HomeMy WebLinkAbout602 Granite Springs Trl - 210715303001Environmental Health Department P.O. Box 179 500 Broadway Eagle, CO 81631-0179 Phone: (970) 328-8730 Fax: (970) 328-7185 Permit Permit No. OWTS-018360-2020 Permit Type: OWTS Permit Work Classification: New Permit Status: Active Issue Date: 10/13/2022 Expires: 1/23/2023 On-Site Wastewater Treatement System Project Address Parcel Number 602 GRANITE SPRINGS TRL, EDWARDS AREA,210715303001 Owner Information Address Mark Heinbaugh PO Box 2090 Edwards, CO 81632 Phone: (970) 390-4305 Cell: Email: markh@vail.net Inspections: For Inspections Call: (970) 328-8755 Engineer Phone Email LKP Engineering, Inc., Luiza Petrovska, PE (970) 390-0307 luiza@lkpeng.com Contractor License Number Phone Email Alpha Excavation LLC alpha1excavation@gmail. com (970) 471-6292OWTSPL-000168-20 22 Permitted Construction / Details: Install the OWTS exactly as depicted in the LKP Engineering design dated March 8, 2019, stamped and signed by Luiza K. Petrovska P.E. The system is designed to serve a five bedroom single family residence. The OWTS consists of a 1530 gallon, two-compartment, Infiltrator Poly Tank and IM540 Infiltrator Poly Tank, one-compartment with an Orenco Pump Assembly by Valley Precast equipped with an Orenco head head pump (PF5005) and effluent filter in the outlet tee. Set the floats to pressure dose 90 gallons approximately 62 feet to a center manifold, connected to six, 41 foot distribution laterals. The laterals are set to distribute effluent across a mounded soil treatment area consisting of an aggregate distribution cell 84'l ong x 9' wide, set atop 2-2.8'of secondary sand filter media 111' long x 38' wide (area includes the 3-1' slope on all sides) as shown in the design drawing. Clear and rake the ground surface immediately prior to placement of aggregate sand. Construction must only be started when the soil site is suitably dry. Maintain all elevations as shown of the engineer's site plan. Contact the design engineer and Eagle County Environmental Health well in advance to conduct of requesting inspections. All inspections necessary to certify proper installation must be performed by the design engineer. System certification along with photos and a record drawing are required to be submitted to, and approved by, Eagle County Environmental Health prior to the use of the system and occupancy of the residence. THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT Issued by: Environmental Health Department, Eagle County, CO Danielle Salinsky Date October 13, 2022 CONDITIONS 1. 2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED 3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT 4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED Thursday, October 13, 2022 1 Environmental Health Department P.O. Box 179 500 Broadway Eagle, CO 81631-0179 Phone: (970) 328-8730 Fax: (970) 328-7185 Permit Permit No. OWTS-018360-2020 Permit Type: OWTS Permit Work Classification: New Permit Status: Active Issue Date: 3/20/2020 Expires: 7/20/2020 On-Site Wastewater Treatement System Project Address Parcel Number 602 GRANITE SPRINGS TRL, EDWARDS AREA,210715303001 Owner Information Address David Smiley PO Box 4615 Eagle, CO 81631 Phone: Cell: Email: Inspections: For Inspections Call: (970) 328-8755 and call the Design Engineer Engineer Phone Email LKP Engineering, Inc., Luiza Petrovska, PE (970) 390-0307 luiza@lkpeng.com Contractor License Number Phone Email Permitted Construction / Details: Arena Excavating, identified on the permit, is not licensed. Arena Excavating must become licensed prior to installation or a licensed installer should be identified. No person shall install, renovate, or repair an OWTS in Eagle County (EC) without a valid EC Systems Contractor License. Any person that conducts a business as a systems contractor without having obtained a valid license section commits a Class 1 petty offense as defined in section 18-1.3-503, C.R.S. Please notify the department when an installer is identified, prior to installation of the OWTS. Install the OWTS exactly as depicted in the LKP Engineering design dated March 8, 2019, stamped and signed by Luiza