Permit
Permit No. OWTS-020231-2020
Permit Type: OWTS Permit
Work Classification: New
Permit Status: Active
Issue Date: 12/9/2020 Expires: 7/12/2021
On-Site Wastewater
Treatement System
Project Address Parcel Number
900 VALLEY RD, EL JEBEL AREA,239133402001
Owner Information Address
Nick Cherney 900 Valley RD
Carbondale, CO
Phone: (845) 729-5054
Cell:
Email: nick@cherney.com
Inspections:
For Inspections Call: (970) 328-8755
and call the Design Engineer
Engineer Phone Email
RB Civil LLC, Romeo Baylosis (970) 471-1103 romeo@rbcivil.com
Contractor License Number Phone Email
Savage Excavation, LLC ray@savagexco.com(970) 963-3424
Permitted Construction / Details:
Install the OWTS exactly as depicted in the CBO Inc. design prepared by Carla Ostberg, dated November 20, 20202,
stamped, signed, and dated November 24, 2020 by Romeo A. Baylosis, PE. The OWTS is designed to serve a four
bedroom single family residence and one bedroom ADU for a total design flow based on five bedrooms. The design
was revised and will use the existing 1500 gallon tank(#IS1705-97).
The OWTS consists connecting the sewer lines from the main house and the ADU at a "wye" to the existing 1,500
gallon two compartment septic tank. Repair to the existing inlet tee and installation of an effluent filter in the outlet
tee must be made. Effluent will then gravity flow through schedule 40 effluent line to a 500 gallon single
compartment Valley Precast pump chamber with an Orenco PF3005 pump within a Orenco Biotube Pump ProPak.
Set the pump floats to dose 80 gallons, before drainback, approximately 122 feet to an Orenco automatic distribution
valve (ADV), placed at the high point of the system and made accessible at grade in an insulated riser. The ADV will
alternate pressure dosed effluent between two sections of the over-excavated sand filter bed, 12 feet by 71 feet, to
be replaced with three feet deep of secondary sand filter media. Install laterals, distribution orifices, and flushing
assemblies as shown on the engineered design.
NOTES: Gradation of the sand media use must be completed within one month prior to the installation and
confirmed with the design engineer. If the sand does not conform to secondary or preferred sand media
requirements, it cannot be used for the sand treatment media.
Written approval from the gas company must be obtained to cross the utility easement prior to beginning
construction.
The sewer line must be encased, as described in table 7-1 footnote 2 or other method of equal protection, for 50 feet
on either side where it crosses the irrigation ditch easement.
Contact Eagle County Environmental Health and the design engineer well in advance of requesting inspections prior
to backfilling any component of the OWTS. The design engineer is responsible for conducting all inspections
necessary to certify the installation and assure the functionality of the system. System certification, along with
photos and a record drawing is required to be submitted to and approved by Eagle County Environmental Health
prior to the use of the system or occupancy of the dwelling.
Friday, April 9, 2021 1
THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF
ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT
Issued by: Environmental Health Department, Eagle County, CO
Claire Lewandowski
Date
December 09, 2020
CONDITIONS
1.
2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM
REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED
3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND
BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS
SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT
4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS,
ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED
Friday, April 9, 2021 2
Inspection Result
Eagle County, Colorado
P.O. Box 179 500 Broadway Eagle, CO
Phone: (970) 328-8730 Fax: (970) 328-7185
IVR Phone: 1-866-701-3307
Inspection Number: INSP-517211-2022 Permit Number: OWTS-020231-2020
Inspection Date: 04/28/2021
Inspector: Lewandowski, Claire
Permit Type: OWTS Permit
Inspection Type: OWTS Final Inspection
Work Classification: NewOwner:Nick Cherney
Job Address:900 VALLEY RD IVR Pin Number:191857
EL JEBEL AREA, CO Project:<NONE>
Parcel Number:239133402001
Contractor:Phone: (970) 963-3424 / Cell: (970) 963-3424Savage Excavation, LLC
Inspection Status: Approved
Inspection Notes
The above-referenced permit has been inspected and finalized.
The Onsite Wastewater Treatment System (OWTS) was designed and installed to serve the five-bedroom residence and one
bedroom ADU on the above property. Additional information about the maintenance of your septic system needs can be
accessed through our website links, provided on the Environmental Health Department’s septic system resource page.
Be aware that changes in the use of your property or alterations of your building may require commensurate changes to, or
relocation of, your septic system. Landscape features, trees with taproots, irrigation systems, and parking areas above the soil
treatment area can cause a premature system failure. It is equally important that you notice and immediately repair dripping
faucets and hissing toilets as this will certainly cause the system to fail. If you have any questions regarding this information,
please contact us at (970) 328-8755 and reference the OWTS septic permit number.
Inspector Comments
Added Item: Dosing Chamber/Tank
500-gallon, single-compartment concrete Valley Precast pump chamber with an Orenco® Biotube
Pump Vault and an Orenco® PF3005 pump was installed.
Added Item: Record Drawing
Approved
Added Item: Record Photos
Approved
Added Item: Site and Soil
Sand gradation confirms secondary sand specifications were met.
Added Item: Final Certification Letter
CBO Inc prepared the final certification, dated August 31, 2022, stamped and signed by Romeo A.
Baylosis, PE.
Added Item: Pressure Distribution
Thursday, September 1, 2022
For more information visit: http://www.eaglecounty.us
Page 1 of 2
Valley
Precast performed start up of the pumping system on August 31, 2022.
Added Item: General Plan
Sewer line was encases where it crossed the culvert and 10 feet on either side. ADV installed at high
point of OWTS.
Added Item: Soil Treatment Area (STA)
Sand filter installer per approved design and regulations.
Added Item: Identification of Systems Contractor
Eagle County licensed installer Savage Excavation completed the installation for this permit.
Thursday, September 1, 2022
For more information visit: http://www.eaglecounty.us
Page 2 of 2
CBO Inc.
129 Cains Lane
Carbondale, CO 81623
970.309.5259
carla.ostberg@gmail.com
August 31, 2022 Project No. C1442
Nick Cherney
nick@cherney.com
Onsite Wastewater Treatment System (OWTS) Installation Observations
900 Valley Road
Eagle County, Colorado
Permit Number OWTS-020231-2020
Nick,
CBO Inc. observed the installation of the onsite wastewater treatment system (OWTS) on April 29,
August 3, September 12, 2021, August 9, 2022, and August 11 for the subject property. Savage
Excavation installed the system.
The OWTS design is based on 4-bedrooms in the main house and 1-bedroom in the accessory dwelling
unit (ADU). An average daily wastewater flow of 675 GPD was used.
The existing 1500-gallon, two-compartment poly septic tank remained in use (at the request of the
owner and contractor) and was connected to both the main residence and ADU. The inlet tee was
repaired, and an effluent filter installed on the outlet tee. This filter must be cleaned annually, or as
needed.
A new, 4-inch diameter Schedule 40 sewer line crossed the top of the culvert. The sewer line was
encased at least 10-feet on each side of the ditch.
A new 500-gallon, single-compartment concrete Valley Precast pump chamber with an Orenco® Biotube
Pump Vault and an Orenco® PF3005 pump was installed. The floats were set to dose approximately 80
gallons each pump cycle, allowing approximately 13 gallons of drain back after each pump cycle. Valley
Precast performed start up of the pumping system on August 31, 2022.
Effluent is pressure dosed through a 1.5-inch diameter pump line from the pump chamber to an Orenco®
automatic distributing valve (ADV), model 6402. The ADV was placed at a high point in an insulated riser
with access from grade.
Effluent is pressure dosed through 1.5-inch diameter distribution lines to an over-excavated, 12’ x 71’ unlined
sand filter, split into two zones. A minimum of 3-feet of sand filter material was installed in the over-
excavated footprint. A gradation of the sand media is enclosed.
Laterals used to disperse the effluent were surrounded by washed coarse screened gravel. Laterals were
1.5-inches in diameter with 5/32-inch diameter orifices facing down, spaced 3-feet on center (OC). Orenco®
Orifice Shields were installed on the laterals at each orifice. Laterals began 2-feet from the edges of the
sand filter, with 4-feet between each lateral. Each 1.5-inch diameter lateral ends in a sweeping ell facing
up with a ball valve for flushing. A soil separation fabric was placed over the gravel layer followed by topsoil
to support vegetative growth.
8-31-2022
The OWTS was generally installed according to specifications. This observation is not a guarantee of
workmanship and/or parts and materials. CBO Inc. should be notified if changes are made to the OWTS
in the future. Any additional OWTS construction must be according to the county regulations.
LIMITS: Observations are limited to components that are visible at the time of the inspection. The installer must
have documented and demonstrated knowledge of the requirements and regulations of the county in
which they are working. The quality of the installation is dependent on the expertise of the installer, soil
type, and weather conditions.
Please call with questions.
Sincerely,
CBO Inc. Reviewed By:
Carla Ostberg, MPH, REHS Romeo Baylosis, P.E.
Distribution piping on sand filters
ADV at high point Flushing valves
ADV Pump chamber set
Pump chamber
Inlet tee and pump prior to setting in chamber
Plumbing entering existing septic tank from main house and ADU / Looking from tank toward ADU
View of ADV behind berm Looking west from ADV
Inspection ports at end of west sand filter zone ADV looking toward residence (south)
Inspection ports and flushing valves at end of east zone / Pump chamber
Control panel
View of septic tank lids near house Inlet tee present (twisted slightly)
Outlet tee with effluent filter / ADV
Environmental Health
Department
P.O. Box 179
500 Broadway
Eagle, CO 81631-0179
Phone: (970) 328-8730
Fax: (970) 328-7185
Permit
Permit No. OWTS-020231-2020
Permit Type: OWTS Permit
Work Classification: New
Permit Status: Active
Issue Date: 12/9/2020 Expires: 7/12/2021
On-Site Wastewater
Treatement System
Project Address Parcel Number
900 VALLEY RD, EL JEBEL AREA,239133402001
Owner Information Address
Nick Cherney 900 Valley RD
Carbondale, CO
Phone: (845) 729-5054
Cell:
Email: nick@cherney.com
Inspections:
For Inspections Call: (970) 328-8755
and call the Design Engineer
Engineer Phone Email
RB Civil LLC, Romeo Baylosis (970) 471-1103 romeo@rbcivil.com
Contractor License Number Phone Email
Savage Excavation, LLC ray@savagexco.com(970) 963-3424
Permitted Construction / Details:
Install the OWTS exactly as depicted in the CBO Inc. design prepared by Carla Ostberg, dated November 20, 20202,
stamped, signed, and dated November 24, 2020 by Romeo A. Baylosis, PE. The OWTS is designed to serve a four
bedroom single family residence and one bedroom ADU for a total design flow based on five bedrooms. The design
was revised and will use the existing 1500 gallon tank(#IS1705-97).
The OWTS consists connecting the sewer lines from the main house and the ADU at a "wye" to the existing 1,500
gallon two compartment septic tank. Repair to the existing inlet tee and installation of an effluent filter in the outlet
tee must be made. Effluent will then gravity flow through schedule 40 effluent line to a 500 gallon single
compartment Valley Precast pump chamber with an Orenco PF3005 pump within a Orenco Biotube Pump ProPak.
Set the pump floats to dose 80 gallons, before drainback, approximately 122 feet to an Orenco automatic distribution
valve (ADV), placed at the high point of the system and made accessible at grade in an insulated riser. The ADV will
alternate pressure dosed effluent between two sections of the over-excavated sand filter bed, 12 feet by 71 feet, to
be replaced with three feet deep of secondary sand filter media. Install laterals, distribution orifices, and flushing
assemblies as shown on the engineered design.
NOTES: Gradation of the sand media use must be completed within one month prior to the installation and
confirmed with the design engineer. If the sand does not conform to secondary or preferred sand media
requirements, it cannot be used for the sand treatment media.
Written approval from the gas company must be obtained to cross the utility easement prior to beginning
construction.
The sewer line must be encased, as described in table 7-1 footnote 2 or other method of equal protection, for 50 feet
on either side where it crosses the irrigation ditch easement.
Contact Eagle County Environmental Health and the design engineer well in advance of requesting inspections prior
to backfilling any component of the OWTS. The design engineer is responsible for conducting all inspections
necessary to certify the installation and assure the functionality of the system. System certification, along with
photos and a record drawing is required to be submitted to and approved by Eagle County Environmental Health
prior to the use of the system or occupancy of the dwelling.
Friday, April 9, 2021 1
THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF
ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT
Issued by: Environmental Health Department, Eagle County, CO
Claire Lewandowski
Date
December 09, 2020
CONDITIONS
1.
2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM
REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED
3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND
BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS
SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT
4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS,
ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED
Friday, April 9, 2021 2
832‐R‐13‐002
• Has 5-10 times
more flow area
than other brands,
so lasts many
times longer
between clean-
ings, increasing
homeowner
satisfaction
• Installs in min-
utes inside new
or existing tanks;
extendible tee
handle for easy
removal
• Easy to clean by
simply hosing off
whenever the tank
needs pumping
• Removes about
two-thirds of sus-
pended solids, on
average, extending
drainfield life
• Corrosion-proof
construction, to
ensure long life
• Lifetime warranty
Residential Biotube® Effluent Filters
Applications
Our patented* 4-in. (100-mm) Biotube Effluent Filters, Biotube Jr., Biotube
Insert Filters, and Biotube Base Inlet Filters are ideal for residential septic
tanks and have a lifetime warranty. They prevent large solids from leaving
the tank, dramatically improving wastewater quality and extending the life
of residential drainfields.
Standard Features & Benefits
• Alarm available, to
signal the need for
cleaning
• Flow modulating
discharge orifices
available to limit
flow rate leaving
tank, mitigat-
ing surges and
increasing
retention time
• Custom and
commercial sizes
available
Effluent from the
relatively clear zone
of the septic tank,
between the scum
and sludge layers,
horizontally enters
the Biotube Effluent
Filter. Effluent then
enters the annular
space between the
housing and the
Biotubes, utilizing
the Biotubes’ entire
surface for filtering.
Particles larger than
the Biotube’s mesh
are prevented from
leaving the tank.
Optional
Features &
Benefits
Biotube
Filtering
Process
8-in. (200-mm)
Base Inlet Filter
4-in. (100-mm)
Insert Filter
4-in. (100-mm) Biotube Jr.
(4-in. Biotube cartridge avail-
able separately as Insert Filter)
Orenco’s superior effluent filters resist clogging better than all other brands. Our stan-
dard, full-sized 4-in. (100-mm) Biotube Effluent Filter provides maximum long-term
protection in a complete package, with housing. Our 4-in. (100-mm) Biotube Jr., at
half the size of our standard model, has more filtering capacity than the full-sized filters
sold by other manufacturers. For tanks with existing outlet tees, the Biotube Insert Filter
is ideal. And for low-profile tanks, there’s the Base Inlet Filter.
