HomeMy WebLinkAboutC82-042 B&B Excavating_change orderNo. .. one... .
CHANGE ORDER
Dated .September, 2.3, 1982
OWNER's Project .......................
Project .... , Fulford Drive- in ,Kaibab, SulQdjy.i,sion
B.&B. Excavating, Inc.
CONTRACTOR........................................................................
Paving Roadway Se tember 20, 1982....„
Contract For ............................... Contract Date ............ .
B. & B. Excavating.,.Inc
CONTRACTOR
You are directed to make the changes noted below in the subject Contract:
..... .. ...... ...........
OWNER
�iT >L�72Ct6
Gu By ... ! .... . ..........
n t
Dated .. ....�� ....... 19.
Nature of the Changes 0
Enclosures:
See Sheet- #2
These changes result in the following adjustment of Contract Price and Contract Time:
Contract Price Prior to This Change Order
Net Opwm se (Decrease) Resulting from this Change Order
Current Contract Price Including This Change Order
NSPE-ACEC 1910-8-B(1978 Edition)
® 1978. National Society of
Professional Engineers
$ --41,694-.-00..........
S ...... ?3?.•.QQ...........
S ... !a45:Z'QQ.........
Contract Time Prior to This Change Order ....................................
30................ .
(Days or Date)
Net (4 o) (Decrease) Resulting from This Change Order .........................
0................ .
(Days)
Current Contract Time Including This Change Order ...........................
. . 30
(Days ur Date)
005
The Above Changes AreYen:er�oed
The Above Changes Are Accepted:
E. '?.. ENGI .0 iy{ge.Y ......
ENG EER
Date ..... N I .........
......, 198z
��%%CONTj/RAACCTOR _
By. ...............
Date ...10 ". J` .................. lw�
OBecause of a width change in Fulford Drive from 26ft. to 22ft. for
ABC, and the pavement width from 22ft. to 20ft., except Pavement
widths to be 22ft. on (4) curves and 23ft. on (1) curve.
The Following changes are proposed:
Revisions to be made to plan Quantities as proposed by the CONTRACTOR
are as follows;
Contractor's Plan Revised Underrun Price
Price Quantity Quantity Underrun
Aggregate Base
Course 10.50/ton 1064 ton
Hot Bituminous
Pavement 34.00/ton 883 ton
NEW ITEM OF WORK
( Blading, Shaping and
and Rolling Roadway
Includes move in 6
Minimum of (8) hours Work
$225.00/Hr. x (8) Hours)
1000 ton 64 ton $672.00
843 ton 40 ton $1360.00
$2032.00
Contractor's Proposed Price
Equals Lump sum of $1800.00