HomeMy WebLinkAboutC84-003 Subdivision Improvements Agreement_Arrowhead at Vail_first amendment51, ? 8 0 2 9 4 aw oA JOHNNETTE PHILLIPS FIRST AMENDED EAGLE CTY. RECORDER SUBDIVISION IMPROVEMENTS AGREEMENT r:R 26 ID 29 AM Tq THIS AGREEMENT, made and entered into this ZJ day of k��i� , 1984, by and between ARROWHEAD AT VAIL, a joint venture, hereinafter referred to as the "Subdivider," and THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO, hereinafter referred to as the "County." A. In accordance with Colo. Rev. Stat. § 30-28-137, as amended, the Subdivider and the County have previously entered into a Subdivision Improvements Agreement (the "Original Agreement") regard- ing improvements to be completed in the subdivision in Eagle County, Colorado known as Arrowhead at Vail (the "Subdivision"). The Original Agreement was dated October 18, 1983, and recorded January 3, 1984, in Book 375, Page 881, as amended by instrument dated rid, 1984, and recorded ,' 2 _, 1984, in Book Page 9,P!5*, all in the real property records of the County of Eagle, State of Colorado, and pertains to those portions of the Subdivision plotted as Arrowhead at Vail, Filing No. 10, ("Filing No. 10"), and Arrowhead at Vail, Filing No. 11 ("Filing No. 11"). B. The Subdivider, as a condition of approval of the final plat of Arrowhead at Vail, Filing No. 12, County of Eagle, State of Colorado ("Filing No. 12"), wishes to amend and restate the Original Agreement, also in accordance with Colo. Rev. Stat. 5 30-28-137, to restate the obligations incurred by the Subdivider under the Original Agreement, and to document the obligations to the County hereby incurred by the Subdivider in connection with Filing No. 12. C. Pursuant to the statutory authority referred to above, the Subdivider is obligated to provide security or collateral suffi- cient in the judgment of the County to make reasonable provisions for completion of certain improvements as set forth in Exhibit A attached to and incorporated in this Agreement by this reference. D. The Subdivider wishes to provide collateral to guaran- tee performance of this Agreement, including construction of the above -referenced improvements, by means of a First Amended Promissory Note and a First Amended Deed of Trust. �*@Xto DI In consideration of the following mutual covenants and agreements, the Subdivider and the County agree to amend and restate the Original Agreement, as follows: 1. Improvements. The Subdivider hereby agrees, at its sole cost and expense, to furnish all equipment and materials neces- sary to perform and complete, in a good workmanlike manner, all improvements as shown in the final plat documents for the Subdivision, in accordance with all plans and specifications for the Subdivision filed in the office of the County Engineer and/or Department of Community Development, and to do all work incidental thereto according to and in compliance with the following: a. All final plat documents submitted prior to or at the time of final plat approval. b. All laws of the United States of America, State of Colorado, County of Eagle, and its respective agencies, affected special districts and/or service districts. c. Such other designs, drawings, maps, specifica- tions, sketches, and other matters submitted by the Subdivider to and approved by any of the above -referenced governmental entities. All said work shall be done under the inspection of and to the satisfaction of the County Engineer and/or the County Building Official, respectively, and shall not be deemed com- plete until approved and accepted as completed by the Board of County Commissioners of the County or said Board's appointed designee. d. In addition to the foregoing, the Subdivider agrees to retain a registered engineer whose duties shall include