* Covered by patent numbers 5,492,635 and 4,439,323
4-in. (100-mm) Biotube Effluent Filter
APS-FT-1
Rev. 3.4 © 11/10
Orenco Systems®, Inc.
To Order
Call your nearest Orenco Systems®, Inc. distributor. For nearest distribu-
tor, call Orenco at 800-348-9843 or go to www.orenco.com and click on
“Distributor Locator.”
Nomenclatures
Riser
wall
Tank wall
Filter housing
Extendible PVC handle
Stainless steel set screws
Top seal plate
Air vents
Biotube® filter cartridge
Solid base
4-in. Biotube
Effluent Filter
4-in. Biotube Jr.
4-in. Biotube Filter (standard)
4-in. Biotube Jr. (includes cartridge and housing)
Distributed By:
8-in. Biotube Filter (base inlet model)
4-in. Biotube Filter Insert (cartridge only)
Junior series
FT J0418
Biotube effluent filter series
Filter diameter (inches)
Cartridge height (inches)
W = fits Type 3034 outlet tee
S = fits Schedule 40 outlet tee
Options:
Blank = no options
M = flow modulation plate installed
A = float bracket attached
Blank = 1/8" filtration
P = 1/16" filtration
Insert
FT i0418
Biotube effluent filter series
Filter diameter (inches)
Cartridge height (inches)
W = fits Type 3034 outlet tee
S = fits Schedule 40 outlet tee
-
For customized options (e.g., NC
indicates North Carolina regions)
-
Blank = 1/8" filtration
P = 1/16" filtration
FT 04
Biotube effluent filter series
Filter diameter (inches)
Housing height: 36" and 44" are standard
Options:
Blank = no options
M = flow modulation plate installed
A = float bracket attached
Cartridge height: 28" and 36" are standard
-
Blank = 1/8" filtration
P = 1/16" filtration
W = fits Type 3034 outlet pipe
S = fits Schedule 40 outlet pipe
FT 2208 14 B
Biotube effluent filter series
Housing height: 22" standard
Cartridge height: 14" standard
Options:
A = float bracket
FS = 2" outlet orifice
FSO = 2" outlet orifice and overflow plate*
Base inlet model
-
Blank = 1/8" filtration
P = 1/16" filtration
Filter diameter (inches)
08 = 8"
* Also available with coupling and sleeve as a “kit”: FT-OVERFLOWKIT
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-BPP-1
Rev. 1.2, © 08/14
Page 1 of 4
Biotube® ProPak Pump Package™
Technical Data SheetOrenco®
60-Hz Series Pump Packages General
Orenco’s Biotube® ProPak™ is a complete, integrated pump package for
filtering and pumping effluent from septic tanks. And its patented pump
vault technology eliminates the need for separate dosing tanks.
This document provides detailed information on the ProPak pump vault
and filter, 4-in. (100-mm) 60-Hz turbine effluent pump, and control panel.
For more information on other ProPak components, see the following
Orenco technical documents:
• Float Switch Assemblies (NSU-MF-MF-1)
• Discharge Assemblies (NTD-HV-HV-1)
• Splice Boxes (NTD-SB-SB-1)
• External Splice Box (NTD-SB-SB-1)
Applications
The Biotube ProPak is designed to filter and pump effluent to either
gravity or pressurized discharge points. It is intended for use in a septic
tank (one- or two-compartment) and can also be used in a pump tank.
The Biotube ProPak is designed to allow the effluent filter to be removed
for cleaning without the need to remove the pump vault or pump, simpli-
fying servicing.
Complete packages are available for on-demand or timed dosing sys-
tems with flow rates of 20, 30, and 50-gpm (1.3, 1.9, and 3.2 L/sec),
as well as with 50 Hz and 60 Hz power supplies.
Standard Models
BPP20DD, BPP20DD-SX, BPP30TDA, BPP30TDD-SX, BBPP50TDA,
BPP50TDD-SX
Product Code Diagram
Biotube® ProPak™ pump package components.
4-in. (100-mm)
turbine effluent pump
Pump motor
Pump
liquid end
Pump vault
Support pipe
Discharge
assembly
Float collar
Float stem
Floats
Float
bracket
Biotube® filter
cartridge
Vault inlet holes
External splice box
(Optional; internal splice
box comes standard.)
Riser lid
(not included)
Riser (not
included)
Control panel
BPP
Pump flow rate, nominal:
20 = 20 gpm (1.3 L/sec)
30 = 30 gpm (1.9 L/sec)
50 = 50 gpm (3.2 L/sec)
Control panel application:
DD = demand-dosing
TDA = timed-dosing, analog timer
TDD = timed dosing, digital timer, elapsed time
meter & counters
Standard options:
Blank = 57-in. (1448-mm) vault height, internal
splice box, standard discharge assembly
68 = 68-in. (1727-mm) vault height
SX = external splice box
CW = cold weather discharge assembly
DB = drainback discharge assembly
Q = cam lock
MFV = non-mercury float
-
Biotube® ProPak™ pump vault
Technical Data SheetOrenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-BPP-1
Rev. 1.2, © 08/14
Page 2 of 4
ProPak™ Pump Vault
Materials of Construction
Vault body Polyethylene
Support pipes PVC
Dimensions, in. (mm)
A - Overall vault height 57 (1448) or 68 (1727)
B - Vault diameter 17.3 (439)
C - Inlet hole height 19 (475)
D - Inlet hole diameter (eight holes total) 2 (50)
E - Vault top to support pipe bracket base 3 (76)
F - Vault bottom to filter cartridge base 4 (102)
ProPak™ pump vault (shown with Biotube filter and effluent pump)
Biotube® Filter Cartridge
Materials of Construction
Filter tubes Polyethylene
Cartridge end plates Polyurethane
Handle assembly PVC
Dimensions, in. (mm)
A - Cartridge height 18 (457)
B - Cartridge width 12 (305)
Performance
Biotube® mesh opening 0.125 in. (3 mm)*
Total filter flow area 4.4 ft2 (0.4 m2)
Total filter surface area 14.5 ft2 (1.35 m2)
Maximum flow rate 140 gpm (8.8 L/sec)
*0.062-in. (1.6-mm) filter mesh available
Biotube® filter cartridge (shown with float switch assembly)
AA
D
E
B B
C
E
Technical Data Sheet Orenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-BPP-1
Rev. 1.2, © 08/14
Page 3 of 4
Pump Curves
Pump curves, such as those shown here, can help you determine
the best pump for your system. Pump curves show the relationship
between flow (gpm or L/sec) and pressure (TDH), providing a graphical
representation of a pump’s performance range. Pumps perform best
at their nominal flow rate, measured in gpm or L/sec.
4-in. (100-mm) Turbine Effluent Pumps
Orenco’s 4-in. (100 mm) Turbine Effluent Pumps are constructed of
lightweight, corrosion-resistant stainless steel and engineered plastics;
all are field-serviceable and repairable with common tools. All 60-Hz
PF Series models are CSA certified to the U.S. and Canadian safety
standards for effluent pumps, and meet UL requirements.
Power cords for Orenco’s 4-in. (100-mm) turbine effluent pumps are
Type SOOW 600-V motor cable (suitable for Class 1, Division 1 and 2
applications).
Materials of Construction
Discharge: Stainless steel or glass-filled polypropylene
Discharge bearing: Engineered thermoplastic (PEEK)
Diffusers: Glass-filled PPO
Impellers: Acetal (20-, 30-gmp), Noryl (50-gpm)
Intake screens: Polypropylene
Suction connection: Stainless steel
Drive shaft: 300 series stainless steel
Coupling: Sintered 300 series stainless steel
Shell: 300 series stainless steel
Lubricant: Deionized water and propylene glycol
Specifications
Nom. flow, Length Weight Discharge Impellers
gpm (L/sec) in. (mm) lb (kg) in., nominal 1
20 (1.3) 22.5 (572) 26 (11) 1.25 4
30 (1.9) 21.3 (541) 25 (11) 1.25 3
50 (3.2) 20.3 (516) 27 (12) 2.00 2
Performance
Nom. flow, hp (kW) Design Rated Min liquid
gpm (L/sec) flow amps cycles/day level, in. (mm) 2
20 (1.3) 0.5 (0.37) 12.3 300 18 (457)
30 (1.9) 0.5 (0.37) 11.8 300 20 (508)
50 (3.2) 0.5 (0.37) 12.1 300 24 (610)
1 Discharge is female NPT threaded, U.S. nominal size, to accommodate Orenco® discharge
hose and valve assemblies. Consult your Orenco Distributor about fittings to connect discharge
assemblies to metric-sized piping.
2 Minimum liquid level is for single pumps when installed in an Orenco Biotube® ProPak™ Pump
Vault.
10 20 30 40 6050 70
0.63 1.26 1.89 2.52 3.793.15 4.42
140
120
100
80
60
40
20
Flow in gallons per minute (gpm)
Flow in liters per second (L/sec)Total dynamic head (TDH) in feetTotal dynamic head (TDH) in metersPF 500511
43
37
30
24
18
12
6
PF 200511
PF 300511
Technical Data SheetOrenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-BPP-1
Rev. 1.2, © 08/14
Page 4 of 4
AUTO
OFF
MAN
NN1
Control Panel (Demand Dose)
Orenco’s ProPak™ demand dose control panels are specifically engineered
for the ProPak pump package and are ideal for applications such as
demand dosing from a septic tank into a conventional gravity drainfield.
Materials of Construction
Enclosure UV-resistant fiberglass, UL Type 4X
Hinges Stainless steel
Dimensions, in. (mm)
A - Height 11.5 (290)
B - Width 9.5 (240)
C - Depth 5.4 (135)
Specifications
Panel ratings 120 V, 3/4 hp (0.56 kW), 14 A, single phase, 60 Hz
1. Motor-start contactor 16 FLA, 1 hp (0.75 kW), 60 Hz; 2.5 million cycles
at FLA (10 million at 50% of FLA)
2. Circuit 120 V, 10 A, OFF/ON switch, Single pole breakers
3. Toggle switch Single-pole, double-throw HOA switch, 20 A
4. Audio alarm 95 dB at 24 in. (600 mm), warble-tone sound, UL
Type 4X
5. Audio alarm 120 V, automatic reset, DIN rail mount silence
relay
6. Visual alarm 7/8-in. (22-mm) diameter red lens, “Push-to-silence,”
120 V LED, UL Type 4X
Control Panel (Timed Dose)
Orenco’s ProPak timed dose control panels are specifically engineered for
the ProPak pump package and are ideal for applications such as timed
dosing from a septic tank into a pressurized drainfield or mound. Analog or
digital timers are available.
Materials of Construction
Enclosure UV-resistant fiberglass, UL Type 4X
Hinges Stainless steel
Dimensions, in. (mm)
A - Height 11.5 (290)
B - Width 9.5 (240)
C - Depth 5.4 (135)
Specifications
Panel ratings 120 V, 3/4 hp (0.56 kW), 14 A, single phase, 60 Hz
Dual-mode Programmable for timed- or demand-dosing
(digital timed-dosing panels only)
1a. Analog timer 120 V, repeat cycle from 0.05 seconds to 30
(not shown) hours. Separate variable controls for OFF and
ON time periods
1b. Digital timer 120-V programmable logic unit with built-in LCD
(shown below) screen and programming keys. Provides control
functions and timing for panel operation
2. Motor-start contactor 16 FLA, 1 hp (0.75 kW), 60 Hz; 2.5 million cycles
at FLA (10 million at 50% of FLA)
3. Circuit breakers 120 V, 10 A, OFF/ON switch. Single pole 120 V
4. Toggle Switch Single-pole, double-throw HOA switch, 20 A
5. Audio alarm 95 dB at 24 in. (600 mm), warble-tone sound, UL
Type 4X
6. Visual alarm 7/8-in. (22-mm) diameter red lens, “Push-to-silence”,
120 V LED, UL Type 4X
Control panel, demand-dose Control panel, timed-dose (digital timer model shown)
1b
2
3
4
56
1
2
3
4
5
6
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PU-PF-1
Rev. 2.2, © 09/14
Page 1 of 6
PF Series 4-inch (100-mm) Submersible Effluent Pumps
Technical Data SheetOrenco®
Applications
Our 4-inch (100-mm) Submersible Effluent Pumps are designed to
transport screened effluent (with low TSS counts) from septic tanks or
separate dosing tanks. All our pumps are constructed of lightweight,
corrosion-resistant stainless steel and engineered plastics; all are field-
serviceable and repairable with common tools; and all 60-Hz PF Series
models are CSA certified to the U.S. and Canadian safety standards for
effluent pumps, meeting UL requirements.
Orenco’s Effluent Pumps are used in a variety of applications, including
pressurized drainfields, packed bed filters, mounds, aerobic units, effluent
irrigation, effluent sewers, wetlands, lagoons, and more. These pumps
are designed to be used with a Biotube® pump vault or after a secondary
treatment system.
Features/Specifications
To specify this pump for your installation, require the following:
• Minimum 24-hour run-dry capability with no deterioration in pump life
or performance*
• Patented 1⁄8-inch (3-mm) bypass orifice to ensure flow recirculation
for motor cooling and to prevent air bind
• Liquid end repair kits available for better long-term cost of ownership
• TRI-SEAL™ floating impeller design on 10, 15, 20, and 30 gpm
(0.6, 1.0, 1.3, and 1.9 L/sec) models; floating stack design on 50 and
75 gpm (3.2 and 4.7 L/sec) models
• Franklin Electric Super Stainless motor, rated for continuous use and
frequent cycling
• Type SOOW 600-V motor cable
• Five-year warranty on pump or retrofit liquid end from date of manu-
facture against defects in materials or workmanship
* Not applicable for 5-hp (3.73 kW) models
Standard Models
See specifications chart, pages 2-3, for a list of standard pumps. For
a complete list of available pumps, call Orenco.
