HomeMy WebLinkAboutC84-008 Asbesco00 s� -- ' nI CONTRACT FOR REMOVAL AND/OR i. ENCAPSULATION .OF ASBEST0S PRODUCTS �� T'L��rr. INNt�� THIS ACRFEMENT ri,idn this 3L day ()f 1 yR q , by and between #W.*% ASBE SCO, I NC . , A Co 1 oradn Corporate on, herei naf ter known as "Asbestos Contractor" , and Fa n_I (` p1) yj hereinafter known as "Owner" , for the �� removal - Ondd%or encapsul teen of asbestos products, said work to be performed as more fully scat forth on Fxhi hi t "A" attached tic-rt-to and incorporated -)y reference herein, • and to be performed at t` o real_ proijorty or properties as more fully described on Exhibit "B" attached hore'Lo an:i i nCorporated livrei n by reference. A proposal and oxerut-:-1 by tho Asbestos Cnntractor, and accepted by the Ownor by d0t irit, iho acceptance section of the proposal shall -be ,, eonsi derel horvi n as a s:ihsti tilt" and ropl acompnt for Exhi hi t "A". rO ;TRACT DOCtIMEUTS The contract docu,;l.-�vlts consist of this agreerient, Exhibits "A" and "D", all listed attachments where indicated with ,in "X% plans and specifications if any, and evidence of insi,rance ar,a dorfori�ianc-2 hn,nds(if required). A���r�ndr���nts, Add�n�iums and Chant o Orders shall also t,- i n-nrl)( ►•ated into tfi i s a ro,�.Yiont if (!xecuted by the parties hereto, and shall be effe.ctivo tha data of such execution. ATTACHMENTS All Attach.at�!its listed holo;1 and indir.atod as applicable by an "X" in the left col urm arr! a ;tart of ,lnd i ►ar.n:-poratv(] 'iorpi n . X 1. Dofinitirn% X ?. rontain.-nont Proa ^trr.l �l-)rk Area Procedures X 4. Codas and Reg.ilations 5. F.stahl i shi nd the Contai nrrir!nt Area (s) G. Removal Procedures 7. Abateriont of rnnta:ain,,t(,d Sni l s X 9. Testi nd and r,oni tori ng 9. Tools and Ekju i ljri,:*nt Clean-ui) :end Disposal X 11. Final Ins;)ecrion and Accodtance X 12. Submittals r MATERIAL, PERFOR14AUCE AND LABOR i `qw I I The Asbestos Contractor agrees to i}rovide all materials, tools, chemicals, and labor required by the Contractor to perform the work as set forth on Exhibit. "A" and described therein, in accordance with the attachments as listed and referenced herei n . TIME OF COMMENCEMENT AND COMPLETION The severaorti^ns ;f thL, work as sot forth shell crn�rmence on or before the fls (lay of l(Ir' and shell he complete on or before the---d-- working � day after comm,?nc,:-j!ven t , sir'n jest however to the' following: (a). Tho sh:,! 1 uiat:­ rho h:rilding, comi)leto with necessary utilities• and facilities, avF-i lablo to Ashest:-)s Contractor on or beforo the tnrnr;oncenient date. Any delay of avai lahi i it,• �,hj,l l (t:.lay thi, comrivnroment (latc- and anY delay exceeding throe days may, -at th--- opti(ro ofi the 1 s")estos ;:nntrisctor, make the t.nti re contract void anti of nn fur•th: r of fe ` . ( h 1 . I t i s i,,ioors tone ant; aurpt,,d hi�twe n the pa rt i Ps that i n the event that the Asbestos Contractor is dolayr-d in porformancii by strikes, la'. or disputes, lock -nuts, unavoid(ablo casualties or caner causes h.�yond the control of the Asbestos Contractor, then the time for performance shall b(- extended from (lay to day plus a reasonable and additional time as niay he req0 red by the Asbestos Contractor to return materials, tools, and personnel to the work pl acv in the event that the delay has Pxceeded three working da., s. Wnrkiny days as used herein shall be from 7 A.M. Monday to 6 P.M. Friday inclusive. PRE -COMMENCEMENT INSPECTION The Asbestos Contractor and Owner shall jointly tour and inspect the building, grounds, and work areas noting tho Pxistancr3, c:onfigiiration, and condition of all property, eyuipaent, furniture and interiors including condition of ceilings, walls and floor coverings. Si,ch notations shall he in writing and both parties shall sign the written notations of the toi,r, thereby ayree i ng to the conditions necessary for the Owner's re-accoptan.ce of tho project at: tim(! of completion. Any post -completion i t+err not noted on this document shall ti? at the Owners expense and shall not he c:ar.rse of (Inlay of payments of any contract prices set forth herein. C04TROL OF WORKPLACE It is agreed and understood by thz! parties hereto that asbestos is generally classified and recognized by persons kno-ii1 dgable as to its' characteristics as a ha: ardous material. Further, the transport, removal, encapsulation, or installation of the material requires due caution and adherence to rigid safety and health procedures. Therefore, the parties agree that access to and control of all areas where the Asbestos Contractor is to perform trndor this contract and daring that performance, shall he under the exclusive. jurisdiction and control of the Asbestos Contractor, excepting th(rrefrcoin only e-mergency situations whpre thA premises are threatened by fire, flooding, or other si t+iati on re(lui ri ng irimediate action by �eT s-ins other than the Asbestos Cnntractor to prevent loss of life or property. The Asbestos Contractor Shall ost.ibl i sh prnc!�dirres and controls Asbestos Contractor shall dean reasonably n(rcol;sary to control and pravllnt the esr_ap:? of asbestos materials and to contain those materials within the ark areas and areas established as removal and transport areas. Those procedurrs are rmoro, sl)ecifically set forth on Attach►ii:-nt `_. Additional ly,access to those arras shall he a set Arol forth on Attachment �_-. A Copy of those proc(►dares shall be posted at the normal and usual entrance into the aroa or ar2ds in which work, will be Performed under this . . `' Nw✓ 1"W 1*VW/ 'contract. Further, the ow-ler hiireh agr(,Ls to provide a copy of attachments and JRPr--/- ' to any other contractors, security personnel or workers not under the control of ;06 Ashestos Contractor. Breach of these conditions hi, the owner or any ayent of the Owner or by any ether pprsnn or organization derforming services for the owner shall be a breach of this contract, and shall entitle the Ashestns Contractor to irmaodiately cease optirat i ons wi thrrlrt fri rthnr liaFility for pe. rfor►iance hereunder. The Ash,-�st os Contractor shall adrlitiniall-y have the oxclusive option to continue performance hereunder after -;uch hr(,!ach not pxcnt!din throe vio.