the inspection, construction engineering, surveying, and materials testing, as applicable, of the improvements to be installed and completed pursuant to this Agreement in accordance with the plans and specifications approved by the County includ- ing, by way of illustration and not limitation, density testing of soils. The engineer retained by the Subdivider shall file with the County written quarterly reports of the results of such engineering services. The subdivider shall perform and complete the work described above relating to Filing No. 10 and Filing No. 11 on or before November 30, 1984, and the work described above relating to -2- Filing No. 12 on or before the respective completion dates identified on page 8 of Exhibit A. 2. Cost -collateral. The total estimated cost of said work and improvements for Filing No. 10, Filing No. 11 and Filing No. 12, is the sum of Two Million One Hundred Seventy -Four Thousand Five Hundred Sixty -One Dollars and No Cents ($2,174,561.00) as evidenced by the f inal estimate of probable construction costs contained within Exhibit A. To secure and guarantee performance of its obligations as set forth herein, the Subdivider agrees to provide security and col- lateral in the form of a First Amended Promissory Note in the amount of Two Million One Hundred Seventy -Four Thousand Five Hundred Sixty" One Dollars and No Cents M r174 r561.00) secured by a First Amended Deed of Trust evidencing a first lien on Lot 21, Arrowhead at Vail, Filing No. 11, County of Eagle, State of Colorado, according to the final plat thereof. The original deed of trust filed in connection with the Original Agreement, recorded in Book 375 at Page 880 of the real property records of the County of Eagle, State of Colorado, is amended and restated in its entirety by the First Amended Deed of Trust. 3. Substitution of Collateral. The Subdivider may at any time substitute the collateral originally deposited with the County under this Agreement for another form of collateral acceptable to the County to guarantee the faithful completion of those improvements referred to herein and the performance of the terms of this Agreement. The County agrees that to the extent any district sells its bonds to provide funds for any of the improvements described in Exhibit A and covenants with the County and Subdivider to install any of the improvements, the note and collateral of the Subdivider shall be released by the County to the extent the improvements are actually completed pursuant to this Agreement. The County acknowledges that the property provided as collateral under this Agreement has a value in excess of the costs of the improvements described in Exhibit A. Accordingly, the County agrees that the subject property provided as collateral may also serve as collateral for other improvements to be constructed by the Subdivider within Arrowhead at Vail up to an aggregate maximum of five million dollars ($5,000,000.00) . 4. Indemnity. Neither the County nor any officer or employee of the County shall be liable or responsible for any acci- dent, loss, or damage happening or occurring to the work specified in this Agreement prior to the completion and acceptance of the same. -3- nor shall the County, nor any officer or employee thereof, be liable f or any persons or properties injured by reason of the nature of said work, and all of said liabilities shall be and are hereby assumed by the Subdivider. The Subdivider hereby agrees to indemnify and hold harmless the County, and any of its officers, agents, and employees against any losses, claims, damages, or liabilities to which the County or any of its officers, agents, or employees may become subject, insofar as any such losses, claims, damages or liabilities (or actions in respect thereof) are