Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout4560 Frying Pan Rd - 246702300029Environmental Health
Department
P.O. Box 179
500 Broadway
Eagle, CO 81631-0179
Phone: (970)328-8755
Fax: (970)328-8788
EAGLE COUNTY
Project Address Parcel No.
004559 FRYING PAN RD BASALT AREA CO 246702300029
Owner Information Address
FRANK MONTALBANO 004559 1/2 FRYING PAN RD Phone: (970)927-5542 E
BASALT CO Cell:
Engineer(s) Phone
Church OWC, LLC (720)898-3434
Contractor(s) License Number Phone Primary Contractor
Excavation Services, Inc. 79-08 (970)963-8355 Yes
Insaections:
For Inspections call (970) 328-8755
Inspection IVR
OWTS Partial Inspection _ 093
OWTS Final Inspection 095
Permitted Construction / Details:
This permit grants permission to add an additional 1,000 gallon two compartment tank to connect to the
existing 1,000 gallon two compartment tank and an additional 400 square feet of absorption credit via 20
Infiltrator Q4 chambers to the existing 744 square feet of absorption area credit, designed to
accommodate a total of four bedrooms. Install exactly as depicted on the design as revised and stamped
on 9-23-08. The engineer must verify half of the effective capacity exists in the first compartment and
certify the system when installed. Occupancy will be permitted once certification is received.
CONDITIONS:
Office Copy
1. THIS PERMIT EXPIRES BY TIME LIMITATION AND BECOMES NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT
COMMENCED WITHIN 120 DAYS OF ISSUANCE, OR BEFORE THE EXPIRATION OF AN ASSOCIATED BUILDING PERMIT
2. ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM
REGULATIONS ADOPTED PURSUANT TO AUTHORITY GRANTED IN CR.S. 25-10-101, et seq., AS AMENDED
3. THIS PERMIT IS VALID ONLY FOR CONNECTION TO STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND
BUILDING REQUIREMENTS CONNECTION TO, OR USE WITH ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND
BUILDING DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMITAND WILL RESULT IN
BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT
4. CHAPTER IV, SECTION 4.03.29 REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN INDIVIDUAL SEWAGE DISPOSAL
SYSTEM TO BE LICENSED
Andrew Jessen September 23, 2008
Issued by: Environmental Health Department, Eagle County, CO Date
Department of
Environmental Health
Eagle (970) 328-8755
Fax: (970) 328-8788
El 3ebel (970) 704-2700
TOLL FREE: 800-225-6136
P.O. Box 179
500 Broadway
Eagle, CO 81631
www.eaglecounty.us
APPLICATION FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
ISDS Permit # 0tO7-5-&-0k- (7/g Building Permit # 5- _09-
INCOMPLETE APPLICATIONS WILL NOT BE ACCEPTED (SITE PLAN MUST BE INCLUDED)
FEE SCHEDULE
APPLICATION FEE $373.00
This fee includes the ISDS Permit, Site Evaluation (Percolation Test, or Soil Profile Observation) and
Final Inspection. Additional fees may be charged if a re -inspection is necessary, or a pre -construction
site visit or consultation is needed. The re -inspection fee is $55.00.
Make all remittance. payable to: Eagle County Treasurer.