-king days has hewn corrected. Any delay occasioned by a brinr4h hereunder exci2edi ng three days, shall gi vP the Asbestos Contractor tho riysrt to d0c.larrl tt,. c��lt: i rt, contract iri default and thereafter take such action as nay ho by 1 a-vi ey,, i ty. STRUCTURES This contract :1,:t:s not i nc l ,idv the c-recti on or� rc.,m val of any permanent structural components to huildin�s or locations unless specifically sot forth on Exhibit "A", and any such r-roction or reii val as riay he rf:cluired by the Asbestos Contractor in ;performance hereunder shall be the sole and separate responsibility and at the expense of the Owner. Any delay in such construction or demolition shall ca-u-se a day by day addition to thy:- time cif performen e by .he Asbestos Contractor and if exceeding three :iorhing days shall give the Asbestos Contractor the rivht to declare the entir(! contract in defa,lt. This soot i on shall not apply to thr- erection and removal of containment areas, shielding, scaffolding, or anj other temporary structure recluired by Asbestos Contractor in thr: performance required under this contract. CONTRACT CHARGES This contract is fixed both as to prico and as to perforr:rance as set forth on Exhibit "A" or and l+roposal r,sed in lieu theroof. Additions, di-alPtions or alterations to the work to he perfori!ied reauPsted b,; thr� 0-rmr!r after exs�cuti on of this contract sha l I he aci.wipl i shed only by written r.hanyrn. ordr-r for a price netyoti ated by the part i r-s, rhar,ye ordc-rs shall be considered add:,ndums to this contract and shall modify both manner and time of performa,►c:ri as well as price hereunder. TEMPORARY SITE FACILITIES The Owner shall provide, at no r-xpr-nse to the Ashestns Contractor, water, heat, light, electrical power, sanitary facilities, weather protection (where required), and security services bPtwt- cen the hours of 6 P J1. and 7 A.M. during vjr_�r'k-days and ?4 hours per day fror►► Friday f P.M. to Monday 7 A.M. Security services for the containment area during work hours as defined herein shall be the respcnsibility of Asbestos Contractor. PAYMENT Unless othervlisc- spor:ified on Exhibit "A", final ,)ayinent shall he due when the work described is fully completed and performed in aLcordance with this contract. Completion shall occrrrr r•,-hen work is complete, final inspection has taken place and when all submissions as set forth tin Attachment have been made by the Asbestos Contractor to tho rawner. Payment in full shall i;m!►ediatvly h•r, du►� and payable thereafter, and any arn.7unts not paid within t o days shall drag interest at the rani of 1 1/2 % interest per month on the unpaid balance from the date payment is due. Progress payments, if any, shall he in accordance with the provisions as set forth on Exhibit "A". CONDITION OF WORK AREA, INITIAL AND FINAL It shall be the sole responsibility of the Omer to provide, prior to the commencement of the work by the Asbestos Contractor, access to all areas where work is to be performed, free of known obstructions and hazards, and a continuing responsibility to inform this n ;hestos Contractor of hazards which coma to the knowledge of the Ownr-r :luring the performance of this contract. If the struc taro is to he ro-:Modeled or demol i shed after performance hereunder by the A;bos; os Contractor,, the Asbestos Contractor shall have no obligation to rrlst.')ro the Nremi s.-s oth:�r than renioviny temporary structures associated with contairwi-?nt and h1 a. areas created by the operations of the Asbestos Contractor. If such hazards cannot he reasonably removed, Asbestos Contractor will mark and identify the hazards andwarn the Owner of the location and nature of those hazards. If the striicttire is to be occtipied or tised after performance hereunder by the Asbestos Contractor, the Asbestos Contractor shall be responsible for restoring the premises to the general condition exi stant at start of operations, excepting therefrom the removal of hazardous product as set forth by this contract. PERFORMANCE, LABOR, AND MATERIAL BONDS Prior to commencement of perfnrmance hereunder, Asbestos Contractor will provide the Owner with a copy of a performance bond issued by an independent bonding company, or in lieu thereof, a cash bond in an amount of not less than 1 112 times the contract price heroundler. A general performance bond shall be satisfactory substitute herefor provided that such general performance Mond is not limited as to location of work performed. INSURANCE Owner shall have in full force and effect, insurance for fire, theft, damage, or other causualty incurred during the course of this contract not a result of the acts of the Asbestos Contractor or agents thereof. Asbestos Contractor will provide evidence of insurance valid during the course of this contract insuring against the acts of the Asbestos Contractor in the performance hereunder. Said insurance shall include Workmans ` Compensation, Public Liability, and fire and extended coverage. Each party hereto shall be considered as an additional insured party to the insurance coverage of the other during the course of performance hereunder, and if proceeds of insurance are paid as a result of casualty coverage, such proceeds shall be allocated in the ratio of loss of each party. SUB -CONTRACTORS Asbestos Contractor shall have the right to employ the services of sun -contractors