HomeMy WebLinkAbout872 Webb Peak - 210720102005Environmental Health Department P.O. Box 179 500 Broadway Eagle, CO 81631-0179 Phone: (970) 328-8730 Fax: (970) 328-7185 Permit Permit No. OWTS-019498-2020 Permit Type: OWTS Permit Work Classification: New Permit Status: Active Issue Date: 9/8/2020 Expires: 1/9/2023 On-Site Wastewater Treatement System Project Address Parcel Number 872 WEBB PEAK, EDWARDS AREA,210720102005 Owner Information Address Mark Cline 447 County Road 2131 Nagogdoches, TX 75965 Phone: (936) 615-9267 Cell: Email: clinedoc1@yahoo.com Inspections: For Inspections Call: (970) 328-8755 Engineer Phone Email KUMAR & ASSOCIATES, Dave Young (970) 945-7988 dyoung@kumarusa.com Contractor License Number Phone Email Ewing Trucking & Construction LLC bart@ewingtrucking.com(970) 390-3708OWTSPL-000178-20 22 Permitted Construction / Details: Install the OWTS exactly as depicted in the Kumar & Associates, Inc design, stamped signed and dated August 25, 2020 by David A Young, PE. The system is designed to serve an eight-bedroom single family residence. The OWTS consists of a 2,500 gallon two-compartment Valley Precast septic tank followed by a 2,000 gallon Valley Precast 3-compartment recirculating/dose tank which will send wastewater to the, Advantex AX-40 series pods for nitrification using an Orenco submersible effluent pump within a Biotube Vault. Nitrified effluent flows to the splitter valve (mode 3B) for recirculation for denitrification then is dosed using an Orenco PF3005 pump to a mounded sand filter soil treatment area (STA). The STA consists of a distribution bed arranged with of four rows of 16 Infiltrator Quick 4 Plus Standard chambers for a total of 64 chambers, set on atop 1.5 feet of secondary sand media that is a basal area 64 feet long by 46 feet wide. Distribution lateral details, along with orifice size, spacing and orientation are on the design drawing. The contractor must verify that all electrical components and inspections are covered under the electrical permit associated with the Orenco Vericom control panel (Model VCOM-AX20B2) and pump connections. The alarm must be connected to a separate circuit. Additional pump details are on the design drawing. Advantex systems must conform to the CDPHE technology approval letter dated May 1, 2018. Note: Gradation of the sand media use must be completed within one month prior to the installation and confirmed with the design engineer. If the sand does not conform to secondary or preferred sand media requirements, it cannot be used for the sand treatment media. Contact Eagle County Environmental Health and the design engineer well in advance of requesting inspections prior to backfilling any component of the OWTS. The design engineer is responsible for conducting all inspections necessary to certify the installation and assure the functionality of the system. System certification, along with photos and a record drawing is required to be submitted to and approved by Eagle County Environmental Health prior to the use of the system or occupancy of the dwelling. Thursday, September 22, 2022 1 THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT Issued by: Environmental Health Department, Eagle County, CO Claire Lewandowski Date September 08, 2020 CONDITIONS 1. 2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED 3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED Thursday, September 22, 2022 2 Inspection Result Eagle County, Colorado P.O. Box 179 500 Broadway Eagle, CO Phone: (970) 328-8730 Fax: (970) 328-7185 IVR Phone: 1-866-701-3307 Inspection Number: EDWARDS AREA - 872 WEBB PEAK - 521797 Permit Number: OWTS-019498-2020 Inspection Date: 04/28/2023 Inspector: Permit Type: OWTS Permit Inspection Type: OWTS Final Inspection Work Classification: NewOwner:Mark Cline Job Address:872 WEBB PEAK IVR Pin Number:191105 EDWARDS AREA, CO Project:<NONE> Parcel Number:210720102005 Contractor:Phone: (970) 926-2770 / Cell: (970) 390-3708Ewing Trucking & Construction LLC Inspection Status: Approved Inspection Notes Inspector Comments Added Item: Septic Tank A 2,500 gallon two-compartment Valley Precast septic tank followed by a 2,000 gallon Valley Precast 3-compartment recirculating/dose tank which will send wastewater to the, Advantex AX-40 series pods for nitrification using an Orenco submersible effluent pump within a Biotube Vault was installed. Added Item: Record Drawing Received 4/27/2023 from K&A. Added Item: Record Photos Received 4/27/2023 from K&A. Added Item: Site and Soil Received 9/2/2020. Added Item: Higher Level Treatment System O&M Contract received 4/28/2023. Added Item: Final Certification Letter Received 4/27/2023 from K&A. Added Item: General Plan Received 9/2/2020. Added Item: Soil Treatment Area (STA) Friday, April 28, 2023 For more information visit: http://www.eaglecounty.us Page 1 of 2 The STA consists of a distribution bed arranged with of four rows of 16 Infiltrator Quick 4 Plus Standard chambers for a total of 64 chambers, set on atop 1.5 feet of secondary sand media that is a basal area 64 feet long by 46 feet wide. Added Item: Identification of Systems Contractor Ewing Trucking & Construction was the licensed installer. Friday, April 28, 2023 For more information visit: http://www.eaglecounty.us Page 2 of 2 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado April 27, 2023 WT Construction Attn: Derrick Gerhardt P.O. Box 5127 Edwards, Colorado 81632 dgerhardt@resortconceptsco.com Project No. 20-7-104.02 Permit No. OWTS-019498-2020 Subject: Certification of Onsite Wastewater Treatment System, Proposed Cline Residence, Lot 9, Block 1, Filing 35, Cordillera, 872 Webb Peak, Eagle County, Colorado Dear Derrick: A representative of Kumar & Associates observed the installation of the Onsite Wastewater Treatment System (OWTS) for the residence at the subject site as required by the Eagle County Environmental Health Department. Our observations and recommendations are presented in this report. The services are supplemental to Kumar & Associates agreement for professional services to WT Construction dated February 5, 2020. We previously designed the OWTS for the residence as submitted in our report dated August 25, 2020, Project No. 20-7-104.02. The system was designed for eight bedrooms. The OWTS was installed by Ewing Trucking and Construction under Permit No. OWTS-019498-2020. We performed our as-built evaluations on September 29 and October 10, 2022 and April 12, 2023. The OWTS components observed included: sewer line, cleanout, septic tank, effluent line, pump, Advantex treatment system, control panel and soil treatment area (STA) and the locations of these components. The installation and locations of the system components were verified as shown on Figure 1. Pictures of the OWTS components made during the site visits are included with this report. The distance locations to the septic tank shown on Figure 1 were made by taping. On September 29, 2022, a sample of the secondary sand media was obtained and the results of gradation analysis test are attached. On April 12, 2023, after power had been supplied to the pump, a pump performance test was performed with adequate pump pressure observed. It is our opinion that the OWTS was installed in general conformance with the above referenced design. The observations and recommendations presented above are based on our site observations and our experience in the area. We make no warranty either express or implied. Alterations to the system or improper backfill and site grading could affect the operation and effectiveness of the OWTS. 28.5'40' Kumar & Associates GRADATION ANALYSIS TEST LABORATORY TEST REPORT DATA Laboratory Client: Location / Plant: Sample / Product: Sample Date: Lab Test Date: Job Number: SIEVE SIEVE OPENING IN MILLIMETERS PERCENT PASSING THRU SIEVE 3"75 100.0 1.5 37.5 100.0 3/4"19 100.0 3/8"9.5 100.0 No. 4 4.75 100.0 No. 8 2.36 90.0 No. 16 1.18 72.0 No. 30 0.6 46.0 No. 50 0.3 19.0 No. 100 0.15 4.0 No. 200 0.075 1.6 GRADATION RESULTS COMPARED TO PREFERRED AND SECONDARY SAND FILTER SPECIFICATIONS Value Units Preferred Sand Value Pass / Fail Preferred Sand Secondary Sand Value Pass / Fail Secondary Sand 0.91 millimeters 0.210 millimeters 0.25 to 0.60 FAIL 0.15 to 0.60 PASS 4.34 unitless ratio < or = 4.0 FAIL < or = 7.0 PASS 1.6 millimeters < or = 3 PASS < or = 3 PASS Effective Size - D10 - Diameter that 10 percent of the sample is finer than. Kumar GWS WT Construction United Sand Filter 09/29/2022 Uniformity Coefficient (D60 / D10) Percent passing thru #200 Sieve 09/29/2022 20-7-104.02 Parameter D60 - Diameter that 60 percent of the sample is finer than. 0 10 20 30 40 50 60 70 80 90 100 0.01 0.1 1 10 100Percent Passing SieveDiameter of Particle in Millimeters Plot of Gradation Analysis 3"1.5"3/4"3/8"#4#8#30#50#100#200 #16 OWTS PHOTOGRAPH LOG PROPOSED CLINE RESIDENCE LOT 9, BLOCK 1, FILING 35, CORDILLERA 872 WEBB PEAK EAGLE COUNTY, COLORADO Project No. 20-7-104.02 Photograph 1: Sewer line exiting residence and cleanout. Photograph 2: Valley Precast 2,500-gallon, 2-chamber septic tank (far) and 2,000-gallon, 3- chamber septic tank (near). OWTS PHOTOGRAPH LOG PROPOSED CLINE RESIDENCE LOT 9, BLOCK 1, FILING 35, CORDILLERA 872 WEBB PEAK EAGLE COUNTY, COLORADO Project No. 20-7-104.02 Photograph 3: Pump installed in the third chamber of the second septic tank. Photograph 4: 1.5” Schedule 40 effluent transport line exiting septic tank to soil treatment area (STA). OWTS PHOTOGRAPH LOG PROPOSED CLINE RESIDENCE LOT 9, BLOCK 1, FILING 35, CORDILLERA 872 WEBB PEAK EAGLE COUNTY, COLORADO Project No. 20-7-104.02 Photograph 5: Advantex AX-40 advanced treatment system. Photograph 6: Soil treatment area (STA). OWTS PHOTOGRAPH LOG PROPOSED CLINE RESIDENCE LOT 9, BLOCK 1, FILING 35, CORDILLERA 872 WEBB PEAK EAGLE COUNTY, COLORADO Project No. 20-7-104.02 Photograph 7: Control panel. 