EIGHTH AMENDMENT
TO
COLORADO MOUNTAIN COLLEGE AND ANDERSON MASON DALE
ARCHITECT AGREEMENT
THIS EIGHTH AMENDMENT (the “Eighth Amendment”) is entered into by and between
COLORADO MOUNTAIN COLLEGE (the “College” or “CMC”) and ANDERSON MASON
DALE (“Architect/Engineer”).
EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Eighth Amendment is intended
to incorporate additional services for design work to provide civil engineering re-design services
for the Breckenridge Phase 1 project, incorporating Phase 2 design elements. The College shall
not be liable to pay or reimburse Architect / Engineer for any performance hereunder or be bound
by any provision hereof prior to the Effective Date.
FACTUAL RECITALS
A.The parties entered into an Architect Agreement dated August 31, 2021 with a First
Amendment dated March 9, 2022, Second Amendment dated May 24, 2022, Third Amendment
dated June 23, 2022, Fourth Amendment dated June 27, 2022, Fifth Amendment dated January 25,
2023, Sixth Amendment dated January 25, 2023 and Seventh Amendment dated September 21,
2023 (the “Agreement”) for the design of a student housing project at its Breckenridge, Edwards,
Spring Valley and Steamboat campuses (the “Project”);
B.The parties now desire to amend the Agreement to include additional services; and
C.Authority exists and funds have been budgeted, appropriated, and otherwise made available
and a sufficient unencumbered balance thereof remains available for payment
NOW THEREFORE, it is hereby agreed that
AGREEMENT
1.Consideration for this Eighth Amendment consists of the payments, which shall be made
pursuant to this Eighth Amendment and the promises, and agreements herein set forth.
2.It is expressly agreed by the parties that this Eighth Amendment is supplemental to the
Agreement, as amended, which is by this reference incorporated herein, that all terms, conditions,
and provisions thereof, unless specifically modified herein, are to apply to this Eighth Amendment
as though they were expressly re-written, incorporated, and included herein.
3.It is agreed the Agreement is and shall be modified, altered, and changed in the following
respects only:
a.Add on services in the amount of $8,556 for plumbing design services for each of the
housing buildings as further described on Exhibit A attached hereto and incorporated
by reference.
b.Add on services in the amount of $8,380 for additional technology services for Phase
1 housing projects as further described on Exhibit A attached hereto and incorporated
by reference.
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
Page 2 of 3
c.Add on services in the amount of $5,995 for stand-alone trash enclosure servicing the
Edwards Phase 2 housing project.
DESCRIPTION OF CHANGES
Programming Schematic
Design
Design
Development
Construction
Documents
Construction
Administration
and Close Out
Reimbursables Total
Contract
Sum
Agreement $55,900 $107,100 $201,200 $263,230 $568,570 $66,000 $1,262,000
First
Amendment
$28,000 $28,000
Second
Amendment
$28,850 $28,850
Third
Amendment
$85,524 $82,537 $5,600 $173,661
Fourth
Amendment
$88,024 $90,599 $5,600 $184,223
Fifth
Amendment
$25,200 $25,200
Sixth
Amendment
$4,708 $3,069 $7,777
Seventh
Amendment
$5,000 $5,000
Eighth
Amendment
$22,931 $22,931
Contract Sum (To Date): $1,737,642
4.The additional funds shall be split and paid for as follows:
Colorado Mountain College: $18,222.30
Eagle County Housing Development Authority: $4,708.70
5.Except with respect to the “Special Provisions,” in the event of any conflict, inconsistency,
variance, or contradiction between the provisions of this Eighth Amendment and any of the
provisions of the Agreement, the provisions of this Eighth Amendment shall in all respects
supersede, govern, and control. The “Special Provisions” shall always be controlling over other
provisions in Agreement or Amendments.
6.FINANCIAL OBLIGATIONS OF THE COLLEGE PAYABLE AFTER THE CURRENT
FISCAL YEAR ARE CONTINGENT UPON FUNDS FOR THAT PURPOSE BEING
APPROPRIATED, BUDGETED, AND OTHERWISE MADE AVAILABLE.
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
Page 3 of 3
THE PARTIES HERETO HAVE EXECUTED THIS AMENDMENT
Persons signing for Architect/Engineer hereby swear and affirm that they are authorized to act on Architect/Engineer’s behalf and acknowledge that the College is relying on their representations to that effect. Principal is not a recognized title and will not be accepted.
ARCHITECT/ENGINEER COLORADO MOUNTAIN COLLEGE
Anderson Mason Dale
_____________________________________ _________________________________ By:__________________________________ By: Matt Gianneschi Title: ________________________________ Title: COO and Chief of Staff Date: _________________________________ Date: _____________________________
_________________________________ By: Julie S. Hanson Title: Director of Purchasing & Contracts Date: _____________________________
ACKNOWLEDGED AND AGREED TO:
ECHDA hereby acknowledges and agrees to the terms and conditions stated herein and assumes obligation for payment of the additional fees agreed upon in this Eighth Amendment.