K. Petrovska P.E. The system is designed to serve a five bedroom single family residence. The OWTS consists of a 2,000 gallon three compartment Valley Precast septic tank with a 2,500 gallon total effective volume (Item #2000T-3CP-F-HH), equipped with an Orenco head head pump (PF500511) in the third compartment, and and effluent filter in the tee between the second and third compartment. Set the floats to pressure dose 90 gallons approximately 62 feet to a center manifold, connected to six, 41 foot distribution laterals. The laterals are set to distribute effluent across a mounded soil treatment area consisting of an aggregate distribution cell 84'l ong x 9' wide, set atop 2-2.8'of secondary sand filter media 111' long x 38' wide (area includes the 3-1' slope on all sides) as shown in the design drawing. Clear and rake the ground surface immediately prior to placement of aggregate sand. Construction must only be started when the soil site is suitably dry. Maintain all elevations as shown of the engineer's site plan. Contact the design engineer and Eagle County Environmental Health well in advance to conduct of requesting inspections. All inspections necessary to certify proper installation must be performed by the design engineer. System certification along with photos and a record drawing are required to be submitted to, and approved by, Eagle County Environmental Health prior to the use of the system and occupancy of the residence. THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS OF ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT Issued by: Environmental Health Department, Eagle County, CO Claire Lewandowski Date March 20, 2020 CONDITIONS 1. 2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED 3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT 4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED Friday, March 20, 2020 1 Inspection Result Eagle County, Colorado P.O. Box 179 500 Broadway Eagle, CO Phone: (970) 328-8730 Fax: (970) 328-7185 IVR Phone: 1-866-701-3307 Inspection Number: INSP-518686-2022 Permit Number: OWTS-018360-2020 Inspection Date: 11/23/2022 Inspector: Salinsky, Danielle Permit Type: OWTS Permit Inspection Type: OWTS Final Inspection Work Classification: NewOwner:Home Equity Development Job Address:602 GRANITE SPRINGS TRL IVR Pin Number:189935 EDWARDS AREA, CO Project:<NONE> Parcel Number:210715303001 Contractor:Phone: / Cell: (970) 471-6292Alpha Excavation LLC Inspection Status: Approved Inspection Notes Inspector Comments Added Item: Septic Tank Inspected and verified on 10/31/2022. A 1530 gallon, two-compartment, Infiltrator Poly Tank and IM540 Infiltrator Poly Tank, one-compartment with an Orenco PF500511 high-head pump assembly by Valley Precast. Added Item: Record Drawing Received 11/22/2022 from LKP Inc. Added Item: Record Photos Received 11/22/2022 from LKP Inc. Added Item: Site and Soil Received 3/11/2020 from LKP Inc. Added Item: Final Certification Letter Received 11/22/2022 from LKP Inc. Added Item: General Plan Received 3/11/2020 from LKP Inc. Added Item: Soil Treatment Area (STA) Inspected and verified on 10/31/2022. The pressure dosing system consisted of six, 41-feet long, 1.25-inch diameter SCH40 pvc, distribution laterals, perforated at their inverts with 1/8-inch holes at 3-foot intervals, arranged on the gravel bed with three laterals on each side of a center manifold. The center manifold 6 feet, 1.25-inch, SCH40 pvc. Wednesday, November 23, 2022 For more information visit: http://www.eaglecounty.us Page 1 of 2 Added Item: Identification of Systems Contractor Alpha Excavation was the licensed installer. Wednesday, November 23, 2022 For more information visit: http://www.eaglecounty.us Page 2 of 2 P.O. Box 724, Eagle, CO 81631 Tel. (970) 390-0307 www.LKPEngineering.com November 22, 2022 Mark Heinbaugh P.O. Box 2090 Edwards, CO 81632 markh@vail.net RE: Inspection of Septic System Installation Heinbaugh 5-Bedroom Residence Lot 4, Block 5, Cordillera Filing No. 34 602 Granite Springs Trail Eagle County, Colorado Project No. 18-3303– OWTS-018360-2020 Dear Mark: At the request of the installer, Travor Dunsdon of Alpha Excavation LLC, on October 