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado ONSITE WASTEWATER TREATMENT SYSTEM DESIGN PROPOSED CLINE RESIDENCE LOT 9, BLOCK 1, FILING 35, CORDILLERA 872 WEBB PEAK EAGLE COUNTY, COLORADO PROJECT NO. 20-7-104.02 AUGUST 25, 2020 PREPARED FOR: WT CONSTRUCTION ATTN: RICK HERMES P. O. BOX 5127 EDWARDS, COLORADO 81632 (rhermes@resortconceptsco.com) Kumar & Associates, Inc. Project No. 20-7-104.02 TABLE OF CONTENTS INTRODUCTION ...................................................................................................................... - 1 - PROPOSED CONSTRUCTION ................................................................................................ - 1 - SITE CONDITIONS ................................................................................................................... - 1 - SUBSURFACE CONDITIONS ................................................................................................. - 1 - OWTS ANALYSIS .................................................................................................................... - 2 - DESIGN RECOMMENDATIONS ............................................................................................ - 3 - SOIL TREATMENT AREA................................................................................................... - 3 - OWTS COMPONENTS ......................................................................................................... - 5 - OWTS OPERATION AND MAINTENANCE.......................................................................... - 8 - OWTS HOUSEHOLD OPERATION .................................................................................... - 8 - OWTS MAINTENANCE ....................................................................................................... - 9 - OWTS CONSTRUCTION OBSERVATION ............................................................................ - 9 - LIMITATIONS ........................................................................................................................... - 9 - FIGURES FIGURE 1 – OWTS SITE PLAN FIGURE 2 – USDA GRADATION TEST RESULTS FIGURE 3 – SOIL TREATMENT AREA CALCULATIONS FIGURE 4 – SOIL TREATMENT AREA PLAN VIEW FIGURE 5 – SOIL TREATMENT ARE CROSS SECTION FIGURE 6 – DISTRIBUTION LINE CLEANOUT DETAIL ATTACHMENTS VALLEY PRECAST 2,500 GALLON, THREE-CHAMBER SEPTIC TANK DETAIL VALLEY PRECAST ADVANTEX TREATMENT SYSTEM AX40 DETAIL ORENCO PF3005 PUMP PERFORMANCE CURVE Kumar & Associates, Inc. Project No. 20-7-104.02 INTRODUCTION This report provides the results of an onsite wastewater treatment system (OWTS) design for the proposed Cline residence to be located on Lot 9, Block 1, Filing 35, Cordillera, 872 Webb Peak, Eagle County, Colorado. The purpose of this report was to provide design details for the OWTS in accordance with the 2018 Eagle County Onsite Wastewater Treatment System Regulations and the Colorado Department of Public Health and Environment’s Regulation #43. The design was performed as supplemental services to our proposal to WT Construction dated December 12, 2019. We previously performed a subsoil study for foundation design of the residence and submitted our findings in a report dated February 5, 2020, Project No. 20-7-104. PROPOSED CONSTRUCTION The residence will be an eight-bedroom, two-story single-family structure with an attached garage and partial basement located on the lot as shown on Figure 1. Finished floor elevations for the main level and partial basement will be approximately 9122.64 feet and 9110.52 feet, respectively. The proposed OWTS soil treatment area (STA) is planned to be located to the west of the residence. Water service will be provided to the residence by the public water supply from Webb Peak to the north of the residence. The location of the proposed water service line does not appear to encroach on the OWTS. If proposed construction is different than that described, we should be contacted to re-evaluate our design recommendations. SITE CONDITIONS The lot was vacant and covered with about 2 to 3 feet of snow at the time of field exploration in January 2020. The ground surface is relatively flat with a gentle slope down to the northwest. There is about 5 feet of elevation difference across the proposed building footprint. Vegetation consists of grass, weeds, and sagebrush, with aspens in the east corner of the building envelope. A two-story single-family residence is located to the southwest and Webb Peak roadway to the northwest of the lot with vacant land to the northeast, east and south. No surface water features were observed in the near vicinity of the lot. We are not aware of any nearby water wells. SUBSURFACE CONDITIONS The field exploration for the OWTS was conducted on January 23, 2020. Two profile pits (Profile Pits 1 and 2) were excavated with a backhoe at the approximate locations shown on Figure 1 to evaluate the subsurface conditions at the planned soil treatment area (STA) for the - 2 - Kumar & Associates, Inc. Project No. 20-7-104.02 OWTS. The pits were logged by a representative of Kumar & Associates. Logs of the profile pits are provided below. Log of Profile Pit 1 Depth USDA Classification 0-2’ TOPSOIL; organic clay loam, moderately blocky, very stiff, slightly moist, dark brown. 2’-8’ GRAVELLY CLAY; strong blocky structure, very stiff, moist, brown. • Disturbed bulk sample taken from 4 to 5 feet. • Bottom of pit @ 8 feet. • No free water or redoximorphic features observed at time of pit excavation. Log of Profile Pit 2 Depth USDA Classification 0-2½’ TOPSOIL; organic loam, moderately blocky, medium stiff, slightly moist, dark brown. 2½’-4½’ CLAY; strong blocky structure, very stiff, moist, brown. 4½’-8’ GRAVELLY CLAY; strong blocky structure, very stiff, moist, brown. • Disturbed bulk sample taken from 3 to 4 feet • Bottom of pit @ 8 feet. • No free water or redoximorphic features observed at time of pit excavation. The soils encountered in the profile pits, below about 2 to 2½ feet of organic topsoil, consisted of nil to about 2 feet of Clay overlying Gravelly Clay that extended down to the pit depths of 8 feet. Hydrometer and gradation analyses were performed on a disturbed bulk sample of the soils from Profile Pit 1 from 4 to 5 feet depth with the results provided on Figure 2. The tested sample (minus No. 10 size sieve fraction) classified as Sandy Clay Loam per the USDA system. No free water was encountered in the pits nor indications of seasonal high groundwater were observed at the time of the pit excavations. Based on the subsurface conditions, our experience in the area, and the laboratory test results, the soils at the STA have been classified as Type 4 per State regulations, which equates to a long- term acceptance rate (LTAR) of 0.20 gallons per square foot per day for the Clay soils. OWTS ANALYSIS Based on the site conditions, the profile pit evaluations and our experience in the area, the clay soils are expansive and tend to swell when wetted. Based on these considerations, we recommend a mounded sand wastewater treatment system for proper treatment of the wastewater effluent. - 3 - Kumar & Associates, Inc. Project No. 20-7-104.02 The system will consist of Infiltrator chambers in a bed configuration overlying a sand filter. The STA will be sized eight bedrooms (11 persons) using an LTAR of 0.8 gallons