Property Owner: JR,dr�V, Me>&[TALPhone: 970.92r-$S42
Mailing Address: �sj I%L F-12'�J�G (�i�N f�—6AS,4Li, L0
Applicant/Contact Person: z4i t� ,,t ,,fg&Pyj_-- Phone:
Licensed Systems Contractor: Cikp License # (3 r7 2
Company/DBA: Phone: 72p 4
Mailing Address: g59D /SST /4THA,_,, sr�E, �a�, L,4kEWn05 60 6021s_
Permit Application is for: F New Installation Alteration F Repair
Location of Proposed Individual Sewage Disposal System:
Legal Description:
Tax Parcel Number: 241p°102.3000Zq Lot Size: i
Assessor's Link: www.eaglecounty.us/patie/
Physical Address: 4596 %z FPIALG R4,d &0AL-
Building Type: V Residential/Single Family Number of Bedrooms:
[- Residential/Multi Family Number of Bedrooms:
Commercial/Industrial* Type of Use:
*These systems require design by a Registered Professional Engineer
Type of Water Supply: KPrivate Well [7 Spring F7 Surface
If Public Name of SupplieE�-
Applicant Signature :
Public
Office Use Only
Amount Paid: �7J?� Receipt#: Check#: ����� Date:
CHURCH OWC, LLC
Onsite Wastewater Consultants
September 30, 2008
Frank Montalbano
4559 1/2 Frying Pan Road
Basalt, Colorado 81621
Subject: OWS Design Installation Observation
4559 1/2 Frying Pan Road
Eagle County, Colorado
COWC Job No. C555
Mr. Montalbano,
As requested, CHURCH Onsite Wastewater Consultants, LLC (COWC) performed a site visit to
observe the installation of the onsite wastewater system (OWS) at the subject site. COWC prepared
an OWS design documents under Job No. C555 dated September 23, 2008.
A site visit was performed on September 19, 2008. At the time of the site visit, a new 1000-gallon
concrete, Copeland mid -seam septic tank was in place ready for backfill.
A site visit was performed on September 24, 2008. At the time of the site visit the sewer piping to
the new septic tank was bedded and an inlet tee was in the tank. There was also an effluent filter
installed. The two new trenches were installed with 10 Infiltrator Standard Quick 4 chambers in
each row. The trenches were at the same elevation and the installer was instructed to lower the
new trench furthest from the house so that the bottom of the first trench was the same elevation as
the top of the second trench. The trenches were level and contained observation pipes.
A site visit was performed on September 29, 2008. At the time of the site visit the chambered
trenches were adjusted to the appropriate elevations and the solid pipe between the trenches was
exposed. The trenches were backfilled. The first septic tank lid was broken and must be replaced.
LIMITATIONS
This letter provides information derived from observations made during three site visits to the
subject site. COWC has observed installed components of the OWS; no inspections have been
performed. COWC does not have the authority to control the installer's methods, protocols, schedule
or the equipment that has been selected by the installer and/or client. Neither the observations
made nor the contents of this letter imply any warrantee or guarantee of materials or workmanship.
It is possible that problems with the system may occur in the future due to installation procedures
that were not able to be observed by COWC.
The observed components of the OWS appear to be installed in general conformance with the
CHURCH OWS design, plans and specifications.
9590 West 14th Avenue Ste. 100, Lakewood, CO 80215 Voice 720-898-3434 FAX: 720-898-3455
r
v
If there are questions, please call.
Sincerely,
CHURCH Onsite Wastewater Consultants, LLC
Kathryn Kangas
RWW/kek
2 copies sent
OWS Installation Observations, C555
September 30, 2008, Page 2
Reviewed By:
Robert W. Wright, P.E
Copy to: Excavation Services, P.O. Box 1159, Carbondale, CO 81623
Copy to: Eagle County Health Department, P.O. Box 179, Eagle, CO 81631
P.O. BOX 527, Wheat Ridge, CO 80034-0567 Voice: 720-898-3434 FAX: 720-898-3455
CHURCH OWC, LLC
Onsite Wastewater Consultants
August 09 2007
Frank Montalbano
4559 1/2 Frying Pan Road
Basalt, Colorado 81621
Subject: OWS Design - Upgrade
4559 1/2 Frying Pan Road
Eagle County, Colorado
COWC Job No. C555
Frank,
a"L,5 III #
As requested, CHURCH Onsite Wastewater Consultants (COWL) has investigated the requested site and
conditions for preparation of an onsite wastewater system (OWS) design. The design was prepared
for Individual Sewage Disposal System (ISDS) permit submittal to Eagle County Health Department
(ECHD).