____________________________ By: Title: Commissioner Date: ________________________
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
12/5/2023
Vice President
Andrew Nielsen
12/5/2023 12/5/2023
12/5/2023
3198 Speer Boulevard
Denver Colorado 80211
303 294 9448
Fax 303 294 0762
www.amdarchitects.com
Paul S. Haack, AIA
Andrew G. Nielsen, FAIA
David C. Pfeifer, AIA
Joey Carrasquillo, AIA
John Graham, AIA
Cathy Bellem, AIA
Ben Blanchard, AIA
Erin Hillhouse, AIA
Gillian H. Johnson, LEED AP ID+C
Suzanne D. Minear, AIA
James R. Taylor, AIA
John D. Anderson, FAIA, 1926 - 2017
Ronald L. Mason, FAIA, Emeritus
Curt. F. Dale, FAIA, 1945 - 2003
Dan Bishop, AIA
John Everin, AIA
Stephan Hall, AIA
Ryan Lutz, AIA
Kristin O’Connell, Assoc. AIA
Cynthia Ottenbrite, AIA
Julie Zurakowski, AIA
Luc Bamberger, AIA
Michael Bucher, AIA
Jenna Michieli, AIA
Beth Mosenthal, AIA
Stephen Showalter, AIA
Katie Spicer, AIA
Todd Swarts, AIA
Matt Weaver, AIA
Zack Writer, AIA
September 25, 2023
Sean Nesbitt, Director of Facilities
Colorado Mountain College
scnesbitt@coloradomtn.edu
RE: Additional Service 011
All (5) Buildings – New Utility Sink
CMC Student Housing | AMD PROJECT #21-157
Dear Sean,
The following is an Additional Service request to provide plumbing design services for all
(5) housing projects as follows:
· Design new utility sink in the second-floor mechanical room within all 5 housing
projects, including construction documents and specification(s).
· Review a common set of product submittals.
· Perform (1) construction observation for the installations once complete
(performed by Cator Ruma). Construction observation not included for
architectural review.
Fee
We propose to provide these services for a total fee of $8,556.00.
The fee breakout is a follows:
ASR011 - Utility Sinks
Scope AMD CRA
TOTAL
FEE
by TASK
Construction Documents (ASI)
2,104
2,300
4,404
Cator Ruma - Plumbing
2,300
AMD - Design Coordination and Management
2,104
Construction Administration
1,052
3,100
4,152
Cator Ruma - Plumbing
3,100
AMD - Design Coordination and Management
1,052
Total Lump Sum Fee
8,556
Total Reimbursable Expenses -
TOTAL COMPENSATION
8,556
EXHIBIT A
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
Page 2
Reimbursables
Reimbursable expenses are included in the project fee.
Schedule
The design will be documented as Architects Supplemental Information (ASI), ASI-25 for
the Phase 01 projects and ASI-E2.6 for the Edwards Phase 2 project. This scope of work
will be incorporated into the CMC Student Housing document set and the work will be
completed under the General Contract for Construction.
We appreciate the opportunity to provide our professional services to you and look forward
to completing our efforts on this project. Please let us know if you have any questions.
Sincerely,
Cynthia Ottenbrite, AIA
Senior Associate
Cc: John Graham
EXHIBIT A
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
3198 Speer Boulevard
Denver Colorado 80211
303 294 9448
Fax 303 294 0762
www.amdarchitects.com
Paul S. Haack, AIA
Andrew G. Nielsen, FAIA
David C. Pfeifer, AIA
Joey Carrasquillo, AIA
John Graham, AIA
Cathy Bellem, AIA
Ben Blanchard, AIA
Erin Hillhouse, AIA
Gillian H. Johnson, LEED AP ID+C
Suzanne D. Minear, AIA
James R. Taylor, AIA
John D. Anderson, FAIA, 1926 - 2017
Ronald L. Mason, FAIA, Emeritus
Curt. F. Dale, FAIA, 1945 - 2003
Dan Bishop, AIA
John Everin, AIA
Stephan Hall, AIA
Ryan Lutz, AIA
Kristin O’Connell, Assoc. AIA
Cynthia Ottenbrite, AIA
Julie Zurakowski, AIA
Luc Bamberger, AIA
Michael Bucher, AIA
Jenna Michieli, AIA
Beth Mosenthal, AIA
Stephen Showalter, AIA
Katie Spicer, AIA
Todd Swarts, AIA
Matt Weaver, AIA
Zack Writer, AIA
October 23, 2023
Sean Nesbitt, Director of Facilities
Colorado Mountain College
scnesbitt@coloradomtn.edu
RE: Additional Service 012
Phase 1 Buildings – IT Backwalk
CMC Student Housing | AMD PROJECT #21-157
Dear Sean,
The following is an Additional Service request to perform technology additional services
for the Phase 1 housing projects (4 buildings) as follows:
·Backwalk the IT work at all four campuses when complete, including telecom
closet and fiber connections. We recommend that CMC IT staff join at least one of
these backwalks to ensure the best coordination
·We anticipate that two individuals will spend two full days to complete this work,
equating to a 1/2 day inclusive of travel at each of the 4 buildings
o Chuck Kaffine, RCDD: Subject matter expert
o Ed Sander-Cederlof, SET: Electrical Contract Administrator
·Conditional requirements prior to scheduling and completion of the backwalk
o CMC IT Staff/ Contractor guarantee access to both the housing building
and any connected IT rooms on campus prior to CRA travel
o Contractor provides signed-off observation reports showing previous
deficiencies for technology systems have been corrected
o Contractor provides testing reports per Division 27 specifications
Fee
We propose to provide these services for a total fee of $8,380.00.