based upon any performance of the Subdivider under this Agreement; and the Subdivider shall reimburse the County for any and all legal or other expenses reasonably incurred by the County in connection with investigating or defending any such loss, claim, damage, liability, or action. This indemnity provision shall be in addition to any other liability which the Subdivider may have. 5. Enforcement. It is mutually agreed, pursuant to the provisions of Colo. Rev. Stat. S 30-28-137 (3) , as amended, that the County or any purchaser of any lot, lots, tract, or tracts of land subject to a plat restriction which is a security portion of this Agreement shall have the authority to bring an action in any district court to compel the enforcement of this agreement on the sale, con- veyance, or transfer of any such lot, lots, tract, or tracts of land, or the enforcement of any other provision of that statute. Such authority shall include the right to compel rescission of any sale, conveyance, or transfer of any lot, lots, tract, or tracts of land contrary to the provisions of any such restrictions set forth in the plat or in any separate recorded instrument, but any such action shall be commenced prior to the issuance of a building permit by the County where so required. 6. Release of Collateral - agglication. It is further mutually agreed that pursuant to the provisions of Colo. Rev. Stat. S 30-28-137 (2) , as amended, as improvements are completed, the Subdivider may apply to the County for a release of part or all of the collateral. Upon inspection and approval, the County shall release said collateral. If the County determines any of the improvements are not constructed in substantial compliance with spec- ifications, it shall furnish the Subdivider a list of specific defi- ciencies and shall be entitled to withhold collateral sufficient to ensure such substantial compliance. If the County determines that the Subdivider will not construct any or all of the improvements in accordance with all of the specifications, the County may withdraw and employ from the deposit of collateral such funds as may be -4- necessary to construct the improvements in accordance with the specifications. 7. warranties. Notwithstanding any provision to the con- trary, there shall be a one-year correction period from the time of completion of the improvements referred to in this Agreement (such time being determined by formal hearing and action by the Board of County Commissioners) , during which time the Subdivider shall promptly correct or remove and replace, in accordance with the County' s written instructions, defective work or materials and conse- quences thereof. Repair or replacement made under the one-year cor- rection period shall bear an additional one-year correction period from the acceptance of the repair or replacement by the Eagle County Engineer. The work shall be collateralized during the correction period in an amount and type of collateral as shall be reasonably determined by the County. Such work shall be inspected approximately sixty (6 0) days prior to the expiration of the one-year correction period, and any deficiencies shall be noted to the Subdivider. 8. Approval of plat. The County agrees to the approval of the final plat of Filing No. 12, subject to the terms and conditions of this Agreement. The previous approval of the County in connection with the final plats of Filing No. 10 and Filing No. 11 is subject to the terms and conditions of this Agreement. 9. Amendment. The parties hereto mutually agree that this Agreement may be amended from time to time, provided that such amend- ment is in writing and signed by all parties hereto. 