structure.
® EAGLE
LAND
Conservation Center PUD Guide Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
• Promote a traditional western/agrarian character through the use of appropriately scaled
and traditional architecture,architectural detailing,textures,and construction techniques
in all new and/or remodeled structures.
Exterior Materials:use of natural materials is encouraged.The following exterior building
materials are appropriate: Page 110
Stone:
• Native stone traditionally found in the Eagle River Valley area,or similar natural
stone used successfully in other areas of Eagle County.
• Stone should be used to reflect and communicate traditional building techniques
1 accurate to the Eagle River Valley. Generally, stone should form the base of
exposed foundations and exterior walls,with lighter materials such as wood or metal
located above.
Wood:
• Logs,timber,with or without chinking,as well as,board and bat,or lap wall
construction and siding are required as a primary building element.
• Artificial materials (including but not limited to hardi-board or similar cementitious
board or lap siding) that accurately reflect true wood materials may be used.
• Log and/or timber wall construction should be oriented horizontally to convey
traditional building techniques for load bearing walls.
• Lighter siding material types such as board and bat or lap siding may be vertically
oriented and are best used for upper portions of building facade such as gable ends
or dormer elements.
Other Acceptable Materials:
• Metal- Corten,rusted or patina panels,copper.
• Stucco—Plaster,or elastomeric stucco.
Roof forms:
• Sloping roof forms - such as gable,hip and shed are encouraged.
• Gable,gambrel and shed roofs should be the dominant form on all structures.
Colors:
• Earth tone colors are encouraged for the body of exterior facades while brighter colors
may be used for accent elements such as window casings, sashes,and trim,exterior
doors,and fixtures.
• Accent colors on doors,windows,railings,fascia,trim may be used as a part of a
coordinated overall color scheme.
7.2 Landscape Principles and Guidelines
The overall intent of the landscape guidelines and principles for the Eagle Valley Land
Trust Conservation Center PUD is to promote and create a waterwise, native, and
visually pleasing landscape that enhances the functionality and compatibility of uses
within the PUD while promoting a respectful interface between the PUD and
surrounding properties.
ElEAGLE
LAND Y
TRUST Conservation Center PUD Guide Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
All portions of the PUD not covered by buildings and other impermeable surfaces
shall be treated with permeable surfaces such as permeable paving and pathway
surfaces, landscape plantings, and vegetative cover. The following principles shall
guide landscape design,installation, and maintenance within the PUD:
• Grading,drainage,landscaping, and revegetation improvements located along the Page 111
western, northern, and eastern boundaries of the PUD shall be designed to blend
with adjoining properties to the extent practical and with special attention paid to
the revegetation of disturbed areas,the selection of native landscape plantings,the
creation of buffers and shading, and the long-term maintenance of the PUD.
• Native revegetation shall be used. This includes tree and perennial shrub species,
ground cover species, and grass seed varieties appropriate for USDA Plant
Hardiness Zone 4b.
• Creation of gathering spaces and shade structures
• Erosion control and revegetation
• Approved waterwise/native planting list.
• Efficient,waterwise outdoor irrigation
7.3 Master Sign Program
Signage within the PUD shall be regulated by the following site-specific standards
which are compliant with the Eagle County Sign Regulations.All signs within the PUD
shall be measured,and their sizes calculated,using the methodologies approved within
the Eagle County Land Use Regulations (ECLURs),as amended from time to time.
7.3.1 Entry Signage
There shall be one (1) entry sign permitted at the main vehicular entrance to the PUD
fronting U.S. Hwy. 6 right-of-way. The intent of the entry sign is to identify the
property to passersby in a permanent, safe, non-distracting manner for motorists
traveling along the U.S. Hwy. 6 corridor.
Entry Sign Standards:
• Number of Signs: One (1) entry sign shall be permitted within the PUD.
• Size of Entry Sign: The entry sign shall not exceed 64 square feet.
