HomeMy WebLinkAboutC99-124 Evans-Mendel-Allison ConstructionC 99-ice y- yj CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER OX ARCHITECT QX CONTRACTOR QX FIELD Q OTHER* 0 PROJECT: Eagle County Rodeo Arena Gracdstarlds CHANGE ORDE1 NUMBER: 010 (name, address) 0426 Fairground Road Eagle, CO 81631 IN-i ITIATION DATE: 4105199 Job Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands CONTRACT DATE: 11.09.98 You are directed to make the following changes in this Contract: CE No. Description 029R Provide overexcavation of footings per direction of Hepwonh- Pawlak, Geotechnical, Inc. Adjustment $55,407 TOTAL $55,407 Not valid until signed by bon, Owner and Amhkee Signature of the Contractor indicates his agreement herewith including any adlushnent in Me Contract Sum or Contract Time. The original (Coptrai; Su ) (Guaranteed Maximum Cost) was ............................................. Net Change by previously authorized Change Orders ............................................................. The (CeatrastSum) (Guaranteed Maximum Cost) prior to this Change Order was ................ The (CantiaetSum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) bythis Change Order............................................................................................. The new (Glans astSum) (Guaranteed Maximum Cost) including this Change Order will be ... The Contract Time will be (increased) by The Date of Substantial Completion as of the date of this Change Order therefore is Owner: Eagle County —Facilities P.O. Box 850 Ea , CO 81631 By. ate: Contractor: Evans-M I -Allison Construction, Inc. P.O. B 826 Avo CO 8 20. Date: 4' 1S $2,124.639 ($43,128) $2,081,511 $55,407 $2,136,918 6 Days 7/15/99 Architect: David Lynn Wise, AIA 73017th Street, Suite 915 THE AMERICAN INSrn11TE OF ARCHITECTS,1735 NEW YORK AVE.. NW.. WASHINGTON, D, C. 200061 1 G701-1978 OWN u CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER �X ARCHITECT [ CONTRACTOR FX FIELD 0 OTHER 0 PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: (name, address) 0426 Fairground Road Eagle, CO 81631 INTITIATION DATE: Job Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: CONTRACT DATE: You are directed to make the following changes in this Contract: CE No. Descriotlon 012R Delete heating system from the project RECEIVE® JUN 0 4 1Q99 FACILITIES MANAGEMENT 016 29-Apr-99 Eagle County Rodeo Arena Grandstands 11.09.98 Adjustment ($2,062) TOTAL ($2,062) Not valid until signed by both Owner and Architect. Signature of the Contractor Indicates his agreement herewith, Including any adjustment In the Contract Sum or Contract Time. The original (Eenkaat Su ) (Guaranteed Maximum Cost) was ............................................. $2,124,639 Net Change by previously authorized Change Orders............................................................. $110,333 The (6eRiraci.Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,234,972 The (6eWrasi-Slim (Guaranteed Maximum Cost) will be-(iAGwaced) (decreased) (uRGIuld) bythis Change Order............................................................................................. ($2,062) The new (CunkasCSum (Guaranteed Maximum Cost) including this Change Order will be ... $2,232,910 The Contract Time will be (increased) (desreaced) {uRcpaRged) by 6 Days The Date of Substantial Completion as of the date of this Change Order therefore is 7/15/99 Owner. Eagle County —Facilities P.O. Box 850 Ea , CO 1631 B its: 1 Contractor: Evans -Mendel -Allison Construction, Inc. P.O. Bo Avo O 81 20 By: Date: Architect: David Lynn Wise, AIA 730 17th Street, Suite 915 Denver, CO 80202 By. _- : ddd{{{ - Gees Dater I I THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 G701 -1978 CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER �X ARCHITECT FXJ CONTRACTOR FIELD OTHER 0 PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: (name, address) 0426 Fairground Road Eagle, CO 81631 INTITIATION DATE: Job Number: 028-099 TO (Contractor): Evans-Mendel-Alllson Construction, Inc. ARCHITECT'S PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: [KK�YY:7_C9�Un\Y�I You are directed to make the following changes in this Contract: CE No. Description 026 Provide tempered glass mirrors RECEIVED JUN 0 4 1999 FACILITIES MANAGEMENT 017 29-Apr-99 Eagle County Rodeo Arena Grandstands 11.09.98 Adiustment $422 TOTAL $422 Not valid until signed by bath Owner and Architect. Signature of the Contractor Indicates his agreement herewith. Including any adjustment in the Contract Sum or Contract Time. The original (C6RtR2at_Sum) (Guaranteed Maximum Cost) was ............................................. $2,124,639 Net Change by previously authorized Change Orders ............................................................. $108,271 The (GQRtrR2=1 RumI (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,232,910 The (Ceakast-Sum (Guaranteed Maximum Cost) will be (increased) (decraacsd) (uRspanged) bythis Change Order............................................................................................. $422 The new (CeRtract-Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,233,332 The Contract Time will be (increased)) by The Date of Substantial Completion as of the date of this Change Order therefore is Owner: Eagle County —Facilities P.O. Box 850 Ea , C 81631 By ate: Contractor. Evans -Mendel -Allison Construction, Inc. P.O. B 6 Avo CO 8 20 By. /} !A Date: y '?y Days 7115199 Architect: David Lynn Wise, AIA 730 17th Street, Suite 915 Den, CO 80202 BY kQ--v r-aIr,"a a THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 0701.1978 CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER EKI ARCHITECT QX CONTRACTOR a] FIELD OTHER Q PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: (name, address) 0426 Fairground Road Eagle, CO 81631 INTITIATION DATE: Job Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: CONTRACT DATE: You are directed to make the following changes in this Contract: CE No. Description 079 Provide shutter on south windows of CroWs Nest RECEIVED JUN 04 1999 FACILITIES MANAGEMENT 018 29-Apr-99 Eagle County Rodeo Arena Grandstands 11.09.98 Adiustment $379 TOTAL $379 Not valid until signed by both Owner and Architect. Signature of the Contractor Indicates his agreement herewith, Including any adjustment in the Contract Sum or Contract Time. The original (GcntracCSum) )(Guaranteed Maximum Cost) was ............................................. $2,124.639 Net Change by previously authorized Change Orders............................................................. $108,693 The (CeRtacCSum) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,233,332 The (GoAbaci-Sum (Guaranteed Maximum Cost) will be (increased) (dccre2se4) (uashaagerl) by this Change Order............................................................................................. $379 The new(GGAtra 4Slim (Guaranteed Maximum Cost) including this Change Order will be ... $2,233,711 The Contract Time will be (increased)) by 6 Days The Date of Substantial Completion as of the date of this Change Order therefore is 7115/99 Owner: Contractor. Architect: Eagle County —Facilities Evans -Mendel -Allison Construction, Inc. David Lynn Wise, AIA P.O. Box 850 x 8 6 P.O_, 73017th Street, Suite 915 Eag , CO 81631 CO 620 �4jn,I Denver, CO 802112 By w%�f By: ate: _1L�. 11 / .T Date: 5� �1q Date: AIA Document G701 ' CHANGE ORDER ' Apol 1978 EDITION ' AIA COPYRIGHT 1978 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE.. NW., WASHINGTON, D.C. 20006 G701 -1978 %Mw CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ❑R ARCHITECT QX CONTRACTOR Mx FIELD 0 OTHER Q PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: (name, address) 0426 Fairground Road Eagle, CO 81631 INTIMATION DATE: Job Number: 028.099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: CONTRACT DATE: You are directed to make the following changes in this Contract: CE No. Description 083R Provide additional excavation to remove unsuitable soils under the new alley way on the North side of site. RECEIVED JUN 04 1999 FACILITIES MANAGEMENT 019 29-Apr-99 Eagle County Rodeo Arena Grandstands 11.09.98 Adjustment $834 TOTAL $834 Not valid until signed by bath Owner and Archted. Signature of the Conlraator Indicates his agreement herewith, Including any adjustment in the Contract Sum or Contract Time. The original (6eRtracLSum) (Guaranteed Maximum Cost) was ............................................. Net Change by previously authorized Change Orders ............................................................. The (CoRtgwA4vw) (Guaranteed Maximum Cost) prior to this Change Order was ................ The (GoRtmgl-Sum (Guaranteed Maximum Cost) will be (increasedHileGAmsed) (uRchaRgatl bythis Change Order............................................................................................. The new (CeRtgctSum) (Guaranteed Maximum Cost) including this Change Order will be ... The Contract Time will be (increased)) by The Date of Substantial Completion as of the date of this Change Order therefore is Owner: Eagle County --Facilities P.O. Box 850 Eagle, CO 1631 te: Contractor: Evans -Mendel -Allison Construction, Inc. P.O. B AvQKCO 8 620 /J Date: V d [ -i /f $2,124,639 $108,693 $2.233,332 $834 $2,234,166 6 Days 7115199 Architect: David Lynn Wise, AIA 730 17th Street, Suite 915 Denver, CO 80202 By.Z��" Date: THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.. NW.. WASHINGTON, D.C. 20006 G701 -1978 CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ARCHITECT M CONTRACTOR Q FIELD OTHER RECEIVED JUN 0 4 1999 FACILITIES MANAGEMENT PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 022 (name, address) 0426 Fairground Road Eagle, CO 81631 INTITIATION DATE: 4-May-99 Job Number: 028.099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands CONTRACT DATE: 11.09.98 You are directed to make the following changes in this Contract: CE No. Descrlotlon Adjustment 053 Provide arena import credit per approval of Hepworth- ($20,677) Pawlak, and credit bond on Change Order No. 10 TOTAL ($20,677) Not valid until signed by both Owner and Architect. Signature of the Contractor Indicates his soneement herevi th. Indudino any adiustmenl in the Contact sum or Contract Time. The original (CaatraGt W ) (Guaranteed Maximum Cost) was ............................................. $2,124,639 Net Change by previously authorized Change Orders............................................................. $113,531 The (CeakasRSum) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2.238.170 The (Contrast -Sum) (Guaranteed Maximum Cost) will be{incmased (decreased) (uar daaged) bythis Change Order............................................................................................. ($20,677) The new(6entact Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,217,493 The Contract Time will be (increased)) by 6 Days The Date of Substantial Completion as of the date of this Change Order therefore is 7115/99 Owner: Contractor: Architect: Eagle County —Facilities Evans -Me I -Allison Construction, Inc. David Lynn Wise, AIA P.O. Box 850 P.O. 8266 730 17th Street, Suite 915 Eag CO $1631 Av , CO 81 0 De O 80202 Byv✓�/j����� q..� s �f l�j '". I� is: C Date: Date: