Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC82-041 GMCO_change order..—. .
I W 4
" No. .. one
.......
{CHANT: 6"W
:�
:�: y a,.w� ,C`.�� , L:i •` :«. .�o�:.'. :,::� i� ptt7 iAir 2, 1982
Dated ...............
OWNER's Project
7.0 miles of Seal Coat pavement resurfacing on Upper
Colorado River Road and Gypsum Creek Road.
CONTRACTOR ..... GKO.CQrPQration...................................................
Contract For .. Seal . Ceat . V4VeMent . Ue$urf acing Contract Date ..September . 29 = .1982 _ . , , , ... _
To: ..... GMCO,Corporation...........................................................
CONTRACTOR
You are directed to maize the changes noted below in the subject Contract:
OWNER
s
.c.0440-Dated ...September . 29, ........ 19.82 .... .
Nature of the Changes
See Attachment
Enclosures:
y' These changes result in the following adjustment of Contract Price and Contract Time:
Contract Price Prior to This Change Order
Net (Increase) tip Resulting; from this Change Order
Current Contract Price Including 1*his Change Order
NSPI:-ACID(_' 1910-,S-11( 1978 I:Jition)
l��Y. �lpanai 5�,�:cty ut
Professional Engineers
S ..?8,851.60............
S ..61,218.60.......... .
s ,853,070.20 .._. .. •.
Attachment to Change Order #1 for 7.0 miles
of Seal Coat Pavement resurfacing on Upper
Colorado River Road and Gypsum Creek Road
`..r' OWNER desires to change from 1/2" top size cover aggregate to 1"
top size cover aggregate on the most southerly 1.6 miles of
Gypsum Creek Road and on 0.25 miles of Upper Colorado River Road
where the existing surface is gravel due to improvement of align-
ment. Estimated application rates associated with the I" top size
aggregate are 38 lbs. per square yard for the cover coat aggregate
and 0.4 gallons per square yard for the bituminous binder material.
1" top size aggregate shall be course aggregate No. 67, as speci-
fied on page 691 of the Division of Highways, State of Colorado,
Standard Specification of Road and Bridge Construction, 1981. This
change results in the following unit item changes;
Present Revised Quantity Unit
Item Unit Quantity Quantity Change Price Increase D, se
Bituminou
Material
Binder Gal. 279104 289624 + 12520 1.40 $29128
Cover Coat
Aggregate
(1/211) Tons 19130 831 - 299 36.20 $1 :.8
Cover Coat
Aggregate
(1") Tons 0 412 + 412 36.20 $149914.40
$17,042.40
1$10,kM
Net Increase $ 69218.60
r
30 days
Contract Time Prior to This Change Order ..................................................... .
(Days or Date)
Net (Increase) (Decrease) Resulting from This Change Order ....................... ................... .
(Days)
Current Contract Time Including This Change Order ...... 30, days• _ .. , .. • . • • .. . . . . ............ . .
(Days or Date)
The Above Changes Are-k°1`� ... 1 .........
e • •i �l�ar
Eh INE:FR
By......
Date ....� �...� ............. 19,�� .
The Above Changes AreAccepted: ted: .. �% ..... t711�.. .......... .
pOA O
By. ..... .... ...............
Date L/C..... �.................. . 19. A