per square foot per day for imported “secondary sand media”. The STA basal area of the sand will be sized for Soil Type 4 with an LTAR of 0.20 gallons per square foot per day. Due to the soil conditions and size of the system needed, we recommend an AdvanTex advanced treatment system be included with the OWTS. The sewage will gravity flow from the residence to the septic tank for primary treatment and then to an advanced treatment system and then be pressured-dosed on a regular basis to the STA for dispersal and final treatment. Pressure dosing is necessary for the sand treatment system. Any basement area facilities wastewater will need to be pumped to the septic tank and should be designed by the plumber. The minimum setback of 10 feet is required from the property lines and the garage area of the residence without crawlspace to the STA. Based on site measurements, the STA is near to these minimum setbacks and its location should be confirmed prior to construction to verify adequate setback. These setbacks assume a perimeter foundation drain for the adjacent garage area will not be installed which we understand will be done. DESIGN RECOMMENDATIONS The design recommendations presented below are based on the proposed construction, the site and subsurface conditions encountered, and our experience in the area. A layout of the proposed OWTS components is provided on Figure 1. If conditions encountered during construction are different than those that are described in this report, please contact us to re-evaluate our design recommendations. SOIL TREATMENT AREA • The STA will consist of 4 rows of 16 Infiltrator Quick 4 Plus Standard chambers in a bed configuration placed on 1½ feet of imported secondary sand media. The sand media will be placed on the scarified native soil. A pressure distribution system will be used to disperse the effluent to the chambers on a regular basis. • The distribution cell was sized based on an LTAR of 0.80 gallons per square foot per day for secondary sand media. The basal area was sized based on an LTAR of 0.20 gallons per square foot per day for Soil Type 4 for the natural clay soils. • A 30% reduction of the STA size was applied for use of Infiltrator chambers. The proposed distribution cell will be 12 feet wide by 64 feet long (768 square feet). • The minimum basal area of the mound is 64 feet long by 46 feet wide (2944 square feet). - 4 - Kumar & Associates, Inc. Project No. 20-7-104.02 • Soil treatment area calculations are shown on Figure 3. • The ground surface in the area of the STA to be graded relatively flat prior to construction of the STA. • Vegetation should be removed and the ground surface scarified to at least 8 inches depth prior to the sand placement. Care should be taken not to compact the scarified subgrade prior to or during the sand placement. • Distribution lines, consisting of 1.5-inch diameter, Schedule 40 piping, with ⅛-inch diameter orifice holes drilled at 4-foot centers near the center of the Infiltrators, should be installed along the complete length of the chambers, see Figure 4. The distribution lines should be suspended approximately 2 inches from the top surface of the chambers by pipe ties. The orifice holes should face up toward the chamber surface above. • An ⅛-inch hole should be drilled on the bottom of each end of the distribution pipe to allow for complete drainage of the distribution line following pressure dosing. Install splash plates below drain holes. • The sand bed should be oriented along ground contours to minimize soil cover. • Sand filter material should extend one foot horizontally from the perimeter of the chamber bed and then be sloped at 3 horizontal to 1 vertical maximum in all directions. • The sand filter media should meet the requirements of the current Eagle County OWTS Regulations for “secondary sand media”. ASTM C33 concrete sand is suitable for the filter media. A sample of the sand filter media should be obtained within one month prior to installation of the system for gradation analyses testing by us or the gradation test results of the sand provided to us for approval. • The sand filter material shall be placed in lifts not exceeding 10 inches thick. Each lift shall be track or bucket compacted until settlement ceases. • A minimum of 10 inches and a maximum of 24 inches of cover soil should be placed over the chambers and sand filter. • Backfill should be graded to deflect surface water away from the STA and should be sloped at 3 horizontal to 1 vertical or flatter. This may require a swale along the up-slope side of the STA. • Disturbed soil should be re-vegetated as soon as possible with a native grass mix. No trees, shrubs or other plants with deep roots should be planted on or near the STA as this may damage the system piping. • Four-inch diameter inspection ports should be installed vertically into the knockouts provided in the Infiltrator end caps. Install ports at each corner of the bed. The inspection port piping should be screwed into the top to the chambers and should not extend down to the ground surface inside the chambers. The inspection ports should - 5 - Kumar & Associates, Inc. Project No. 20-7-104.02 extend at least 8 inches above the finished ground surface or be protected in a valve box at finished grade. • A 10 feet setback is required from the STA to the property lines. • A 10 feet setback is required from the STA to the garage area of the residence. • A 20 feet setback is required from the STA to any areas of the residence with a basement, crawlspace or foundation drains. • A plan view of the STA is presented on Figure 4 and a cross section of the STA is presented on Figure 5. • Cleanouts are required at the end of the distribution line. See Figure 6 for the cleanout detail. OWTS COMPONENTS Recommended OWTS components provided below are based on our design details and our experience with the specific component manufacturers. Equivalent components may be feasible but need to be approved by us prior to construction. Septic Tank • A 2,500 gallon, two-chamber septic tank from Valley Precast will be used for primary treatment. A detail of the tank is provided as an attachment to the report. • A submersible effluent pump enclosed in a Biotube Pump Vault will be installed in the dosing tank. • The tank must be a minimum of five feet from the residence and from the STA. The tanks must be a minimum of 10 feet from any potable water supply lines. • The tank must be set level. The excavation bottom must be free of large rocks or other objects that could damage the tank during placement. A road base or gravel bedding material may be needed to prevent tank damage during placement and act as a leveling course. • The tank lids must extend to final surface grade and made to be easily located. • Install the tank with 2 feet minimum cover soil for frost protection. Maximum tank soil cover is 4 feet. Advanced Treatment • A 2,000 gallon, three-chamber septic tank with an AdvanTex AX40 treatment system will be used for advanced treatment. A detail of the tank and system is provided as an attachment to the report. • The system should be set up in Mode 3B for recirculation. • A submersible effluent pump enclosed in a Biotube Pump Vault will be installed in the second third chambers of the tank. The pump in the second chamber will recirculate - 6 - Kumar & Associates, Inc. Project No. 20-7-104.02 effluent through the Advantex AX40 system. The pump in the third chamber will dose effluent to the STA. • The advanced treatment system to be installed by Valley Precast. • The tank must be a minimum of five feet from the residence and from the STA. The tanks must be a minimum of 10 feet from any potable water supply lines. • The tank must be set level. The excavation bottom must be free of large rocks or other objects that could damage the tank during placement. A road base or gravel bedding material may be needed to prevent tank damage during placement and act as a leveling course. • The tank lids must extend to final surface grade and made to be easily located. • Install the tank with 2 feet minimum cover soil for frost protection. Maximum tank soil cover is 4 feet. • The control panel should be attached to the exterior of the residence within line of site of the system. A communications line should be run to the control panel for remote monitoring. • Air vents must extend above expected peak snow level. Sewer Pipe • The sewer line to the septic tank should not be less than the diameter of the building drains and not less than 4 inches in diameter. • The sewer pipe should have a rating of SDR35 