in the performance hereunder. Any such sub -contractor employed shall he bound by the same terms and conditions as set forth herein as binding on the Asbestos Contractor. Asbestos Contractor will not suffer or permit liens on the property and shall timely pay and discharge all reasonable labor, materials, and other obligations owed by the Asbestos Contractor to sub -contractors that affect. and pertain to the work to be performed hereunder. The Asbestos Contractor shall notify Owner of the names of sub -contractors proposed to perforri the principal portions of any work hereunder, and shall not -employ any sub -contractor to whom the Owner has reasonable objection. The Asbestos Contractor shall not be required to employ any sub -contractor to whom Asbestos Contractor has reasonable objection. CORRECTION OF WORK The Asbestos Contractor shall correct any work that fails to conform to the requirements of the Contract documents if discovered prior to or during final inspection. After final inspection and acceptance by the owner, Asbestos Contractor shall correct only slich items as fail to meet applicable regulations regarding. the handling, removal, or Pncarlisul ati on of asbestos products. The provisions of this article apply to work done by sub -contractors as well as direct employees of the Asbestos Contractor. ARRITRATIOH All claims or disputes arising nut of this Contract or the breach thereof shall be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association then obtaining unless the parties mutually agree otherwise. Notice of the demand for arbitration shall be filed in writing with the other party to the Contract and with the American Arbitration Association and shall be made within a reasonable time after the dispute has arisen. The prevailing party in any arbitration had hereunder or subsequent action by a Court of competent jurisdiction in aid thereof, shall be entitled to award of costs and reasonable attorneys fees. INTERPRETATION This Contract is to he construed and interpreted, where necessary, in accordance with the lads and regulations of the State of Colorado, and any liabilities or dariages flowing herefrom shall be determined by reference thereto. Any provision hereto shall he severable if required for interpretation or if unenforceable by law, without affecting or altering the remainder hereunder or the liabilities or benefits herein. This agreement executed the day and date first above written. c ASBESCO, IN'C., A Co do Corporation Own t!r Ashesto ractor tit ,� / It e: DEFINITIONS The following list includes those words or phrases within the contract to which this document is attached which are unique or common to the asbestos removal, control, and abatement industry. The list is not intended to be all inclusive nor is it intended to Exclude such definitions as may be reasonably necessary or proper for interpretation of the contract. Any item contained on this list shall, however, take precedence for purposes of definition over any word or phrase which might be otherwise defined. Abatement The processes or procechirps used to decrease or eliminate the release of fibers from materials containing asbestos to the surrounding ati-.iosphere or structures. This definition shall incl-tidti all ;procedures for the encapsulation, containment, removal,, and disposal of asbestos containintj raterials at or from affected locations. Airlock A device, system or structure allowing ingress or egress -to a Containment area without causing the migration of asbestos outside the containment area. May be designated as eguipmont or personnel and typically consists of two or more curtained entries separated by an enclosed transition space. Air Monitoring The process of sanipl i ng the air at a location for the presence of airborne particulate matter, specifically as used herein for the presence of asbestos fibers. Amended Water _ Water containing one or more surfactants. Asbestos Contractor The person, company or other legal entity having the right and duty by written agreement executed by both that entity and the building owner or General Contractor to contain, removo, encapsulate, abate, and/or dispose of asbestos products. Where the agreement is executed by a General Contractor, the entity providing asbestos control services may also be referred as the Asbestos Sub -Contractor or Sub -Contractor. Authorized Visitor Those persons who have been designated in writing by the General Contractor, Building Owner, or the Asbestos Removal Contractor as having right of access to areas in which asbestos abatement procedures are in progress. Building Owner The owner of record of the property and improvements upon or within which the asbestos is to be removed. This definition shall include those persons who have been designated in writing by the owner to act as agents for said owner. f 'ontai nment The processes, procedures and techniques of isolating materials or surfaces containing asbestos contamination for the purpose of preventing the farther spread of such contamination to ajoining or surrounding areas. Containment Area A temporary work location estahlished i,sing suitable procedures and materials to prevent the migration of asbestos or asbestos contaminated materials to ajacent or surrounding locations. Decontamination Area An enclosed room or area connected to the containment area by one or more airlocks used to remove asbestos c.onta,:i i rati on frow personnel and equipment prior to movement to uncontrolled areas. Disposal The transportation of Encapsulated asbestos or asbestos contaminated materials from the work site to a disposal site. Disposal Site An established area or location approved, monitored and designated by appropriate local, state, or fedi-1ral authorities and used for the permanent locating of toxic, hazardous, or