Product Code Diagram
PF -
Nominal flow, gpm (L/sec):
10 = 10 (0.6) 15 = 15 (1.0)
20 = 20 (1.3) 30 = 30 (1.9)
50 = 50 (3.2) 75 = 75 (4.7)
Pump, PF Series
Frequency:
1 = single-phase 60 Hz
3 = three-phase 60 Hz
5 = single-phase 50 Hz
Voltage, nameplate:
1 = 115* 200 = 200
2 = 230† 4 = 460
Horsepower (kW):
03 = 1⁄3 hp (0.25) 05 = ½ hp (0.37)
07 = ¾ hp (0.56) 10 = 1 hp (0.75)
15 = 1-½ hp (1.11) 20 = 2 hp (1.50)
30 = 3 hp (2.24) 50 = 5 hp (3.73)
Cord length, ft (m):‡
Blank = 10 (3) 20 = 20 (6)
30 = 30 (9) 50 = 50 (15)
* ½-hp (0.37kW) only
†220 volts for 50 Hz pumps
‡Note: 20-foot cords are available only for single-phase pumps through 1-½ hp
Franklin
Super Stainless
Motor
Franklin
Liquid End
Discharge Connection
Bypass Orifice
Suction Connection
LR80980
LR2053896
Powered by
Technical Data SheetOrenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PU-PF-1
Rev. 2.2, © 09/14
Page 2 of 6
Specifications, 60 Hz
Pump Model
PF100511 10 (0.6) 0.50 (0.37) 1 115 120 12.7 12.7 6 1 ¼ in. GFP 23.0 (660) 16 (406) 26 (12) 300
PF100512 10 (0.6) 0.50 (0.37) 1 230 240 6.3 6.3 6 1 ¼ in. GFP 23.0 (660) 16 (406) 26 (12) 300
PF10053200 10 (0.6) 0.50 (0.37) 3 200 208 3.8 3.8 6 1 ¼ in. GFP 23.0 (660) 16 (406) 26 (12) 300
PF100712 4, 5 10 (0.6) 0.75 (0.56) 1 230 240 8.3 8.3 8 1 ¼ in. GFP 25.9 (658) 17 (432) 30 (14) 300
PF10073200 4, 5 10 (0.6) 0.75 (0.56) 3 200 208 5.1 5.2 8 1 ¼ in. GFP 25.4 (645) 17 (432) 31 (14) 300
PF101012 5, 6 10 (0.6) 1.00 (0.75) 1 230 240 9.6 9.6 9 1 ¼ in. GFP 27.9 (709) 18 (457) 33 (15) 100
PF10103200 5, 6 10 (0.6) 1.00 (0.75) 3 200 208 5.5 5.5 9 1 ¼ in. GFP 27.3 (693) 18 (457) 37 (17) 300
PF102012 5, 6, 7, 8 10 (0.6) 2.00 (1.49) 1 230 240 12.1 12.1 18 1 ¼ in. SS 39.5 (1003) 22 (559) 48 (22) 100
PF102032 5, 6, 8 10 (0.6) 2.00 (1.49) 3 230 240 7.5 7.6 18 1 ¼ in. SS 37.9 (963) 20 (508) 44 (20) 300
PF10203200 5, 6, 8 10 (0.6) 2.00 (1.49) 3 200 208 8.7 8.7 18 1 ¼ in. SS 37.9 (963) 20 (508) 44 (20) 300
PF150311 15 (1.0) 0.33 (0.25) 1 115 120 8.7 8.8 3 1 ¼ in. GFP 19.5 (495) 15 (380) 23 (10) 300
PF150312 15 (1.0) 0.33 (0.25) 1 230 240 4.4 4.5 3 1 ¼ in. GFP 19.5 (495) 15 (380) 23 (10) 300
PF200511 20 (1.3) 0.50 (0.37) 1 115 120 12.3 12.5 4 1 ¼ in. GFP 22.3 (566) 18 (457) 25 (11) 300
PF200512 20 (1.3) 0.50 (0.37) 1 230 240 6.4 6.5 4 1 ¼ in. GFP 22.5 (572) 18 (457) 26 (12) 300
PF20053200 20 (1.3) 0.50 (0.37) 3 200 208 3.7 3.8 4 1 ¼ in. GFP 22.3 (566) 18 (457) 26 (12) 300
PF201012 4, 5 20 (1.3) 1.00 (0.75) 1 230 240 10.5 10.5 7 1 ¼ in. GFP 28.4 (721) 20 (508) 33 (15) 100
PF20103200 4, 5 20 (1.3) 1.00 (0.75) 3 200 208 5.8 5.9 7 1 ¼ in. GFP 27.8 (706) 20 (508) 33 (15) 300
PF201512 4, 5 20 (1.3) 1.50 (1.11) 1 230 240 12.4 12.6 9 1 ¼ in. GFP 34.0 (864) 24 (610) 41 (19) 100
PF20153200 4, 5 20 (1.3) 1.50 (1.11) 3 200 208 7.1 7.2 9 1 ¼ in. GFP 30.7 (780) 20 (508) 35 (16) 300
PF300511 30 (1.9) 0.50 (0.37) 1 115 120 11.8 11.8 3 1 ¼ in. GFP 21.3 (541) 20 (508) 28 (13) 300
PF300512 30 (1.9) 0.50 (0.37) 1 230 240 6.2 6.2 3 1 ¼ in. GFP 21.3 (541) 20 (508) 25 (11) 300
PF30053200 30 (1.9) 0.50 (0.37) 3 200 208 3.6 3.6 3 1 ¼ in. GFP 21.3 (541) 20 (508) 25 (11) 300
PF300712 30 (1.9) 0.75 (0.56) 1 230 240 8.5 8.5 5 1 ¼ in. GFP 24.8 (630) 21 (533) 29 (13) 300
PF30073200 30 (1.9) 0.75 (0.56) 3 200 208 4.9 4.9 5 1 ¼ in. GFP 24.6 (625) 21 (533) 30 (14) 300
PF301012 4 30 (1.9) 1.00 (0.75) 1 230 240 10.4 10.4 6 1 ¼ in. GFP 27.0 (686) 22 (559) 32 (15) 100
PF30103200 4 30 (1.9) 1.00 (0.75) 3 200 208 5.8 5.8 6 1 ¼ in. GFP 26.4 (671) 22 (559) 33 (15) 300
PF301512 4, 5 30 (1.9) 1.50 (1.11) 1 230 240 12.6 12.6 8 1 ¼ in. GFP 32.8 (833) 24 (610) 40 (18) 100
PF30153200 4, 5 30 (1.9) 1.50 (1.11) 3 200 208 6.9 6.9 8 1 ¼ in. GFP 29.8 (757) 22 (559) 34 (15) 300
PF301534 4, 5 30 (1.9) 1.50 (1.11) 3 460 480 2.8 2.8 8 1 ¼ in. GFP 29.5 (685) 22 (559) 34 (15) 300
PF302012 5, 6, 7 30 (1.9) 2.00 (1.49) 1 230 240 11.0 11.0 10 1 ¼ in. SS 35.5 (902) 26 (660) 44 (20) 100
PF30203200 5, 6 30 (1.9) 2.00 (1.49) 3 200 208 9.3 9.3 10 1 ¼ in. SS 34.0 (864) 24 (610) 41 (19) 300
PF303012 5, 6, 7, 8 30 (1.9) 3.00 (2.23) 1 230 240 16.8 16.8 14 1 ¼ in. SS 44.5 (1130) 33 (838) 54 (24) 100
PF303032 5, 6, 8 30 (1.9) 3.00 (2.23) 3 230 240 10.0 10.1 14 1 ¼ in. SS 44.3 (1125) 27 (686) 52 (24) 300
PF305012 5, 6, 7, 8 30 (1.9) 5.00 (3.73) 1 230 240 25.6 25.8 23 1 ¼ in. SS 66.5 (1689) 53 (1346) 82 (37) 100
PF305032 5, 6, 8 30 (1.9) 5.00 (3.73) 3 230 240 16.6 16.6 23 1 ¼ in. SS 60.8 (1544) 48 (1219) 66 (30) 300
PF30503200 5, 6, 8 30 (1.9) 5.00 (3.73) 3 200 208 18.7 18.7 23 1 ¼ in. SS 60.8 (1544) 48 (1219) 66 (30) 300
PF500511 50 (3.2) 0.50 (0.37) 1 115 120 12.1 12.1 2 2 in. SS 20.3 (516) 24 (610) 27 (12) 300
PF500512 50 (3.2) 0.50 (0.37) 1 230 240 6.2 6.2 2 2 in. SS 20.3 (516) 24 (610) 27 (12) 300
PF500532 50 (3.2) 0.50 (0.37) 3 230 240 3.0 3.0 2 2 in. SS 20.3 (516) 24 (610) 28 (13) 300
PF50053200 50 (3.2) 0.50 (0.37) 3 200 208 3.7 3.7 2 2 in. SS 20.3 (516) 24 (610) 28 (13) 300
PF500534 50 (3.2) 0.50 (0.37) 3 460 480 1.5 1.5 2 2 in. SS 20.3 (516) 24 (610) 28 (13) 300
PF500712 50 (3.2) 0.75 (0.56) 1 230 240 8.5 8.5 3 2 in. SS 23.7 (602) 25 (635) 31 (14) 300
PF500732 50 (3.2) 0.75 (0.56) 3 230 240 3.9 3.9 3 2 in. SS 23.7 (602) 25 (635) 32 (15) 300
PF50073200 50 (3.2) 0.75 (0.56) 3 200 208 4.9 4.9 3 2 in. SS 23.1 (587) 26 (660) 32 (15) 300Design gpm (L/sec)Horsepower (kW)PhaseNameplate voltageActual voltageDesign flow ampsMax ampsImpellersDischarge size and material 1Length, in. (mm)Min. liquid level, 2 in. (mm)Weight, 3 lb (kg)Rated cycles/day
Technical Data Sheet Orenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PU-PF-1
Rev. 2.2, © 09/14
Page 3 of 6
Specifications, 60 Hz (continued)
Pump Model
PF500734 50 (3.2) 0.75 (0.56) 3 460 480 1.8 1.8 3 2 in. SS 34.8 (884) 25 (635) 31 (14) 300
PF501012 50 (3.2) 1.00 (0.75) 1 230 240 10.1 10.1 4 2 in. SS 27.0 (686) 26 (660) 35 (16) 100
PF50103200 50 (3.2) 1.00 (0.75) 3 200 208 5.7 5.7 4 2 in. SS 26.4 (671) 26 (660) 39 (18) 300
PF501034 50 (3.2) 1.00 (0.75) 3 460 480 2.2 2.2 4 2 in. SS 26.4 (671) 26 (660) 39 (18) 300
PF5015124 50 (3.2) 1.50 (1.11) 1 230 240 12.5 12.6 5 2 in. SS 32.5 (826) 30 (762) 41 (19) 100
PF501532004 50 (3.2) 1.50 (1.11) 3 200 208 7.0 7.0 5 2 in. SS 29.3 (744) 26 (660) 35 (16) 300
PF503012 4, 5, 7, 8 50 (3.2) 3.00 (2.23) 1 230 240 17.7 17.7 8 2 in. SS 43.0 (1092) 37 (940) 55 (25) 100
PF50303200 4, 5, 8 50 (3.2) 3.00 (2.23) 3 200 208 13.1 13.1 8 2 in. SS 43.4 (1102) 30 (762) 55 (25) 300
PF503034 4, 5, 8 50 (3.2) 3.00 (2.23) 3 460 480 5.3 5.3 8 2 in. SS 40.0 (1016) 31 (787) 55 (25) 300
PF505012 5,6,7,8 50 (3.2) 5.00 (3.73) 1 230 240 26.2 26.4 13 2 in. SS 65.4 (1661) 55 (1397) 64 (29) 300
PF505032 5,6,7,8 50 (3.2) 5.00 (3.73) 3 230 240 16.5 16.5 13 2 in. SS 59.3 (1506) 49 (1245) 64 (29) 300
PF751012 75 (4.7) 1.00 (0.75) 1 230 240 9.9 10.0 3 2 in. SS 27.0 (686) 27 (686) 34 (15) 100
PF751512 75 (4.7) 1.50 (1.11) 1 230 240 12.1 12.3 4 2 in. SS 33.4 (848) 30 (762) 44 (20) 100
Specifications, 50 Hz
Pump Model
PF100552 10 (0.6) 0.50 (0.37) 1 220 230 3.9 4.1 6 1 ¼ in. GFP 23.0 (584) 17 (432) 26 (12) 300
PF100752 4, 5 10 (0.6) 0.75 (0.56) 1 220 230 6.2 6.2 9 1 ¼ in. GFP 26.8 (658) 17 (432) 30 (14) 300
PF101552 5, 6 10 (0.6) 1.50 (1.11) 1 220 230 10.5 11.4 18 1 ¼ in. SS 39.5 (1003) 22 (559) 46 (21) 300
PF300552 30 (1.9) 0.50 (0.37) 1 220 230 4.1 4.1 4 1 ¼ in. GFP 22.5 (572) 19 (483) 26 (12) 300
PF300752 30 (1.9) 0.75 (0.56) 1 220 230 6.1 6.1 5 1 ¼ in. GFP 24.8 (630) 19 (483) 29 (13) 300
PF301052 30 (1.9) 1.00 (0.75) 1 220 230 7.4 7.4 7 1 ¼ in. GFP 28.4 (721) 20 (508) 32 (15) 100
PF301552 4, 5 30 (1.9) 1.50 (1.11) 1 220 230 9.3 9.3 8 1 ¼ in. GFP 35.4 (899) 24 (610) 40 (18) 100
PF500552 50 (3.2) 0.50 (0.37) 1 220 230 4.0 4.0 2 2 in. SS 20.3 (516) 25 (635) 29 (13) 300
PF500752 50 (3.2) 0.75 (0.56) 1 220 230 6.3 6.4 3 2 in. SS 23.7 (602) 25 (635) 31 (14) 300
PF501052 50 (3.2) 1.00 (0.75) 1 220 230 7.3 7.4 4 2 in. SS 27.0 (686) 26 (660) 35 (16) 100
PF501552 50 (3.2) 1.50 (1.11) 1 220 230 9.1 9.1 5 2 in. SS 32.5 (826) 30 (762) 42 (19) 100
PF751052 75 (3.2) 1.00 (0.75) 1 220 230 7.3 7.3 4 2 in. SS 30.0 (762) 27 (686) 34 (15) 100
1 GFP = glass-filled polypropylene; SS = stainless steel. The 1 ¼-in. NPT GFP discharge is 2 7⁄8 in. octagonal across flats; the 1 ¼-in. NPT SS discharge is 2 1⁄8 in. octagonal across flats; and the
2-in. NPT SS discharge is 2 7⁄8 in. hexagonal across flats. Discharge is female NPT threaded, U.S. nominal size, to accommodate Orenco® discharge hose and valve assemblies. Consult your Orenco
Distributor about fittings to connect hose and valve assemblies to metric-sized piping.
2 Minimum liquid level is for single pumps when installed in an Orenco Biotube® Pump Vault or Universal Flow Inducer. In other applications, minimum liquid level should be top of pump. Consult
Orenco for more information.