or stronger. • The sewer pipe should be sloped between 2% to 4% to help limit disturbance of solids in the tank and the potential for sewage bypass of the first chamber of the tank. If a steeper slope is needed, this can be accomplished with vertical step-downs in the sewer line. • A minimum 36 inches of cover soil should be provided over the sewer pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost and we recommend 48 inches of soil cover over the sewer pipe in these areas, and the pipe be insulated on top and sides with 2-inch-thick blue foam insulation board. If adequate soil cover is not possible, we should be contacted for re-evaluation prior to installation. • The sewer pipe should be bedded in compacted ¾ inch road base or native soils provided that the native soils contain no angular rocks or rocks larger than 2½ inches in diameter to help prevent settlement of the pipe. Sags in the pipe could cause standing effluent to freeze and damage the piping. • Install cleanout pipes within 5 feet of the building foundation, where the sewer pipes bend 90 degrees or more and at every 100 feet of sewer pipe. • All 90-degree bends should be installed using a 90-degree long-sweep or by using two 45-degree elbows. - 7 - Kumar & Associates, Inc. Project No. 20-7-104.02 • The sewer line location shown on Figure 1 is considered conceptual. We assume that there will be only one sewer line exiting the residence. It is the responsibility of the owner/contractors to locate all sewer line exit locations and connections to the septic tank. We should be notified if there are other sewer lines exiting the building. Effluent Transport Piping • The effluent transport pipe should be 1.5-inch diameter Schedule 40 piping sloped at a 2% minimum to drain back to the dose chamber from the STA. • The effluent transport pipe should be bedded in compacted ¾-inch road base or native soils provided that the native soils contain no angular rocks or rocks larger than 2½ inches in diameter to help prevent settlement of the pipe. Sags could cause standing effluent to freeze and damage to the piping. • A minimum 18 inches of cover soil should be provided over the effluent transport pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost. We recommend 48 inches of soil cover over the effluent pipe and insulation with at least 2 inches of rigid foam insulation in these areas. If adequate cover soil is not possible, we should re-evaluate the condition prior to installation. • The effluent pipe should be double encased with larger diameter Schedule 40 PVC pipe underneath driveway surfaces and be provided with at least 48 inches of soil cover and be insulated on top and sides with 2-inch-thick foam insulation board. • All 90-degree bends should be installed using a 90 degree long-sweep or by using two 45-degree elbows. Effluent Pumping System • An Orenco PF3005, 115-volt, submersible effluent pump with a 1.5-inch diameter discharge assembly, or equivalent, will be required for the effluent pumping. • The maximum effluent transport distance from the pump discharge to the STA estimated to be 25 feet. • The elevation difference from pump discharge to the STA is estimated to be about 3 feet. • The pump should be enclosed in an Orenco Biotube Pump Vault for effluent filtering and protection of the pump from vibration. • An equivalent pump must be capable of operating at 29.5 gallons per minute at 12.1 feet of total dynamic head. A pump performance curve is provided as an attachment to this report. • The floats should be set to provide a dose volume of approximately 126 gallons. The actual dose volume will be about 123 gallons assuming 3 gallons of drainback in the transport line. To achieve the desired dose volume, the upper (“ON”) and lower (“OFF”) floats should be set approximately 12½ inches apart. - 8 - Kumar & Associates, Inc. Project No. 20-7-104.02 • The flow differential between the first and last orifices is estimated to be 0.8%. • The high-water alarm float should be placed approximately 3 inches above the “ON” float in the dose tank. The high-water alarm must be wired on a separate electrical circuit from the pump. • An ⅛-inch diameter weep hole should be drilled in the effluent transport line prior to exiting the dose tank so the transport line can drain after each pumping cycle. OWTS OPERATION AND MAINTENANCE The OWTS will require periodic inspection and maintenance to function properly. A properly designed, installed and maintained system can greatly increase its lifespan. The level of maintenance will vary depending on the complexity of the system and water use habits of the residents. We recommend that an OWTS Operation and Maintenance (O&M) Manual be developed. Valley Precast should hold a 3-year Operation and Maintenance contract and be renewed as needed. Below are some basic recommendations for the OWTS O&M. OWTS HOUSEHOLD OPERATION • Use of high efficiency water fixtures is recommended to decrease the hydraulic load on the OWTS system. • Fix plumbing leaks immediately as this may cause a hydraulic overload of the soil absorption system. • Do not irrigate the area on top of or directly upgradient of the soil absorption field as this may cause a hydraulic overload. • Do not dispose of household waste down drains as this may clog or damage OWTS components. Examples of household waste includes: dental floss, cotton swabs, coffee grounds, paper towels, feminine products and many other kitchen and bath items. • Use of kitchen garbage disposals is not recommended. If a garbage disposal is utilized, kitchen wastewater should be screened thoroughly. Many kitchen solids are not decomposed in the septic tank and may cause increased tank pumping frequency. • Do not dispose of household chemicals, greases, oils, paints, hot tub water or water softener backwash in household drains. A separate drywell, if feasible, may be necessary for hot tub water or water softener backwash disposal. • Limit the use of bleach as this may harm useful bacteria in the septic tank and soil absorption system. • Liquid dishwasher and clothes washer detergent is recommended for households served by an OWTS. Clay substances used as fillers in powder detergents may result in clogging of the soil absorption system. - 9 - Kumar & Associates, Inc. Project No. 20-7-104.02 • The effluent in septic tanks can freeze during extended periods of non-use in cold weather. We recommend that a tank heater be installed in this system to help prevent freezing. OWTS MAINTENANCE • Valley Precast should hold a 3-year Operations and Maintenance contract for the OWTS. • Inspect the septic tank, pump, pump vault filter and STA at least annually for problems or signs of failure. • The filter should be cleaned annually by spray washing solids into the first chamber of the septic tank. • The septic tank should be pumped and cleaned about every 3 to 5 years depending on use. Longer pumping intervals may increase the amount of solids that reach the STA, which may shorten its life span. • Pumping of the septic tank should take place when the level of the sludge and scum layers combined take up 25 to 33% of the capacity of the first chamber of the septic tank. OWTS CONSTRUCTION OBSERVATION The Eagle County Environmental Health Department requires that the designer of the system provide a record drawing and certification of the OWTS construction (As-Built inspection). We should be provided with at least 48-hour notice prior to the installer needing the inspections. Prior to issuance of our certification letter, we require observation of all system components prior to backfill. The As-Built inspection will include a pump test for the system. The number of site visits required for the inspection will depend on the installer’s construction schedule. LIMITATIONS We have conducted this design in accordance with generally accepted engineering principles and practices in this area at this time. We make no warranty either expressed or implied. The recommendations provided in this report are based on the site conditions, profile pit evaluations and soil texture analysis, the proposed construction and our experience in the area. Variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations Kumar & Associates SILT COBBLES COARSE GRAVEL MEDIUMMEDIUMV. FINE SAND CLAY FINE CO.FINEV. CO.CO.FINE Kumar & Associates Kumar & Associates Kumar & Associates NATIVE SOILSREMOVE VEGETATION AND SCARIFYUPPER 8" OF GROUND SURFACEPRIOR TO SAND PLACEMENTEXISTING GROUND SURFACE SAND FILTER46' MINIMUMBASAL WIDTH14.0'12.0'4" DIAMETEROBSERVATION PORTINFILTRATOR QUICK 4PLUS STANDARD LOWPROFILE CHAMBERS10" COVER SOIL.3H:1V MAX. SLOPE.1.5' THICK SANDFILTER UNDERCHAMBER BEDMAXIMUM CUT DEPTH OF 1.5'.SCARIFY UPPER 8" PRIOR TOSAND PLACEMENT.UPHILL SWALE TO DIVERTSURFACE WATERKumar & Associates Ground Surface Insulate lid with 2" blue board Backfill valve box to bottom of cap with onsite soil 1.5" Sch. 40, 90° long-sweep or two 45° elbows 1.5" Sch. 40, threaded cap Install 6" valve box at ground surface Kumar & Associates NOT TO SCALE Notes 1.All piping, fittings and valves should be Sch. 40 39C. 2.Install distribution line cleanouts at the end of each distribution line. Pump Selection for a Pressurized System - Single Family Residence Project 20-7-104.02 / 872 Webb Peak, Eagle County Parameters Discharge Assembly Size Transport Length Transport Pipe Class Transport Line Size Distributing Valve Model Max Elevation Lift Manifold Length Manifold Pipe Class Manifold Pipe Size Number of Laterals per Cell Lateral Length Lateral Pipe Class Lateral Pipe Size Orifice Size Orifice Spacing Residual Head Flow Meter 'Add-on' Friction Losses 1.50 25 40 1.50 None 3 9 40 1.50 4 64 40 1.50 1/8 4 5 None 0 inches feet inches feet feet inches feet inches inches feet feet inches feet Calculations Minimum Flow Rate per Orifice Number of Orifices per Zone Total Flow Rate per Zone Number of Laterals per Zone % Flow Differential 1st/Last Orifice Transport Velocity 0.43 68 29.5 4 0.8 4.7 gpm gpm % fps Frictional Head Losses Loss through Discharge Loss in Transport Loss through Valve Loss in Manifold Loss in Laterals Loss through Flowmeter 'Add-on' Friction Losses 2.6 1.3 0.0 0.1 0.1 0.0 0.0 feet feet feet feet feet feet feet Pipe Volumes Vol of Transport Line Vol of Manifold Vol of Laterals per Zone Total Volume 2.6 0.9 27.1 30.7 gals gals gals gals Minimum Pump Requirements Design Flow Rate Total Dynamic Head 29.5 12.1 gpm feet 0 5 10 15 20 25 30 35 40 0 50 100 150 200 250 300 Net Discharge (gpm) PumpData PF3005 High Head Effluent Pump 30 GPM, 1/2HP 115/230V 1Ø 60Hz, 200V 3Ø 60Hz Legend System Curve: Pump Curve: Pump Optimal Range: Operating Point: Design Point: SCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCFSCF SCF SCF SCF SCF SCF SCF SCF SCF SCF SCF SCF SCF SCF SCF SCF SCFSCFSCFSCF SC F91259121912291239124911991189117911691159114 9113911291119 1 1 5 9 1 1 6 91 1 7 91 1 8 911 9 912 0 912 1 912 2 9123 91249120SURVEY STATIONBENCHMARK 10" NAILEL. 9126.06TRANSFORMERPVC PIPES & POSTTELEPHONE BOXGAS MARKERPVC PIPE CLUSTEREDGE OF ASPHALTCURB STOPL=22.77', R=30.00'∆=43° 29' 20", T=11.97'Ch=S9° 10' 56"W, ChD=22.23'L=27.34', R=30.00'∆=52° 13' 01", T=14.70'Ch=S70° 37' 19"W, ChD=26.40'L=14.12', R=515.00'∆=1° 34' 16", T=7.06'Ch=N45° 17' 56"E, ChD=14.12'N46° 05' 04"E 80.31'L=95.38', R=50.00'∆=109° 17' 34", T=70.48'Ch=N42° 05' 03"E, ChD=81.56'WEBB P EAK 12.5'1 2 . 5 'PROPERTY LINE, TYP.12.5' UTILITY &DRAINAGEEASEMENT, TYP.12.5' UTILITY &DRAINAGEEASEMENT, TYP.12.5'11.361+002+00 2+ 9 0 BP: 1+ 0 0 . 0 0 PC: 1+ 0 2 . 2 6 PT: 1+25.07PC: 1+32.39PT: 1+47.61 PC: 1+49.88 PT: 2+19.53EP: 2+90.0122.6422.6422.5022.6422.5222.6422.5321.8722.52 CLINE RESIDENCELOT 90872 WEBB PEAK5.630 AC100'-00" = 9122.649115 9 1 1 6911718.9518.6018.3817.601 8 . 5 6 19.019.0911891199119 911791169115912591249123912421.1321.3722.1320.11912022.02>> >>> > > > >> > > > >91229 1 2 1 9121 9122 9120 21.421.79123>>>>>21.9721.87> > > >>> > > > >>>>>>>>>>>>>> > > >>>>>>>>>>>>>PROPERTY LINE, TYP.BUILDING ENVELOPE, TYP.BUILDING ENVELOPE, TYP.ROOF LINE, TYP.ROOF LINE, TYP.3:13:13:13:1GARAGE DOOR = 19.89M A I N L E V E L F F = 2 2 . 6 4TW 20.0BW 14.1TW 20.0BW 14.112'S74° 24' 45"E2.26'L=22.81',R=30.00'Δ=43.57N62° 01 ' 13 "E7.32 'S88° 54' 29"E2.27'L=69.65',R=30.00'Δ=133.03S 4 4 ° 0 7 ' 0 7 " W 7 0 . 4 7 '22.6422.3722.5022.1422.019.8920.0521.022.1422.149 1 2 019.939119 30 LF 18" ADS-N12@ 2.6%9122912321.3716.519.89>>>>>>>>>>>>> > > >>>>> > > > > > > > > > > > > >>>>>>19.091199 1 2 1 9 1 2 2 9119912191229123912491189117 9120912022.3721.87>>>>>>>>>>GRATE 19.24INV 17.04GRATE 21.1INV 16.3256 LF 8" ADS-N12WT @ 2%36 LF 8" ADS-N12WT @ 2%2211.7710.9511111.6611.6712.2712.7512 . 3 1 12 . 5 1>>>>>>>>>>>INV. IN 09.28INV. OUT 08.50GBGB413.6513.41 13.7813.54 15.61 15.8517.2317.3718.8619.0419.2210'R10'R3910935 5689INV 15.222.0221.22 1 . 210 10111111111111111222.6422.5422.3722.0412912 0 9 1 2 2 1212121212121212121212121212121214141414ETC ETC ETC ETCETCETCETCETCETCETCETCETCETCETCWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWS21.87151617181877191919192020201991209119>>>>>>>>>>>>>>>>>>>>>91229121GGGGGGGGGGGG17.518.591229122SAND FILTER DISTRIBUTION AREA, TYP.OWTS DISTRIBUTION CELL, TYP.SEPTIC TANKS, TYP.FOR OWTS DESIGN SEE PLANSBY KUMAR & ASSOCIATES, INC.91199118219118Profile: Cline Driveway, Sta:1+00 to Sta:2+90Scale: Vert.=5', Horiz.=10' 9108 9110 9120910891109120Pr:9111.36 Ex:9110.41+00Pr:9113.67 Ex:9114.0 Pr:9116.62 Ex:9116.92+00Pr:9118.69 Ex:9117.1 Pr: Ex:9117.92+903.00%4.00%5.90%PVIS: 1+00.00 PVIE: 9111.36 PVIS: 1+06.00 PVIE: 9111.36 PVIS: 1+21.00 PVIE: 9111.96 PVIS: 2+19.50 PVIE: 9117.77 PVIS: 2+90.00 PVIE: 9119.89EXISTING GROUND PROFILE AT CENTERLINEPROPOSED GROUND PROFILE AT CENTERLINEMATCH GRADE GARAGE DOOR0%1) BASIS OF ELEVATION: 9126.06 FOR THE 10" NAIL SURVEYSTATION BENCHMARK LOCATED TO THE WEST OF THE NWBUILDING SETBACK LINE , PER THE TOPOGRAPHIC SURVEY BYSTARBUCK SURVEYORS & ENGINEERS DATED 08-21-01.2) THE LOCATION OF EXISTING IMPROVEMENTS, LOT LINES, ANDEASEMENTS ARE BASED UPON THE FINAL PLAT OF LOT 9, BLOCK1, CORDILLERA SUBDIVISION, FILING NO. 35, AND SURVEYCONTROL MONUMENTS FOUND AT THE TIME OF THE SURVEYAND SHOWN ON THE TOPOGRAPHIC SURVEY REFERENCEDABOVE.3) SEE ADDITIONAL SITE NOTES, LEGEND & DETAILS ON SHEETC2.4) LOCATIONS OF UTILITY SERVICES TO THE EXISTINGSTRUCTURE WERE NOT LOCATED ON THE BASE SURVEY. PRIORTO CONSTRUCTION LOCATE ALL UTILITY SERVICE HORIZONTALAND VERTICAL LOCATIONS THROUGHOUT THE NEWCONSTRUCTION ZONE. PROTECT AGAINST DAMAGE ASNECESSARY FROM ANY NEW CONSTRUCTION. MAINTAINMINIMUM REQUIRED DEPTHS AND COVER AS ESTABLISHED BYEACH UTILITY OR METRO DISTRICT. CONTACT ENGINEER IFCONFLICTS OCCUR.5) AREA OF DRIVEWAY & AUTO-COURT: 4682 SF AREA OF SNOW STORAGE: 1496 SF (32%)0010'20'Scale: 1" = 10'8020801880188020>>>>ETCETCWSWSWSWSWSSLSLSLSLSLPROPOSED SPOT ELEVATIONDRAINAGE SWALEFLOW ARROWWATER SERVICESEWER SERVICEELECT., PHONE & CATV SERVICEGAS SERVICESEDIMENT CONTROL FENCEPROPOSED MAJOR/MINOR CONTOUREXISTING MAJOR/MINOR CONTOUREROSION BALESASPHALT DRIVEWAYNORTH AMERICAN GREEN SC-250BN EROSIONCONTROL FABRIC, OR RIPRAP ALTERNATIVESNOW STORAGEFLAGNOTEBOULDER WALLWATER CURB STOPSCFSCFTOP OF WALLBOTTOM OF WALLGRADE BREAKHIGH POINTLOW POINTTOWBOWGBHPLP96.75GG12345681011712914151617181920FLAGNOTES:MATCH TO EXISTING EDGE OF ROADWAY.PROVIDE END WALLS AND WING WALLS CONSTRUCTED WITH STONE TO MATCHBUILDING MATERIALS.REGRADE PORTION OF ROADSIDE DITCH AS NECESSARY TO ENABLE NEW CULVERTTO MAINTAIN 12" OF COVER AT THE DRIVEWAY.TRANSITION FROM ROADWAY GRADE INTO -2% CROSS SLOPE TOWARD THEDOWNHILL IN THE FIRST 30 FEET OF DRIVEWAY.PROTECT CULVERT WHEN CONSTRUCTING IMPROVEMENTS ABOVE FROM MATERIALAND EQUIPMENT, TYP.WHERE PROPOSED SWALE DAYLIGHTS WITH NATURAL GROUND, FAN OUT DRAINAGESWALE TO EVENLY DISSIPATE DRAINAGE, TYP.PROVIDE DRAINAGE SWALE AS SHOWN, WITH NORTH AMERICAN GREEN SC250EROSION FABRIC OR RIPRAP. SEE DETAIL.INSTALL 12" NYLOPLAST DRAIN BASIN WITH DOME GRATE. INSTALL HEAT TAPE INBASIN & CULVERT.INSTALL 12" NYLOPLAST IN-LINE DRAIN WITH STANDARD GRATE. INSTALL HEAT TAPEIN BASIN & CULVERT.FINISH GRADE AT WINDOW WELL TO BE 12" MIN. LOWER THAN SILL ELEVATION. DONOT ALLOW ANY ROOF DRAINAGE TO FALL (UTILIZE GUTTER) IN AREAS OF WINDOWWELLS. INSTALL WINDOW WELL DRAIN PER THE DETAIL ON SHEET C2.SLOPE PATIOS AND DECKS AT 1% MIN. AWAY FROM THE STRUCTURE.GRADE AROUND THE PERIMETER OF BUILDING AS NECESSARY 10% FOR 5-FEET MIN.IN UNPAVED AREA TO ENSURE PROPER DRAINAGE AWAY FROM THE FOUNDATION.ENSURE MEANS TO DRAIN AREA BETWEEN REAR OF HOUSE AND PATIO ANDWALKWAYS. SHAPE WALKWAYS AND PATIOS TO DRAIN AWAY FROM THE HOUSESUCH THAT ANY DRAINAGE CAN SHEET FLOW TO THE EXTERIOR DRAINAGE SWALES.LOCATE EXISTING CURB STOP, CONFIRM LOCATION AND CONNECTION WITH EAGLERIVER WATER & SANITATION DISTRICT, CONNECT AND EXTEND NEW WATER SERVICETO MECHANICAL ROOM. MAINTAIN COVER OVER NEW SERVICE PER DISTRICTREGULATIONS.LOCATE & INSTALL GAS SERVICE FROM EXISTING SERVICE STUB TO MECHANICALROOM. MAINTAIN COVER OVER NEW SERVICE PER UTILITY REGULATIONS.EXTEND ELECTRIC, TELEPHONE & CABLE TV SERVICES TO METER CABINET. MAINTAINCOVER & CLEARANCES BETWEEN/OVER NEW SERVICES PER UTILITY REGULATIONS.CREATE NEW DRAINAGE SWALE TO DIVERT UPHILL DRAINAGE. LOCATE FLOWLINEHORIZONTALLY AND VERTICALLY AS SHOWN, INSTALL NORTH AMERICAN GREENSC250 EROSION FABRIC.EROSION LOGS PER DETAIL ON SHEET C2.SEDIMENT CONTROL FENCE PER DETAIL ON SHEET C2.PROVIDE CONSISTENT SLOPE BETWEEN ELEVATION 9119 TO 9118 FOR SAND FILTERDISTRIBUTION ZONE.ByRevisionNo.Date 923 Cooper AvenueSuite 201Glenwood Springs, CO 81601tele: 970.945.5252fax: 970.384.2833Engineer or SurveyorSealSheetClient Information:PROJECT NO.FILE NAME:Designer:Drafter:Date:N:\PROJECTS\2019\19026-Cline Lot 9 Cordilerra\dwg\Cline SP-01.dwg 8/26/2020 7:46 AM NORTH9. 