controlled substances. Encapsulation _ The processes or proced•ires :hereby materials or substances containing asbestos are impregnated, coated, covered or si+rraunded by other materials or substances designed and intended to prevent the ascape or migration of asbestos from the material so treated. General Contractor The. person, company or other legal entity having the right and duty by written agreement executed by both that entity and the building owner to construct new, improvements or demolish, re -model or modify existing structures on real property. If the nature of the work to be performed consists exclusively of asbestos related activities, the Asbestos Contractor may also be referred to as the General Contractor. HEPA Equipment high efficiency particulate absolute vacuum devices containin3 a filter system for retaining asbestos fihers greater than 0.3 microns at 99.971. reliability. HEPA Filter A high cfficir,ncy partici,late absolute device normally attached to HEPA equipment used to and capable of trapping and retaining asbostoes fibers having a length greater than 0.3 microns in length at 99.99% rf--�l i abi l i ty. Negative Pressure System A device or groupin, of related devices used to maintain an atmospheric pressure differnntial between a containment area or decontamination area and ambient air such that the containment area or decontamination area has an atmospheric pressure less the .inihi ent pressure. Regulations The most recently published issues of all written and published directives, procedures, legislative acts (including revisions and amendments), and other ` established for the purpose of setting minillIUM standards for the LISP, ;:u �t.,;►i, application, removal and stora a of dangerous, hazardous, toxic (Ir controlled substances. As used herein, the definition shall include, at a 111inimu�I the following: , A. Title 29, CFR Svc tions N10.10ol (Asbestos), 1910.134 (Respiratory Protection), and 1910.145 (Signaye) . R. Title 40 UR, Part 61, Sljhparts A and R (Plational Ermnission Standards for Haza r;lous Air Pollutants.) C. ANSI Z.9.2-71 Fundamentals of Local Exhaust Ventilation Systems 0. Applicabl stat :And local codes and ordinances as applied to asbestos. Removal The processes, procedures and methods for relocating asbestos from surfaces, materials and areas to encapsulation devices. Sub -Contractor The person, cotiipany or ether legal entity having the right and duty by written agreement executed by both that entity and the Asbestos contractor to provide asbestos control services. Surfactant -- An additive chef-iical at,ent used to increase the wetting and ;penetrant ability of a fluid. Worker Protective System The articles of clothin;, yari',Pnts and protective .devices used to prevent a person present in a containment or decontamination area from being directly exposed to asbestos fibers, either by bodj contact or bj inhalin�-j or ingesting such fibers. A comp ete system would consist, at a Pi niinum, of disposable outer garinents, protective foot coverinjs, disposable gloves, head covering, and a respirator covering both nose and mouth. Any person actively engaged in abatement would also require eye protection. CONTAINMENT AREA CONTROL No building owner, General Contractor, Sub -contractor, authorized visitor or any other person shall enter or attempt to enter a containment or de -contamination area, unless, prior to such entry, that person has the written permission of the Asbestos Contractor or does so under a general authorization provided for under contractual agreement between the building owner, General Contractor, or Sub -Contractor, any person violating this provision sha11 be immediately subject to bring detained for action by law enforcement authorities or ejected from the premises. Regardless of prior permission, such entry shall be only during hours and under such other conditions as estahlished by the contract of which this is a part. Thi s sec t i on sha 11 net: app I y to personnel entr1ri ny the con to i n-ment or de -contamination area for emergency pruposes sutk. as th% 0t*VrettJb!ft 0it theft, fire or damage to the premises with the implied authority to so enter. All persons entering areas 'designated a% containment or de -contamination areas, except as set forth above for emergency purposes, shall he :.!cli.,ipptd with grid using a worker protective system, shall enter and exit only through designated air locks, and shall upon exit from the area, use available abatement equipment, facilities and procedures to prevent the migration of asbestos fibers from the containment• or de -contamination areas. Further, upon exit, all disposable articles of outer clothing includiny respirator filters shall be placed in desiynatc�d containers. No article of clothing, item of equipment, sample or any other moveable object shall be removed from the containment or de -contamination area unless it shall have fi rst hPen de-contami nated or vori fied by the Asbestos Contractor or authorized agent as hei nU free of asbestos contamination. When attached to the contract (if which this is a mart, the document entitled " Work Area Procedures" sha11 Stipp 1ement and be an addition to this section. /np - 1 - CODES,REGULATIONS, ORDINANCES The following codes, regulations and ordinances are applicable to performance under the contract to which this is attached. The following list is not all inclusive, and additional regulations may apply in the local jurisdiction in which the work is to be performed. 1. Title 29, CFR, Section 1910.1001 (Asbestos) 2. Title 29, CFR, Section 1910.134 (Respiratory Protection) 3. Title 29, CFR, Section 11)l().1^5 (Signa e) 4. Title 439 CFi?, Part 61 , S-,h-;,arts A and 13 (National Emission Standards for Hazardous Air Poll,itants) 5. ANSI Z.9.2. (1971) Fundamentals of Local Exhaust Ventilation Systems. 