Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC99-124 Evans-Mendel-Allison ConstructionC 99-ice y- yj
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER OX
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER* 0
PROJECT: Eagle County Rodeo Arena Gracdstarlds CHANGE ORDE1 NUMBER: 010
(name, address) 0426 Fairground Road
Eagle, CO 81631 IN-i ITIATION DATE: 4105199
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description
029R Provide overexcavation of footings per direction of Hepwonh-
Pawlak, Geotechnical, Inc.
Adjustment
$55,407
TOTAL $55,407
Not valid until signed by bon, Owner and Amhkee
Signature of the Contractor indicates his agreement herewith including any adlushnent in Me Contract Sum or Contract Time.
The original (Coptrai; Su ) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders .............................................................
The (CeatrastSum) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (CantiaetSum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged)
bythis Change Order.............................................................................................
The new (Glans astSum) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County —Facilities
P.O. Box 850
Ea , CO 81631
By.
ate:
Contractor:
Evans-M I -Allison Construction, Inc.
P.O. B 826
Avo CO 8 20.
Date: 4' 1S
$2,124.639
($43,128)
$2,081,511
$55,407
$2,136,918
6 Days
7/15/99
Architect:
David Lynn Wise, AIA
73017th Street, Suite 915
THE AMERICAN INSrn11TE OF ARCHITECTS,1735 NEW YORK AVE.. NW.. WASHINGTON, D, C. 200061 1 G701-1978
OWN
u
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER �X
ARCHITECT [
CONTRACTOR FX
FIELD 0
OTHER 0
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER:
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE:
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR:
CONTRACT DATE:
You are directed to make the following changes in this Contract:
CE No. Descriotlon
012R Delete heating system from the project
RECEIVE®
JUN 0 4 1Q99
FACILITIES MANAGEMENT
016
29-Apr-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adjustment
($2,062)
TOTAL ($2,062)
Not valid until signed by both Owner and Architect.
Signature of the Contractor Indicates his agreement herewith, Including any adjustment In the Contract Sum or Contract Time.
The original (Eenkaat Su ) (Guaranteed Maximum Cost) was .............................................
$2,124,639
Net Change by previously authorized Change Orders.............................................................
$110,333
The (6eRiraci.Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................
$2,234,972
The (6eWrasi-Slim (Guaranteed Maximum Cost) will be-(iAGwaced) (decreased) (uRGIuld)
bythis Change Order.............................................................................................
($2,062)
The new (CunkasCSum (Guaranteed Maximum Cost) including this Change Order will be ...
$2,232,910
The Contract Time will be (increased) (desreaced) {uRcpaRged) by
6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is
7/15/99
Owner.
Eagle County —Facilities
P.O. Box 850
Ea , CO 1631
B
its: 1
Contractor:
Evans -Mendel -Allison Construction, Inc.
P.O. Bo
Avo O 81 20
By:
Date:
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 915
Denver, CO 80202
By. _- : ddd{{{ - Gees
Dater I I
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 G701 -1978
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER �X
ARCHITECT FXJ
CONTRACTOR
FIELD
OTHER 0
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER:
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE:
Job Number: 028-099
TO (Contractor): Evans-Mendel-Alllson Construction, Inc. ARCHITECT'S PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR:
[KK�YY:7_C9�Un\Y�I
You are directed to make the following changes in this Contract:
CE No. Description
026 Provide tempered glass mirrors
RECEIVED
JUN 0 4 1999
FACILITIES MANAGEMENT
017
29-Apr-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adiustment
$422
TOTAL $422
Not valid until signed by bath Owner and Architect.
Signature of the Contractor Indicates his agreement herewith. Including any adjustment in the Contract Sum or Contract Time.
The original (C6RtR2at_Sum) (Guaranteed Maximum Cost) was ............................................. $2,124,639
Net Change by previously authorized Change Orders ............................................................. $108,271
The (GQRtrR2=1 RumI (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,232,910
The (Ceakast-Sum (Guaranteed Maximum Cost) will be (increased) (decraacsd) (uRspanged)
bythis Change Order............................................................................................. $422
The new (CeRtract-Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,233,332
The Contract Time will be (increased)) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County —Facilities
P.O. Box 850
Ea , C 81631
By
ate:
Contractor.
Evans -Mendel -Allison Construction, Inc.
P.O. B 6
Avo CO 8 20
By. /} !A
Date: y '?y
Days
7115199
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 915
Den, CO 80202
BY kQ--v
r-aIr,"a a
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 0701.1978
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER EKI
ARCHITECT QX
CONTRACTOR a]
FIELD
OTHER Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER:
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE:
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR:
CONTRACT DATE:
You are directed to make the following changes in this Contract:
CE No. Description
079 Provide shutter on south windows of CroWs Nest
RECEIVED
JUN 04 1999
FACILITIES MANAGEMENT
018
29-Apr-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adiustment
$379
TOTAL $379
Not valid until signed by both Owner and Architect.