8. 7. 6. 5. 4. 3. 2.01/21/20BUIPAHcline sp-01.dwg19026970.926.1720EDWARDS, CO 81632PO BOX 5127WT CONSTRUCTIONEAGLE COUNTY, COLORADO 1. PERMIT SET Grading, Drainage And Erosion Control Plan Cline Residence C119082B R UCE D LEWISCOL O RADO LICENSEDPROFESSIONAL ENG INEER 1/20/208.26.20 OWTS FIELD GRADING PH21 8" CLASS 6 AGGREGATE BASECOURSE COMPACTED TO 95%STANDARD PROCTOR12' ASPHALT DRIVEWAY1.0'1.0GRAVEL SHOULDER2 MAX.12.0%STRIP ALL TOPSOIL, SCARIFYAND RECOMPACT SUBGRADE AMINIMUM OF 12" DEPTH TO 95%STANDARD PROCTOR3" CLASS C ASPHALTICPAVEMENTEXISTING GROUNDCL2.0%2 MAX.1EROSION CONTROL FABRIC1 FT. DRAINAGE DITCH IFSHOWN IN PLAN VIEWGRAVEL SHOULDER0010'20'Scale: 1" = 10'GENERAL NOTES12"2:1 MAXLINE W/ NAG-SC250 EROSIONCONTROL FABRIC, 6.67' OR 8' ROLLWIDTH, OR RIPRAPGRADE ASNECESSARY2:1 MAXGENERAL NOTES:1.ALL CONSTRUCTION SHALL MEET OR EXCEED THE CURRENT CONSTRUCTION AND DESIGN STANDARDS ESTABLISHED BY THE DESIGNGUIDELINES AND THE COUNTY AND BE SUBJECT TO OBSERVATION BY THE COUNTY AND THE PROJECT ENGINEER.2.THIS DESIGN WAS PREPARED WITHOUT THE BENEFIT OF A SUBSURFACE UTILITY ENGINEERING (SUE) STUDY OR MAP. THIS DESIGN HAS BEENPREPARED FOR A PRIVATE DEVELOPMENT USING EXISTING UTILITY INFORMATION PROVIDED BY OTHERS. EXISTING UTILITIES ARE SHOWN ASTHEY ARE BELIEVED TO EXIST, BUT MAY NOT REPRESENT ACTUAL FIELD CONDITIONS. BOUNDARIES UNLIMITED INC. DID NOT CONFIRM ANYDATA PROVIDED OR PERFORM ANY ADDITIONAL RESEARCH OR NOTIFICATION TO ELEVATE THESE PLANS TO SENATE BILL 18-167 STANDARDS.AS SUCH, BOUNDARIES UNLIMITED INC. MAKES NO GUARANTY, EXPRESSED OR IMPLIED, FOR THE LOCATION OF SUBSURFACE UTILITIESCONTAINED WITHIN THIS PLAN SET. IF THE CLIENT AND/OR CONTRACTOR REQUIRES A SUBSURFACE UTILITY ENGINEERING STUDY OR MAPFOR FULL COMPLIANCE WITH SENATE BILL 18-167, THEN A MORE EXHAUSTIVE INVESTIGATION SHALL BE OBTAINED BY THE CLIENT AND/ORCONTRACTOR PRIOR TO COMMENCING WITH ANY CONSTRUCTION. OTHERWISE, PRIOR TO ANY EXCAVATION, CONTRACTOR SHALL CONTACTALL APPROPRIATE UTILITY COMPANIES FOR LINE LOCATIONS. CONTRACTOR SHALL NOTIFY PROJECT ENGINEER OF ANY POTENTIAL CONFLICTSPRIOR TO UTILITY CONSTRUCTION SO THAT LINE OR GRADE CHANGES CAN BE MADE TO AVOID A CONFLICT WITH ANY EXISTING UTILITY. THECONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES FROM DAMAGE DURING CONSTRUCTION AND, AT NO EXPENSE TO THE CLIENT ORPROJECT ENGINEER, REPAIR ANY DAMAGED UTILITIES..3.ALL EXCAVATIONS FOR UTILITY LINES, RETAINING WALLS, ROADWAYS, BUILDING STRUCTURES, DRAINAGE FACILITIES AND TRENCHES, ALONGWITH WORK IN GENERAL, SHALL MEET THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA),COLORADO INDUSTRIAL COMMISSION, OR THE COLORADO DIVISION OF MINES, WHICH EVER APPLIES. SAFETY IS THE CONTRACTOR'SRESPONSIBILITY. NO OTHER PARTIES ARE RESPONSIBLE FOR SAFETY IN, ON OR ABOUT THE SITE, NOR FOR COMPLIANCE BY THE APPROPRIATEPARTY WITH ANY REGULATIONS RELATING HERETO.4.COMPACTION MUST BE ATTAINED AND COMPACTION RESULTS SUBMITTED TO THE COUNTY AND THE PROJECT ENGINEER PRIOR TOACCEPTANCE. COMPACTION SHALL MEET OR EXCEED COUNTY REGULATIONS. 95% STANDARD PROCTOR DENSITY IS REQUIRED FOR ALLROADWAY AND DRIVEWAY SUBGRADE CONSTRUCTION AND TRENCH BACKFILL UNDER THE SAME, & 90% STANDARD PROCTOR DENSITY INLANDSCAPE AREAS, UNLESS NOTED OTHERWISE OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER. SEE SOILS REPORT FOR STRUCTURALFOUNDATION RECOMMENDATIONS.5.THE CONTRACTOR SHALL CONTAIN HIS CONSTRUCTION ACTIVITIES TO THE AREA WITHIN THE STREET RIGHT OF WAY AND PROPERTY OWNED,OR EASEMENTS PROVIDED TO OWNER. THE CONTRACTOR SHALL NOT OPERATE OUTSIDE THIS AREA WITHOUT THE PRIOR CONSENT OF THEPROPERTY OWNER INVOLVED. ANY DAMAGE TO PRIVATE PROPERTY BY THE CONTRACTOR OUTSIDE THESE LIMITS WITHOUT THE PERMISSIONOF THE PRIVATE PROPERTY OWNER WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.6.THE CONTRACTOR SHALL ENSURE DRAINAGE AWAY FROM ALL STRUCTURES IN ALL DIRECTIONS. DO NOT ALLOW WATER TO POND ON-SITE.PROVIDE SWALES TO DRAINAGE STRUCTURES AND RUNOUT. SHALLOW DRAINAGE SWALES HAVE A TENDENCY OVER TIME TO FILL IN &BECOME LESS EFFECTIVE. PERIODIC MAINTENANCE, AT LEAST TWICE A YEAR, IS NECESSARY TO CHECK THE INTEGRITY OF THE SWALE &MAINTAIN DRAINAGE CHARACTERISTICS. BUILDING FOUNDATION WALL HEIGHT TO BE A MINIMUM OF 6" ABOVE FINISH GROUND AT EXTERIORWALL.7.THE CONTRACTOR SHALL AT ALL TIMES KEEP TWO FULL SETS OF CONTRACT DRAWINGS MARKED UP TO INDICATE THE AS-BUILT CONDITIONS.THE DRAWINGS SHALL BE PROVIDED TO THE OWNER AND THE ENGINEER UPON COMPLETION OF THE WORK. WHERE PRACTICAL, THECONTRACTOR IS TO PROVIDE AT LEAST TWO TIES FROM PHYSICAL MONUMENTS TO ALL FITTINGS, VALVES, MANHOLES, AND THE END OF ALLSERVICE LINES.8.ON-SITE OBSERVATIONS AND REVIEW CONDUCTED BY THE COUNTY OR THE PROJECT ENGINEER OF CONSTRUCTION WORK IN PROGRESS ARENOT TO BE CONSTRUED AS A GUARANTEE OR WARRANTY BY THE COUNTY OR THE PROJECT ENGINEER OF THE COMPLETED WORK AND THECONTRACTOR'S RESPONSIBILITIES.9.THE CONTRACTOR SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO SIGNIFICANTLY REDUCE ANY POTENTIAL POLLUTION CAUSED BY HISACTIVITIES, INCLUDING VEHICLE FUELING, STORAGE OF FERTILIZERS OR CHEMICALS, ETC. THE CONTRACTOR SHALL HAVE IDENTIFIEDPROCEDURES FOR HANDLING POTENTIAL POLLUTANTS AND IDENTIFIED SPILL PREVENTION AND RESPONSE PROCEDURES PRIOR TO ANYACTIVITIES AT THE PROJECT SITE.10.THE CONTRACTOR SHALL NOT SCALE DRAWINGS FOR CONSTRUCTION PURPOSES. ANY MISSING DIMENSIONS OR DISCREPANCIES IN PLANS,FIELD STAKING, OR PHYSICAL FEATURES SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER. IF THE CONTRACTOR PROCEEDSWITH THE WORK WITHOUT NOTIFYING THE ENGINEER, HE DOES SO AT HIS OWN RISK.11.DISPOSAL OF TRASH, ASPHALT, CONCRETE AND CONSTRUCTION DEBRIS IS THE CONTRACTORS RESPONSIBILITY AND SHALL BE CONSIDEREDPART OF THE WORK.12.HORIZONTAL & VERTICAL INFORMATION FOR EXISTING PROPERTY LINES, TOPOGRAPHY, ROADWAY, UTILITIES & DRAINAGE STRUCTURES WERESUPPLIED BY STARBUCK SURVEYORS AND ENGINEERS, JOB NO. 201-20 DATED 08-21-01. SEE LANDSCAPE, ARCHITECTURAL ANDSTRUCTURAL ENGINEERING PLANS FOR ADDITIONAL BUILDING AND LANDSCAPE INFORMATION.13.SEE ADDITIONAL LANDSCAPE INFORMATION FROM WT CONSTRUCTION, LLC. IN NON HARDSCAPE AREAS, GRADE AT A MINIMUM OF 12" INTHE FIRST 10 FEET AWAY FROM THE STRUCTURE, OR AS DIRECTED BY THE GEOTECHNICAL STUDY. EXTERIOR BACKFILL SHOULD BE ADJUSTEDTO NEAR OPTIMUM MOISTURE AND COMPACTED TO AT LEAST 95% OF THE MAXIMUM STANDARD PROCTOR DENSITY IN PAVEMENT AREASAND TO AT LEAST 90% OF THE MAXIMUM STANDARD PROCTOR DENSITY IN LANDSCAPE AREAS. SEE & FOLLOW RECOMMENDATIONS OF THEGEOTECHNICAL SUBSOIL STUDY BY_____________ DATED ____________ JOB NO. ____________.14.ALL PRODUCT INFORMATION SHOWN IS AS PROVIDED BY THE MANUFACTURER. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING ANDCOMPLYING WITH THE MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS FOR THE INSTALLATION OF ALL MATERIALS WITHSPECIAL ATTENTION TO PROPER SEALING OF MATING SURFACES. THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE ENGINEER IF ANYDISCREPANCIES ARE FOUND BETWEEN THE DELIVERED PRODUCTS AND THOSE SHOWN ON THIS PLAN.15.FOUNDATION AND RETAINING WALL DESIGNS TO BE OBTAINED FROM, OR VERIFIED BY THE PROJECT STRUCTURAL OR GEOTECHNICALENGINEER.16.THE FOUNDATION DRAIN SYSTEM SHALL BE INSTALLED PER THE RECOMMENDATION OF THE STRUCTURAL AND GEOTECHNICAL ENGINEERS.17.THE SURVEYOR RESPONSIBLE FOR STAKING THE FOUNDATION OF THE HOUSE IS RESPONSIBLE TO MAKE SURE HE HAS THE LATEST SITE,FOUNDATION & ARCHITECTURAL PLANS AVAILABLE, ALONG WITH ANY UPDATED LOTLINE, SETBACK & EASEMENT INFORMATION.18.INSTALL ROOF GUTTERS AND DOWNSPOUTS THAT DISCHARGE WELL BEYOND THE LIMITS OF ALL BACKFILL. CONFIRM DOWNSPOUT DRAINAGEHAS GOOD POSITIVE GRADE RUNNING AWAY FROM THE HOUSE. STORM DRAIN PIPES TO BE INSTALLED WITH 1% MINIMUM SLOPE TO THEOUTFALL POINTS. HEAT TAPE SHALL BE INSTALLED IN ALL EXTERIOR ROOF DRAIN PIPES, DOWNSPOUTS, AREA DRAINS, AND STORM DRAINPIPES.19.LANDSCAPING WHICH REQUIRES REGULAR HEAVY IRRIGATION SUCH AS SOD, AND LAWN SPRINKLER HEADS SHOULD BE LOCATED AT LEAST10 FEET FROM FOUNDATION WALLS.20.ACCUMULATED SNOWFALL SHALL BE REMOVED TO GRASS AREA TO ENSURE THAT PROPER DRAINAGE