3 Weight includes carton and 10-ft (3-m) cord.
4 High-pressure discharge assembly required.
5 Do not use cam-lock option (Q) on discharge assembly.
6 Custom discharge assembly required for these pumps. Contact Orenco.
7 Capacitor pack (sold separately or installed in a custom control panel) required for this pump. Contact Orenco.
8 Torque locks are available for all pumps, and are supplied with 3-hp and 5-hp pumps. Design gpm (L/sec)Horsepower (kW)PhaseNameplate voltageActual voltageDesign flow ampsMax ampsImpellersDischarge size and material 1Length, in. (mm)Min. liquid level, 2 in. (mm)Weight, 3 lb (kg)Rated cycles/day
Technical Data SheetOrenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PU-PF-1
Rev. 2.2, © 09/14
Page 4 of 6
Materials of Construction
Discharge Glass-filled polypropylene or stainless steel
Discharge bearing Engineered thermoplastic (PEEK)
Diffusers Glass-filled PPO (Noryl GFN3)
Impellers Celcon® acetal copolymer on 10-, 20, and 30-gpm models; 50-gpm impellers are Noryl GFN3
Intake screen Polypropylene
Suction connection Stainless steel
Drive shaft 7/16 inch hexagonal stainless steel, 300 series
Coupling Sintered stainless steel, 300 series
Shell Stainless steel, 300 series
Motor Franklin motor exterior constructed of stainless steel. Motor filled with deionized water and propylene glycol for constant lubrication. Hermetically
sealed motor housing ensures moisture-free windings. All thrust absorbed by Kingsbury-type thrust bearing. Rated for continuous duty. Single-
phase motors and 200 and 230 V 3-phase motors equipped with surge arrestors for added security. Single-phase motors through 1.5 hp
(1.11 kW) have built-in thermal overload protection, which trips at 203-221˚ F (95-105˚ C).
Using a Pump Curve
A pump curve helps you determine the best pump for your system. Pump curves show the relationship between flow (gpm or L/sec) and pressure
(total dynamic head, or TDH), providing a graphical representation of a pump’s optimal performance range. Pumps perform best at their nominal
flow rate — the value, measured in gpm, expressed by the first two numerals in an Orenco pump nomenclature. The graphs in this section show
optimal pump operation ranges with a solid line. Flow flow rates outside of these ranges are shown with a dashed line. For the most accurate
pump specification, use Orenco’s PumpSelect™ software.
Pump Curves, 60 Hz Models
Total dynamic head (TDH) in feetFlow in gallons per minute (gpm)
24 81012141660
800
700
600
500
400
300
200
100 PF1005-FC
w/ ¼" flow
controller
PF10 Series, 60 Hz, 0.5 - 2.0 hp
PF1007
PF1010
PF1020
PF1005
Total dynamic head (TDH) in feetFlow in gallons per minute (gpm)
36 12 15 18 21 2490
160
140
120
100
80
60
40
20
0
PF1503
PF15 Series, 60 Hz, 0.3 hp
Technical Data Sheet Orenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PU-PF-1
Rev. 2.2, © 09/14
Page 5 of 6Total dynamic head (TDH) in feetFlow in gallons per minute (gpm)
5102025303540150
400
350
300
250
200
150
100
50
0
PF2005
PF2010
PF2015
PF20 Series, 60 Hz, 0.5 - 1.5 hp
Total dynamic head (TDH) in feetFlow in gallons per minute (gpm)
510202530354045150
800
900
700
600
500
400
300
200
100
0
PF3005
PF3007
PF3010
PF3015
PF3020
PF3030
PF3050 PF30 Series, 60 Hz, 0.5 - 5.0 hp
Total dynamic head (TDH) in feetFlow in gallons per minute (gpm)
450
400
350
300
250
200
150
100
50
0 10 02040506070809030
PF5050
PF5030
PF5015
PF5010
PF5007
PF5005
PF50 Series, 60 Hz, 0.5 - 5.0 hp
Total dynamic head (TDH) in feetFlow in gallons per minute (gpm)
10 20 40 50 60 70 80 90 100300
80
90
100
70
60
50
40
30
20
10
0
PF75 Series, 60 Hz, 1.0 - 1.5 hpPF7515
PF7510
60 Hz Models (continued)
Technical Data SheetOrenco®
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PU-PF-1
Rev. 2.2, © 09/14
Page 6 of 6Total dynamic head (TDH) in metersTotal dynamic head (TDH) in feet, nominalFlow in liters per second (L/sec)
Flow in gallons per minute (gpm), nominal
0.90.80.70.60.50.40.30.20.10
13119.57.96.34.83.21.6
120
100
80
60
40
20
0
160
180
140
394
328
262
197
131
66
525
459
PF100552
PF100752
PF101552
PF1005-FC
w/ 6mm flow
controller
PF10 Series, 50 Hz, 0.37 - 1.11 kW
Total dynamic head (TDH) in metersTotal dynamic head (TDH) in feet, nominalFlow in liters per second (L/sec)
Flow in gallons per minute (gpm), nominal
0.8 1.2 1.6 2.0 2.40.40
13 19 25 326.3
60
80
100
120
40
20
0
197
262
328
131
66
PF301552
PF301052
PF300752
PF300552
PF30 Series, 50 Hz, 0.37 - 1.11 kW
Total dynamic head (TDH) in metersTotal dynamic head (TDH) in feet, nominalFlow in liters per second (L/sec)
Flow in gallons per minute (gpm), nominal
0.5 1.0 2.0 2.5 3.0 3.5 4.0 4.51.50
7.9 16 32 40 48 56 6324
40
45
35
30
25
20
15
10
5
0
131
115
98
82
66
49
33
16
PF501552
PF501052
PF500752
PF500552
PF50 Series, 50 Hz, 0.37 - 1.11 kW
Total dynamic head (TDH) in metersTotal dynamic head (TDH) in feet, nominalFlow in liters per second (L/sec)
Flow in gallons per minute (gpm), nominal
0.6 1.2 2.4 3.0 3.6 4.2 5.44.8 6.01.80
10 19 4838 57 67 76 8629
27
30
24
21
18
15
12
9
6
3
0
89
79
69
59
49
39
30
20
PF751052
PF75 Series, 50 Hz, 0.75 kW
Pump Curves, 50 Hz Models
Introduction
Orenco’s automatic distributing valve assemblies, pressurized with small high-head effluent
pumps, are useful for distributing effluent to multiple zones. These zones can be segments
of sand filter manifolds, drainfields, or other effluent distribution systems. Distributing
valve assemblies can substantially simplify the design and installation of a distribution sys-
tem and reduce installation costs. This is particularly true where a distributing valve assem-
bly is used instead of multiple pumps and/or electrically operated valves. Additionally, a
reduction in long term operation and maintenance costs is realized due to a reduced size
and/or number of pumps. More even distribution can be achieved on sloping sites by zoning
laterals at equal elevations. This eliminates drainback to lower lines and the unequal distrib-
ution of effluent that occurs at the beginning of a cycle.
Valve Operation
The valve itself has only a few moving parts, requires no electricity, and alternates automati-
cally each cycle. Refer to Figure 1 for the following valve operation description. The flow
of the incoming effluent forces the rubber flap disk 1 to seat against the valve bottom 2.
The opening 3 in the rubber flap disk aligns with an opening in the valve bottom to allow
flow to only one valve outlet. The stem 4 houses a stainless steel spring which pushes the
rubber flap disk away from the valve bottom after the flow of effluent stops. The stem acts
as a cam follower and rotates the rubber flap disk as the stem is raised and lowered through
the cam 5. The force from the flow of effluent pushes the stem down through the cam and
the stainless steel spring pushes the stem back up through the cam when the flow of effluent
stops. Each linear motion of the stem allows the rubber flap disk to rotate half the distance
necessary to reach the next outlet. When there is no flow, the rubber flap disk is in the “up”
position and is not seated against the valve bottom.
5
4
3
2
1
Inlet
Outlets
Figure 1:
6000 Series Valve
Orenco Automatic Distributing
Valve Assemblies
NTP-VA-1
Rev. 1.2, © 11/03
Orenco Systems®, Inc.
Page 1 of 6
For Wastewater Effluent Systems
This article may describe design criteria that was in effect at the time the article was written. FOR CURRENT DESIGN
CRITERIA, call Orenco Systems, Inc. at 1-800-348-9843.
The Distributing Valve Assembly
The Orenco Automatic Distributing Valve Assembly combines the distributing valve itself and sever-
al other components to give a complete preassembled unit that is easy to install, monitor, and main-
tain. Figure 2 shows a complete assembly. Because distributing valves with several outlets can be
difficult to line up and glue together in the field, the discharge lines in the assemblies are glued in
place at Orenco. The unions (1) allow removal and maintenance of the valve. The clear PVC pipe
sections (2) give a visual check of which discharge line is being pressurized. The inlet ball valve (3)
allows a quick, simple method to test for proper valve cycling. The ball valve also stops the flow of
effluent in case the pump is activated unexpectedly during maintenance or inspection. Check valves
may be necessary on the discharge lines. Use of check valves is discussed in the valve positioning
section.
Valve Assembly Hydraulics
Liquid flowing through the valve assembly must pass through fairly small openings and make several
changes in direction. Because of this, headlosses through the valve assembly are fairly high. Table 1
gives the headloss equations for several different assemblies and Figure 3 shows the graphical repre-
sentations of these equations. Orenco recommends that high-head turbine pumps be used to pressur-
ize the valve assemblies to ensure enough head is available for proper system operation. High-head
turbine pumps are also recommended because the use of a distributing valve usually requires more
frequent pump cycling. The high-head turbine pumps are designed for high cycling systems and will
outlast conventional effluent pumps by a factor of 10 or more in a high cycling mode. Furthermore,
the high-head turbine pump intake is 12 inches or more above the bottom of the pump and tends to
prevent any settled solids from being pumped into the distribution valve and obstructing its opera-
tion. A minimum flow rate through the distributing valve is required to ensure proper seating of the
rubber flap disk. Minimum flow rates for the various models are given in Table 1.
Figure 2:
Orenco Distributing Valve Assembly (6000 Series Valve)
NTP-VA-1
Rev. 1.2, © 11/03
Orenco Systems®, Inc.
Page 2 of 6
Table 1. Automatic Distributing Valve Assembly Headloss Equations
Model Series Equation Operating Range (gpm)
V4400A HL = 0.085 x Q1.45 10 - 40
V4600A HL = 0.085 x Q1.58 10 - 25
V6400A HL = 0.0045 x Q2 + 3.5 x (1 - e-0.06Q) 15 - 70
V6600A HL = 0.0049 x Q2 + 5.5 x (1 - e-0.1Q) 15 - 70
NTP-VA-1
Rev. 1.2, © 11/03
Orenco Systems®, Inc.
Page 3 of 6
0
5
10
15
20
25
30
35
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
Flow (gpm)Head Loss Through Assembly (ft.)V4600A
V4400A
V6600A
V6400A
The Pumping System
Although the distributing valve was designed for the irrigation industry, it has started to gain fairly
wide acceptance in the effluent pumping industry. However, because of the mechanical movements
of the valve, it is necessary to take steps to prevent solids from reaching the distributing valve that
may impede the operation of the valve. Orenco Biotube®Pump Vaults — when properly sized and
installed — provide the necessary protection to prevent valve malfunction. The Biotube®pump vault
accepts effluent only from the clear zone between a tank’s scum and sludge layers and then filters
this effluent through a very large surface area screen cartridge. Without this protection in effluent
systems, the valve has very little chance of reliable long-term operation.
Figure 3:
Automatic distributing valve assembly headloss curves
Valve Positioning
The physical position of the valve in relation to the pump and the discharge point is very important
for proper valve operation. The most reliable operation occurs when the valve is placed at the high
point in the system and as close to the pump as possible. The transport line between the pump and
valve should be kept full if possible. If the line is empty at the beginning of each cycle, pockets of
air during filling can cause random rotation of the valve. The valve is particularly vulnerable to this
erratic rotation with empty lines that are long and not laid at a constant grade. An ideal valve loca-
tion is shown in Figure 4.
If the final discharge point is more than about 2 feet above the valve and the system does not drain
back into the dosing tank, check valves should be installed on the lines immediately following the
valve and a pressure release hole or line should be installed just prior to the valve. This pressure
release hole or line can go into a return line to the dosing tank or to a “minidrainfield” near the valve.
In order for the valve to rotate reliably, no more than about 2 feet of head should remain against the
valve to allow the rubber flap disk to return to its up position. In many cases, it may take from one
minute to several minutes for the pressure in the valve to be lowered enough for proper rotation to
occur. Special care should be taken when installing systems controlled by programmable timers to
ensure cycling does not occur too rapidly. Figure 5 illustrates a valve assembly using check valves.
Pumping downhill to the valve should be avoided unless the transport line is very short and the ele-
vation between the discharge line out of the tank and the valve is less than about 2 feet. If the valve
is located many feet below the dosing tank, random cycling may occur while the transport line drains
through the valve at the end of the cycle. A pressure sustaining valve located just before the distrib-
uting valve may overcome this problem in some instances.
Dosing Tank
Discharge Laterals
Distributing Valve Assembly
Transport Line
Figure 4:
Ideal valve location
NTP-VA-1
Rev. 1.2, © 11/03
Orenco Systems®, Inc.
Page 4 of 6
System Startup
Refer to the Hydrotek Valve booklet that is provided with the distributing valve assembly for the
sequencing of the valve outlets. The transport line should always be flushed with clean water before
installing the valve. Any sand, gravel, or other foreign objects that may have been in the pipe during
installation can easily become lodged in the distributing valve, causing malfunction.
With the pump running, alternately close and open the ball valve on the distributing valve assembly
to check proper rotation of the valve. (Note: If check valves are used on the lines after the distribut-
ing valve, the pump may need to be turned on and off to allow the pressure to be released from the
valve.) If visual operation of which zone is operating is not possible, watch the clear pipe on each
line for indication of which zone is operating.
Maintenance
Annually check for proper operation by following procedures listed in the Hydrotek Valve booklet
and system startup procedures listed above.
Troubleshooting
1. PROBLEM: Valve does not change or cycle to next zone or outlet
CAUSE: The stem and disk assembly is not rotating when water flow is turned off and then
back on.
SOLUTION 1: Ensure that there is no debris inside the cam. Clean and carefully reinstall the cam.
SOLUTION 2: If fewer than the maximum number of outlets are being used, check the installation
of the cam. Ensure that the stem and disk assembly is not being held down by an
improperly installed cam. Refer to the cam replacement instructions.
h
Check Valves if h>2'-0"
Distributing Valve Assembly
Transport Line
Dosing Tank
Pressure Release
Line if h>2'-0"
Discharge Laterals
Figure 5:
Valve assembly below final discharge point
NTP-VA-1
Rev. 1.2, © 11/03
Orenco Systems®, Inc.
Page 5 of 6
SOLUTION 3: Remove the valve top and check for proper movement of stem and disk assembly.
Check for and remove any debris or foreign objects that may jam or retard the
movement of the disk.