SITE CONDITIONS
The investigated site is an approximate 1/2-acre lot. A site plan is indicated on Figure 1. The property
is located in a rural area where an OWS is required and is serviced by a community well. There is an
existing OWS on the site which is permitted for a two bedroom dwelling. Vegetation at the proposed
drainfield area consists of a moderate cover of grasses.
EXISTING CONSTRUCTION
There is an existing 2-bedroom residence. The design was done by Glenwood Structural and Civil
under Job # 00066, dated 8/30/02.There is an easement in place with the adjacent neighbor, which
allows the neighbors field on your lot. _ aAowtvvo-compartment septic tank.
There is an existing field in place for a two -bedroom dwelling with an infiltrative area of 496 square
feet of surface including a 50% reduction for use of chambers. The residence is served water by a
community well.
PROPOSED CONSTRUCTION
A two -bedroom addition to the existing single-family residence is proposed. In accordance with the
ISDS regulations, the sewage load for a four -bedroom residence is 600 gallons per day (GPD). The
peak sewage loading is 900 GPD using a 1.5 peaking factor.
SUBSURFACE CONDITIONS
Subsurface conditions were explored by drilling two profile borings in the proposed drainfield areas
Subsurface conditions observed consisted of 6 inches of topsoil underlain to 8 feet by relatively dense
silty, clayey, sandy gravel with cobbles and boulders as per Hepworth Pawlak Geotech Job No 100-
761. Free water was not encountered in the profile boring.
9590 West 14th Avenue Ste. 100, Lakewood, CO 80215 Voice 720-898-3434 FAX: 720-898-3455
OWS Design, Job No. C555
Revised 07-08-09, Page 2
Five percolation test holes were drilled at the locations indicated on Figure 1 to depths ranging from
about 30 to 32 inches. The percolation test results ranged from 22 to 120 minutes per inch (MPI).
The average percolation rate recommended by Hepworth-Pawlak was 40 MPI.
RECOMMENDATIONS
The OWS should be installed as specified in Figures 1. The upgrade requires additional septic tank
capacity, a distribution box and additional drainfield trench area.
itZS O
ISDS regulations call for a minimum of a 1-500 gallon septic tank to serve a 4-bedroom dwelling.
There is an existing 1000-gallon tank in place. To satisfy this requirement the addition of a second
(1000-gallon, two -compartment tank should be installed in series providing a total tank capacity of {�
2000 gallons. To serve the field in a serial distribution design the installation of a two -outlet '
distribution box should be connected as identified in Figure 1.
i
Current ISDS regulations call for an infiltrative area for a four -bedroom dwelling of 1138 square feet.
ing a 50% reduction for chamber trenches a total of 569 square feet is required. With an existing
Iready in place, an additional 73 square feet is required. COWC proposes an additional 8 Quick
chambers in a trench, which will provide 78.96 square feet. 1-( & kt o ( 1,J
qq 3 -1y rat old ;k -4 cv--`
a % 3W- Vehicular movement over the field area should be kept at a minimum to avoid compaction of the
receiving soils. Dump trucks and rubber -tire backhoes are to be kept off of the proposed field area.
The surface of the field should be seeded after installation of the system. A cuorl s
"Pasture, or Prairie" should be used. These mixes rir% ^^}
to 15 inches high. No e--'---
and small livestock pa; (U
INSTALLATION OBS
The installation of thex drainfield construction c ' C)
septic tank is to be insti
bedded and distribution i
4 chambers in place bef �- D
service. Our office shoud > v✓ �/
24 hours in advance. TI
drainfield or additional si I v
additional unit rate fee.
The goal of an operation ais to observe the operation and perform minor
maintenance to the OWS to allow for proper, long term functioning of the system. COWC suggests an
operation and maintenance schedule or contract with a private maintenance company exist.