• Materials/Design: The entry sign may be crafted of natural materials
including but not limited to wood,metal,and stone.Lighting will be downward
or backlit and shall be designed,installed, and maintained so as not to permit
light trespass off the Property.
7.3.2 Wayfinding Signage
Within the PUD, small (less than two square feet) wayfinding signs may be placed at
key areas around the site to direct visitors and guests to public and private areas around
the PUD. There is no limit on the number of wayfinding signs that may be displayed
within the PUD at any one time so long as the purposes and intents of the Eagle
EAGLE
Y
® LANDD T LAN Conservation Center PUD Guide Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
County Sign Code are met. If necessary,all wayfinding signage that is illuminated shall
be designed,installed, and maintained with dark sky compliant lighting fixtures.
7.4 Exterior Lighting Standards
All permanent exterior lighting within the PUD is restricted to downcast, full cutoff
fixtures that are dark or night sky compliant. Page 112
Spotlights or similar exterior lighting that cast glare or which have the potential to
create light trespass outside the PUD are prohibited.
8.0 Access and Circulation
Access to U.S. Highway 6 is provided by a driveway entrance located at the southeast corner
of the Property and is permitted by the Colorado Department of Transportation (CDOT)
under Access Permit No. 397111. The PUD will maintain the current access point and will
continue to exercise CDOT Access Permit No. 397111.
Prior to development of any accessory residential use(s) on the Property, the property owner
shall conduct a traffic study to determine the traffic impacts of such residential use and shall
thereafter submit to the Colorado Department of Transportation an access permit application,
for review and approval.
9.0 Parking and Event Management Plan
With the exception of certain temporary events occurring within the PUD,all parking for uses
within the PUD is limited to on-site parking. No parking of vehicles, or the loading or
unloading of vehicles, is permitted along or within the U.S. Hwy. 6 right-of-way unless
approved by Eagle County on a case-by-case basis.
For all events exceeding 30 guests in attendance, the Parking and Event Management Plan
attached hereto under Appendix A shall be implemented.Appendix A may be amended from
time to time by Eagle Valley Land Trust and approved under the Minor Amendment
provisions of Section 12 of this PUD Guide document.
10.0 Open Space Plan
Due to the size of the PUD,the intended non-profit use of the PUD,as well as the previously
developed or disturbed nature of the Property, there are limited opportunities to create
significant areas of active open space as defined by Eagle County. Through redevelopment
and renovation of the Property which will return significant portions of the Property to a more
natural state through the creation of landscape areas,interpretive gardens, and multi-purpose
outdoor gathering spaces, as well as the limitation of building lot coverage, the PUD will
include areas totaling a minimum of 25%of the Property that will function as open air,usable
spaces.
EAGLE
nittl Conservation Center PUD Guide Adopted June 2024
TRULAND
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
11.0 Sustainability Measures
The Eagle Valley Land Trust Conservation Center PUD has been designed with sustainability
in mind.
11.1 Alternative Energy Production and Energy Efficiency
The PUD will promote and permit the on-site production of alternative energy Page 113
inclusive of Solar Energy Device, Solar Energy System, Solar Thermal System, and
Small Scale Wind Turbine as defined by Eagle County.
The PUD permits the renovation and retrofitting of existing systems and fixtures
within existing buildings, in compliance with applicable codes as may be amended
from time to time, to increase energy efficiency while promoting the use of energy
efficient site,building and systems designs for all permanent structures in the future.
11.2 Water Efficiency
Water efficiency will be implemented through the use of low flow fixtures, in
compliance with applicable codes as may be amended from time to time, to increase
water efficiency within all permanent buildings requiring water service. Additionally,
the following methods will also be implemented:
• Waterwise landscaping techniques and technologies.
• Waterwise design, installation, and maintenance of all temporary and
permanent irrigation.
• Waterwise design, installation, and maintenance of all revegetation and
landscape treatments.