10. Assumption. This Agreement shall be enforceable against the Subdivider, provided, however, that in the event the Subdivider sells or transfers all or part of the Subdivision, as shown in the final plat (prior to extensive sales of individually platted tracts), the obligations of the Subdivider under this Agreement as to that portion of the Subdivision may be assumed by the purchaser of the parcel, and Subdivider shall have no further obliga- tions under this Agreement. It is agreed, however, that no such assumption of these obligations shall be effective unless the County gives its prior approval to such assumption, following an investiga- tion of the financial condition of the purchaser. 11. Warning of dangerous conditions. I t i s f u r t h e r agreed that the Subdivider shall at all times give good and adequate warning to the traveling public of each and every dangerous condition existing in any of the roads within the Subdivision, and will protect -5- the traveling public from such defective or dangerous conditions. It is understood and agreed that the roads within the Subdivision are private, shall be under the charge of the Subdivider for the purpose of this Agreement, and further, that the County shall have no respon- sibilities or liabilities relative to the roads. 12. Amendment and Restatement. It is understood and agreed that the Original Agreement is amended and restated in its entirety in this Agreement, and that the obligations evidenced by the Original Agreement comprise part of, and are not separate from, the obligations evidenced by this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first above written. AT.T.EU r By. Clerk of the Board of 'County Commissioners ATTEST: By r� ( SEAL) -6- �47 n `IrlrlaLiri 111 •.N llr• . COUNTY COUNTY OF EAGLE, STATE OF COLORADO By and Through its BOARD OF COUNTY COMMISSIONERS By: LL/. W. Keith Troxel, C airman SUBDIVIDER ARROWHEAD AT VAIL, a Colorado joint venture consisting of ARROWHEAD, LTD., a Colorado limited partnership, and WEDGE REAL ESTATE LTD., a Texas limited partnership By: ARROWHEAD, LTD., a Colorado imited part nership By: 'Gene 7artner By: r By: V 1--� By: 4GeneeG lrr Part er General Partner By: WEDGE REAL ESTATE LTD., a Texas limited partnership By: MINEFA RESORTS, INC., a Delaware corporation, Geer 1 Partner., �F By. Its: wmMcom_ STATE` -OF COLORADO COUNTY -°'OF EAGLE By: IMPERIAL BAY CORPORATION, a Delaware corporation, General Partne'r,- SS. Its: The fo_r e o'ng instrument was acknowledged before me this �S day of ) , 1984, by �Y�Y-�Y�<�� ��'�Q as General Partner of Arro� Ltd., a Colorado limited partnership and joint venturer in Arrowhead at Vail, a Colorado joint venture. WITNESS my hand and official seal. //-- My commission expires & ,,f r Notary Public Address [SEAL] STATE OF COLORADO SS. COUNTY OF EAGLE �3 The foregoing instrument was acknowledge] before me this day of , 1984, by .•)�reticc 7> z�w as General Partner of Arr whead, Ltd., a Colorado limited partnership and joint venturer in Arrowhead at Vail, a Colorado joint venture. [SEAL] WITNESS my hand and official seal. My commission expires -�f6 -7- notary vuniic &I, Address 1 STATE OF COLORADO ) SS. COUNTY OF EAGLE ) The f redoing instrument was cknowledged before me this day of , 1984, by as General Partner of Art whead, Ltd., a Colorado li 'ted partnership and joint venturer in Arrowhead at Vail, a Colorado joint venture. WITNESS my hand and of f icial seal. My commission expires i' i • � Notary Public A t w \ c Address [SEAL] STATE OF COLORADO ) } SS. COUNTY OF EAGLE ) The foregoing instrument as acknowled ed before me this day of , 1984, by �� as General Partner of Arr whead, Ltd., a Colorado limited partne ship and joint venturer in Arrowhead at Vail, a Colorado joint venture. [SEAL] WITNESS my hand and official seal. My commission expires /teary Public Add r es s -8- STATE OF GOLORA:DG— 7� C