Septic tanks. • The scum and sludge accumulation in the septic tanks should be monitored
yearly. Once the scum or sludge thickness reaches 25% of the chamber depth, the entire
chamber should be pumped. We anticipate a pumping frequency of 1 to 3 years at design
flows. An alternative is a regular pumping frequency of every year.
OWS Design, Job No. C555
Revised 07-08-09, Page 3
Drainfield.•The surface around the fields is to be observed monthly for signs of failure such as
lush vegetation growth or effluent ponding. Liquid levels in each field section are to be
observed through the observation pipes and levels recorded.
General. System users must realize an onsite wastewater system is different from public
sewer service. There are daily considerations such as not putting plastic or other non -
biodegradable material into the system. Water use should be monitored so toilets are not
allowed to run when seals malfunction. Allowing fixtures to flow continuously to prevent water
lines from freezing is not acceptable. Although the proposed system can accommodate
variable flows, spreading water use over several hours and eliminating peak flows is
recommended. To illustrate the point, a malfunctioning toilet can consume in excess of 1000
GPD. Excessive daily loading could flood and irreparably harm the OWS.
COWC cautions against installation of a water softener. The chemical and hydraulic loading
from the backwash of a water softener may be detrimental to the OWS and a separate
dryweil should be constructed for the backwash waste, if a softener is installed. No land-
scaping or plastic can be used over the field, which will reduce performance of the field. The
design of the OWS is based on the treatment of domestic sewage only. Swimming pool or spa
water is not to be discharged into the OWS.
The proposed system design is based on design flows in the report. Increased flows may
hydraulically or organically overload each respective OWS, causing premature failure.
LIMITATIONS
Our investigation, layout, design, and recommendations are based on data submitted. If conditions
considerably different from those described in this report are encountered, we should be called to
observe the conditions. If proposed construction is changed, we should be notified to evaluate the
effect of the changes on the wastewater system. All construction is to be in accordance with the
Individual Sewage Disposal System (ISDS) regulations. Pipe type and size, burial requirements, and
other specifications, which are not depicted in our report, are to conform to the requirements of the
ISDS regulations. The installer of the system is to be approved by the ECHD and is to have
demonstrated knowledge of the ISDS regulations and requirements.
If you have questions or if COWC can be of additional assistant '
ce ly,
ria dwards, ROWP
Project Engineer
Attachments
3 copies sent
Ed%
6.25'x4' INFILTRATOR STANDARD 4 GRAVELLESS CHAMBER 4" OBSERVATION PIPE, TYP
o
1
1
1
1
1
-
6.25'x4' INFILTRATOR STANDARD 4 GRAVELLESS CHAMBER
0
o-
-
6.25'x4' INFILTRATOR STANDARD 4 GRAVELLESS CHAMBER
0
o
-
3'x4' INFILTRATOR
4" SCH 40 EFFLUENT PIPE FROM D-BOX, TYP QUICK.4 GRAVELLESS SERIAL OVERFLOW PIPE
CHAMBER SOLID 4" SCH 40 PVC
001
1
1
1
1
1
1
1
1
1
1
-
68'
FIELD DETAIL PLAN
N.T.S
PIPE CAP, TYP
4" OBSERVATION PIPE, TYP
EXISTING GRADE
/\\ BACKFILL, TYP
x
\� j�\ �j IN -SITU SOIL, TYP
00
d / INFILTRATOR QUICK4
GRAVELLESS CHAMBER
-_, SERIAL OVERFLOW PIPE Z
04
EXTENT OF
EXCAVATION
6' MIN 3'
(TYP) (TYP)
FIELD DETAIL PROFILE
N.T.S
TRENCH SPECIFICATI❑NS
DESIGN CRITERIA NUMBER OF TRENCHES - 4
RESIDENCE = 4 BEDROOMS LENGTH OF TRENCHES - 68 FEET,
RESIDENCEMS
17 CHAMBERS
LOADING = Q = GPD WIDTH OF EACH TRENCH - 3 FEET,
TOTAL LOADIATION
1 CHAMBER
RATE = 40 MPI TOTAL NUMBER OF CHAMBERS - 68
PERCOAREA
CHAMBERS
= (1.5 X 750 X Vn ) / 5 = 1138 SF T❑TAL AREA - 569 SF
50% REDUCTI❑N FOR TRENCHES =569 SF
CHURCH OWC, LLC
MONTALBANO RESIDENCE
Onsite Wastewater Consultants
Onsite Wastewater Engineering -Geological Engineering
FIELD DETAILS
9590 W. 14th Ave., Ste. 100, Lakewood, CO 80215
Voice: (720) 898-3434 Fax: (720) 898-3455
JOB NO. C555 DATE: 08/2007
FIGURE 3
R
•
®
?