EXHIBIT A
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
Page 2
The fee breakout is a follows:
Reimbursables
Reimbursable expenses are included in the project fee.
Schedule
The backwalk for each building will be documented with a field observation report. This
scope of work will be incorporated into the CMC Student Housing document set and any
cited deficient work will be completed under the General Contract for Construction.
We appreciate the opportunity to provide our professional services to you and look
forward to completing our efforts on this project. Please let us know if you have any
questions.
Sincerely,
Cynthia Ottenbrite, AIA
Senior Associate
Cc: John Graham
Scope AMD CRA
TOTAL FEE
by TASK
Construction Administration 880 7,500 8,380
Cator Ruma - Technology 7,500
AMD - CA Coordination and Management 880
8,380
-
8,380
ASR012 - Phase 1 Technology Backwalks
Total Lump Sum Fee
Total Reimbursable Expenses
TOTAL COMPENSATION
EXHIBIT A
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
3198 Speer Boulevard
Denver Colorado 80211
303 294 9448
Fax 303 294 0762
www.amdarchitects.com
Paul S. Haack, AIA
Andrew G. Nielsen, FAIA
David C. Pfeifer, AIA
Joey Carrasquillo, AIA
John Graham, AIA
Cathy Bellem, AIA
Ben Blanchard, AIA
Erin Hillhouse, AIA
Gillian H. Johnson, LEED AP ID+C
Suzanne D. Minear, AIA
James R. Taylor, AIA
John D. Anderson, FAIA, 1926 - 2017
Ronald L. Mason, FAIA, Emeritus
Curt. F. Dale, FAIA, 1945 - 2003
Dan Bishop, AIA
John Everin, AIA
Stephan Hall, AIA
Ryan Lutz, AIA
Kristin O’Connell, Assoc. AIA
Cynthia Ottenbrite, AIA
Julie Zurakowski, AIA
Luc Bamberger, AIA
Michael Bucher, AIA
Jenna Michieli, AIA
Beth Mosenthal, AIA
Stephen Showalter, AIA
Katie Spicer, AIA
Todd Swarts, AIA
Matt Weaver, AIA
Zack Writer, AIA
November 7, 2023
Sean Nesbitt, Director of Facilities
Colorado Mountain College
scnesbitt@coloradomtn.edu
RE: Additional Service 013
Edwards Phase 2 Building – Trash Enclosure
CMC Student Housing | AMD PROJECT #21-157
Dear Sean,
The following is an Additional Service request for documentation to add a stand-alone
trash enclosure servicing the Edwards Phase 2 housing project. The location has been
coordinated with both Eagle County and Colorado Mountain College via email
correspondence on October 24, 2023. The design will match the enclosure approved for
the Edwards Phase 1 project. The scope of work includes:
· Modify current plans and base files to include concrete pad and trash enclosure
comprising both civil and architectural scope and documentation.
· The geotechnical report provides the concrete section detail for the proposed trash
enclosure.
· Revised and/or new plans anticipated to consist of:
o C050 – Demolition Plan (new)
o C100 – Site, Paving & Signage Plan (revised)
o C110 – Horizontal Control & Striping Plan (revised)
o C112 – Site Details (revised)
o C200 – Overall Grading Plan (revised)
o C201 – Detailed Grading Plan (revised)
o C400 – Erosion Control Plan (revised)
o A-100-ED2 – Site Plan – ED2 (revised)
· It is anticipated that no drainage letter will be required as part of this scope of work.
· Shop drawing review and (1) architectural punch walk for the trash enclosure, once
completed, is included.
Fee
We propose to provide these services for a total fee of $5,995.00.
EXHIBIT A
DocuSign Envelope ID: 3B6D543D-FE42-4EE8-BDB8-BADFD3802EE4
Page 2
The fee breakout is a follows:
Reimbursables
Reimbursable expenses are included in the project fee.
Schedule
This scope of work will be incorporated into the CMC Student Housing document set and
any cited deficient work will be completed under the General Contract for Construction.
We appreciate the opportunity to provide our professional services to you and look forward
to completing our efforts on this project. Please let us know if you have any questions.
Sincerely,
Cynthia Ottenbrite, AIA
Senior Associate
Cc: John Graham
Scope AMD M/M
TOTAL FEE
by TASK
Construction Administration 3,480 2,515 5,995
Martin/Martin - Civil 2,515
AMD - ASI Revisions and CA support 3,480
5,995
-
5,995
ASR013 - Edwards Phase 2 Trash Enclosure
Total Lump Sum Fee
Total Reimbursable Expenses
TOTAL COMPENSATION