Signature of the Contractor Indicates his agreement herewith, Including any adjustment in the Contract Sum or Contract Time.
The original (GcntracCSum) )(Guaranteed Maximum Cost) was ............................................. $2,124.639
Net Change by previously authorized Change Orders............................................................. $108,693
The (CeRtacCSum) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,233,332
The (GoAbaci-Sum (Guaranteed Maximum Cost) will be (increased) (dccre2se4) (uashaagerl)
by this Change Order............................................................................................. $379
The new(GGAtra 4Slim (Guaranteed Maximum Cost) including this Change Order will be ... $2,233,711
The Contract Time will be (increased)) by 6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is 7115/99
Owner:
Contractor.
Architect:
Eagle County —Facilities
Evans -Mendel -Allison Construction, Inc.
David Lynn Wise, AIA
P.O. Box 850
x 8 6
P.O_,
73017th Street, Suite 915
Eag , CO 81631
CO 620 �4jn,I
Denver, CO 802112
By
w%�f
By:
ate: _1L�. 11 /
.T
Date: 5� �1q
Date:
AIA Document G701 ' CHANGE ORDER '
Apol 1978 EDITION ' AIA COPYRIGHT 1978
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE.. NW., WASHINGTON, D.C. 20006
G701 -1978
%Mw
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER ❑R
ARCHITECT QX
CONTRACTOR Mx
FIELD 0
OTHER Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER:
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTIMATION DATE:
Job Number: 028.099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR:
CONTRACT DATE:
You are directed to make the following changes in this Contract:
CE No. Description
083R Provide additional excavation to remove unsuitable soils
under the new alley way on the North side of site.
RECEIVED
JUN 04 1999
FACILITIES MANAGEMENT
019
29-Apr-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adjustment
$834
TOTAL $834
Not valid until signed by bath Owner and Archted.
Signature of the Conlraator Indicates his agreement herewith, Including any adjustment in the Contract Sum or Contract Time.
The original (6eRtracLSum) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders .............................................................
The (CoRtgwA4vw) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (GoRtmgl-Sum (Guaranteed Maximum Cost) will be (increasedHileGAmsed) (uRchaRgatl
bythis Change Order.............................................................................................
The new (CeRtgctSum) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased)) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County --Facilities
P.O. Box 850
Eagle, CO 1631
te:
Contractor:
Evans -Mendel -Allison Construction, Inc.
P.O. B
AvQKCO 8 620 /J
Date: V d [ -i /f
$2,124,639
$108,693
$2.233,332
$834
$2,234,166
6 Days
7115199
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 915
Denver, CO 80202
By.Z��"
Date:
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.. NW.. WASHINGTON, D.C. 20006 G701 -1978
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER
ARCHITECT M
CONTRACTOR Q
FIELD
OTHER
RECEIVED
JUN 0 4 1999
FACILITIES MANAGEMENT
PROJECT: Eagle County Rodeo Arena Grandstands
CHANGE ORDER NUMBER:
022
(name, address) 0426 Fairground Road
Eagle, CO 81631
INTITIATION DATE:
4-May-99
Job Number: 028.099
TO (Contractor): Evans -Mendel -Allison Construction, Inc.
ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620
CONTRACT FOR:
Eagle County Rodeo Arena Grandstands
CONTRACT DATE:
11.09.98
You are directed to make the following changes in this Contract:
CE No. Descrlotlon Adjustment
053 Provide arena import credit per approval of Hepworth- ($20,677)
Pawlak, and credit bond on Change Order No. 10
TOTAL ($20,677)
Not valid until signed by both Owner and Architect.
Signature of the Contractor Indicates his soneement herevi th. Indudino any adiustmenl in the Contact sum or Contract Time.
The original (CaatraGt W ) (Guaranteed Maximum Cost) was ............................................. $2,124,639
Net Change by previously authorized Change Orders............................................................. $113,531
The (CeakasRSum) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2.238.170
The (Contrast -Sum) (Guaranteed Maximum Cost) will be{incmased (decreased) (uar daaged)
bythis Change Order............................................................................................. ($20,677)
The new(6entact Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,217,493
The Contract Time will be (increased)) by 6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is 7115/99
Owner: Contractor: Architect:
Eagle County —Facilities Evans -Me I -Allison Construction, Inc. David Lynn Wise, AIA
P.O. Box 850 P.O. 8266 730 17th Street, Suite 915
Eag CO
$1631 Av , CO 81 0 De O 80202
Byv✓�/j����� q..�
s �f l�j '". I�
is: C Date: Date: