Permit
Permit No. OWTS-024594-2022
Permit Type: OWTS Permit
Work Classification: New
Permit Status: Active
Issue Date: 7/7/2022 Expires: 11/4/2022
On-Site Wastewater
Treatement System
Project Address Parcel Number
966 WEBB PEAK, EDWARDS AREA,210720101007
Owner Information Address
Keystone East Ranch Corp 966 Webb Peak
Edwards, CO 81632
Phone:
Cell: (303) 883-6227
Email: lgl968@aol.com
Inspections:
For Inspections Call: (970)
328-8755
Engineer Phone Email
LKP Engineering, Inc., Luiza Petrovska, PE (970) 390-0307 luiza@lkpeng.com
Contractor License Number Phone Email
TS Construction and Engineering
LLC
tom.scheuermann@gmail.
com
(970) 389-6636OWTSPL-000191-20
22
Permitted Construction / Details:
Install the new system exactly as depicted in the LKP Inc design February 22nd, 2022, stamped and signed on May
11th, 2022 by Luiza Petrovska, PE. This system is designed to accommodate the maximum daily flows for a 5
bedroom residence.
The OWTS consists of one sewer line from the residence. A Valley Precast 1,500 gallon (2,000 gallon total volume), 3
compartment concrete septic tank with an Orenco high head pump PF500511 in the 3rd compartment will be used.
The pump will be set to dose 90 gallons per dose. The STA consists of a bed of 4 rows of 23 Infiltrator Quick4 Plus
Standard chambers on an unlined sand filter with three feet of secondary sand with distribution laterals, orifice size,
and space as shown in the approved design.
Note: Gradation of the sand media use must be completed within one month prior to the installation and confirmed
with the design engineer. If the sand does not conform to secondary or preferred sand media requirements, it
cannot be used for the sand treatment media.
Contact Eagle County Environmental Health and the design engineer well in advance of requesting inspections prior
to backfilling any component of the OWTS. The design engineer is responsible for conducting all inspections
necessary to certify the installation and assure the functionality of the system. System certification, along with
photos and a record drawing is required to be submitted to and approved by Eagle County Environmental Health
prior to the use of the system or occupancy of the dwelling.
THIS PERIMT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 120 DAYS
OF ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT
Issued by: Environmental Health Department, Eagle County, CO
Danielle Salinsky
Date
July 07, 2022
CONDITIONS
1.
2.ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM
REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED
3.THIS PERMIT IS VALID ONLY FOR PERFORMING WORK ON OWTS ASSOCIATED WITH STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND
BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH, ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS
SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT
4.1.6(A)(1) EAGLE COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS REQUIRES ANY PERSON WHO CONSTRUCTS,
ALTERS OR INSTALLS AN ON-SITE WASTEWATER TREATMENT SYSTEM TO BE LICENSED
Thursday, July 7, 2022 1
P.O. Box 724, Eagle, CO 81631 Tel. (970) 390-0307 www.LKPEngineering,com
October 30, 2023
Lou Glisan
Keystone East Ranch
400 No. Park Ave #10-B
Breckenridge, CO 80424
lgl968@aol.com
303-883-6227
RE: Inspection of Septic System Installation
5-bedroom Glisan Residence
Lot 11, Block 1, Cordillera Filing No. 35
966 Webb Peak
Eagle County, Colorado
Project No. 22-3582– OWTS-024594-2022
Dear Lou:
At your request, on August 15 and November 11, 2022, and on October 20, 2023, we visited
your property on Lot 11, Block 1, Cordillera Filing No. 35, 966 Webb Peak, Eagle County, Colorado.
The purpose of our site visits was to inspect the installation of the septic system.
The system was installed in overall compliance with the septic system design, Drawing No.
22-35825OWTS.dwg, dated May 11, 2022. At the time of the inspection, we observed the following:
The building sewer line (backfilled before inspection) was connected to the southeast side of
the residence, north of the SE corner. The cleanout was 4’10” away from the foundation wall, as
shown on the attached as-built sketch. They installed 1500-gallons, three compartments, precast,
concrete, septic tank by Valley Precast with an effluent filter in the second compartment and an
Orenco PF500511 high-head pump assembly in the third compartment. The inlet of the tank had the
sanitary Tees installed. The tank access ports had corrugated, plastic risers with secured, green,
plastic covers. The covers were secured with nuts, bolts, and screws. The risers over the first to
compartments were 4 feet high, and the one over the pump chamber was 3-ft high. The control panel
was installed on a wooden post, between the septic tank and the residence, close to the pump
chamber.
The effluent line from the pump chamber to end manifold of the soil treatment area, was about
42 feet long, 1.5-inch diameter, sch40 pvc pipe. The end manifold was about 7.5 feet long, 1.5-inch
sch40 pvc. The soil treatment area consisted of infiltrator chambers arranged in a bed configuration
with three rows of 23 Quick Four Plus Standard Infiltrator Chambers in each. Three feet of the onsite
silty, clayey, rocky soil was overexcavated from the bottom of the trenches and replaced with three
feet of secondary sand media (the graph is attached to this report). Pressure dosing system consisting
of 94-ft, 1.25-inch sch40 laterals perforated at the top with 1/8-inch holes at 4-ft intervals, suspended
from the side of each row of infiltrator chambers. The ends of the laterals were equipped with
flushing assemblies, piped through the end caps. A squirt test was performed during the last
inspection and it was satisfactory. Four inspection ports were installed (in the end caps of the first and
Glisan 5-Bedroom Residence
966 Webb Peak
Project No. 22-3582
October 30, 2023
P.O. Box 724, Eagle, CO 81631 Tel. (970) 390-0307 www.LKPEngineering,com
last chamber of the outside rows of the STA bed) in the opening opposite the pressure distribution
lines.
The septic tank installation and startup of the pump system were done by the installer, Tom
Scheuermann, TS Construction and Engineering, LLC, and his crew.
Kurt from the ECEH Department were present during the inspection and the squirt test as well
There is no other warranty either expressed or implied.
Sincerely,
LKP Engineering, Inc.
Luiza Petrovska, PE
cc: danielle.salinsky@eaglecounty.us, environment@eaglecounty.us
J:\_WP X4-LKP\_2022\22-3582OSIQ4PLUS-BEDSAND-PRESSURE.DOCX
10/30/2023
1500 GALLONS, 3-COMPARTMENTS, CONCRETE
SEPTIC TANK WITH AN EFFLUENT FILTER AND
AN ORENCO PUMP ASSEMBLY BY VALLEY
PRECAST
SDR35 BUILDING SEWER LINE.
BACKFILLED BEFORE INSPECTION
CLEANOUT
STA BED WITH 4 ROWS OF
23 INFILTRATOR
CHAMBERS PER ROW
QUICK 4 PLUS, STANDARD
INFILTRATOR CHAMBER
(TYPICAL)
~7.5 FEET, 1.25-INCH DIAM.
SCH40PVC END MANIFOLD
INSPECTION PORT AT
THE FOUR CORNERS
OF THE STA BED
FLUSHING ASSEMBLY
THROUGH THE END
CAPS
ABOUT 42 FEET 1.5-INCH
SCH40 EFFLUENT LINE
4 FEET RISERS34.0'
3 FEET RISER
HOUSE UN
D
E
R
CONSTRUC
T
I
O
N
~94', 1.25-INCH DIAMETER LATERALS,
PERFORATED WITH 1/8-INCH HOLES AT 4-FOOT
INTERVALS AT THE TOP OF THE LATERAL
CONTROL
PANEL
SKETCH
PROJECT NO.:
DATE:
PROJECT DESCRIPTION:LKP Engineering, Inc.
CIVIL/GEOTECHNICAL
PERMIT NO.:AS-BUILT
22-3582
OWTS-024594-2022
August 15 and November 22,
2022, and October 20, 2023
P.O. Box 724 Eagle, CO 81631, (970) 390-0307, www.LKPEngineering.com
LOT 11, BLOCK 1, CORDILLERA FILING NO. 35
966 WEBB PEAK
EAGLE COUNTY, COLORADO
LOU GLISAN RESIDENCE
Inspection Result
Eagle County, Colorado
P.O. Box 179 500 Broadway Eagle, CO
Phone: (970) 328-8730 Fax: (970) 328-7185
IVR Phone: 1-866-701-3307
Inspection Number: INSP-526566-2023 Permit Number: OWTS-024594-2022
Inspection Date: 10/20/2023
Inspector: Weems, Kirk
Permit Type: OWTS Permit
Inspection Type: OWTS Final Inspection
Work Classification: NewOwner:Keystone East Ranch Corp
Job Address:966 WEBB PEAK IVR Pin Number:196510
EDWARDS AREA, CO Project:<NONE>
Parcel Number:210720101007
Contractor:Phone: (970) 389-6636 / Cell: TS Construction and Engineering LLC
Inspection Status: Approved
Inspection Notes
Inspector Comments
Added Item: Septic Tank
10/20/23 - Inlet tee not visible from tank lid. GC will fix and send photo to LKP to be included in final
documents.
Added Item: Record Drawing
Received 10/30/2023 from LKP.
Added Item: Record Photos
Received 10/30/2023 from LKP.
Added Item: Site and Soil
Received 6/27/2022.
Added Item: Final Certification Letter
Received 10/30/2023 from LKP.
Added Item: General Plan
Received 6/27/2022.
Added Item: Soil Treatment Area (STA)
10/20/23 - Squirt approx 60" in height. Inspection ports in corners of bed. Flush assemblies in place at
distal end of laterals.
Added Item: Identification of Systems Contractor
TS Construction was the licensed installer.
Thursday, November 9, 2023
For more information visit: http://www.eaglecounty.us
Page 1 of 2
Thursday, November 9, 2023
For more information visit: http://www.eaglecounty.us
Page 2 of 2
11/7/23, 11:47 AM IMG_6819Control panel.JPG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:45 AM FXWB5564Inlet Tee.JPEG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:47 AM IMG_6818Pump assembly.JPG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:47 AM IMG_3445Tank.jpg
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:47 AM IMG_6820Tank.JPG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:53 AM NUQI0023Filter handle extended.JPEG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:47 AM IMG_6810Squirt test.JPG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:46 AM IMG_2668OEX STA Bed.JPG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:46 AM IMG_3437STA.jpg
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:46 AM IMG_3438STA - flushing assemblies.jpg
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:46 AM IMG_3443effluent tank-end manifold.jpg
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:47 AM IMG_6816W end of STA to House.JPG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:47 AM IMG_6817Tank-Control Panel - CO.JPG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:53 AM TLML9519CO cap.JPEG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1
11/7/23, 11:53 AM TTXX3734Inlet tee extended into the MH opening.JPEG
https://mail.google.com/mail/u/0/#all/FMfcgzGwHVJjLXbjzWfDRMWvpslSHWpl?projector=1&messagePartId=0.3 1/1