AWAY FROM THE BUILDING ISMAINTAINED.21.FINISH GRADE & SPOT ELEVATIONS ASSUME THAT THE FOUNDATION WALLS EXTEND ABOVE THE BUILDING FINISH FLOOR & HANGER FLOORJOISTS ARE USED.22.INSTALL DEEP & SHALLOW UTILITY SERVICES ACCORDING TO ARROWHEAD AT VAIL & RESPECTIVE UTILITY COMPANY OR METRO DISTRICTSPECIFICATIONS AND REGULATIONS. HORIZONTAL LOCATIONS OF SERVICE LINES ARE SUGGESTIONS ONLY, PROPOSED UTILITY SERVICES TOTHE RESIDENCE MAY BE VARIED FROM THE LOCATIONS SHOWN. ALL WATER AND SEWER SERVICES SHALL BE INSTALLED WITH A 7.5 FT.MINIMUM COVER, OR PER METRO DISTRICT REGULATIONS.23.DRAINAGE PIPES CALLED OUT AS ADS SHALL BE ADVANCED DRAINAGE SYSTEMS N-12 WATER RESISTANT PIPE (ADS N-12-WT) OR ENGINEERAPPROVED EQUAL. ALL PIPES SHALL BE INSTALLED WITH WATERTIGHT CONNECTIONS.24.CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITTING FOR CONSTRUCTION FROM THE APPROPRIATE GOVERNMENTALENTITIES.25.ALL UTILITIES, BOTH UNDERGROUND OR OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE THROUGHOUT THE ENTIRECONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR DAMAGES TO, OR INTERRUPTION OF, SERVICES CAUSEDBY THE CONSTRUCTION.EROSION CONTROL NOTES:1. IMPLEMENTATION OF THE EROSION AND SEDIMENT CONTROL MEASURES SHALL PRECEDE STRIPPING OF NATIVE VEGETATIVECOVER AND AS GRADING PROGRESSES.2. ALL TEMPORARY AND PERMANENT SOIL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED AND REPAIREDAS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. STRAW BALE DIKES OR SILT FENCING MAYREQUIRE PERIODIC REPLACEMENT. SEDIMENT TRAPS WILL REQUIRE PERIODIC SEDIMENT REMOVAL.3. INSTALL PERMANENT EROSION FABRIC IN THE FLOW LINES OF DRAINAGE SWALES.SEDIMENT CONTROL FENCE DETAILPOINTS A MUST BE HIGHER THAN POINT BPOINT AENTRENCH 3"POINT APOINT BPOINT AEROSION LOGPOINT BFLOWPOINT APLAN VIEWPLAN VIEWUSE 2 PINE STAKES 1 1/2" x 1 1/2" x 12" AT ALLEROSION LOG ENDS OR JOINTS, OTHERWISEUSE A STAKE EVERY 24 IN. AND CONTINUETO ALTERNATE ORIENTATION THROUGHOUTTHE LENGTH OF THE EROSION LOG.EROSION LOGØENTRENCH 3"ØFLOWTO EACH OTHERAPPROX. 90°lc3dt r016SECTION A-ASECTION D-DFEATURE THAT NEEDSPROTECTIONSEDIMENT REMOVAL SHALL BE PERFORMEDCONTINUOUSLY FOR PROPER FUNCTION.FLOWFLOWAREA DRAINEROSION LOGTYPICAL SWALE SECTIONTemporary Erosion Control LogINSTALL EROSION CONTROL FABRICPER MANUFACTURERSRECOMMENDATIONSPROPOSED DRIVEWAY TYP. SECTIONTO BE VERIFIED BY PROJECT GEOTECHNICAL ENGINEERTEE/BENDS WITH GLUEDJOINTS ORWATERTIGHT ADAPTERS6" OR 8"Ø SCH.40 PVC RISER,TYP.4"Ø ADS TO SCH. 40 PVC90° BEND4"Ø ADS N-12-WT CPP6" OR 8"Øx4"ØWYE6" OR 8"ØTEE6" OR 8"Ø 90° BENDBUILDING4"Ø SCH. 40 PVCRISER4"Ø SCH. 40 PVC45° BENDDOWNSPOUT4" ADS DOWNSPOUTCONNECTORTypical Site Drain(N.T.S)Typical Roof Drain(N.T.S)IF SPECIFIEDREFER & COORDINATE WITH THE GEOTECHNICAL REPORTNYLOPLAST AREA DRAIN WITH DOME GRATE, PVC RISER ANDTEE OR BEND, TYP. EXTEND HEAT TAPE FROM NEARESTDOWNSPOUT THROUGH THE PIPE AND CONNECT TO THEBOTTOM OF THE GRATE,TYP. INSTALL TEMPORARY FILTERFABRIC OR SEDIMENT BASKET UNDER THE GRATE. SEE SITEPLAN FOR RIM ELEVATIONSNYLOPLAST INLINE DRAIN OR(BEND ONLY) 6" CLEANOUTWITH PVC RISER AND TEE ORBEND, TYP.HEAT TAPEALL JOINTS TO BEWATER TIGHT, TYP.BELOW GRADE WALLSLOPE PERREPORTBACKFILLSLOPEPEROSHAWATER PROOFING PERSTRUCTURAL ENGINEER, TYP.ATTACH PLASTIC SHEETINGAT FOUNDATION WALLSLIPJOINTSLAB-ON-GRADEFOOTING OR PADCOVER ENTIRE WIDTH OFGRAVEL WITH NON-WOVENGEOTEXTILE FABRIC (MIRAFI160N OR EQUIVALENT).4"Ø PERFORATED RIGID PIPE (SDR35 PVC). THE PIPESHOULD BE PLACED IN A TRENCH WITH A SLOPE OF 1%MIN. (1/8 INCH DROP PER FOOT) TO DRAIN.ENCASE PIPE IN 1/2" TO 1-1/2"WASHED GRAVEL. EXTEND GRAVELLATERALLY TO FOOTING AND ATLEAST 1/2 HEIGHT OF FOOTING. FILLENTIRE TRENCH WITH GRAVEL.NOTES:1.THE BOTTOM OF THE DRAIN SHOULD BE AT LEAST 2 INCHES BELOW BOTTOM OFFOOTING AT THE HIGHEST POINT AND SLOPE DOWNWARD TO A POSITIVE GRAVITYOUTLET OR TO A SUMP WHERE WATER CAN BE REMOVED BY PUMPING.2.CONTRACTOR TO FOLLOW ANY ADDITIONAL RECOMMENDATIONS OF THEGEOTECHNICAL ENGINEER8" MIN. OR BEYOND 1:1 SLOPEFROM BOTTOM OF FOOTING,(WHICHEVER IS GREATER)SLOPE TO DRAIN6" MINIMUMTYPICAL FOUNDATION DRAIN2" MIN.PREFABRICATED DRAINAGECOMPOSITE (MIRADRAIN6000 OR EQUIVALENTCONFIRM WITH GEOTECHNICAL ENGINEERByRevisionNo.Date 923 Cooper AvenueSuite 201Glenwood Springs, CO 81601tele: 970.945.5252fax: 970.384.2833Engineer or SurveyorSealSheetClient Information:PROJECT NO.FILE NAME:Designer:Drafter:Date:N:\PROJECTS\2019\19026-Cline Lot 9 Cordilerra\dwg\Cline SP-01.dwg 8/26/2020 7:46 AM NORTH9. 8. 7. 6. 5. 4. 3. 2.01/21/20BUIPAHcline sp-01.dwg19026970.926.1720EDWARDS, CO 81632PO BOX 5127WT CONSTRUCTIONEAGLE COUNTY, COLORADO 1. PERMIT SET Notes And Details Cline Residence C21' MIN.0.5124"Ø MIN.ANGULARBOULDERS6' MAX.12"MIN.TOP OF WALL ELEVBOTTOM OFWALL ELEVTO BE VERIFIED BY PROJECT SOILSENGINEERREFER & COORDINATE WITH THE GEOTECHNICAL REPORT6"1' DEEPDIVERSIONSWALE1-1/2" SCREENED ROCKBACKFILL (TYP.)COMPACT BACKFILL UNDERBOULDERS TO 95% STANDARDPROCTOR DENSITY, WITH A MOISTURECONTENT NEAR OPTIMUM TYP.NOTES:1.THIS DETAIL IS FOR RETAINING LANDSCAPED AREAS ONLY AND SHALL NOT BEUSED TO RETAIN STRUCTURE OR VEHICLE LOADED AREAS.2.FREE DRAINING WALL BACKFILL SHOULD BE CAPPED WITH AT LEAST 12 INCHESOF COMPACTED HEAVY CLAYS TO REDUCE SURFACE WATER INFILTRATION3.ROUND RIVER BOULDERS ARE NOT ACCEPTABLE.4.SET BASE ROWS ON BENCHES WHERE THE TOPSOIL HAS BEEN REMOVED ANDTHE SUBBASE HAS BEEN SCARIFIED TO 9" MINIMUM DEPTH & RECOMPACTED TO95% STANDARD PROCTOR.5.CARE SHOULD BE TAKEN NOT TO OVER COMPACT THE BACKFILL OR USE LARGEEQUIPMENT NEAR THE WALL.6.SELECT AND PLACE BOULDERS IN A MANNER WHICH PERMITS AT LEAST 30%CONTACT AREA WITH ADJACENT BOULDERS.7.PLACE LARGER BOULDERS AT BOTTOM AND TRANSITION TO SMALLER BOULDERSAT TOP OF WALL. UNDER NO CIRCUMSTANCES SHOULD ANY BOULDER BEPLACED ON TOP OF ANOTHER BOULDER WHICH IS SMALLER THAN ITSELF.MIRAFI 140N OR 160NFILTER FABRIC1' COMPACTEDHEAVY CLAY4"Ø PERFORATED PVC PIPE (SLOPED AT 0.5%MIN.) WHERE ADJACENT TO THE WALL. DRAINTO THE DITCH OR DAYLIGHT AT 2% MIN. WITHSOLID PIPE. DRAIN PIPE SYSTEM MUST HAVE 4"MIN. GRAVEL BEDDING ON ALL SIDES.BOTTOM ROW Ø= 2/3 HEIGHT OF WALL,OR 30"Ø MIN. ANGULAR BOULDERSBOULDER WALL DETAIL, LANDSCAPED AREA7001-110-1111:100A3130 VERONA AVEBUFORD, GA 30518PHN (770) 932-2443FAX (770) 932-2490www.nyloplast-us.comTITLEREVDWG NO.12 IN - 30 IN DB & ID NON TRAFFIC INSTALLATIONDRAIN BASIN / CURB INLET DRAIN ACJA2-22-02DRAWN BYMATERIALDATEDRAWN BYPROJECT NO./NAMEAPPD BYDWG SIZESHEETSCALEDATE2-22-02CJA12" - 30" INLINE DRAINTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICHNYLOPLAST HAS PROPRIETARY RIGHTS. THERECEIPT OR POSSESSION OF THIS PRINT DOES NOTCONFER, TRANSFER, OR LICENSE THE USE OF THEDESIGN OR TECHNICAL INFORMATION SHOWNHEREIN REPRODUCTION OF THIS PRINT OR ANYINFORMATION CONTAINED HEREIN, ORMANUFACTURE OF ANY ARTICLE HEREFROM, FORTHE DISCLOSURE TO OTHERS IS FORBIDDEN,EXCEPT BY SPECIFIC WRITTEN PERMISSION FROMNYLOPLAST.BACKFILL MATERIAL SHALL BECRUSHED STONE OR GRAVELMATERIAL MEETING CLASS 1 OR 2 ASSPECIFIED IN ASTM D2321.BACKFILL MATERIAL SHALL BEPLACED UNIFORMLY IN 12" LIFTS ANDCOMPACTED TO 90 - 95% DENSITY.12" - 30" DRAIN BASINBACKFILL MATERIAL SHALL BECRUSHED STONE OR GRAVELMATERIAL MEETING CLASS 1 OR 2 ASSPECIFIED IN ASTM D2321.BACKFILL MATERIAL SHALL BEPLACED UNIFORMLY IN 12" LIFTS ANDCOMPACTED TO 90 - 95% DENSITY.DRAIN BASIN / INLINE DRAIN1 OF 1Per Plan6" SUMP6" BEDDINGPER PLANSINTERGRATED DUCTILE IRON FRAME &GRATE TO MATCH BASIN O.D.OUTLET ADAPTERWATERTIGHT JOINTCLASS 6 ABC COMPACTED TO95% STANDARD PROCTORDRAIN BASIN LAYOUT2.75"1.25"22.13"Ø18.64"ØNYLOPLASTDUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS 1.25"NYLOPLAST DRAIN BASINSTANDARD GRATE ASSEMBLYDIMENSIONS ARE FOR REFERENCE ONLYACTUAL DIMENSIONS MAY VARYDIMENSIONS ARE IN INCHESGRATE MEETS H-20 LOAD RATINGQUALITY: MATERIALS SHALL CONFORM TO ASTM A536 GRADE 70-50-05PAINT: CASTINGS ARE FURNISHED WITH A BLACK PAINTLOCKING DEVICE AVAILABLE UPON REQUEST SEE DRAWING NO.7001-110-0356" MIN. AND GRADE AWAY FROMTHE FOUNDATION AT 10% MIN. FOR 5'12" MIN.WINDOWFINISHFLOORNOTES:1.RAILING AND/OR PROTECTIVEGRATING BY OTHERS.FOUNDATION FOUNDATION 6"Ø AREA DRAINAND 4"Ø PVC PIPEGRADE FLOOR TOAREA DRAINCONNECT TO THEFOUNDATION DRAINWINDOW WELL DRAIN3" MINUS WASH ROCKBACKFILL TO NATURALCOBBLESCONFIRM WITH GEOTECHNICAL ENGINEER19082B R UCE D LEWISCOL O RADO LICENSEDPROFESSIONAL ENG INEER 1/20/20 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 http://www.colorado.gov/cdphe/wqcd John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer March 26, 2015 Joseph Soulia, Government Relations Representative Orenco Systems Incorporated 814 Airway Ave. Sutherlin, OR 97479 Subject: Orenco, Advantex Series, Proprietary Treatment Product - Acceptance For Use in Colorado On-site Wastewater Treatment Systems Dear Mr. Soulia: Pursuant to section 43.13 of the On-site Wastewater Treatment System Regulation 5 CCR 1002-43 (Regulation 43), the Water Quality Control Division (Division) has reviewed drawings and specifications received between October 6, 2014 and January 12, 2015 for the Advantex proprietary treatment technology products listed below. The Advantex treatment technology is accepted as a higher level treatment system for use as a component of an on-site wastewater treatment system (OWTS) subject to the design criteria in Table 1 below. This acceptance is not intended as an endorsement or third-party certification of the technology. This acceptance addresses the following product models: Orenco, Advantex AX-20 for treatment level TL3N with flows up to 500 gpd. Orenco, Advantex AX-20RT for treatment level TL3N with flows up to 500 gpd. Orenco, Advantex AX-25RT for treatment level TL3N with flows up to 625 gpd. Orenco, Advantex AX-100 for treatment level TL3N with flows up to 2,000 gpd. This acceptance applies only to OWTS with design capacity less than or equal to 2,000 gallons per day (gpd). Review and approval for the design of any OWTS proposing to use this technology will be reviewed by the local public health agency. As individual local public health agency regulations may be more stringent than Regulation 43, the Division cannot ensure the acceptance of a treatment technology within any given jurisdiction. Any modifications to the physical attributes or characteristics of this treatment technology must be submitted to this office for review and acceptance by the Division prior to sale in Colorado. The Division will review modifications, any additional third party verification reports and issue a revised acceptance letter, or denial, as appropriate. Joe Soulia, Orenco Systems Inc. March 26, 2015 On-site Wastewater Treatment System Treatment Technology Acceptance Page 2 of 4 Table 1. Design Criteria for Orenco Systems Inc., Advantex series models listed above: Design Criteria 1. A septic tank consistent with section 43.9(A) and 43.9(B) and an effluent screen consistent with section 43.3(44) and 43.9(I) must precede the treatment unit. Surge volume may be required for some applications based on manufacturer recommendations. Pretreatment for non-residential kitchens must include adequate separate grease separator tank(s) prior to the primary septic tank(s) as required in section 43.9(J) of Regulation 43. 2. Mode configuration requirements: a. In order to attain TL2, TL2N or TL3 effluent, the design of the treatment system may - - This will ensure the required BOD, TSS and TN reductions. Mode 1 is defined as recirculating all of the filtrate to the secondary chamber of the processing tank. b. - order to obtain the required nitrogen reduction for this treatment level. Mode 3 is defined as recirculating all, or a portion, of the filtrate to the primary chamber of the processing tank. 3. Cold weather considerations, general: a. All units must incorporate 1-inch insulation attached to the bottom of all lids and risers covers integral to the treatment unit. Insulating around the process tanks, risers, and other components will be at the discretion of the design engineer. b. For installations in areas where snow accumulates each winter, the air vent must be extended to ensure it terminates above the peak snow level. 4. Cold weather considerations for TL2N, TL3 and TL3N: a. As per data supplied by Orenco Systems Inc., treatment systems that integrate air source for the treatment pod. This configuration would be typical of a single family residential treatment system. b. air source to ensure that the temperature of the filtrate remains above 50º F. This configuration would be typical of a commercial treatment system with an AX-100 treatment unit. 5. Timer settings for dosing the treatment unit: a. Timed-dosing to the treatment unit is required. The initial timer settings should be established based on the expected average daily flow and a 4:1 filter recirculation ratio. b. A residual pressure of 3 to 6 feet (5 feet desired) within the treatment unit is used to determine the initial timed-dose settings. c. AX-20 and AX- Orenco Systems design manual for further specifications. d. AX- time should be adjusted depending on the average daily flows. See the Orenco Systems design manual for further specifications. 6. Design flow shall be for maximum occupancy. Design flow for single-family residential designs may vary based on the regulations adopted by the local board of health for each specific location. Design flow values and strengths for multi-family and commercial systems shall be consistent with section 43.6(A)(4). Therefore, all design criteria in this acceptance are based on total gallons per day and the assumption of residential strength wastewater. Joe Soulia, Orenco Systems Inc. March 26, 2015 On-site Wastewater Treatment System Treatment Technology Acceptance Page 3 of 4 7.The design must include pressure dosed distribution of effluent. Reductions in soil treatment area size or separation distances shall be as described in section 43.10(C)(4) of Regulation 43. 8. The designated higher level treatment rating is identified for each model on page 1. Use in higher level treatment applications requires system be designed by a Colorado Licensed Professional Engineer. The accepted treatment product may also be used for applications requiring less than the approved treatment level of the product. Reductions in soil treatment area size or separation distances based on higher level treatment may not be applied unless the local public health agency has a maintenance oversight program in place as described in section 43.14.D of Regulation 43. In locations where the local public health agency has not adopted a maintenance oversight program, the treatment system may be used but only with soil treatment area size and separation distances consistent with treatment level TL1 requirements. 9. In addition to these design criteria, other provisions of Regulation 43 and local regulations also apply to a specific design as well as good OWTS design practice. The Division does not approve manufacturer design manuals. Manufacturer provisions shall not be applicable if those provisions are not consistent with Regulation 43, these design criteria, and the regulations adopted by the local board of health for the design location. Local public health agencies will review proposed designs to confirm consistency with Regulation 43, these design criteria, the local board of health regulations adopted pursuant to Regulation 43, and good OWTS design practice. 10. Monitoring of the system may be required by the regulations adopted by the local board of health for the design location. 11. The treatment technology is not intended for industrial sources of wastewater. The treatment technology is intended to receive domestic wastewater with TL1 concentrations (see Table 6-3 in Regulation 43) exiting the septic tank. Wastewater with higher concentrations will require verification of the products ability to treat the wastewater and appropriate modifications or pretreatment. 12. Design shall provide access for maintenance and repair. As per the requirements of Regulation 43, septic tanks and all treatment components, other than the soil treatment area, shall be equipped with access manholes and risers that extend to or above final grade. All risers and lids shall be watertight and secure. Additional Operation and Maintenance Criteria 1. Design shall include an Operation and Maintenance (O&M) Manual to be provided for all installations. Individual operation plans shall include scheduled inspections, assessments, and maintenance of the treatment. This plan for scheduled inspections and assessments should include a routine inspection as described in section 43.14(D)(4)(b) unless the local regulations require more frequent inspections. The owner of the OWTS is responsible for arranging proper design, operation, and maintenance of the facility to achieve the desired treatment level. Joe Soulia, Orenco Systems Inc. March 26, 2015 On-site Wastewater Treatment System Treatment Technology Acceptance Page 4 of 4 If you have any - 2366 or chuck.cousino@state.co.us. Sincerely, Charles J. Cousino, REHS On-site Wastewater Treatment System Coordinator Engineering Section Water Quality Control Division Colorado Department of Public Health and Environment cc: SCG Enterprises, Roger Shafer P.E. (local representative) Files