SS. COUNTY OF HARRIS The I regoing instrume t w s acknowledged before me this .0 , 1984, by 6_' w ash`<-c< 11,eCf, 7-and a, as of Minefa Resorts, Inc., a Delaware corporation and General Par ner of WEDGE Real Estate Ltd., a Texas limited partnership and joint venturer in Arrowhead at Vail, a Colorado joint venture. WITNESS my hand and official seal. My commission expires Cfli jb GNU-'vWt Lt�C'1C� Notary Public [SEAL] STATE OF eoLeRADO 7Zer/45 SS. COUNTY OF HARRIS Address The foregoing instrument was acknowledged before me this day of Ck,"') t 1984, .by dac/� ,_f��`;� as�'Yr/�a aw,G-rand /. l7e1 as Imperial Bay Corporation, a Delaware corporation and General PaFtner of WEDGE Real Estate Ltd., a Texas limited partnership and joint venturer in Arrowhead at Vail, a Colorado joint venture. [SEAL] WITNESS my hand and official seal. My commission expires �o a ce w, 1. n ck- Notary Public ODA —9— Address S EXHIBIT A TO SUBDIVISION IMPROVEMENTS AGREEMENT EAGLE COUNTY BOARD OF COUNTY COMMISSIONERS AND ARROWHEAD AT VAIL, A JOINT VENTURE DESCRIPTION OF IMPROVEMENTS Arrowhead shall construct water, sewer, roads and landscaping at Arrowhead at Vail in accordance with the engineering plans prepared by Centennial Engineering, Inc. The details of all such improvement work are attached to this Exhibit A. The following is a cost and timetable for completion of each category of improvement. Roads Water Sewer Total Filing No. 10 $1473,125 $ 1562645 $131,736 $ 435,506 Filing No. 11 2351,600 260,280 1815,321 677,201 Filing No. 12 322,442 94,500 111,025 5279967 Offsi_te - 8292790 585,136 887,926 $7059167 $19341,215 $4829218 $23,528,600 Completed 1983 - (1252520) (2289519) (354,039) $705,167 $1,215,695 $2539699 $29174,561 CENT NN1AL ENGINEERING, INC. OFFICE LOCATION: 15000 WEST 64TH AVENUE, d1 A COLORADO MAILING ADRESS: P. O. DRAWER 1307, ARVADA0 ADo 80001 s CEI Job No. 192.03 Date 11-16-83 By Page 1 of _ f Checked by (Date) Client Arrowhead at Vail Project Arrowhead at Vail Subject Estimate of Probable Construction Costs for Filing No. 10 (for Subdivision Improvements Agreement) Wll COST ESTIMATE ITEM NO. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT COST ITEM COST TOTAL COST ROADWAYS Removal of Asphalt Mat 40 S.Y. 5 0 200. Excavation/Embankment 6 175 C.Y. 6 0 37,050. Reve etation 3 AC. 1,850 00 5,550. Aggregate Base Course (Class 1, 2 or 4 1. 625 TON 7 00 1.1 375. Aggregate Base Course (Class 6) 3 325 TON 9 0 29,925. I Hot Bituminous Pavement Gradin E (Haul & Asphalt) 1 800 TON 32 00 57,600. Hot Bituminous Pavement Grading E (Haul & Patching) 15 TON 100 00 1,500. Hot Bituminous Pavement Leveling Grading EX (Haul & Asphalt) 65 TON 45 00 2,925. Crack Sealing 7_1000 L.F. 1 00 1,000. ROADWAY TOTAL 147 125. �Roadway quantities include 1widening of U.S. 6 & 24) DOMESTIC WATER 8" Ductile Iron Pipe 830 L.F. 32 DO 26 560. 12" Ductile Iron Pipe 2,030 L.F. 42 0 85 260. 1 8" Gate Valve & Valve Box 2 EACH 750 30 1.500. 12'' Butterfly Valve & Valve Box 4 EACH 1 050 DO 4 200. Fire Hydrant Assembly 5 EACH 13,150 DO 15,750. 1-1/4" Water Service Connection 725 L.F. 25 0 18,125. Casing Pipe 50 L.F. 105 0 5,250. i)OMES`I.'IC WATER TOTAL 1.56 645. ------------- —f -- -- i CE%1TENNIAL ENGINEERING, INC. OFFICE LOCATION: 15000 WEST 64TH AVENUE ,� ��JJA, COLORADO MAILING ADRESS: P. O. DRAWER 1307, ARVADA,aQLORADO 80001 Page 2 of 2 CEI Job No. 192.03 Date 11-16-83 By WD Checked by _ (Date) Client Arrowhead at Vail Project Arrowhead at: Vail Subject Estimate of Probable Construction. Costs for riling No. 10 (for Subdivision Improvements Agreement) COST ESTIMATE ITEM NO. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT COST ITEM COST TOTAL COST SANITARY SEWER Adjust Manhole Rim 2 EACH 375 00 750. 