31, 2022 we visited your property on Lot 4, Block 5, Cordillera Filing No. 34, 602 Granite Springs Trail, Eagle County, Colorado. The purpose of our site visit was to inspect the installation of the OWTS – consisting of pressure-dosed, mound system. The system was installed in overall compliance with the septic system design, Drawing No. 18-3303OWTS.dwg, last updated on August 19, 2022. At the time of the inspection, we observed the following: They installed 1530 gallon, two-compartment, Infiltrator Poly Tank and IM540 Infiltrator Poly Tank, one-compartment with an Orenco PF500511 high-head pump assembly by Valley Precast. An effluent filter was installed in the second compartment of the 1530-gallon poly tank. The inlet of the tank had the Tee installed. The tank access ports had corrugated, plastic risers with secured, green, plastic covers. The covers were insulated and will be secured with nuts, bolts, and screws. The building sewer line was connected to the back of the residence, as shown on the attached as-built sketch. A cleanout was constructed on the building sewer line about 1.6 feet away from the house. The building sewer line was 4-inch diameter SDR35 PVC pipe. The two-compartment septic tank and the pump tank, were connected with about 44 feet of 4- inch diameter, SDR35 PVC pipe. The effluent line from the pump chamber to the center manifold of the mound system, was 1.5-inch diameter, SCH40 PVC pipe. The soil treatment area consisted of a mound system, consisting of a sand fill with a gravel distribution cell. The sand was from United Gravel Pit, was less than 30-days old, and it passed the classification for a secondary sand. The pressure dosing system consisted of six, 41-feet long, 1.25- inch diameter SCH40 pvc, distribution laterals, perforated at their inverts with 1/8-inch holes at 3- Heinbaugh Residence 602 Granite Springs Trail Project 18-3303 November 22, 2022 Page 2 of 2 P.O. Box 724, Eagle, CO 81631 Tel. (970) 390-0307 www.LKPEngineering.com foot intervals, arranged on the gravel bed with three laterals on each side of a center manifold. The center manifold 6 feet, 1.25-inch, SCH40 pvc. The ends of the laterals were equipped with flushing assemblies. A squirt test was performed during the inspection. Two inspection ports were installed, one on each side of the distribution cell, at about the middle between the laterals. The OWTS installation and the system start-up was done by Travor Dunsdon. The control panel for the pump was installed in the utility box attached to the foundation wall on the north side of the residence, as shown on the as-built sketch. There is no other warranty either expressed or implied. Sincerely, LKP Engineering, Inc. Luiza Petrovska, PE cc: Eagle County Environmental Health Department E-mail: danielle.salinsky@eaglecounty.us; environment@eaglecounty.us J:\_WP X4-LKP\_2018\18-3303OSIMND-PUMPPRESSURE.DOCX 11/22/2022 P.O. Box 724, Eagle, CO 81631 Tel. 970-390-0307 www.lkpengineering.com August 19, 2022 Mark Heinbaugh P.O. Box 2090 Edwards, CO 81632 markh@vail.net RE: Soil and Site Evaluation Revision Lot 4, Block 5, Cordillera Filing No. 34 602 Granite Springs Trail Eagle County, Colorado Project No. 18-3303 Dear Mark: The following report was revised to replace the concrete septic tank with Infiltrator septic tanks, due to supply shortage. On October 27, 2018, we visited the subject property on Lot 4, Block 5, Cordillera Filing No. 34, 602 Granite Springs Trail, Eagle County, Colorado near Edwards, Eagle County, Colorado. The purpose of our site visit was to observe the site and select an area for the new, Onsite Wastewater Treatment System (OWTS). Buz Reynolds, The Reynolds Corporation, dug the profile holes. The proposed Onsite Wastewater Treatment System (OWTS) will consist of 1530 gallon, two-compartment, Infiltrator Poly Tank and IM540 Infiltrator Poly Tank, one-compartment with an Orenco Pump Assembly by Valley Precast. The septic tank will have an effluent filter in the second compartment. The Soil Treatment Area (STA) will consist a mound system. The mound system was designed partially in compliance with the Technical Guidance for Mounded Wastewater