SOLUTION 4: Check for freedom of movement of stem and disk assembly up and down over the
center pin in bottom of valve. Scale deposits may build up on the pin and hold stem
and disk assembly down. Clean pin and again check for freedom of movement.
SOLUTION 5: Be sure that all operating outlets are not capped and that the flow to operating zones
is not restricted in any manner. This would cause pressure to build up in the valve
and lock the stem and disk assembly in the down position.
SOLUTION 6: The backflow of water from uphill lines may be preventing the valve from cycling
properly. This can happen when the valve is placed too far below an elevated line.
If the valve cannot be placed close to the high point of the system, a check valve
should be installed near the valve in the outlet line that runs uphill from the valve
and a drain line installed just prior to the valve to relieve the pressure.
2. PROBLEM: Water comes out of all the valve outlets
CAUSE: Stem and disk assembly not seating properly on valve outlet.
SOLUTION 1: Check for sufficient water flow. A minimum flow rate is required to properly seat
the disk as shown in Table 1.
SOLUTION 2: Remove the valve top and check the inside walls to ensure that nothing is interfering
with the up and down movement of the stem and disk assembly inside the valve.
SOLUTION 3: Make sure that the operating outlets are not capped and that the flow to the operat-
ing zones are not restricted in any manner.
3. PROBLEM: Valve skips outlets or zones
CAUSE: Pumping into an empty transport line — especially downhill — may cause the valve
to skip outlets from pockets of air allowing the rubber flap disk to raise during a
cycle.
SOLUTION 1: Keep the transport line full.
SOLUTION 2: If the line must remain empty between cycles, use a larger diameter transport line
laid at a constant grade to prevent air pockets from forming.
CAUSE: The stem and disk assembly is being advanced past the desired outlet.
SOLUTION 1: Ensure that the correct cam for the desired number of zones is installed and that the
outlet lines are installed to the correct outlet ports of the valve as indicated by the
zone numbers on the top of the cam.
NTP-VA-1
Rev. 1.2, © 11/03
Orenco Systems®, Inc.
Page 6 of 6
Distributing Valves
General
Orenco’s Automatic Distributing Valve Assemblies are
mechanically operated and sequentially redirect the
pump’s flow to multiple zones or cells in a distribution
field. Valve actuation is accomplished by a combination
of pressure and flow. Automatic Distributing Valve
Assemblies allow the use of smaller horsepower pumps
on large sand filters and drainfields. For example, a large
community drainfield requiring 300 gpm can use a six-line
Valve Assembly to reduce the pump flow rate requirement
to only 50 gpm.
Orenco only warrants Automatic Distributing Valves when
used in conjunction with High-Head Effluent Pumps with
Biotube®Pump Vaults to provide pressure and flow
requirements, and to prevent debris from fouling valve
operation. An inlet ball valve and a section of clear pipe
and union for each outlet are provided for a complete
assembly that is easy to maintain and monitor. Ideal
valve location is at the high point in the system. Refer to
Automatic Distributing Valve Assemblies (NTP-VA-1) for
more information.
Standard Models
V4402A, V4403A, V4404A, V4605A, V4606A, V6402A, V6403A,
V6404A, V6605A, V6606A.
Nomenclature
Submittal
Data Sheet
Side View
ball valve
elbow
Top View
coupling
clear pipe
distributing valve
union
Bottom View
elbows
Specifications
Materials of Construction
All Fittings: Sch. 40 PVC per ASTMspecification
Unions: Sch. 80 PVCper ASTMspecification
Ball Valve: Sch. 40 PVCper ASTMspecification
Clear Pipe: Sch. 40 PVCper ASTMspecification
V4XXX Distributing Valves: High-strength noncorrosive ABSpolymer and stainless steel
V6XXX Distributing Valves: High-strength noncorrosive ABSpolymer, stainless steel, and die cast metal
NSU-SF-VA-1
Rev. 3.0, © 4/03
Page 1 of 2
Applications
Automatic Distributing Valve Assemblies are used to pressurize
multiple zone distribution systems including textile filters, sand
filters and drainfields.
V
Indicates assembly
Model series:
44 = 4400 series (2-4 outlets)
46 = 4600 series (5-6 outlets)
64 = 6400 series (2-4 outlets)
66 = 6600 series (5-6 outlets)
Distributing valve
Number of active outlets
A
Distributing Valves (continued)
Flow (gpm)Head Loss Through Assembly (ft.)0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
5
10
15
20
25
30
35
V4400A
V6600A
V6400A
V4600A
NSU-SF-VA-1
Rev. 3.0, © 4/03
Page 2 of 2
Model Inlet Size (in.) Outlets Size (in.) Flow range (gpm) Max Head (ft.) Min. Enclosure
V4402A 1.25 1.25 10 - 40 170 VB1217
V4403A 1.25 1.25 10 - 40 170 VB1217
V4404A 1.25 1.25 10 - 40 170 VB1217
V4605A 1.25 1.25 10 - 25 170 RR2418
V4606A 1.25 1.25 10 - 25 170 RR2418
V6402A 1.5 1.5 15 - 100 345 RR2418
V6403A 1.5 1.5 15 - 100 345 RR2418
V6404A 1.5 1.5 15 - 100 345 RR2418
V6605A 1.5 1.5 15 - 100 345 RR2418
V6606A 1.5 1.5 15 - 100 345 RR2418
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-SF-OS-1
Rev. 1.1, © 09/14
Page 1 of 1
Orifice Shields
Technical Data SheetOrenco®
General
Orenco Orifice Shields snap-fit onto laterals. They may be placed on
top of or beneath a lateral, depending on the location of the orifice.
Orifice shields are covered by method-of-use patent # 5,360,556.
Standard Models
OS075, OS100, OS125, OS150, OS200
Product Code Diagram
Material of Construction
PVC per ASTM D-1784
Physical Specifications
Model Shield O.D. Lateral pipe O.D.
in. (mm) in. (mm)
OS075 3.5 (89) 1.05 (27)
OS100 3.5 (89) 1.315 (33)
OS125 3.5 (89) 1.66 (42)
OS150 4.5 (114) 1.90 (48)
OS200 4.5 (114) 2.375 (60)
Applications
Orenco® Orifice Shields are used in a pressurized distribution system
to protect the orifices from backfill debris that might cause orifice
blockage.
Orifice shield installed on lateral pipe, standard configuration
Shield
Orifice
Cutaway view, standard configuration
Shield
Orifice
Cutaway view, cold weather configuration
OS
Lateral pipe size, nominal:
075 = 0.75 in. (20 mm)
100 = 1.00 in. (25 mm)
125 = 1.25 in. (32 mm)
150 = 1.50 in. (40 mm)
200 = 2.00 in. (50 mm)
Orifice shield
Item#
SEK- Orenco® Flushing Assemblies
Flushing Assemblies
Orenco® flushing assemblies provide easy
access for lateral maintenance. Flushing
assembly kits include a PVC sweep with ball
valve and a polyethylene valve box enclosure.
Orenco® flushing assemblies are available in the
following sizes:
• 1” diameter
• 1.25” diameter
• 1.5” diameter
• 2" diameter
Valve Boxes
Orenco® valve boxes are used to provide access
to flushing assemblies. Constructed of
polyethylene.
Valve Box, 7-in. diameter round enclosure
Note: Kits include VB7 valve box enclosure.
(719) 395-6764
Fax: (719) 395-3727
28005 County Road 317
P.O. Box 925
Buena Vista, CO 81211
Water &
Wastewater
• Systems
• Products
• Service Website: http://valleyprecast.com/
Email: frontdesk@valleyprecast.com
33 Four Wheel Drive Road
Carbondale, CO 81623
970.309.5259
carla.ostberg@gmail.com
November 20, 2020 Project No. C1442
Nick Cherney
nick@cherney.com
Subsurface Investigation and Onsite Wastewater Treatment System Design
4-Bedroom Residence + 1-Bedroom Assessor Dwelling Unit (ADU)
900 Valley Road
Eagle County, Colorado
Nick,
CBO Inc. performed a subsurface investigation and completed an onsite wastewater treatment system
(OWTS) design for the subject residence. The 4.57-acre property is located outside of Basalt, in an area
where OWTSs and wells are necessary. Original design documents described the main house and ADU
being served by separate OWTSs. Total bedroom count has changed and there is a desire to have both
structures be served by the proposed OWTS. Design documents dated May 11, 2020 should be
discarded.
Legal Description: Lot 1, GABOSSI SUBDIVISION.
Parcel ID: 2391-334-02-001
SITE CONDITIONS There is a main residence and accessory dwelling unit (ADU) on the property. The ADU will have 1-
bedroom after the remodel and is currently served by an existing OWTS documented by Eagle County
Individual Sewage Disposal System (ISDS) Permit 1705-97. This OWTS will be abandoned. The main
house will have 4-bedrooms after the remodel. The proposed OWTS will serve both structures.
A private well, located on the western side of the property, serves the residences. The well is located at
least 50-feet from the proposed septic tank and at least 100-feet from the proposed soil treatment area
(STA).
The Roaring Fork River is located on the southern portion of the property.
A ditch bisects the center of the property. While the sewer line will need to cross the ditch, all other
components will be at least 50-feet from the ditch.
Other easements are present on the property. Most notably, a 50-foot gas easement that crosses the
northern portion of the property. This easement will need to be crossed with a sewer line, but no other
OWTS component will be placed within the easement. The gas company must be notified prior to
construction in the easement.
The proposed STA will be located in the northern portion of the property, between the gas line easement
and the electrical easement. It is relatively flat, sloping slightly (less than 5%) to the south. The area is
currently utilized a yard.
Page 2
There should be no traffic or staging of material over the future STA site to avoid compaction of soils
prior to construction of the STA.
Table 1 describes the minimum required setback of OWTS components to physical features on the
property compared to approximate, proposed setback distances.
Table 1
OWTS Components and
Physical Features
Minimum Required Setback Approximate Proposed Setback
House to Septic Tank 5’ 27’
Septic Tank to Well 50’ 130’
Septic Tank to Water Course 50’ 50’ (ditch)
STA to House 20’ 196’
STA to Well 100’ 168’
STA to Water Course 50’ 146’ (ditch)
SUBSURFACE The subsurface was investigated on March 16, 2020 by digging two soil profile test pit excavations (Test
Pits). Visual and tactile soil analysis was completed by Carla Ostberg at the time of excavation.1
The materials encountered in the Test Pit #1 consisted of dark brown, moist, topsoil and rootzone to 6-
inches, underlain by medium brown, moist, loamy sand with greater than 65% rock and cobbles to a
maximum depth explored of 7.0-feet. No bedrock or groundwater was encountered.
Excavation began on Test Pit #2 and we encountered an irrigation line. Not wanting to disturb more area
in the proposed STA than necessary, we did not continue digging.
A sample of the soils was taken from Test Pit #1 at 3-feet below grade. A sieved sample of the soil
formed a ball, but no ribbon. Soil structure shape was single-grain and consistence was loose. Soil
texture was gritty.
Soils are classified as R-0 due to content of rock. The design will require an over-excavated, pressured
dosed, unlined sand filter with a minimum of 3-feet of “Secondary Sand” filter material. A long term
acceptance rate (LTAR) of 0.8 gallons per square foot, will be used to design the OWTS.
1 Carla Ostberg holds a Certificate of Attendance and Examination from the CPOW Visual and Tactile
Evaluation of Soils Training.
Page 3
Approx. berm area Test Pit #1
Sieved sample rock content greater than 35%
Page 4
DESIGN SPECIFICATIONS
The existing OWTS will be abandoned by pumping and removing the poly septic tank and filling the void
with on-site soils. The STA will be abandoned in place
Design Calculations:
Main House = 75 GPD x 2 people/bedroom x 3 Bedrooms + 75 GPD (4thbedroom) = 525 GPD
ADU = 75 GPD x 2 people/bedroom x 1 Bedroom = 150 GPD
Average Design Flow = 525 GPD + 150 GPD = 675 GPD
LTAR = 0.8 GPD/SF
675 GPD / 0.8 GPD/SF = 844 SF
Page 5
The new OWTS design is based on 4-bedrooms in the main house and 1-bedroom in the ADU. An
average daily wastewater flow of 675 GPD will be used.
For the purposes of this OWTS design, Benchmark Elevation has been established as the existing sewer
line elevation as it enters the existing septic tank (100’). CBO Inc. should be notified of any
discrepancies or problems with grade elevations of proposed components during installation of the
OWTS.
OWTS Component Minimum Elevation
Primary Tank Inlet Invert 100’ (Benchmark) EXISTING
Top of Culvert 97.92’ (fall of 25”) / 61’ with min. 1% fall = min.
7.625”)
Pump Chamber Ground surface at 97.25’ (fall of 8”) / 55’ with min.
1% fall = min. 6.875”)
ADV 122’ with min. 1% raise for drain back = min.
15.25”
The existing sewer line elevations will determine depth of the new septic tank to maintain a minimum 2%
fall from the main house and ADU. A double-sweep clean out should be added to each if one does not
already exist. The system installation will include a new 1500-gallon, two-compartment concrete septic
tank with an Orenco® Biotube Effluent Filter on the outlet tee. The sewer line exiting the septic tank must
have a minimum 1% fall to the pump chamber. The sewer line will cross the top of the culvert. The sewer
line should be encased at least 10-feet on each side of the ditch opening (see W4.0/1 Encasement
Detail). This line should be insulated with blue board to protect from freezing. Any portion of the sewer
line under the driveway or area subject to traffic must be minimum Schedule 40.
A new 500-gallon, single-compartment concrete Valley Precast pump chamber with an Orenco® Biotube
Pump Vault and an Orenco® PF3005 pump must be installed. The floats should be set to dose
approximately 80 gallons each pump cycle, allowing approximately 13 gallons of drain back after each
pump cycle. A pump curve is enclosed. The pump must be capable of a minimum design flow rate of 24.4
GPM and a minimum total dynamic head of 23.2 feet with 5 feet residual head at last orifice. The control
panel for the pump must be located within line of sight of the septic tank. We recommend Valley Precast out
of Buena Vista be contracted for start-up of the pumping system.
Pump Table
Dose Range Max = 182 gal. (675 GPD x 25%
+ 13 gal drain back)
Min. 61 gal. (12 gal x 4) + 13 gal
drain back
Dose Setting 80 gallons/dose 13 gallons drain back (122 / 1.5”
diameter pump line)
Float Separation 500 gallon single-compartment
Valley Precast concrete pump
chamber
8” on/off float separation
Pump Criteria 24.4 gallons per minute (GPM) 23.2 feet total dynamic head
(TDH)
Effluent will be pressure dosed through a 1.5-inch diameter pump line from the pump chamber to an
Orenco® automatic distributing valve (ADV), model 6402. This pump line must have a minimum 1% grade
for proper drain back into the tank after each pump cycle. The ADV must be placed a high point in the
system and be placed in an insulated riser with access from grade. Screened rock must be placed below the
ADV to support the ADV and to assure the clear pipes existing the ADV remain visible for future inspection
and maintenance.