8" PVC Sewer 2.263 L.F. 32 00 72.416. Manhole (10 foot) 2 EACH 1,700 00 3 400. Manhole (15 foot) 2 EACH 2,200 00 4,400, ,Manhole (20 foot) 4 EACH 2 700 00 10 800. i _!Manhole (25 foot) _ 3 EACH 3,300 00 9,900. Sanitary -Sewer Service Connection 680 L.r. 34 00 23 120. lDrop Manhole Connection 1 EACH 1 700 00 1,700. Casing Pipe 50 L.F. 105 0 5,250, SANITARY SEWER TOTAL 131 736. OVERALL TOTAL, 435 506. :ENT.ENNIAL ENGINEERING, INC. iFFICE LOCATION: 15000 WEST 64TH AVENUE, A�_�� OLORADO .1AII.ING-ADRESS: P. O. DRAWER 1307, ARVADA, CRADO 80001 ;E1 Job No. 192.03 Date 11-16-83 By V' 1 Page 1 of 2 s WD Checked by (Date) Ment riow yea a a� Project Arrowhead at Vail ,ub)ect Estimate of Probable Construction -Costs for Filing No. 11 (For? Subdivision Improvements Agreement) COST ESTIMATF ITEM! NO. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT COST 00 ITEM COST TOTAL COST RO ADIJAY S Removal of Asphalt Mat 20 S.Y. 5 100. Excavation/Embankment 11,850 C.Y. F 6 00 71,100. 00 Reve etation 3 AC. 1,850 5,550. -Aggregate Base Course (Class 1, 2 or 4) 1,625 TON 7 00 111375. _ _Aggregate Base Course (Class 6) 2,600 TON 9 00 23,400. Subgrade Reconstruction 8,125 C.Y. 6 00 48,750. Hot Bituminous Pavement -- 70,400. Grading E (Haul & As halt) 2,200 TON 32 00 Hot Bituminous Pavement Grading E (Haul & Patchin ) 10 TON 100 00 1,000. Hot Bituminous Pavement Level.in Grading EX Haul & As halt) 65 TON 45 00 2,925. Crack Sealing 1. 000 L.F. 1 00 1,00 ROADWAY TOTAL 235 600. _(Roadway quantities include widening of U.S. 6 & 24 DOMESTIC WATER 6" Ductile Iron Pipe 235 I..F. 27 00 6,345. ` 8" Ductile Iron Pipe 2,380 L.F. 32 00 76,160. 1.2" Ductile Iron Pipe 23725 L.F. 42 00 1141045 6" Gate Valve & Valve Box 1 EACH 525 00 525. 8" Gate Valve & Valve Box 12 EACH 750 00 9,000. 12" Butterfly Valve & Valve Box 7 EACH 1,050 00 7,350. Vacuum & Air Release Valve 1. EACH 2,1.00 00 2,100. CiV•TENNIAL ENGINEERING, INC OFPICE LOCATION: 15000 WEST 64TH AVENIj*.,-wwbA, COLORADO MAILING ADRESS: P. O. DRAWER 1307, ARVADA, COLORADO 80001 CEI Job No. 192.03 Date 11-16-83 Page 2 of 2 By WD Checked by (Date) Client Arrowhead at Vail Project Arrowhead at Vail Sub]ect Estimate of Probable Construction Costs for Filing No. 11(For Subdivision Improvements Agreement) COST ESTIMATE ITEM NO. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT COST ITEM COST TOTAL COST Fire Hydrant Assembly 8 EACH 3,150 00 25,200. 1-1/4" Water Service Connection 430 L.F. 25 00 10.750. Casing Pipe 80 L.F. 105 00 8.400. DOMESTIC WATER TOTAL 260 280. SANITARY SEWER 8" PVC Sewer 4 622 L.F. 27 00 124 794. 10" PVC Sewer 217 L.F. 31 00 61727. Manhole (10 foot) 13 EACH 1,700 00 22 100. Manhole 15 foot 5 EACH 2.200 00 11.000. Manhole (20 foot) 1 EACH 2 700 00 2,700. 4" PVC Sanitary Sewer. Service Connection 560 L.F. 25'' 00- 14,000. SANITARY SEWI?R TOTAL 1$1 321. OVERALL TOTAL 7 2 1 CENTENNIAL ENGINEERING, INC. ..OFFICE LOCATION: 15000 WEST 64TH AVENUE A, COLORADO MAILING ADRESS: P. O. DRAWER 1307, ARVADA, COLORADO 80001 CEI Job No. 192.03 Date 11-16-83 Client Arrowhead at Vail By Project Page 1 of I wd Checked by (Date) Arrowhead at Vail Subject Estimate of Probable Cost-: for Other Infrastructure Improvements Needed for Filings No. 10 and No. 11 (For Subdivision Improvements Agreement) COST ESTIMATE ITEM NO. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT COST ITEM COST TOTAL COST DOMESTIC WATER 4" Ductile Iron Pipe- 1 075 L.F. 26 00 27,950. 8" Ductile Iron Pipe 10 L.F. 32 00 320. 12" Ductile Iron Pie 995 L.F. 42 00 41A790. 16" Ductile Iron Pipe 1,595 L.F. 64 00 102 080. 12" Butterfly Valve & Valve Box 4 EACH l 050 00 4.200. 16" Butterfly Valve & Valve T3ox 1 EACH 2 100 00 2 100. Concrete Water Tank L.S. L.S. 563,650 00 563 650. Water Chlorination Equipment L.S. L.S. 12,800 00 127800. 15 Horsepower Idater Pump Equip. 1 EACH 11,200 00 11)200. 