Treatment Systems and partially with the Wisconsin Mound System Guidance. According to the guidelines of the Technical Guidance for Mounded Wastewater Treatment Systems the maximum recommended linear loading rate for soil types 3A through 5 is in the range of 3.0 to 5.0 gpd/lf. With this rate the length of the proposed mound system was greater than the site. Due to the size of the site and relatively gentle to moderate slope of 8 percent we decided to use the Wisconsin Mound System Guidance, where the area of the distribution cell remained the same but the dimensions changed, thus allowing the mound system to fit on the site. The linear loading rate used in the final design was 7.2 gpd/lf. ! Preliminary Investigation G Address: 602 Granite Springs Trail, Cordillera, Colorado G Legal Description: Lot 4, Block 5, Cordillera Filing No. 34, Eagle County, Colorado. G Existing Structures: There are no existing structures on the property. It is a vacant lot. G Location of existing and proposed wells on property: There are no existing Page 2 of 4 P.O. Box 724, Eagle, CO 81631 Tel. 970-390-0307 www.lkpengineering.com 602 Granite Springs Trail August 19, 2022 Project No. 18-3303 wells on the property. The water to the property is provided by Cordillera Metro. G ECEHD (Eagle County Environmental Health Department) records: There are no records of existing septic system on the property. G Topography: The topography of the leachfield site has gentle slope of 8 percent. G Soil Data: The profile holes were excavated and observed on October 27, 2018. The soil exposed in the profile holes was as follows: Profile Hole #1 0 To 6" topsoil 6" to 2 feet blocky clay 2 to 4 feet brown, rocky clay with angular rock fragments 4 to 8 feet whitish-yellowish to grayish, sandy clay Sample At 48 inches Clay, Type 4, LTAR = 0.2 GPD/SF No Ground Water Encountered Profile Hole No. 2 0 to 1 foot of topsoil 1 to 2 feet blocky clay 2 to 7 feet brown, hard clay 7 to 8 feet light brown, whitish, very moist, sandy- silty clay at 4.5 feet, clay, type 4, LTAR = 0.2 GPD/SF at 7 feet moisture content, MC=35% No Ground Water Encountered Used design Long Term Acceptance Rate = 0.20 gpd/sf G Location of applicable setbacks in Table 7-1 ! Reconnaissance G Landscape position: The proposed leachfield site will be located in the Back /Side Position of the site and north of the proposed residence. G Topography: The topography of the proposed leachfield site is gentle. G Vegetation: The vegetation within the proposed leachfield site consisted of grass and pine tree forest. The site surrounding the leachfield was similar with grass, clearing in the middle of the lot and surrounded by pine forest. Page 3 of 4 P.O. Box 724, Eagle, CO 81631 Tel. 970-390-0307 www.lkpengineering.com 602 Granite Springs Trail August 19, 2022 Project No. 18-3303 G Natural and cultural features: The property is within the Cordillera Subdivision, south of Edwards Colorado. The area is mountainous with pine forest. G Current and historic land use: The current use is residential. It appears that previous use was possibly grazing for livestock. ! Detailed Soil Investigation G Visual and tactile evaluation of two or more soil profile test pit excavation; Two profile holes were dug, observed and logged and visual and tactile evaluation test was done. G Percolation tests plus one or more soil profile holes or one or more profile test pit excavations: Two profile holes were observed and logged on October 27, 2018. ! Report and Site Plan G Name, address, telephone number, email address, and credentials and qualification of individual who conducted site evaluation: This site evaluation was completed by Luiza Petrovska, PE, of LKP Engineering, Inc. LKP Engineering, Inc., is located at 67 Robins Egg Lane, Eagle, Colorado. The phone number is 970-390-0307 and Luiza=s email is luiza@lkpeng.com G Dates of preliminary and detailed evaluation: October 27, 2018. G A graphic soil log, to scale: Attached G Setback distances in Table 7-1: Well Potable water Structure with basement Structure w/o basement PL Lake Surface Water Piped Irrigation Ditch Septic Tank Tank n/a 10’+ n/a ~58’ NPL~38’+ n/a