6. EPA Publication 560/5-83-002 (Guidance for Controlling Friable Asbestos-ContaininU Materials in Buildings) 7. ANSI Z-30.2.-80 Respirator Control Procedures 8.- EPA,OSHA, NIOSH reguldtions and procedures as they apply to control, removal, and disposal of hazardous rnaterials. . .. . . . . V lqh%� ESTABLISHING THE CONTAINMENT AREA The following procedures are intended to be the general procedures for establishing and maintaining the containment area. They are not all-inclusive and additional procedures may be required on the specific project to which this attachment pertains. In all cases where additional precautions are required, the more stringent procedures shall in all cases apply. 1. Prior to commencing work, the area or areas to be established as containment areas shall be isolated and completely sealed off from surrounding areas. Doors wh.i ch will not be regt, i red in the course of abatement shall he sealed in such a manner that they will be available only for emergency purposes. All air conditioning openings shall he covorod with a non -permeable covering and taped. All utility outlets which might por►i0 t the mi �rati on of air will he temporarily sealed. All other openings such as corridors, doorways, skylights, ducts, grills, diffusers and any other penetrations shall also be sealed temporarily to establish the containment ar(2a.- - _ 2. Movable objects shall be either removed from the area after determining they are not asbestos contaminated or covered with non -permeable coverings and taped. Non -movable objects which will remain in the area after final clean -tip shall be covered or otherwise protected to prevent asbestos contamination from the abatement procedures. 3.. The containment area shall he cleaned using HEPA vacuum equipment or suitable wet cleanin( methods. No procedure shall he used for this pre -cleaning which will raise dust which might migrate outside the containment area. All equipment used for this process shall be equipped with suitable HEPA filters. 4. Flour and wall surfaces shall then be covered with a non -permeable covering such as 6 mil plastic sheeting. The floor covering shall extend at least 12 inches up the walls and wd-1'l coverings shall extend _to the floor level. All lap joints shall be sealed or taped to prevent migration of contaminants behind the non -permeable barriers. 5. Airlocks and passages for equipment and r�aterials are then to be established. In all cases, access betwpon contaminated and non-contarni nated rooms shall he through an air -lock and access -between roans within the containment area shall be through a three curtained door -way. 6. If separate areas of the building are to remain occudied or otherwise in use, they must be separated from the containment area by both air -tight barriers and by vandal barriers where necessary to prevent breach of the containment area. 7. All barriers and non -permeable coverings are to be periodically inspected for breach or dalidge. Upon discovery of such damaye or breach, it shall be i<Wiediately repaired and all exposed surfaces are to be considered as contaminated until monitored or cleaned using suitable procedures. Once established. the conttr i ru re nt a r-'�a is to he maintained at negative air, d►Jrinl all tirios that personnel are present or work is underway in the area. There shall be no regijirowiont to maintain negative air pressure during non -work periods, provided that adt>,lc,ate security is used to prevent non -authorized persons from. entering the contai nr:rr!nt area and no activity is underway which might cause migration of asbestos fibers. ASBESTOS REMOVAL PROCEDURES The following procedures are to he considered as the minimum required procedures for control, removal and containment of asbestos contaminated surfaces, materials and objects. These procedures are not intended to be all-inclusive and additional procedures may be required clue to the nature. of the work to be performed. In all cases, where these procedures are modified, the more stringent procedure shall control. Modifications of these procedures shall be the exclusive right of the Asbestos Contractor and shall be done in accordance with existing EPA, OSHA, and NIOSH rules, regulations and advisories relating to the abatement and control of hazardous materials. Authorization for stich mortification from any other person shall not be effective finless reasonably aecessary for the irunediate protection of persons or property from ir►mi ni-!nt risk of hodi ly injury or destruction. 1. All b1:lk roilioval of asbestos containing materials shall be done by iamedi ately pl aci ny st,ch object-., in non-permaeable containers having suitable strenght to prevent penetration by objects placed within them. All such containers shall be suitably ;narked or labeled as containing asbestos products. 2. All surfaces from which asbestos has been removed or surfaces which may be contaminated with asbestos shall either be wet wipes with amended water or where appropriate, vacuumed with HEPA vacuum equipment. All wiping materials, disposable cloths, mop heads, etc. used in the cleaning process shall be stored in a non -permeable container suitably inarked. 3. All waste. water created -from wet wiping and wet stripping and all shower water waste shall be considered contaminated. No such water shall be disposed of until it has been filtered or placed in suitable containers for disposal at approved sites. - 4. 13ef(ire commPnci ri j the removal of asbestos materials, the surfaces shall be sprayed with amended water using airless spray eyuipiijont or compressed air at low pressure capable of providing a "mist" application to prevent airborne migration of asbestos fibers. The work surface Should he kept continuously wet during the work process to minimizo fi,-)er dispersion. 