O O
c a
Ld
Q
c
oo
Z
W
O
�
w
(n
t
N
cn
m 0
m a
^ v
co
co
J
N
a v
LZ
LD It
W
0 V
Z LL
m
3
`
UJI
'D
J
N>
0
O
U
CDgyp+
n'2
p� p
p t
y
7
O
Y m
p p
p
V
4]
m
CD N
rt.+
3 0.D
U
to m
CD O N
•CDco CL
-00
47,
c
N
o
CD
(r1
E
Q
C
U
CD
CD CD a-c
0
d 0
Y
c
7
O
—
p
a:
CDLZ
O
U
.Za
M
>
W
Z
w
0
Y
z
w ,{
U
ColO
W
Q
�—
J C
E •
a-
m w
U
s
D
0,a v
J
Q CO
�
�
Z
c0
O
LL
TF
c
o
=3
0
m
U
4�
LU
(q
CL
N
c
•�
L
O O
U U
O) LC)
a-+
x
N
W
o
CZ
I—
I�,
N OJ LO
C O LCCJ
CD
E
>
co -cozC?
Q
CZ
Q
_J tf c6 — o0
E
J��(�o
cn o �
J
0
(,0Q)o x
CZ
U
� LT
f—
0,00
3:0
'
U
co��J
CD
A)
0-_
0-
C
U� c°
>N
_Q
U(n N
�
�
O ro� C)
� �
r•a o
� O
�� �
CD
ate©
CLf)
0m
Y
CHURCH OWC, LLC
Onsite Wastewater Consultants
9590 West le Avenue, Ste. 100 Lakewood, CO 80215-4716
(720) 898-3434 Voice • (720) 898-3455 Fax
Facsimile Transmittal
To: /tom%✓ C/ r rr% From: e 0 e5
Company;��li
Redpient Fax: C��,�,�� Recipient Phone:
Job No:
:,ages: (including fax cover page) Date: 7�111ae5
0 Urgent 0 For Review ❑ Please Comment ❑ Please Reply Rf As Requested
Comments/Re:
/ AEI I�/lr 4d'i�2
Wl/iG GFf�G�G �� GAG G dlil�"�Gln/S �
YoIJ fF Gnu,
OUr 7;;�n 7;1'K- cs �" / s 0�
r�
/ �IL� "AA�� '. S 'G 1 Q! 5
eCCHURCH OYVC, LLC • (720)&34.i4 Volpe . (720) 896.3455 Fax
r
4" OBSERVATION PIPE, TYP
3'x4' INFILTRATOR
4" SCH 40 EFFLUENT PIPE FROM D—BOX, TYP QUICK 4 GRAVELLESS SERIAL OVERFLOW PIPE
CHAMBER SOLID 4" SCH 40 PVC
FIELD DETAIL PLAN
N.T.S
PIPE CAP, TYP
4" OBSERVATION PIPE, TYP
EXISTING GRADE
x BACKFILL, TYP
IN —SITU SOIL, TYP
v /
INFILTRATOR QUICK4
GRAVELLESS CHAMBER
SERIAL OVERFLOW PIPE -
'
EXTENT OF
EXCAVATION
6' MIN
F� OYP)
FIELD DETAIL PROFILE
N. f—S
RESIDENCE = 4 BEDRD❑MS .��
TOTAL LOADING = 0 = 600 GPD 5K (00 yc,
PERCOLATION RATE = 40 MPI �'
AREA=C. 15=1138SF
50% REDUCTI❑N FOR TRENCHES =569 SF
CHURCH OWC, LLC
Cnsite Wastewater Consultants
Onsite Wastewater Engineering -Geological Engineering
9590 W. 14th Ave., Ste. 100, Lakewood, CO 80215
Voice: (720) 898-3434 Fax: (720) 898-3455
3'
ICH SPECIFICATIONS
NUMBER OF TRENCHES - 4
LENGTH OF TRENCHES — 68 FEET, 17 CHAMBERS
WIDTH OF EACH TRENCH — 3 FEET, 1 CHAMBER
TOTAL NUMBER OF CHAMBERS — 68 CHAMBERS
TOTAL AREA -- 569 SF
MONTALBANO RESIDENCE
FIELD DETAILS
JOB NO_ C555 DATE: 08/2007
FIGURE 3
CHURCH OWC, LLC
Onslte Wastewater Consultants
9590 West 10 Avenue, Ste. 100 Lakewood, CO 80215-4716
(720) 998-3434 Voice • (720) 898-3455 Fax