n/a - STA n/a 25’+ n/a 27’+/- NPL ~30’ n/a n/a ~10’ G G Setback distances in Table 7-2: Items 1-4, observed. There is no well, pond, dry gulch or cut bank. The limiting layer is the clay soil at about 2 feet. G A drawing (to scale) with complete property boundary lines on minimum of 8.5 x 11" # Label profile test pits/holes # North Arrow # Graphic scale # Horizontal and vertical reference points of proposed STA # Contours OR slope direction and % slope Page 4 of 4 LKP Engineering, Inc. 602 Granite Springs Trail August 19, 2022 Project No. 18-3303 # Location of any visible or known unsuitable, disturbed, or compacted soils # The proposed elevation of the infiltrative surface of the STA from benchmark or ground surface G Anticipated construction related issues: Some of the pine forest within the proposed mound perimeter area will have to be cut down. G Assessment of known or foreseeable land use changes expected to affect the system performance: None known. G Narrative explaining difficulties encountered during site evaluation: There were no difficulties encountered during the site evaluation. The graphic soil logs are appended to this report. LKP Engineering, Inc. Luiza Petrovska, PE Enclosure J:\_WP X4-LKP\_2018\18-3303SOIL-SITE-EVAL-MOUND-INFILTRATORTANKS.DOCX 8/19/2022 ! G 602 Granite Springs Trail, Cordillera, Colorado G Lot 4, Block 5, Cordillera Filing No. 34, Eagle County, Colorado. G There are no existing structures on the property. It is a vacant lot. G There are no existing wells on the property. The water to the property is provided by Cordillera Metro. G There are no records of existing septic system on the property. G The topography of the leachfield site has gentle slope of 8 percent. G The profile holes were excavated and observed on October 27, 2018. The soil exposed in the profile holes was as follows: Profile Hole #1 0 To 6" topsoil 6" to 2 feet blocky clay 2 to 4 feet brown, rocky clay with angular rock fragments 4 to 8 feet whitish-yellowish to grayish, sandy clay Sample At 48 inches Clay, Type 4, LTAR = 0.2 GPD/SF No Ground Water Encountered Profile Hole No. 2 0 to 1 foot of topsoil 1 to 2 feet blocky clay 2 to 7 feet brown, hard clay 7 to 8 feet light brown, whitish, very moist, sandy- silty clay at 4.5 feet, clay, type 4, LTAR = 0.2 GPD/SF at 7 feet moisture content, MC=35% No Ground Water Encountered Used design Long Term Acceptance Rate = 0.20 gpd/sf G ! G The proposed leachfield site will be located in the Back /Side Position of the site and north of the proposed residence. G The topography of the proposed leachfield site is gentle. G The vegetation within the proposed leachfield site consisted of grass and pine tree forest. The site surrounding the leachfield was similar with grass, clearing in the middle of the lot and surrounded by pine forest. G The property is within the Cordillera Subdivision, south of Edwards Colorado. The area is mountainous with pine forest. G The current use is residential. It appears that previous use was possibly grazing for livestock. ! G G ! G This site evaluation was completed by Luiza Petrovska, PE, of LKP Engineering, Inc. LKP Engineering, Inc., is located at 67 Robins Egg Lane, Eagle, Colorado. The phone number is 970-390-0307 and Luiza=s email is luiza@lkpeng.com G October 27, 2018. G Attached G from STA (Soil Treatment Area – edge of mound perimeter or leachfield) to tank, about 10 feet, STA to building about 27 feet, STA to the north property line about 30 feet and to the east about 30 feet, septic tank to building about 56 feet. G : Items 1-4, observed. There is no well, pond, dry gulch or cut bank. The limiting layer is the clay soil at about 2 feet. G # # # # # # # G Some of the pine forest within the proposed mound perimeter area will have to be cut down. G None known G There were no difficulties encountered during the site evaluation. Pump Selection for a Pressurized System - Single Family Residence Project 18-3303 Heinbaugh / 602 Granite Springs Parameters Discharge Assembly Size Transport Length Transport Pipe Class Transport Line Size Distributing Valve Model Max Elevation Lift Manifold Length Manifold Pipe Class Manifold Pipe