11.3 On-Site Recycling and Composting
The PUD shall enjoy an on-site recycling and composting program, inclusive of on-
site recycling signage,receptacles and services, as well as an on-site compost program
inclusive of food and plant waste composting within secure bins, receptacles, and/or
wildlife resistant storage areas which are capable of locking.
12.0 Minor Modifications and Amendments
12.1 Minor Modifications &Administrative Approvals
Minor modifications are those that do not materially affect or change the character,
purpose, or intent of the PUD. Minor modifications shall be based upon written
request by the landowner or owners having a recognized interest in the lands within
the PUD and may be administratively approved and permitted upon a determination,
in writing,by the Eagle County Community Development Director or assign(s).
Minor modifications shall include but are not limited to those changes that modify the
following:
EAGLE
`� TRUST Conservation Center PUD Guide Adopted June 2024
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
• Building Locations: Minor modifications to the location of permanent and
temporary structures within the boundaries of the PUD so long as minimum
setbacks are maintained.
• Event Parking Management Plan: Minor modifications to event parking
management plan(s),inclusive of but not limited to changes in the number of
events per annum, the number and/or location of offsite parking spaces. ,Page 114
• Sustainability Measures: Minor modifications to the sustainability measures
within the PUD inclusive of modifications to the type and characteristics of
uses, improvements, and installations for alternative energy production
(ground mounted and building mounted solar installations); small-scale wind
production.
• Technical Revisions: Minor modifications to technical aspects of approved
engineering plans and/or approved site,landscape,
• Determinations of Similar Use: Minor modifications and/or additions to the
list of uses permitted by right as well as those categorized as accessory or
temporary that do not fundamentally alter the purpose, intent, or impacts
associated with the PUD.
12.2 Major Amendments
Any changes, modifications, and/or amendments that are intended to modify the
use(s), density, or dimensional standards of the PUD in a manner that 1)- are not
deemed "minor" and, 2) will fundamentally alter the purpose, intent, or impacts
associated with the PUD shall be deemed Major Amendments and shall follow the
processes outlined for Amendments to the Preliminary Plan for Planned Unit
Development in the Eagle County Land Use Regulations, as may be amended from
time to time.
13.0 Definitions
Definitions applicable to the interpretation,governance and enforcement of the Eagle Valley
Land Trust Conservation Center PUD shall be those adopted by Eagle County and published
in the Eagle County Land Use Regulations (ECLURs),as may be amended from time to time.
14.0 PUD Enforcement
All provisions of the Eagle Valley Land Trust PUD as promulgated within this PUD Guide
shall be enforceable by the Eagle County Government.
15.0 Appendices/Exhibits
15.1 Eagle Valley Land Trust Conservation Center PUD Events and Parking
Management/Operations Plan (Appendix A).
® EAGLE
LAND V Conservation Center PUD Guide Adopted June 2024
TRUST
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Exhibit C
Variation Matrix
•
Dimensional L --
Limitation
Side Setback The greater of 10' 10' Obtain Desired Design Qualities
12.5'or half the
building height
Rear Setback The greater of 5' 10' Obtain Desired Design Qualities
12.5'or half the
building height
Use
Education Special Use N/A Permitted Public Facility
Use
Residential Not Allowed N/A Permitted Affordable Housing
Use
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Exhibit D
Eagle Valley Land Trust Conservation Center
Event Operations Plan
When The Eagle Valley Land Trust(EVLT) moves its operations to the Conservation
Center, it will host events on-site to support its mission and fundraising needs.
EVLT also plans to rent or donate the space to community groups or other
organizations for events and programming.
Events Sizes Defined
The Eagle Valley Land Trust will host three sizes of events at the Conservation Center.
EVLT's events support the organization's pursuit of its land conservation mission and
support the organization's operations by way of fundraising.