Page 6
Effluent will be pressure dosed through 1.5-inch diameter distribution lines to an over-excavated, 12’ x 71’
unlined sand filter, split into two zones. A minimum of 3-feet of sand filter material will be installed in the
over-excavated footprint. Sand filter material must be clean, coarse sand, all passing a screen having four
meshes to the inch. The sand must have an effective size between 0.15 and 0.60 mm. The uniformity
coefficient must be 7.0 or less. Material meeting ASTM 33, for concrete sand, with three percent or less
fines passing 200 mesh sieve may be used. A gradation of the sand media must be provided.
Laterals used to disperse the effluent must be surrounded by washed coarse screened gravel or crushed
stone. All of the gravel or stone must pass a 2 ½-inch screen and must be retained on a ¾-inch screen. The
manifold must be 1.5-inches in diameter. Laterals must be 1.5-inches in diameter with 5/32-inch diameter
orifices facing down, spaced 3-feet on center (OC). We recommend Orenco® Orifice Shields be installed on
the laterals at each orifice. Laterals will begin 2-feet from the edges of the filter, with 4-feet between each
lateral. Each 1.5-inch diameter lateral must end in a sweeping ell facing up with a ball valve for flushing.
A soil separation fabric should be placed over the gravel layer followed by approximately 1-foot of topsoil or
other suitable soil able to support vegetative growth.
COMPONENT SPECIFICATIONS
The component manufacturers are typical of applications used by contractors and engineers in this area.
CBO Inc. must approve alternative components prior to installation of the OWTS. Requests must
be submitted, in writing, to our office for approval prior to installation. Component technical data
sheets are available upon request.
COMPONENT MANUFACTURER MODEL NO. COMMENTS
Septic Tank Valley Precast Item # 1500T-2CP 2-compartment concrete
septic tank
Pump Chamber Valley Precast Item # 500T-1CP-HH Single-compartment
concrete pump chamber
with high head pump
Pump Orenco® PF300511 ½ HP
120 Volt
Biotube ProPak Pump Package Orenco® BPP30DD Vault, Filter, Control Panel (demand dose)
Tank Risers and Lids Orenco® Double-walled PVC Risers and Lids (24” diameter)
ADV Orenco® V6402A 1.5” Inlet and Outlets
ADV Riser and Lid Orenco® Double-walled PVC Risers
and Lids (30” diameter) Orifice Shields Orenco® OS150 1.5 inch diameter (60 total) Flushing Assembly Orenco® 1.5” diameter (2) 45° or 90° long sweep only (6 total)
The component manufacturers are typical of applications used by contractors and engineers in this area.
Alternatives may be considered or recommended by contacting our office. Construction must be
according to Eagle County On-Site Wastewater Treatment System Regulations, the OWTS Permit provided
by Eagle County Environmental Health Department, and this design.
Page 7
INSTALLATION CONTRACTOR
CBO Inc. expects that the installer be experienced and qualified to perform the scope of work outlined in this
design. The installer must review this design thoroughly and coordinate with our office in advance of
installation. Any additional conditions in this design or county permit must be completed and documented
prior to final approval of the OWTS installation. Communication between the installer and this office is
expected throughout the installation.
INSTALLATION OBSERVATIONS CBO Inc. must view the OWTS during construction. The OWTS observation should be performed before
backfill, after placement of OWTS components. Septic tanks, distribution devices, pumps, dosing
siphons, and other plumbing, as applicable, must also be observed. CBO Inc. should be notified 48 hours
in advance to observe the installation.
In an effort to improve the accuracy of the record drawing, we request that the installer provide a
sketch of the installation, including path of the sewer lines, water line installation (if applicable),
septic tank location, STA location, and measurements from building corners or another fixed
objects on the property. This sketch is most easily provided on Sheet W2.0 of the OWTS Design
Packet. Photographs of the installation and final cover are also requested to supplement our installation
documentation.
REVEGETATION REQUIREMENTS
An adequate layer of good quality topsoil capable of supporting revegetation shall be placed over the entire
disturbed area of the OWTS installation. A mixture of native grass seed that has good soil stabilizing
characteristics (but without taproots), provides a maximum transpiration rate, and competes well with
successional species. No trees or shrubs, or any vegetation requiring regular irrigation shall be placed over
the area. Until vegetation is reestablished, erosion and sediment control measures shall be implemented
and maintained on site. The owner of the OWTS shall be responsible for maintaining proper vegetation
cover.
OPERATION INFORMATION AND MAINTENANCE
The property owner shall be responsible for the operation and maintenance of each OWTS servicing the
property. The property owner is responsible for maintaining service contracts for manufactured units,
alternating STAs, and any other components needing maintenance.
Geo-fabrics or plastics should not be used over the STA. No heavy equipment, machinery, or materials
should be placed on the backfilled STA. Machines with tracks (not wheels) should be used during
construction of the STA for better weight distribution. Livestock should not graze on the STA. Plumbing
fixtures should be checked to ensure that no additional water is being discharged to OWTS. For example, a
running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a STA.
If an effluent filter or screen has been installed in the OWTS, we recommend this filter or screen be cleaned
annually, or as needed. If the OWTS consists of a pressurized pump system, we recommend the laterals be
flushed annually, or as needed.
Page 8
11-24-2020
The homeowner should pump the septic tank every two years, or as needed gauged by measurement of
solids in the tank. Garbage disposal use should be minimized, and non-biodegradable materials should not
be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener
should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS.
Mechanical room drains should not discharge into the OWTS. The OWTS is engineered for domestic waste
only.
ADDITIONAL CONSTRUCTION NOTES If design includes a pump, weep holes must be installed to allow pump lines to drain to minimize risk of
freezing. The pump shall have an audible and visual alarm notification in the event of excessively high
water conditions and shall be connected to a control breaker separate from the high-water alarm breaker
and from any other control system circuits. The pump system shall have a switch so the pump can be
manually operated.
Extensions should be placed on all septic tank components to allow access to them from existing grade.
Backfill over the STA must be uniform and granular with no material greater than minus 3-inch.
LIMITS: The design is based on information submitted. If soil conditions encountered are different from conditions
described in report, CBO Inc. should be notified. All OWTS construction must be according to the county
regulations. Requirements not specified in this report must follow applicable county regulations. The
contractor should have documented and demonstrated knowledge of the requirements and regulations of
the county in which they are working. Licensing of Systems Contractors may be required by county
regulation.
Please call with questions.
Sincerely,
CBO Inc. Reviewed By:
Carla Ostberg, MPH, REHS Romeo A. Baylosis, PE
Pump Selection for a Pressurized System - Single Family Residence Project
Cherney / 900 Valley Road
Parameters
Discharge Assembly Size
Transport Length Before Valve
Transport Pipe Class
Transport Line Size
Distributing Valve Model
Transport Length After Valve
Transport Pipe Class
Transport Pipe Size
Max Elevation Lift
Manifold Length
Manifold Pipe Class
Manifold Pipe Size
Number of Laterals per Cell
Lateral Length
Lateral Pipe Class
Lateral Pipe Size
Orifice Size
Orifice Spacing
Residual Head
Flow Meter
'Add-on' Friction Losses
1.25
122
40
1.50
6402
7
40
1.50
4
6
40
1.50
6
33
40
1.50
5/32
3
5
None
0
inches
feet
inches
feet
inches
feet
feet
inches
feet
inches
inches
feet
feet
inches
feet
Calculations
Minimum Flow Rate per Orifice
Number of Orifices per Zone
Total Flow Rate per Zone
Number of Laterals per Zone
% Flow Differential 1st/Last Orifice
Transport Velocity Before Valve
Transport Velocity After Valve
0.68
36
24.4
3
0.5
3.9
3.9
gpm
gpm
%
fps
fps
Frictional Head Losses
Loss through Discharge
Loss in Transport Before Valve
Loss through Valve
Loss in Transport after Valve
Loss in Manifold
Loss in Laterals
Loss through Flowmeter
'Add-on' Friction Losses
4.2
4.3
5.4
0.2
0.1
0.1
0.0
0.0
feet
feet
feet
feet
feet
feet
feet
feet
Pipe Volumes
Vol of Transport Line Before Valve
Vol of Transport Line After Valve
Vol of Manifold
Vol of Laterals per Zone
Total Vol Before Valve
Total Vol After Valve
12.9
0.7
0.6
10.5
12.9
11.8
gals
gals
gals
gals
gals
gals
Minimum Pump Requirements
Design Flow Rate
Total Dynamic Head
24.4
23.2
gpm
feet
0 5 10 15 20 25 30 35 40
0
50
100
150
200
250
300
Net Discharge (gpm)
PumpData
PF3005 High Head Effluent Pump
30 GPM, 1/2HP
115/230V 1Ø 60Hz, 200V 3Ø 60Hz
PF3007 High Head Effluent Pump
30 GPM, 3/4HP
230V 1Ø 60Hz, 200/460V 3Ø 60Hz
PF3010 High Head Effluent Pump
30 GPM, 1HP
230V 1Ø 60Hz, 200/460V 3Ø 60Hz
PF3015 High Head Effluent Pump
30 GPM, 1-1/2HP
230V 1Ø 60Hz, 200/230/460V 3Ø 60Hz
Legend
System Curve:
Pump Curve:
Pump Optimal Range:
Operating Point:
Design Point:
EASEMENT PERREC. NO. 201311289N61°54'00"WN86°00'00"W400.00'182.27'75.00'S06°25'23"ES85°24'00"EN08°12'07"
E
479.45'383.25'325.96'S00°57'17"W N 52°05'23" E543.17'S
5
2
°
0
5
'
2
3
"
W
6
9
6
.
5
3
'N 89°37'00" W313.03' MEAS.LOT 2RONCE LANELOT CFJ GLASSIER TYPE A MINOR SUBDIVISIONLOT 14.574 AC.±A.C.E.S.EASEMENT PERREC. NO. 201311289LOT 4LOT 3#5 REBAR & 1.25" YELLOWPLASTIC CAP L.S. #14111FOUND 0.10' ABOVE GROUND#5 REBAR & 1.25" RED PLASTICCAP L.S. #14111 FOUND 0.15'ABOVE GROUND#5 REBAR & 1.25" DIA. ORANGEPLASTIC CAP L.S. #37935 FOUND0.20' ABOVE GROUND5' WITNESS CORNER (PREVIOUSLYSET W.C. DUE TO FENCE DISABLEDVEHICLES PARKED ON ACTUAL CORNER)#5 REBAR & 1.25" RED PLASTICCAP L.S. #37935 FOUND0.80' BELOW GROUNDTBM EL= 6423.05'#5 REBAR & 1.25"RED PLASTICCAP L.S. #37935FOUND 0.20'BELOW GROUNDVALLEY ROAD#5 REBAR & 1.25" YELLOWPLASTIC CAP L.S. #14111 FOUND0.20' ABOVE GROUND67.25' WITNESS CORNERMEAS.#5 REBAR & 1.25" YELLOWPLASTIC CAP L.S. #14111 FOUNDFLUSH WITH GROUNDBEARS N06°35'42"E 79.78'MEAS. FROM SOUTHEAST CORNERLOT 1#5 REBAR & 1.25" DIA. ORANGEPLASTIC CAP L.S. #37935 FOUND0.10' ABOVE GROUNDFOUND 140' WITNESS CORNER(PREVIOUSLY SET W.C.DUE TO STEEP SLOPES)S85°24'00"E115.00' MEAS./RECORDS00°00'00"E 442.71' MEAS.313.03' RECORD442.72' RECORD