Size Number of Laterals per Cell Lateral Length Lateral Pipe Class Lateral Pipe Size Orifice Size Orifice Spacing Residual Head Flow Meter 'Add-on' Friction Losses 2.00 62 40 1.50 None 14 6 40 1.25 6 41 40 1.25 1/8 3 5 None 0 inches feet inches feet feet inches feet inches inches feet feet inches feet Calculations Minimum Flow Rate per Orifice Number of Orifices per Zone Total Flow Rate per Zone Number of Laterals per Zone % Flow Differential 1st/Last Orifice Transport Velocity 0.43 84 36.4 6 0.8 5.8 gpm gpm % fps Frictional Head Losses Loss through Discharge Loss in Transport Loss through Valve Loss in Manifold Loss in Laterals Loss through Flowmeter 'Add-on' Friction Losses 2.7 4.6 0.0 0.3 0.1 0.0 0.0 feet feet feet feet feet feet feet Pipe Volumes Vol of Transport Line Vol of Manifold Vol of Laterals per Zone Total Volume 6.6 0.5 19.1 26.1 gals gals gals gals Minimum Pump Requirements Design Flow Rate Total Dynamic Head 36.4 26.7 gpm feet 0 10 20 30 40 50 60 70 80 0 20 40 60 80 100 120 140 160 Net Discharge (gpm) PumpData PF5005 High Head Effluent Pump 50 GPM, 1/2HP 115/230V 1Ø 60Hz, 200/230V 3Ø 60Hz Legend System Curve: Pump Curve: Pump Optimal Range: Operating Point: Design Point: Plant 102_01202-Eagle Basic Quality Statistical Summary Report Sieve/Test SpecificationAverageSt DevTests Product 14111-Gypsum 1/4" Concrete Sand Target Specification CDOT Fine Aggregate Period 09/13/2022 - 10/13/2022 1/2" (12.5mm)100 0.610 3/8" (9.5mm)100 0.6 100-10010 #4 (4.75mm)100 0.7 95-10010 #8 (2.36mm)90 2.2 80-10010 #16 (1.18mm)73 1.8 50-8510 #30 (.6mm)46 1.5 25-6010 #50 (.3mm)19 1.3 10-3010 #100 (.15mm)5 0.5 2-1010 #200 (75µm)1.8 0.40 0-310 Pan 0.0 0.0010 1Page:of 2CRH Americas Materials (AMAT)StonemontQC 10/13/2022 Query Query Selections Date Created 10/13/2022 Date Range 09/13/2022 - 10/13/2022 Plant Eagle 2Page:of 2CRH Americas Materials (AMAT)StonemontQC 10/13/2022 MOUND DIMENSIONS DESCRIPTION SYMBOL DIMENSION (FEET) BED WIDTH A 9.00 BED LENGTH B 84.00 MOUND FILL C 2.00 MOUND FILL D 2.80 MOUND DEPTH - DISTRIBUTION CELL E 0.75 MOUND DEPTH - FINAL COVER F 1.00 DOWNSLOPE SETBACK I 18.00 UPSLOPE SETBACK J 9.00 SIDESLOPE SETBACK K 12.50 MOUND LENGTH L 111.00 MOUND WIDTH W 38.00 PROFILE HOLE #1 0 TO 6" TOPSOIL 6" TO 2 FEET BLOCKY CLAY 2 TO 4 FEET BROWN ROCKY CLAY WITH ANGULAR ROCK FRAGMENTS 4 TO 8 FEET WHITISH-YELLOWISH TO GRAYISH SANDY CLAY SAMPLE AT 48 INCHES CLAY TYPE 4, LTAR = 0.2 GPD/SF - MOUND SYSTEM DESIGN CALCULATIONS FOR A MOUND SYSTEM DUE TO LOW LTAR AND HIGH MOISTURE CONTENT IN THE PROFILE HOLES, A MOUND TYPE SYSTEM WITH A MINIMUM OF 24 INCHES OF SAND FILL BELOW THE DISTRIBUTION MEDIA AND WITH PRESSURIZED DISTRIBUTION NETWORK IS RECOMMENDED FOR THIS SITE. LTAR FOR DESIGN = 0.2GPD/SF NUMBER OF BEDROOMS = 5 MAXIMUM DAILY FLOW = QMAX QMAX = 3 BEDROOMS X 2 PERSONS/BEDROOM X 75 GALLONS/PERSON/DAY + 2 ADDITIONAL BEDROOMS AT 75GPD QMAX = 600 GPD SITE SLOPE WITHIN ABSORPTION AREA = 8% SEPTIC TANK V = 1250 GALLONS FOR 4 BEDROOMS PLUS 250 GALLONS FOR EACH ADDITIONAL BEDROOM USE 2000 GALLONS, THREE-COMPARTMENTS, ELECTRIC LIFT SEPTIC TANK BY VALLEY PRECAST ABSORPTION AREA SOIL LOADING RATE SLR = 0.3 GPD/SF LINEAR LOADING RATE LLR = 7.2 GPD/LF IN ORDER TO REDUCE THE LENGTH OF THE MOUND SYSTEM FOR A SECONDARY SAND, SAND FILL LOADING RATE SFLR = 0.8 GPD/SF DISTRIBUTION CELL WIDTH (A) A = LLR/SFLR A = (7.2 GPD/F) / (0.8 GPD/SF) A = 9 FEET DISTRIBUTION CELL WIDTH (B) B = DESIGN FLOW/LLR B = 600 GPD/7.2GPD/SF B = 84 FEET THE ABSORPTION BED DIMENSION WITHIN THE MOUND SYSTEM WILL BE 9 FEET WIDE BY 84 FEET LONG. THE ABSORPTION BED WILL BE PARALLEL TO THE SURFACE CONTOURS. WITH THE ADDITIONAL 1 FOOT ON EACH SIDE THE DISTRIBUTION CELL DIMENSIONS WILL BE 11 FEET BY 86 FEET. THE PERIMETER OF THE MOUND WILL BE 38 FEET WIDE AND 111 FEET LONG. SITE PREPARATION STAKE OUT THE MOUND PERIMETER. CUT AND REMOVE ANY EXCESSIVE VEGETATION. INSTALL THE DELIVERY PIPE FROM THE DOSING CHAMBER TO THE MOUND. BACKFILL AND COMPACT THE PIPE TRENCH. FILL PLACEMENT PLACE THE FILL MATERIAL OVER THE PREPARED SITE. THE FILTERING MATERIAL USED IN A SAND FILTER MUST BE CLEAN, COARSE SAND, CLASSIFIED AS PRIMARY SAND OR SECONDARY SAND. THE ABOVE DESIGN WAS