40 Horsepower Water Pump Equip-. l EACH 16,200 00 lb 200. Water Control System L.S. L.S. 47 500 00 47 500. DOMESTIC WATER TOTAL 829 790. SANITARY SEWER 8" PVC Sewer 1 664 L.F. 24 00 39 936. Manhole (10 foot) 5 EACH 1,700 00 8,500. Manhole (15 foot) 2 EACH 2 200 00 41400. Manhole (20 foot) 1 EACH 2,700 00 2,700. Concrete Encasement 104 L.F. 25 00 2)600. SANITARY SEWER TOTAL 58 136. OVERALL TOTAL 887 926. NOTE: The domestic water improvements are needed needed For b for only th Min& Filing N N . 10 and No. . 10. 11. The sanitary sewer improvements -are CENTENNIAL ENGINEERING, INC. FiFFICE'LOCATION: 15000 WEST 64TH AVENUb,.rwVbA, COLORADO MAILING ADRESS: P. 0. DRAWER 1307, ARVADA, (:uLORADO 80001 v page 1 _ of :1 CEI Job No. 192.03 Date 11 / L 3 / 83 By WD Checked by _ (Date) Client Arrowhead at Vail Project Arrowhead at Veil Subject Summary of Public Improvements Constructed in 1.983 for Filings No. 10 and No 11 (based on unit costs from estimates of probable construction costs) COST ESTIMATE ITEM NO. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT COST ITEM COST TOTAL COST DOMESTIC WATER 4" Ductile Iron Pine 1 075 L.F. 26 00 27.950. 6" Ductile Iron Pipe 235 L.F. 27 00 6 345. 8" Ductile Iron Pie 980 L.F. 32 00 31 360. 12" Ductile Iron Pipe 795 L.F. 42 00 33 390. 6" Gate Valve & Valve Box 1 Each 525 00 525. 8" Gate Valve & Valve Box 8 Each 750 00 61000. Fire H3:drant-Assembly 2 Each 3 150 00 6 300. CasinR Pie 130 L.F. 1.05 00 13,650. DOMESTIC WATER TOTAL 125 520. SANITARY SEWER Adjust Manhole Rim 1 Each 375 00 375. 8" PVC Sewer 5 346 L.F. 27 68 147 977. 1" PVC Sewer 217 L. 1. 00 6 7 2 7 1, Manhole (10 foot) 1.3 Each 1,700 00 22,100. i Manhole 15foot) Each 2.200 00 11.000. 1D o - Mnnholp (2S font) I Eqrh 3,3Q0 fo-1 --31300. Casilic, RippT SANITARY SEWER TOTAL i OVERALL TQTAL 354,039. CENTENNIAL ENGINEERING, INC. OFFiCF�LbCATION: 15M WEST 64TH AVENUE, A��, COLORADO MAILING ADRESS: P. O. DRAWER 1307, ARVADA, COLORADO 80001 Page 1 of 1 CEI Job No. 192.03 Date 2-9-84 By AEP Checked by WD (Date) Cl lent Arrowhead at Vail Project Arrowhead at Vail Subject Filing No. 12 - Final Estimate of Probable Construction Costs COST ESTIMATE ITEM NO. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT COST ITEM COST TOTAL COST 202A Removal of Asphalt Mat 560 Y. 5 00 2 800. 202B Removal of Structures L.S. L.S. 2,000 0 23,000. 203A Excavation 199300 C.Y. 4 0 779200. 203B Embankment Material 4,000 C.Y. 2 0 82,000. 207 Topsoil 22500 C.y. 3 0 72500. 212 Reve etation 4 ACRE 1,850 0 7)400. 304A Aggreaate Base Course (C1.1,2 or 4) 4,900 ON 7 00 342300. 304B Aggregate Base Course (Cl. 6) 32400 TON 9 00 301600. 403A Hot Bituminous Pavement Grading E (Haul and Asphalt) 3 100 TON 32 00 99,200. 403B Hot Bituminous Pavement Grading E (Haul and Patching) 25 TON 100 00 21,500. 403C Hot Bituminous Pavement Leveling Grading EX (Haul and Leveling)— 100 rON 45 00 42500. 403D Crack Sealing 2 000 L.F. 1 00 29,000. 506 12" Riprap 50 C.Y. 20 00 1 000. 601 Concrete Class A (Wall) 19 C.Y. 400 00 7,600. 603A 18" Corrugated Metal Pie 244 L.F. 34 00 8,296. 603B 24" Corrugated Metal Pie 177 L.F. 42 00 7)434. 603C 42" Corrugated Metal Pie 50 .F.- 75 00 3,750. 603D 78" Corrugated Metal Pie 46 L.F. 142 00 62532. 603E 84" Corrugated Metal Pie 56 L.F. 155 00 89680. 603F 18" Metal End Section 2 EACH 200 00 400. 603G 24" Metal End Section 3 EACH 250 00 750. 322,442 604A 8" PVC Sewer 357 L.F. 25 00 8,925. 604B Manhole (10 foot) 1 EACH 12700 00 1,700. 604C Manhole (15 foot) 1 EACH 2,200 00 21200. 609 Cobble Median Strip 2 ,455 L.F. 40 00 98,200. 1:11,025 619A 12" Ductile Iron Pie 1,4775 L.F. 40 00 719000. 619B 12" Butterfly Valve & Valve Box 5 EACH 1,050 00 51,250. 619C Vacuum and Air Release Valve 1 EACH 2 500 00 21500. 619D Fire Hydrant Assembly 5 EACH 3,150 00 1 152750. 94,500 TOTAL 527 967. oads ewer later