REC. NO. 406909BASIS OF BEARINGS#5 REBAR & 1.25" RED PLASTICCAP L.S. #37935 FOUND FLUSHWITH GROUNDLOT BFJ GLASSIER TYPE A MINOR SUBDIVISIONREC. NO. 406909LOT 3ARLIAN RANCH SUBDIVISIONREC. NO. 362254NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTIONBASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRSTDISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT INTHIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THECERTIFICATION SHOWN HEREON.ByNO.DateProject NO.RevisionDrawn By:Checked By:Date:Computer File:P.O. Box 1746Rifle, CO 81650Phone (970) 625-1954Fax (970) 579-7150www.peaksurveyinginc.comSNWEPeak Surveying, Inc.Since 2007170251 OF 2NICK CHERNEYEAGLE COUNTY, COLORADOIMPROVEMENT SURVEY PLATLOT 1, GABOSSI SUB.900 VALLEY ROADJRNJRNMAY 14, 2017025.DWG104/01/20UPDATE SURVEYJRN204/07/20UPDATE ELEC. EASEMENTSJRN305/28/20UPDATE SURVEYJRNIMPROVEMENT SURVEY PLATLOT 1, GABOSSI SUBDIVISION ACCORDING TO THE FINAL PLAT RECORDED FEBRUARY 11, 1981 AS RECEPTION NO. 214681COUNTY OF EAGLE, STATE OF COLORADOPROPERTY DESCRIPTIONLOT 1, GABOSSI SUBDIVISION ACCORDING TO THE FINAL PLAT RECORDED FEBRUARY 11, 1981AS RECEPTION NO. 214681, COUNTY OF EAGLE, STATE OF COLORADO.NOTES:1) THIS PROPERTY IS SUBJECT TO RESERVATIONS, RESTRICTIONS, COVENANTS, BUILDINGSETBACKS AND EASEMENTS OF RECORD, OR IN PLACE AND EXCEPTIONS TO TITLE SHOWN INTHE TITLE COMMITMENT PREPARED BY LAND TITLE GUARANTEE COMPANY, ORDER NO.BAR64001423, DATED EFFECTIVE APRIL 20, 2017.2) THE DATE OF THIS SURVEY WAS MAY 10, 2017, MAY 09, SEPTEMBER 10, DECEMBER 10, 2018,FEBRUARY 18, MARCH 20, AND MAY 20, 2020.3) BASIS OF BEARINGS FOR THIS SURVEY IS A BEARING OF N89°37'00"W BETWEEN THENORTHEAST CORNER OF LOT 4, A REBAR AND CAP, L.S. #14111 AND THE NORTHWEST CORNEROF OF LOT 4, A #5 REBAR, BOTH FOUND IN PLACE4) UNITS OF MEASURE FOR ALL DIMENSIONS SHOWN HEREON IS U.S. SURVEY FEET.5) THIS SURVEY IS BASED ON GABOSSI SUBDIVISION RECORDED FEBRUARY 11, 1981 ASRECEPTION NO. 214681, THE FJ GLASSIER TYPE A MINOR SUBDIVISION PLAT RECORDED AUGUST01, 1989 AS RECEPTION NO. 406909 AND A WARRANTY DEED RECORDED OCTOBER 1, 2003 ASRECEPTION NO. 852177 IN THE EAGLE COUNTY CLERK AND RECORDER'S OFFICE, AND CORNERSFOUND IN PLACE.6) THIS PROPERTY IS SUBJECT TO A RIGHT-OF-WAY AND EASEMENT TO ROCKY MOUNTAINNATURAL GAS COMPANY AS DESCRIBED IN BOOK 337 AT PAGE 241 DATED OCTOBER 19, 1961.7) THIS PROPERTY IS SUBJECT TO A NON-EXCLUSIVE EASEMENT AS RECORDED OCTOBER 4, 1983IN BOOK 369 AT PAGE 773.8) THIS PROPERTY IS SUBJECT TO A 50' SETBACK FROM THE HIGH WATER LINE OF THE ROARINGFORK RIVER PER BOOK 318 AT PAGE 310. THIS PROPERTY IS ZONED RR ACCORDING TO EAGLECOUNTY LAND USE CODE. BUILDING SETBACKS SHOULD BE VERIFIED WITH THE PLANNINGDEPARTMENT PRIOR TO ANY DESIGN OR CONSTRUCTION.9) ELEVATIONS AS SHOWN ARE BASED ON A GPS OBSERVATION UTILIZING THE WESTERNCOLORADO RTVRN GPS NETWORK (88 ORTHO DATUM) YIELDING AN ONSITE ELEVATION OF6423.05' ON THE NORTHEAST CORNER AS SHOWN. CONTOUR INTERVALS EQUAL 1 FOOT.10) ORDINARY HIGH WATER LINE LOCATIONS WERE ESTABLISHED BY WATERSHEDENVIRONMENTAL CONSULTANTS FEBRUARY, 2020.11) THE SUBJECT PROPERTY WAS UNDER CONSTRUCTION AT THE TIME OF THE FEBRUARY 18,AND MARCH 20, 2020 FIELD SURVEYS.NESW0306090120150180210240270300330P e ak Surveying, Inc.0606012024030010010020040050COL
O
R
ADO LICENSEDPROFESSIONAL LAND
S
U
RVEYO R
JAS
O
N R. NEIL37935LOT 1 - A.C.E.S. EASEMENTCONTROL DIAGRAM - BASIS OF BEARINGSIMPROVEMENT SURVEY STATEMENTI, JASON R. NEIL, HEREBY CERTIFY TO NICK CHERNEY, HIS ATTORNEYS, SUCCESSORS ANDASSIGNS AND TO LAND TITLE GUARANTEE COMPANY, THAT I AM A PROFESSIONAL LANDSURVEYOR LICENSED UNDER THE LAWS OF THE STATE OF COLORADO; THAT THISIMPROVEMENT SURVEY PLAT IS TRUE, CORRECT AND COMPLETE BASED ON MY KNOWLEDGE,INFORMATION AND BELIEF AS LAID OUT AND SHOWN HEREON; THAT THIS IMPROVEMENTSURVEY PLAT IS NOT A GUARANTY OR WARRANTY, EITHER EXPRESSED OR IMPLIED, THATTHIS IMPROVEMENT SURVEY PLAT WAS MADE BY ME FROM AN ACCURATE SURVEY OF THEREAL PROPERTY PERFORMED BY ME OR UNDER MY DIRECT SUPERVISION ON MAY 10, 2017,MAY 09, SEPTEMBER 10, DECEMBER 10, 2018, FEBRUARY 18, MARCH 20, AND MAY 20, 2020; THAT,IN THE PREPARATION OF THIS IMPROVEMENT SURVEY PLAT, I RELIED UPON LAND TITLEGUARANTEE COMPANY, ORDER NO. BAR64001423, DATED EFFECTIVE APRIL 20, 2017; THAT THELOCATION AND DIMENSIONS OF ALL BUILDINGS, IMPROVEMENTS, EASEMENTS, RIGHTS OFWAY IN EVIDENCE OR KNOWN TO ME AND ENCROACHMENTS BY OR ON THE REAL PROPERTYAND MATTERS REFERENCED IN SAID TITLE COMMITMENT CAPABLE OF BEING SHOWN AREACCURATELY SHOWN, AND THAT THIS PLAT IS IN ACCORDANCE OF AN IMPROVEMENTSURVEY PLAT AS SET FORTH IN C.R.S. §38-51-102(9). DATED: MAY 28, 2020 BY:___________________________________ JASON R. NEIL, P.L.S. NO. 37935 FOR AND ON BEHALF OF PEAK SURVEYING, INC.COUNTY SURVEYOR'S CERTIFICATE OF DEPOSIT:DEPOSITED THIS ______ DAY OF ________________ 2020, AT _______ .M., IN THE EAGLE COUNTY INDEX FORINFORMATIONAL LAND SURVEY PLATS AT PAGE NO'S. _____________________.BY: __________________________________ EAGLE COUNTY SURVEYORDATE: ___________________FILING INFORMATION:GOV'T LOT 11, SECTION 33, TOWNSHIP 7 SOUTH, RANGE 87 WEST, OF THE SIXTH PRINCIPAL MERIDIAN.GOV'T LOT 2, SECTION 4, TOWNSHIP 8 SOUTH, RANGE 87 WEST, OF THE SIXTH PRINCIPAL MERIDIAN.SHEET INDEXSHEET 1 CONTROL DIAGRAMSHEET 2 LOT 1 IMPROVEMENT SURVEY
N61°54'00"WN86°00'00"W400.00'182.27'75.00'S06°25'23"ES85°24'00"EN08°12'07"E
479.45'383.25'325.96'S00°57'17"W XXXXXXXXXXXG
GXXXXXXOEOEOE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OEOSWSINGLE STORY WOODFRAME HOUSE2 STORYWOOD FRAMEWATER PUMPWATER EDGE OF WATERFLOOD PLAINOVERHEADFLOWLINE DITCHEDGE OF ROADCONC. WALKHOTTUBPLANTERGRAVEL DRIVEGUARD RAILHOUSESIGN (TYP.)GRAVEL DRIVE50' WIDE HIGH PRESSURE GASEASEMENT PER PLATREC. NO. 21468150' WIDEUTILITY ANDACCESS EASEMENT7.5 WIDE UTILITY, DRAINAGEAND MAINTENANCE EASEMENT100 YEAR15' WIDE DITCHEASEMENT PLATREC. NO. 214681PER PLAT REC. NO. 214681LOT 2ROARING FORKRIVERVALLEY ROADRONCE LANELOT CFJ GLASSIER TYPE A MINOR SUBDIVISION50' WIDE GAS EASEMENTPER BK.560, PG.74848" CMPFENCE19.8'58.1'2
8
.
8
'29.7'19.1'14.1'11.0'46.3'30.3'17.0'39.1'28.9'33.7'
20
.
0
'20' WIDE ELECTRICALEASEMENT PER 20' ACCESS EASEMENTBK. 560, PG. 748AND BK.737, PG.324PER PLAT REC. NO. 214681FENCEDECK900 VALLEY ROAD& CONC.PATIOSPOWERLINE EASEMENTPER PLAT REC. NO. 21468130" CMPCON
C
.
P
A
T
I
O IGCON
C
.PLAT REC. NO. 214681WWELLIIRRIGATION CONTROL (TYP.)GAS METERTIESTEPS76.7'113.6'
288.7'SPIGOTLOT 14.574 AC.±134.8'102.3'A.C.E.S.BK. 576 PG. 964EASEMENT PERREC. NO. 201311289S85°24'00"E115.00' MEAS./RECORD#5 REBAR & 1.25" DIA. ORANGEPLASTIC CAP L.S. #37935 FOUND0.20' ABOVE GROUND5' WITNESS CORNER (PREVIOUSLYSET W.C. DUE TO FENCE DISABLEDVEHICLES PARKED ON ACTUAL CORNER)#5 REBAR & 1.25" RED PLASTICCAP L.S. #37935 FOUND0.80' BELOW GROUNDTBM EL= 6423.05'#5 REBAR & 1.25" YELLOWPLASTIC CAP L.S. #14111 FOUND0.20' ABOVE GROUND67.25' WITNESS CORNERMEAS.#5 REBAR & 1.25" YELLOWPLASTIC CAP L.S. #14111 FOUNDFLUSH WITH GROUNDBEARS N06°35'42"E 79.78'MEAS. FROM SOUTHEAST CORNEROF LOT 1#5 REBAR & 1.25" DIA. ORANGEPLASTIC CAP L.S. #37935 FOUND0.10' ABOVE GROUNDFOUND 140' WITNESS CORNER(PREVIOUSLY SET W.C.DUE TO STEEP SLOPES)FLOWLINE DITCHPER FEMA PANEL08037C0738D, DATEDDECEMBER 04, 2007#5 REBAR & 1.25" RED PLASTICCAP L.S. #14111 FOUND 0.15'ABOVE GROUNDREC. NO. 406909X X X X
X
X
XSTONEPATIO
ECONCRETESTEPSSHED26.3'10.2'GRAVEL DRIVEWAYHOTTUBELEC.BOX34.1'49.1'CONCRETEPATIO 6426.5'#5 REBAR & 1.25"RED PLASTICCAP L.S. #37935FOUND 0.20'BELOW GROUNDOHWM#1OHWM#22#21#20#19#18#17#16#15#14#13#12#11#10#9#8#7#6#5#4#3#2ORDINARY HIGH WATER LINE MARKEDBY WATERSHED ENVIRONMENTALCONSULTANTS FEBRUARY 202050' STREAM SETBACK FROMORDINARY HIGH WATERLINE50'
50'50' STREAM SETBACKFROM ORDINARYHIGH WATERLINE24" CMPFENCEFENCEGRAVEL DRIVEWAYOE
OE
OE
OE
OE
OE
OE
ARCHERYTARGET63856390639564006405641064116412641564166
4
2
0
6420
642064206420642564256425
6
4
3
0
642
5
6420
64256425
64256
4
2
5
64256415641064056400639563905.4'11.9'OEOEOEOEOEOEOEOEOEOEOEOESHED
22.2'10.2'0.2'ACCORDING TO REC. NO.201910828 THIS ELECTRICLINE IS TO BE VACATEDHOWEVER, AT THE TIME OFTHE MARCH 20, 2020 SURVEYTHIS LINE WAS IN PLACE8.
2
'18.2'OVERHANG6421.5'6419.2'6418.9'6418.6'6418.6'6418.6'6418.3'6418.8'6419.0'6418.9'6418.7'FIREPIT6421.3' GND6421.6' CONC6422.2'F.F.6422.34'6421.8'6423.2'F.F. STONEPATIO6423.45'EAVE6431.5'F.F. STONEPATIO6423.28'F.F.6423.70'RIDGE6443.1'CONC.6426.15'CONC.6426.22'CONC.6426.26'6425.6'6425.8'6425.7'F.F.6426.88'STEP6426.84'DECK6447.6'DECK6447.6'OH6435.5'OH6435.5'OH6435.6'OH6435.6'RIDGE6450.8'F.F.6426.39'OAKDRIP LINEPINEDRIP LINE20" DIA6420.2'ASPEN12" DIA6423.0'OAKDRIP LINEPINEDRIP LINE10" DIA6423.3'3 ASPEN10" DIA6422.6'COTTONWOOD27" DIA6423.7'SEPTICLIDASPEN18" DIA6424.6'ASPEN16" DIA6424.5'ASPEN14" DIA6424.6'VIEW TO CENTER ISLANDAPPROX. ORDINARY HIGHWATER LINE MARKEDLOCATED BY PSI05/20/20ByNO.DateProject NO.RevisionDrawn By:Checked By:Date:Computer File:P.O. Box 1746Rifle, CO 81650Phone (970) 625-1954Fax (970) 579-7150www.peaksurveyinginc.comSNWEPeak Surveying, Inc.Since 2007170252 OF 2NICK CHERNEYEAGLE COUNTY, COLORADOIMPROVEMENT SURVEY PLATLOT 1, GABOSSI SUB.900 VALLEY ROADJRNJRNMAY 14, 2017025.DWG104/01/20UPDATE SURVEYJRN204/07/20UPDATE ELEC. EASEMENTSJRN305/28/20UPDATE SURVEYJRNIMPROVEMENT SURVEY PLATLOT 1, GABOSSI SUBDIVISION ACCORDING TO THE FINAL PLAT RECORDED FEBRUARY 11, 1981 AS RECEPTION NO. 214681COUNTY OF EAGLE, STATE OF COLORADONESW0306090120150180210240270300330P e ak Surveying, Inc.030306012015IMPROVEMENT LOCATIONHATCH LEGENDOVERHEAD ELEC.LINE TYPE LEGENDFLOWLINE DITCHFENCE LINEEASEMENTOEXASPHALTCONCRETEGRAVELSYMBOL LEGENDWATER SHUT OFFGAS METERGSET MONUMENTMAIL BOXEDGE OF ROADIRRIGATION VALVEIFOUND MONUMENTSEPTIC LIDWATER SPIGOTSWELLSIGNPOWER POLEWOSW100YR FLOODPLAINCMPCOLORADO LICENSEDPROFESSIONAL LAND SURVEYOR JASON R. NEIL37935IMPROVEMENT SURVEY STATEMENTI, JASON R. NEIL, HEREBY CERTIFY TO NICK CHERNEY, HIS ATTORNEYS, SUCCESSORS ANDASSIGNS AND TO LAND TITLE GUARANTEE COMPANY, THAT I AM A PROFESSIONAL LANDSURVEYOR LICENSED UNDER THE LAWS OF THE STATE OF COLORADO; THAT THISIMPROVEMENT SURVEY PLAT IS TRUE, CORRECT AND COMPLETE BASED ON MY KNOWLEDGE,INFORMATION AND BELIEF AS LAID OUT AND SHOWN HEREON; THAT THIS IMPROVEMENTSURVEY PLAT IS NOT A GUARANTY OR WARRANTY, EITHER EXPRESSED OR IMPLIED, THATTHIS IMPROVEMENT SURVEY PLAT WAS MADE BY ME FROM AN ACCURATE SURVEY OF THEREAL PROPERTY PERFORMED BY ME OR UNDER MY DIRECT SUPERVISION ON MAY 10, 2017,MAY 09, SEPTEMBER 10, DECEMBER 10, 2018, FEBRUARY 18, MARCH 20, AND MAY 20, 2020; THAT,IN THE PREPARATION OF THIS IMPROVEMENT SURVEY PLAT, I RELIED UPON LAND TITLEGUARANTEE COMPANY, ORDER NO. BAR64001423, DATED EFFECTIVE APRIL 20, 2017; THAT THELOCATION AND DIMENSIONS OF ALL BUILDINGS, IMPROVEMENTS, EASEMENTS, RIGHTS OFWAY IN EVIDENCE OR KNOWN TO ME AND ENCROACHMENTS BY OR ON THE REAL PROPERTYAND MATTERS REFERENCED IN SAID TITLE COMMITMENT CAPABLE OF BEING SHOWN AREACCURATELY SHOWN, AND THAT THIS PLAT IS IN ACCORDANCE OF AN IMPROVEMENTSURVEY PLAT AS SET FORTH IN C.R.S. §38-51-102(9). DATED: MAY 28, 2020 BY:___________________________________ JASON R. NEIL, P.L.S. NO. 37935 FOR AND ON BEHALF OF PEAK SURVEYING, INC.