PREPARED BASED ON SECONDARY SAND WITH SAND FILL LOADING RATE OF 0.8 GPD/SF. THE CLASSIFICATION OF THE SAND FILL TO BE USED IN THE MOUND SYSTEM MUST BE LESS THAN 30 DAYS OLD AND SUBMITTED TO THE ENGINEER PRIOR TO THE SAND FILL PLACEMENT. THE RESULTS OF THE SAND FILL SPECIFICATION MIGHT REQUIRE A REVISION OF THE SYSTEM. THE HEIGHT OF THE SAND FILL SHOULD BE THE ELEVATION OF THE TOP OF THE ABSORPTION BED. SHAPE THE SIDES OF THE MOUND TO THE RECOMMENDED SLOPE, AS SHOWN ON THE DETAILS. DISTRIBUTION NETWORK PLACEMENT CAREFULLY PLACE THE COARSE AGGREGATE ON THE SAND BED. THE COARSE AGGREGATE WILL CONSIST OF 3/4 TO 2-1/2 INCH CLEAN, CRUSH ROCK. LEVEL THE AGGREGATE TO A MINIMUM DEPTH OF 6 INCHES. ASSEMBLE THE DISTRIBUTION NETWORK OVER THE AGGREGATE. THE DISTRIBUTION NETWORK WILL CONSIST OF EIGHT 1.25-INCH DIAMETER SCH40 PVC, 41-FEET LONG LATERALS, (THREE ON EACH SIDE OF A 1-1/4-INCH DIAMETER CENTER MANIFOLD). THE INVERTS OF THE LATERALS SHALL BE PERFORATED WITH 1/8-INCH HOLES SPACED EVERY 36 INCHES. FOR THE PRESSURE DISTRIBUTION NETWORK USE SCHEDULE 40 PVC (ASTM D 2665) OR ABS (ASTM 2661) PIPE. THE LATERALS SHALL BE LAID LEVEL. CONNECT THE FLUSHING ASSEMBLY AT THE OUTER END OF EACH LATERAL. PLACE A MINIMUM OF 3 INCHES OF ADDITIONAL AGGREGATE OVER THE CROWN OF THE PIPES. PLACE A SUITABLE BACKFILL BARRIER, SUCH AS FILTER FABRIC, OVER THE AGGREGATE. SQUIRT TEST OF THE RESIDUAL HEAD ON THE MOUND LATERALS REMOVE THE END CAPS OF THE FLUSHING ASSEMBLY IN ORDER TO FLUSH THE LATERALS CLEAN FROM ANY DRILLING DEBRIS OR DIRT. PROVIDE ONE 1/8-DIAMETER HOLE IN A TEMPORARY CAP ON THE ENDS OF THE FLUSHING ASSEMBLY FOR THE SQUIRT TEST. RUN THE SQUIRT TEST TO MEASURE THE 5-FT RESIDUAL HEAD (+/-10%) AFTER THE TEST REMOVE THE TEMPORARY, PERFORATED CAPS AND REPLACE WITH THE PERMANENT CAPS. COVERING OF THE MOUND SYSTEM PLACE A FINER TEXTURED SOIL, SUCH AS CLAY OR SILT LOAM OVER THE TOP OF THE BED, TO A MINIMUM THICKNESS OF 6 INCHES. PLACE ADDITIONAL 6 INCHES OF GOOD QUALITY TOPSOIL OVER THE ENTIRE MOUND SURFACE. PLANT GRASSES ADAPTABLE TO THE CLIMATE OVER THE MOUND SYSTEM. PUMP SELECTION A PUMP CAPABLE OF DELIVERING 37GPM AGAINST 27 FEET OF HEAD CAN BE USED. THE ELEVATIONS BETWEEN THE PUMP INVERT AND THE MANIFOLD INVERT MUST BE FIELD VERIFIED. THE PUMPING SYSTEM MUST ALSO INCLUDE PUMP CONTROLS AND AN ALARM SYSTEM, AUDIBLE AND VISUAL. THE PUMP DOSING WILL BE ON DEMAND WITH 90 GALLONS PER DOSE. USE ORENCO, PF500511 HIGH HEAD EFFLUENT PUMP, 115/230V, 50GPM, 1 2 HP, OR EQUIVALENT, APPROVED BY THE ENGINEER. WHEN THE PUMP SHUTS OFF THE EFFLUENT LINE WILL DRAIN BACK INTO THE PUMP CHAMBER. THE PUMP SYSTEM MUST BE TESTED BEFORE THE FINAL INSPECTION OF THE SEPTIC SYSTEM AND A LETTER OF THE TEST SUBMITTED TO THE ENGINEER. INSPECTION PIPE INSTALL A 4 INCH DIAMETER INSPECTION PIPE ON BOTH ENDS OF THE GRAVEL BED. THE PIPE WILL BE OPEN ON THE BOTTOM. THE BOTTOM OF THE PIPE WILL BE AT THE SAME ELEVATION AS THE BOTTOM OF THE GRAVEL BED. THE BOTTOM 8 INCHES OF THE INSPECTION PIPE WILL BE PERFORATED. THE PIPE WILL BE COVERED WITH A VENT CAP. PROFILE HOLE #2 0 TO 1 FOOT OF TOPSOIL 1 TO 2 FEET BLOCKY CLAY 2 TO 7 FEET BROWN, HARD CLAY 7 TO 8 FEET LIGHT BROWN, WHITISH, VERY MOIST, SANDY-SILTY CLAY AT 4.5 FEET, CLAY, TYPE 4, LTAR = 0.2 GPD/SF - MOUND SYSTEM AT 7 FEET MOISTURE CONTENT, MC=35% GENERAL NOTES 1. BEFORE DIGGING NOTIFY ALL APPLICABLE UTILITY COMPANIES. 2. OBTAIN OWTS PERMIT FROM THE EAGLE COUNTY ENVIRONMENTAL HEALTH DEPARTMENT PRIOR TO INSTALLATION OF THE SYSTEM. 3. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. 4. NOTES AND DETAILS ON SPECIFIC DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. 5. CONFLICTS OR DISCREPANCIES WITH GRADES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY AND PRIOR TO PROCEEDING WITH WORK. 6. ALL FINISH GRADES SHALL PROVIDE FOR NATURAL RUNOFF OF WATER WITHOUT LOW SPOTS OR POCKETS. 7. ALL DISTURBED AREAS WILL BE RESTORED AND REVEGETATED. 