5. . Untreated surfaces of asbestos ,ndterial left in place shall be encapusulated in a non -permeable material or shall be enclosed behind permanent air tight barriers. Such surfdCPS shall I)e marked and labeled as containing asbestos products. 6. When an asbestos waste container has been filled, it shall be sealed and checked for proper iiiarkings. The outer surfaces shall be wet sponge cleaned and immediately removed to the decontaiiiinaiton and disposal area. Where appropriate, waste containers shall be evacuated before final sealing using HEPA equipment so that the interior of the container is at negative pressure after final sealing. 7. After all asbestos material has been removed and bagged or sealed Identified, the containment area will be HEPA vacuumed and wet wiped. After containers have been removed, the room shall be completed cleaned and/or wet and an air sample taken in accordance with test in /moni-toring found to be free of asbestos contaminants, the room will be sealed ano d marked sasIa non -access area until all areas within the containment area are free of asbestos contamination. ABATE14ENT OF CONTAMINATED -SOILS Abatement of asbestos contaminants within soil generally consists of three procedures; (a) excavation of the immediate surface of the soil , (b) vacuuming of the soil surface when contamination is only on the surface, and (c) solidification of the soil surface to prevent migration of asbestos fibers. The following procedures are to be used when abatement work is to proceed where asbestos products have contaminated soil material. The procedures as outlined are alternative and completion of each procedure is not always required. The choice of procedures shall be the exclt+sive decision of the Asbestos Contractor, and any work performed shall be in addition to the normal procedures set forth in the contract to which this is attached. Unless specifically set forth on the description of work to be performed or unless specifically set forth on the bid proposal, the cost of soil abatew:� nt shall be doterviined by separate bid and acceptance. Such acceptance shall constitute a adden-lum or change order to the base contract and shall increase the ov;,rall price C-iccordingly• 1• Excavation of soil surfaces is to be used when pre -work inspection and soil sampling indicates that contamination extends to a depth which would make vacuuming ineffective. No excavation shall take place unless sufficient wetting of the soil has taken place to minimize migration of asbestos fihers• Generally, the wetting procedures shall follow those used in the earth moving trade for air pollution abatement, but in no case shall excavation procedures continue where soil moisture is less than 8% by weight. Further, amended water "misting" shall be used in the immediate vicinity of the excavation activities at all times that soil is being removed and prepared for disposal, _ Depth of soil removal shall be pre -determined by inspection and sampling. In the event that progress insj,ections and ongoiny samplingl indicates that additional depths of excavation are required, the contract price shall be increased in direct relationship to volume reviovad. Soil removed for disposal shall riot he transported beyond the iminedi ate vicinity of the excavation unless the contaminated soil is first placed in sealed containers, suitably ,narked and the outer surfaces de -contaminated before transport. If permitted by current EPA, HIOSH, and DOT regulations, the soil may be transported in bulk containers, but in no case shall the contaminated soil be transported in open containers. 2. Vacuuming of soil to remove contaminated surface soil may be utilized where appropriate. Vacuum equipment must be HEPA filtered and all filters shall be disposed of after use in accordance with normal procedures for such disposal . Depth of removal shall be determined by norriial sampling procedures, and in the event that rerioval exceeds 1 inch, the removal shall thereafter he deemed as excavation and the contract price adjusted accordingly. Soil removed shall be contained for disposal in accordance with normal procedured for disposal of contaminated waste materials. J. 14here excavation or vacuuming is deemed in -appropriate, soil shall he stfbjo�ted to a combined surface solidification and stabilization procedure. That procedure shall be similar to concrete surfacing except that amended water "misting" shall be used in addition to concrete procedures while work is in progress. Surface coating procedures such as "asj)ha 1 t ;javi ny shall generally not be appropriate i.inless the surface is unlikely to tip subjected to loads which might reasonal ly break 1-,)1 coatinj • 4. Regardless of the Soil abatemont procedure used, no asbestos contaminated 'material shall remain in the area of operations which might reasonably cause subsequent release into the atmosphere of asbestos particles in excess of EPA guidelines. 5. At completion of soil abatements operations, the site shall be final sampled to assure compliance with such EPA guidelines. • AIR AND SURFACE TESTING A?1D MONITORING A. AIR SAMPLING Air sai:rpliny shall he divided into three phases and shall be further divided into three area sampling requirements. The three phases are: (a) Initial Pre -Contract Conditions, (h) Progress Sampling, and (c,) Final Inspection Sa;igdinq. The three sampl i n, regij i r,--:::E?n is are: (i) outsi(to the ;'oftair+!ii-nt ark=a, (i i) mtside tht� 'bui ldin(j, and (iii) inside the containment area. All sampling except as otherwise noted shall be determined by a minimum sample size of 960 liters (8 hour TWA) at sea level adjusted to the standard pressure altitude of the work site. Daily samples will be taken while work is in I)rotjress in accordance with ai•pl i cabl e regirl ati ons including but not 1 iriii ted to OSHA requi r'e u:nts for cei l-'i n; concentration (Pi,rsonnel) and 8 hour tllile weighted avipraye for work area exposure level. Air sampling shall also accoilidl i shed while abatement work is in progress by attaching a sampling device to ion..