CHERNEY, NICK
900 VALLEY RD
CARBONDALE, CO 81623-9755
Account: R027431
Tax Area: 007 - EL JEBEL (AREA) -
007
Acres: 4.570
Parcel: 2391-334-02-001
Situs Address:
000900 VALLEY RD
EL JEBEL AREA, 0
Value Summary
Value By:Market Override
Land (1)$424,500 N/A
Single Family
Residence (1)
$1,504,900 N/A
Total $1,929,400 $1,929,400
Legal Description
Subdivision: GABOSSI SUBDIVISION Lot: 1
BK-0318 PG-0310
BK-0533 PG-0274 SWD 06-29-90
BK-0533 PG-0273 QCD 06-29-90
BK-0728 PG-0776 QCD 05-12-97
BK-0737 PG-0324 EAS 09-16-97
R668406 DEC 09-04-98
R852178 QCD 09-18-03
Sale Data
Doc. #Sale Date Deed Type Validity Verified Sale Price Ratio Adj. Price Ratio Time Adj.
Price
Ratio
201710207 05/30/2017 WD QV Y $2,235,000 86.33 $2,235,000 86.33 $2,235,000 86.33
852177 09/26/2003 WD QV Y $1,450,000 133.06 $1,450,000 133.06 $1,450,000 133.06
B: 000728 P:
000775
05/12/1997 WD QV Y $325,000 130.62 $325,000 130.62 $325,000 130.62
Land Occurrence 1
Abstract Code 1112 - SINGLE FAM.RES.-LAND Percentage 100.0
Use Code 1000 - RESIDENTIAL Neighborhood 1044 - BASALT
Land Code 6581 - NEW BASALT Super Neighborhood 900 - BASALT / EL JEBEL AREA
Size 4.57 Location Adjustment 150
SubArea ACTUAL EFFECTIVE HEATED FOOTPRINT
Land L 1
Total 1.00
Value Rate Rate Rate Rate
Property Record Card
Eagle County
A#: R027431 P#: 239133402001 As of: 05/18/2020 Page 1 of 3
Land Occurrence 1
$424,500 424,500.00
Single Family Residence Occurrence 1
Abstract Code 1212 - SINGLE FAM.RES-
IMPROVEMTS
Percentage 100.0
Use Code 1000 - RESIDENTIAL Neighborhood 1044 - BASALT
Building Type 121200 - SFR Arch Style 3 - 2 STORY
Exterior Wall 6 - BD/BATTEN Percentage 100.0
Roof Cover 6 - ASP SHINGL Roof Structure 8 - IRREGULAR
Interior Wall 8 - DECORATIVE
5 - DRYWALL
Percentage 50.0
50.0
Floor 23 - CERAMIC TL
14 - CARPET INV
Percentage 25.0
75.0
Heating Fuel 3 - GAS Heating Type 8 - RAD WATER
Air Conditioning 1 - NONE Actual Year Built 1997
Bedrooms 4 Bathrooms 4.5
Construction Quality 9 - GOOD PLUS Effective Year Built 2010
Fixtures 18 Rooms 10
Units 1 Units 1
Super Neighborhood 900 - BASALT / EL JEBEL AREA Stories 2 - STORIES 2.0
Use Code 1000 - RESIDENTIAL Garage 4 - GARAGE 1101-1250
SubArea ACTUAL EFFECTIVE HEATED FOOTPRINT
AOF 504 504 504 504
BAS 1993 1993 1993 1993
FOP 370 111 370
FUS 1039 1039 1039 1039
GAF 1178 1178
PTO 457 46 457
Total 5,541.00 3,693.00 3,536.00 5,541.00
Value Rate Rate Rate Rate
$1,504,900 271.59 407.50 425.59 271.59
Property Record Card
Eagle County
A#: R027431 P#: 239133402001 As of: 05/18/2020 Page 2 of 3
Single Family Residence Occurrence 1
Sketch by Apex Medina™
30.0'14.0'3.0'7.5'4.5'7.0'19.0'8.0'11.0'46.0'30.0'13.7'BAS
1992.9 sf 20.0'11.0'20.0'PTO
220.0 sf
15.0'10.0'2
3
.
6
'9.9'PTO
237.6 sf
28.0'28.5'29.5'7.0'4.5'7.5'3.0'14.0'GAF
786.0 sf
24.5'21.0'28.0'6.0'3.5'15.0'FUS
535.5 sf28.0'18.0'28.0'18.0'
AOF
504.0 sf
28.0'14.0'28.0'14.0'
GAF
392.0 sf5.0'23.0'38.0'23.0'5.0'FOP
370.0 sf
28.0'18.0'28.0'18.0'
FUS
504.0 sf
Abstract Summary
Code Classification Actual Value Taxable
Value
Actual
Override
Taxable
Override
1112 SINGLE FAM.RES.-LAND $424,500 $30,350 NA NA
1212 SINGLE FAM.RES-IMPROVEMTS $1,504,900 $107,600 NA NA
Total $1,929,400 $137,950 NA NA
Property Record Card
Eagle County
A#: R027431 P#: 239133402001 As of: 05/18/2020 Page 3 of 3
Claire Lewandowski <claire.lewandowski@eaglecounty.us>
900 Valley Road / Cherney Residence
10 messages
Carla Ostberg <carla.ostberg@gmail.com>Wed, Mar 24, 2021 at 4:20 PM
To: Claire Lewandowski <claire.lewandowski@eaglecounty.us>, Danielle Sell <danielle.sell@eaglecounty.us>, Geoff Stangl <geoff@stanglbuilders.com>,
jay@birdhouse-designs.com
Hi Everyone,
They are getting ready to install this system.
Originally we were going to use the existing system to serve the ADU, but plans changed and we decided to combine houses on one new system.
The existing septic tank is approximately 3-feet from the new house foundation. This site has some challenges in that we have to maintain a high enough
elevation of the septic tank to achieve fall for the sewer line to cross over the culvert that encases the ditch under the driveway. We also have to maintain 50-feet
from the ditch to the septic tank, which pushes us pretty close to the house and there are several mature trees that we want to save, so we don't have many
alternatives for a new area for the septic tank.
The contractor is thinking the tank should stay in the same approximate location, which prompted the question of whether or not we could continue to use the
existing septic tank. I did an inspection of the system several years ago. The tank appears to be in good shape and is 1500 gallons (same size as the proposed
septic tank). Wondering if we can encroach slightly on the min. 5' separation between the new foundation and the septic tank. The foundation has already been
poured, so we can show proper backfill between the foundation and existing tank if you wanted us to take some pictures.
Let us know and feel free to call with additional questions.
Thank you!
Carla Ostberg
CBO Septic Consulting
970.309.5259
Office
981 Cowen Drive, B-7
Carbondale, CO 81623
Mailing
33 Four Wheel Drive Road
Carbondale, CO 81623
3 attachments
C1442 OWTS Design Packet 11 20 20.pdf
4389K
900 Valley Road OWTS Inspection Packet.pdf
14046K
invoice_1924_from_Altitude_Septic.pdf
23K
Claire Lewandowski <claire.lewandowski@eaglecounty.us>Thu, Mar 25, 2021 at 5:12 PM
To: Carla Ostberg <carla.ostberg@gmail.com>
Cc: Danielle Sell <danielle.sell@eaglecounty.us>, Geoff Stangl <geoff@stanglbuilders.com>, jay@birdhouse-designs.com
Hi Carla and Geoff,
I spoke with Geoff about this a few minutes ago. I think that is okay, especially since it is existing, and in good condition, the additional 2' would be a burden and
have little to no benefit.
We will get this in our queue for review.
Thanks!
[Quoted text hidden]
--
Claire Lewandowski, REHS
Environmental Health Specialist III
970-328-8755 (office)
970-328-8747 (direct)
environment@eaglecounty.us
www.eaglecounty.us
For current information on COVID19 in Eagle County, please visit http://eaglecountycovid.org/
or call 970-328-9750
Carla Ostberg <carla.ostberg@gmail.com>Fri, Mar 26, 2021 at 9:25 AM
To: Claire Lewandowski <claire.lewandowski@eaglecounty.us>
Cc: Danielle Sell <danielle.sell@eaglecounty.us>, Geoff Stangl <geoff@stanglbuilders.com>, jay@birdhouse-designs.com
Thanks Claire!
Carla Ostberg
CBO Septic Consulting
970.309.5259
Office
981 Cowen Drive, B-7
Carbondale, CO 81623
Mailing
33 Four Wheel Drive Road
Carbondale, CO 81623
[Quoted text hidden]
Geoff Stangl <geoff@stanglbuilders.com>Tue, Mar 30, 2021 at 4:36 PM
To: Carla Ostberg <carla.ostberg@gmail.com>, Claire Lewandowski <claire.lewandowski@eaglecounty.us>, Danielle Sell <danielle.sell@eaglecounty.us>,
jay@birdhouse-designs.com
Cc: Kendra Stangl <kendra@stanglbuilders.com>
Hey Claire,
Hope all is great. Just wanted to follow up on approval to use the exisng sepc tank at this project, for our records. Also, opons for masonry wood burning
fireplaces that meet Eagle County regs. Thanks much!
[Quoted text hidden]
Virus-free. www.avg.com
Claire Lewandowski <claire.lewandowski@eaglecounty.us>Tue, Mar 30, 2021 at 5:03 PM
To: Geoff Stangl <geoff@stanglbuilders.com>
Cc: Carla Ostberg <carla.ostberg@gmail.com>, Danielle Sell <danielle.sell@eaglecounty.us>, jay@birdhouse-designs.com, Kendra Stangl
<kendra@stanglbuilders.com>
You got it. I will get to this review shortly
Thank you,
Claire
Claire Lewandowski, REHS
Environmental Health Specialist III
Eagle County Public Health & Environment
970-328-8747
[Quoted text hidden]
2 attachments
image001.jpg
8K
image001.jpg
8K
Claire Lewandowski <claire.lewandowski@eaglecounty.us>Mon, Apr 5, 2021 at 9:50 AM
To: Geoff Stangl <geoff@stanglbuilders.com>
Cc: Carla Ostberg <carla.ostberg@gmail.com>, Danielle Sell <danielle.sell@eaglecounty.us>, jay@birdhouse-designs.com, Kendra Stangl
<kendra@stanglbuilders.com>
Geoff and Carla,
Was the $800 permit fee mailed? Because this is a new design and a new permit, a new permit fee and application must be sent.
Let me know if it already was or if you have any questions.
Thank you!
[Quoted text hidden]
--
Claire Lewandowski, REHS
Environmental Health Specialist III
[Quoted text hidden]
Carla Ostberg <carla.ostberg@gmail.com>Mon, Apr 5, 2021 at 9:51 AM
To: Claire Lewandowski <claire.lewandowski@eaglecounty.us>
Cc: Geoff Stangl <geoff@stanglbuilders.com>, Danielle Sell <danielle.sell@eaglecounty.us>, Jay Engstrom <jay@birdhouse-designs.com>, Kendra Stangl
<kendra@stanglbuilders.com>
I haven't been a part of permitting, so I don't know the history. I know we re-designed a couple times.
Carla Ostberg
CBO Septic Consulting
970.309.5259
Office
981 Cowen Drive, B-7
Carbondale, CO 81623
Mailing
33 Four Wheel Drive Road
Carbondale, CO 81623
[Quoted text hidden]
Claire Lewandowski <claire.lewandowski@eaglecounty.us>Fri, Apr 9, 2021 at 2:40 PM
To: Carla Ostberg <carla.ostberg@gmail.com>, nick@cherney.com, jay@birdhouse-designs.com, Geoff Stangl <geoff@stanglbuilders.com>
Cc: Danielle Sell <danielle.sell@eaglecounty.us>
Good afternoon,
Please see the attached invoice, application, and application instructions. I cannot begin the review of the septic design until the application and $800 permit fee
has been received.
Also, please secure permission to cross the utility easement belonging to the gas company and provide us with that letter, needed prior to us issuing the permit.
Thank you,
Claire
On Wed, Mar 24, 2021 at 4:20 PM Carla Ostberg <carla.ostberg@gmail.com> wrote:
[Quoted text hidden]
[Quoted text hidden]
3 attachments
2020 OWTS Permit Instructions.pdf
71K
2021 OWTS Permit Application_fillable.pdf
473K
CA_Invoice_Eagle-4-9-2021 2.33.11 PM.pdf
58K
Geoff Stangl <geoff@stanglbuilders.com>Fri, Apr 9, 2021 at 3:18 PM
To: Claire Lewandowski <claire.lewandowski@eaglecounty.us>, Carla Ostberg <carla.ostberg@gmail.com>, nick@cherney.com, jay@birdhouse-designs.com
Cc: Danielle Sell <danielle.sell@eaglecounty.us>
Hi Claire,
Your office has already reviewed and approved the proposed new OWTS at 900 Valley Rd. Permit# OWTS-020231-2020 was issued on 12/9/2020. I show that
Stangl & Son Builders issued check# 4524 on 11/30/2020 for the review and permit fee of $800. We have one minor change, keeping the exisng sepc tank
in line with the new system, as opposed to digging it up and swapping it out with a new one. Carla outlines that below. You and I discussed this back on March
25th on the phone.
I have forwarded this email to Roy Watkins with Black Hills Energy High Pressure Div. He has been onsite for preconstrucon locates and consultaon. He will
be onsite at the me we dig and cross over the gas easement. Roy will send your request for a leer of sign off to his manager. Hope to have that for you early
next week.
Thanks much,
[Quoted text hidden]
Virus-free. www.avg.com
Claire Lewandowski <claire.lewandowski@eaglecounty.us>Fri, Apr 9, 2021 at 3:27 PM
To: Geoff Stangl <geoff@stanglbuilders.com>
Cc: Carla Ostberg <carla.ostberg@gmail.com>, nick@cherney.com, jay@birdhouse-designs.com, Danielle Sell <danielle.sell@eaglecounty.us>
Thank you, Geoff for the clarification. I thought the change was relative to the new design and not the previous, but now I see that is the only change here. I will not
need a new application nor fee. I will look for the easement crossing approval next week. Thank you!