Small (0-30 guests) events are defined as those where the property can accommodate
parking on site. Medium events (31-100 guests) require some parking on-site and some
parking off-site. Large events require all parking to be off-site (101-400 guests). Staff
and volunteers are included in the guest counts.
EVLT's events aim to embody the organization's ethos. Therefore, excess noise will be
closely controlled to maintain a nature-forward atmosphere. Outdoor event music and
programming typically concludes by 10pm.
Large Event Operations Plan
Day Before Event:
The day before a large event is dedicated to load in and set up by EVLT's staff and
contract
services including tent, bathroom, and other rentals.
• Event tent load in and setup (8 -10 staff)
• Decor and table setup (10 volunteers)
Day of Event
The day of a large event, EVLT's staff and volunteers are onsite from 8am to 11 pm
preparing the site, hosting the event, and cleaning up after the event.
• 8am - 12pm site prep (5 staff)
• 12pm-10pm - event prep/onsite activities/offsite parking &shuttling
• 10:45pm -staff depart
Day after event
The day after a large event, EVLT's staff tears down and cleans the property. Rental
companies retrieve their items between 8am and 5pm.
• 9am - 5pm site for cleanup, teardown, loading
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Large Event Parking Plan
EVLT's Conservation Center can accommodate approximately 25 cars on site. For
medium and large events, off-site parking will be required. Large events will typically
provide a valet service at an offsite parking lot. Shuttles will transport guests from
offsite parking to theConservation Center. Depending on the event size, 3-7 shuttles
will be utilized.
Because medium and large events tend to occur in the evenings and during the
summer, schools are the primary opportunity for off-site parking. Three schools exist
within three miles of the Conservation Center: St. Clair of Assisi, Vail Christian High
School, and Edwards Elementary School. Written approvals have been obtained from
Vail Christian High School and Edwards Elementary School (attached). Specific event
parking permission must be obtained one month in advance of large events. Additional
offsite parking locations may be added in the future and will follow a similar process
for event parking approval.
Parking Logistics
To obtain parking permission, EVLT's event staff lead must reach out to the facilities
manager at either Vail Christian High School or Edwards Elementary with a draft event
plan to obtain parking permission for the event. Once approved in writing, EVLT's event
staff lead and event planner should work with the 3rd party valet and shuttle company
to develop a shuttling plan for the event, including shuttle circulation strategy, timing,
signage, and staffing.
At least two hours before the event, EVLT staff will place signage at the Conservation
Center reminding guests where valet and shuttle parking is available. Signage will also
be placed at the offsite valet/shuttle lot with specific instructions for parking and
catching the shuttle. For many large events, valet attendants will be stationed at the
vehicle drop-off location to help manage parking and vehicle circulation.
In addition, EVLT requests that staff, board members, and volunteers carpool and
shuttle to and from small, medium, and large events held at the Conservation Center.
Any vehicles that must remain on the property during large events must be moved to
the north end of the property while shuttles are active.
Parking and dropoff by individual patrons or event attendees along Highway 6 will
always be prohibited. Signage prohibiting parking along Highway 6 and directing
drivers to off-site parking locations will be posted during events of all sizes.
After large events, EVLT will follow up with offsite parking partners to ensure that their
parameters are being met and make sure that the parking and shuttling plan is
adequate for future events.
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
Shuttling Plan
EVLT has typically employed a 3rd party valet service and 3rd party shuttle service to
move large event guests from offsite parking lots to event locations. Events hosted at
the Conservation Center property will typically follow a similar formula.
The numbers and sizes of shuttles required will be determined on a case-by-case basis
depending on the guest count. Typically, 3-7 18-passenger van shuttles, operated by a
3rd party professional shuttle service, are sufficient for transporting guests to and
from large events. Shuttles typically begin operating one hour prior to the event start
and leave the offsite parking lot in 3-10 minute increments depending on the number
of shuttles available.