• or more workers. 'lot less than one sample _shall be taken :)f liters lx�r cc for ime hour. A.(]) Initial Pre -Contract Conditions A si ngl i� air saopl a shall he taken by the Asbestos Contractor before comnienciny work (a) outside the building or buildings, (b) inside each building but outside the work ar+!a , and (c) at the work arf�a . These samples shall be Asbestos Contractors samples for historical and comparison purposes and shall not be part of final inspection requirements. A. (?.) Progress "'Sampling Progress sampling shall be as folio;ys: ( i ) outside the containment area- on(, sample daily (tlinimuil) (ii) within the containinimt area- as required by the Asbestos Contractor (i i i) worker sampling- as regiii red by current OSHA ream remen is and by t.h6- (Contractor. A.D) Final Inspection Sampliny Final inspection sam pl inU shall be suhmitted as a part of the over-all final inspection of the job, dnd shall cansi st of: (i) an arih i ent air sam,A o, taken outside each f,f fected building, • (ii} a sample taken within the containment area, and (iii) a sample taken within the bijilding bait outside the containment area. Work shall he deemed complete when the final inspection saripling indicates that interior sa•nple results are equal to or less than exterior sample results and the avt-ra qe of the last throe conseci,tive air tests yield a res-ilt of equal to or less than 0.02 asbestos fibers per cubic centimeter of air sarilil ed . TOOLS AND EQUIPMENT The following is a partial list of the tools and e(jl.ii pment required for performance under the contract to which this docii!-nent is attached. It is not intended to be all-inclusive and additional tools may be required. Where minimum requirements are set forth for specific tools and equipment, those requirements shall be Mandatory both for the listed equipment as well as any dlternative or substitute equipment which may be used in ;performance of the contract. All ;power ok-uiprient shall rieet th►? at),)licable standards set by MISI, 1119 ASTH, or MIS. speci ficatirins and shall be kept in doors rr.,pai r and in operating condition. Certain tools a.id ►,4ui jjm(!nt to `.)e i,sed in performance of the contract are of special desi n and porfor;;iance an;i arc, props-letary to the Asbestos + ontractor. The Asbestos Contra::tnr rii l l certify th,it thoso items of equilment rnvv,pt or exceed ap,pl i cabl a standards for i tes1ts porformi nU tha saiiie function, but shall not be required to revOal the oxact perfr,ri-;;incP or methods r)f operation of those items. 1. hand tools including cleaning equipment. 2. Airless or low pressure liquid power operated spray oqui pl:i►ant . 3. Scaffolriin;; 4. Commiji-i_ical[ion Ez(Iuii}i:gent suitable for efficient inter -room conwiunications. 5. Envi ronri�ntal Control Equi pi,ient, i ncl iadi ny but not limited to exhaust vefit i 1 at i on and dust collection, used for reduction or elimination of airborne asbestos fibers. Such egllipr,l-,nt shall be HEPA niinirium designed, constructers, installed and r-wintained in accordance with A►,SI 7.0?-2-1971 as aiiiended. Area exhaust units shall be utilized and vented to discharge outside the building and provide negative pressure in the contai twient area for the duration of the work to be performed. The ;filtered; ne ative air system shall provide pressure differential frow int lke side of the prim jry filter to the exhaust side of the HEPA filter. The filter system shall be capable of reinaving 99.99% of all airborne asbestos fibers greater than 5 microns in size as tested at 0.02 cubic centimeters of air at the outlet filter. 6. Personnel respiratory protection equipment mr--eti ng the standards of 29CFR 1910.1001. All such equ i;nilent shall have replaceable and disposable filter systems capable of accepting both particulate and chemical abatement filters unless the equipment is generally knoin as "supplied air" deriving its atmosphere either from connected external sources or from "bottled" air. 7. Personnel eye and hears protection devices where the work environiner,t reasonably requires such protection. 8. Protective fall hody clothing consisting at a minimu111 of full body coveralls, h ,adgear, and foor covori ngs. Such equipment may consist of both disposable and non-disdosahlV drtirles. CLEAN UP AND DISPOSAL A. Clean-up Visible accumulations cif asbestos material and debris shall not be preinitted during the removal operations. All contaminated materials shall be placed in suitable contain;irent devices and when those devices are filled, they shall be sealed, the outer surfaces de -contaminated, and removed to the de -contamination area for placement in disposal containers. Disposal containers shall riot he permitted to accinmul ate in the de -contamination area. As such contain,-!rs are generated, they shall be sealed, the outer surfaces dry-conta.1rinated and marked in accordance with existing regulations, and they shall 5o r:vlovod to ti-mi)nrary stora.je pending transport to permanent disposal sites. After all mows drid-;ir:=as within the containment area have been de -contaminated and all visible asbestos either removed or encapsulated, the floor and Mall coverin►js shall he removed. Cnverinus on doors, windows, vents, etc, shall fto not he removed at this time. All surfaces within the contain:=rant area shall then he cleaned with water and ' HEPA vacuur.i equipment as appropriate. A detailed visual inspection shall be performed by the Asbestos Contractor for the presence of