2.8' 6'1.5'2' FROM PUMP MOUND SECTION NOT TO SCALE 9" INSPECTION PORT 4-INCH DIAMETER SDR35 WITH PERFORATIONS ON THE BOTTOM 8-INCHES VENT CAP CLEARED AND RAKED SURFACE SAND FILL MANIFOLD INVin=2.9' ABOVE EXISTING GRADE 1.5' 3/4" TO 2-1/2" ROCK 41 FEET, 1.25-INCH DIAMETER SCH40PVC LATERALS PERFORATED WITH 1/8-INCH HOLES AT 3-FT INTERVALS AT THEIR INVERTS FILTER FABRIC, MIRAFI 140N, NONWOVEN CLAY OR TOPSOIL FILL MOUNDED AT THE MIDDLE TOPSOIL 6-FT, 1.25 INCH DIAMETER SCH40 PVC CENTRAL MANIFOLD I = 18'A+2 = 11'9' 3 1 ~8% WH ITE SPR INGS ROAD40' Pub l ic R ight - Of - Way Lot 4 2.229 acres G R A N I T E S P R IN G S T R A I L 5 0 ' P u b l i c R i g h t - O f - W a y LOT 5 PROFILE HOLE - 2 PROFILE HOLE - 1 GARAGE EL=9211' MAIN LEVEL EL=9212' INVout=9207' INVin=9198' CLEANOUT TOP OF RISER ELEVATION = 9201' 75 FEET SDR35 BUILDING SEWER LINE. SET THE FIRST AND THE LAST 5 FEET OF THE PIPE AT 2% SLOPE (INSULATE THE PIPE WHERE DEPTHS ARE LESS THAN 4 FEET BELOW FINISH GRADE) 2000 GALLONS, 3-COMPARTMENTS, CONCRETE SEPTIC TANK WITH AN EFFLUENT FILTER AND A PUMP BY VALLEY PRECAST 38.73' 10.00' 41.94'26.58' 30.47' 29.72' 9.00' 84. 0 0 ' 32.00' 105 . 0 0 ' 18.00' 12.50' 12.50' 9.00' MOUND PERIMETER (SAND FILL) DISTRIBUTION CELL (GRAVEL BED) DISTRIBUTION LATERALS FLUSHING ASSEMBLY (TYPICAL AT THE END OF EACH LATERAL) 6-FT LENGTH, 1.25-INCH DIAMETER, SCH40 PVC CENTRAL MANIFOLD SIX, 41-FT LONG LATERALS, THREE ON EACH SIDE OF THE CENTRAL MANIFOLD,1.25-INCH DIAMETER, SCH40 PVC, PERFORATED AT THEIR INVERTS WITH 1/8-INCH HOLES AT 3-FOOT INTERVALS, WITH FLUSH ASSEMBLY AT THE ENDS, . INSPECTION PORT SEE DETAIL (TYPICAL AT BOTH ENDS OF THE DISTRIBUTION CELL) 11.00' 86. 0 0 ' ABOUT 62 FEET OF 1.5 INCH DIAMETER, SCH40 PVC TRANSPORT LINE NOTES: 1. BENDS IN THE BUILDING SEWER SHALL BE LIMITED TO 45 DEGREES. 2. THE SEPTIC TANK SHALL BE INSTALLED LEVEL. 3. IF HIGH GROUND WATER TABLE IS ENCOUNTERED DURING CONSTRUCTION, THE SEPTIC TANK MUST BE ANCHORED TO PREVENT UPLIFT. 4. THE TANK SHALL HAVE RISERS OVER EACH ACCESS MANHOLE AND ALL RISERS SHALL EXTEND TO OR ABOVE FINAL GRADE. 5. EACH RISER LEAD SHALL HAVE A SECURE CLOSING MECHANISM, SUCH AS A LOCK, SPECIAL HEADED BOLTS OR SCREWS, OR SUFFICIENT WEIGHT TO PREVENT UNAUTHORIZED ACCESS. 5. THE SEPTIC TANK AND ALL THE PIPING WILL BE BACKFILLED UP TO THE INVERTS PRIOR TO SCHEDULING AN INSPECTION. 6. THE EFFLUENT FILTER MUST HAVE THE HANDLE EXTENDED TO WITHIN FEW INCHES OF THE COVER FOR INSPECTION AND MAINTENANCE. 7. THE FIRST AND LAST FIVE FEET OF THE BUILDING SEWER LINE MUST HAVE A SLOPE OF 2%. 8. AVOID VEHICLE TRAFFIC OVER THE SYSTEM. 7. ALL INSTALLATIONS SHALL MEET THE RULES AND REGULATIONS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY AND OWTS REG 43, EFFECTIVE AUGUST 24, 2018. 8.FOR THE INSPECTION OF THE SEPTIC SYSTEM - NOTIFY THE EAGLE COUNTY PUBLIC HEALTH AGENCY AND THE DESIGN ENGINEER A MINIMUM OF 48-HOURS PRIOR TO BACKFILLING ANY PART OF THE SYSTEM TO SCHEDULE AN INSPECTION. Sweeping Ell SIDE VIEW FLUSHING ASSEMBLY N.T.S. 10" VALVE BOX CLEANOUT CAP VENT CAP INSPECTION PORT 4-INCH DIAMETER SDR35 WITH PERFORATIONS ON THE BOTTOM 8-INCHES INSPECTION PORT N.T.S. DRAWN BY: CHECKED BY: PROJECT NO.: SHEET: DRAWING NO.: DATE:BYDESCRIPTIONDATENO.L.P. L.P. C-1 18-3303 MARCH 8, 2019 18-3303OWTS.DWGONSITE WASTEWATER TREATMENT SYSTEMLOT 4, BLOCK 5, CORDILLERA FILING NO. 34602 GRANITE SPRINGS TRAILEAGLE COUNTY, COLORADOPREPARED FORP.O. Box 724 EAGLE, CO 81631Tel (970) 390-0307www.lkpengineering.comMARK HEINBAUGH 11/23/22, 6:40 AM IMG_3226Tank.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:40 AM IMG_3229STA-MND.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:40 AM IMG_3230CO.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:41 AM IMG_3233Tanks.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:41 AM IMG_3235OWTS.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:41 AM IMG_3236OWTS2.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:41 AM IMG_8711Pump.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:41 AM IMG_8722ControlPanel.JPG https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:41 AM Travor-17 mnd filter fabric.jpg https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:41 AM Travor-18 mnd gravel backfill STA.jpg https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1 11/23/22, 6:42 AM Travor-21 flushin assembly CO East side.jpg https://mail.google.com/mail/u/0/#inbox?projector=1&messagePartId=0.3 1/1