Shuttle Circulation
Shuttles should enter the Conservation Center property and pull forward and parallel
to the curb at the front of the building. Each shuttle should pull as far forward (West)
as possible to allow other shuttles to pull in behind. The front shuttle should pull
forward and turn around in a counterclockwise direction and proceed to the property
exit. Only one shuttle should turn around at a time.
EVLT's staff will ensure that the turnaround is clear and maintained. No other vehicles
may be parked or operated in the main parking lot of the Conservation Center while
shuttles are operating. Load-in of catering and other event functions must finish prior
to the beginning of the event. Vehicles on the north side of the property may be
operated, loaded, and unloaded during shuttle circulation since vehicles on the north
side will not interfere with the shuttle lane.
Shuttles must be carefully timed so that there is ample room in the pull-through lane
to accommodate them. Shuttles may not wait in or on the shoulder of Highway 6 while
shuttles move through the Conservation Center's drop-off loop. If a backup occurs,
shuttles should wait at the offsite pickup lot until the backup is cleared before
departing.
Third-Party Events
EVLT may donate or rent the Conservation Center to community groups or other
organizations for events and programming periodically. Third-party event organizers
must submit an event operations plan to EVLT's Executive Director or Deputy Director,
including catering, parking/shuttling, and outdoor noise details two weeks in advance
of the event. Third-party events must comply with EVLT's event operations and parking
plans.
DocuSign Envelope ID:E3647B88-9C00-47F4-A4E9.4A265B5D8683
Exhibit E
Phasing Plan
Phase I (Anticipated Winter-Spring 2024)
Phase I focuses on work, both interior and exterior,within the southern third of the
Property that will first transform the existing retail building into the new headquarters
of the Eagle Valley Land Trust, while performing deferred maintenance on the exterior
to the building, addressing and improving existing conditions (grading, drainage, and
surface) of the existing parking lot, removing and replacing sidewalks and improving
ADA access to the existing building, and enhancing landscaping and signage at the
entrance to the property.
The timing of Phase I improvements is expected to align with the PUD Amendment
entitlement process, whereby interior tenant finish work is expected to be permitted
and commenced during the entitlement process in the winter and spring of 2024, while
site work to improve the existing parking lot and ADA access from the parking lot to
the new administrative headquarters building will likely occur following PUD zoning
entitlements in the summer of 2024.
Additionally, Phase I will include general site clean-up over the entirety of the Property
to remove structures and stored equipment and supplies associated with the retail
nursery and landscape uses of the previous PUD. Key activities and improvements
planned withing Phase I include:
• Interior remodel and tenant finish to allow for intended non-profit administration
and office uses.
• Exterior clean-up of site, including removal of greenhouse structures, as well as
removal of stored landscape contractor materials.
• Regrading and surfacing the existing site entry and parking lot to address parking
requirements and improve site drainage, while also addressing ADA access from the
parking lot to the administrative building.
Phase II (Anticipated Summer 2024- Fall 2024)
Phase II will involve completing site and landscape improvements over the remaining
two-thirds of the Property generally located north of the existing retail building. Phase
II activities and improvements are envisioned as primarily exterior in nature and will
be commenced after the Eagle Valley Land Trust Conservation Center PUD has been
approved by Eagle County. Key activities and improvements planned within Phase II
include:
• Site Work:
o Re-grading portions of the northern two-thirds of the Property to create
outdoor program spaces, to address drainage and stormwater management
issues, and to improve existing conditions for driveway access along the east
boundary of the Property.
o Landscaping and the creation of outdoor program/event space, to include
renovation and/or reconstruction of existing retaining wall systems; creation
DocuSign Envelope ID:E3647B8B-9C00-47F4-A4E9-4A265B5D8683
of new drainage and stormwater management/water quality systems;
creating hardscapes using porous paver materials; creation of planters and
interpretive garden/landscape bed spaces; creation of an overflow parking
area; as well as the design and construction of a potential elk viewing platform
structure.