visible asbestos products or materials. If asbestos is found to be present, it will be removed or encapsulated and the area a; ain cleaned and inspocted. If no visiblif, ashestos contamination is found, thr area will be air monitored and sampled for asbestos fibers. A sampling test yielding a result yreatpr than 0.02. fibers per crjhi c centimeter of air shall cause the entire containrrioat area to he wet cleaned again and such sucessive cleanings shall continue until air sample res0ts yield an asbestos fiber count of equal to or less than 0.02 fi bors per cubic centimeter of air sampl ed . When both visual inspocti nn and containment area air sampl ps indicate the containment area is free of asbestos fibers, the "final" containment area and outside "ambient" air sawples shall be taken and compared. When those tests are in accordance with air saripl i ng and monitor standards set forth elsewhere, the removal, containment and encapsulation portions of the contract shall be deemed complete. Removal of temporary barriers, containment area structures, equipment, and all rer:iai ni ny barriers between the containment area and other areas within the building or buildings shd 11 proceed. All such materials reillived shall either be wet de -contaminated or disposod of as contaminated waste. Any residual dust or debris shall also be disposed of as contaminated waste. B. Disposal tlo contai!rinated waste shall he rei,ioved from the containment area unless and until it has been placed in iirr,aerr,reable containers, suitably marked and the outer surf aces de -contaminated. All iriiperi-r�-�ahle containers shall, in tarn, he ;placed in :,iochanical disposal devices (ie. metal drums) sealed, and the Outer surfaces rip -contaminated and suitably marked. As sufficient n=wrbers of such disposal containers accur,rul ate for efficient trans;)nrt, they shall he removed and transported to an EPA approved disposal site. This contiii ners shill i he hoth air and water -tight and during transport shall not he unreasonably exi)oserl to risk of dairayv, theft or vandal i svi. An asbestos disposal forte previously approved by the Asbestos Contractor r— shall, be completed by both the transporter and the disposal site operator for each ..delivery of disposal devices to the site. r FINAL INSPECTION AND ACCEPTANCE A: Final Inspection Prior to requesting a final inspection tour, the Asbestos Contractor will (a). re-establish all moveable objects to their original positions as noted on the pre-comrie.nce'11 ont tour, ( b) , remove and d i spose of 11VAC fi 1 ters as contami hated waste , (c) . react i vav, hiri l di ny utility systems as directed by this 0,"iner and as requirt�d by the tour, (d). cori,)lott, ,+icy other r,;,�(itions contain(-d on the pre -commencement tour document . They Ashest(+s r(,rItractor and Owner will then jointly tour the building, grounds and work area, noting any items contained on the pre-colmilencealent tour ream rod boforo ri•—acceptance by the owner. Only i tem:is contained on the pre-coinnencement toter are required to br, completed by Asbestos tContractor before the final physical inspection shall he doomed corr;)lete. B: ACCEPTANCE When the final physical inspection is complete and the Asbestos Contractor has made, all subni ttal s cnntai ned on the document entitled "Suhrii ttal s Attachment", _ the Owner shall have 48 hours to object in writing to .any item the Oomer reasonably believes does not conform to the contract or performance thereunder. Failure to provide such ;bitten notice shall constitute waiver of any such discrepancies and acceptance of the projoct and contract performance. SUBMITTALS The following list shall constitute all docwnents required to be submitted by Asbestos Contractor to Owner pursuant to the contract to which this is attached. Exact photocopies of those documents shall bo deemed as compliance. 1. Federal (EPA), State and local permits (where applicable) . 2. Landfill Operi:tars Permit 3. Disposal Curti f j -_;;tt. 4. F.iiploYOe arli S:;h-Contractars 'Zolease for.-;-), 5. Area and s�. ;•�;:,: �l ".i r ",�� .�.1 i rty S'.es;;l is G. Ins.ijrejnCt 7. Final Inspoc:tion doc.ri:n'- EXHIBIT A Proposal p Proposal No. 2 19 6 ' FROM ASBESCO INC. RE�E 1 Sheet No.1759 VAN BUEN WAY AURORA COLO. 80011 Q�i� 119a4 Date Sept. 28, 193 PHONE: 361-6667 �ZZ-p/GG Proposal Submitted To Work To Be Performed At Nam Eagle County Govt.Street 550 Broadway Street 550 Broadway City Eagle State Co. Date of Plans City Eagle Architect State Colorado Telephone Number 1-328-7311 We hereby propose to furnish all the materials and perform all the labor necessary for the completion of Remove and dispose of asbestos from pipes and joints as specified, All work to be done in compliance with E.P.A., O.S.H.A, and Colorado clean air regulations. All work to be done by qualified persons with Asbesco, Inc. All lab reports and analysis to be done by Hager La>ora oric Inc. All monitoring to be done by independent monitoring company. A copy of these reports will be given to the above named agencies, along with a copy to the owner and contractor. 1aa+ shall be furnished by owner. and. el-oGtriGity All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of Two Thousand Six Hundred and no/100---------------------Dollarsl$2,600.00 I. with payments to be made as follows: Net 15 days u on com letion omp a ion eing when ab repots are delivered. Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance upon above work. Workmen's Compensation and Public Liability Insurance on above work to be taken out by Asbesco, Inc. Respectfully submitted Asbesco, Inc. / Pbr Note — This proposal may be withdrawn by us if not accepted within 30 days ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Accepted Signature Date ___— Signature TOPS FORM 5450 LITHO IN U. S. A.