Facsimile Transmittal
To: Monqueescha Walker From: Bob Wright
Company: Eagle County Health Department
Recipient Fax: 970-328-8788
Job No: C555
Pages: 5
❑ Urgent ❑ For review
Monqueescha,
Recipient Phone:
Client: Montalbano
Date: 8/13/09
❑ Please Comment ❑ Please reply
I apologize for taking so long to get back to you regarding the drainfseld sizing for the Montalbano OWS. I looked back
through the files and reviewed the gradation we have in our records. In evaluating that gradation against the percolation
test results, It appears that the sample taken probably is not representative of the areas where percolation tests were
conducted. The uniformity of the percolation test results would indicate that the soil is sandier than the gradation
reflect.
The gradation results of 31% gravel, 29% sand and 40% silt and clay does not give us a good idea what the actual clay
fraction is. With the percolation results averaging around 40 MPI, it appears that the silt fraction of the fines is the
governing portion of the gradation.
I have revised the report to reflect this evaluation, under the section titled Subsurface Conditions. The drainfieid sizing is
good as previously submitted. Please replace the previous revision to the written report with the one following this fax
cover letter, and being mailed to you today.
If there are questions, please feel free to give us a call at your convenience.
Thanks very much,
CHURCH Onsite Wastewater Con ultants, LLC
"4
Bob Wright, PE
Project Engineer
RECEIVE®
AUG 12 2000
ENVIRONMENTAL
Kl..d' y
CHURCH OWC, ULC . (M) 84&3434 Voice . (720) M-3455 FRX
. -.
CHURCH OWC, LLC
Onsite Wastewater Consultants
July 21, 2008
Frank Montalbano
4559 1/2 Frying Pan Road
Basalt, Colorado 81621
Subject: OWS Design Upgrade
4559 1/2 Frying Pan Road
Eagle County, Colorado
COWC Job No. C555
Mr. Montalbano,
As requested, CHURCH Onsite Wastewater Consultants (COWC) has Investigated the requested site
and conditions for preparation of an onsite wastewater system (OWS) upgrade design to augment
an existing drainfield to allow the addition of bedrooms to an existing residence. The design was
prepared for Individual Sewage Disposal System (ISDS) permit submittal to Eagle County Health
Department (ECHD).
SITE CONDITIONS
The investigated site is an approximate 1/2-acre lot. A site plan is indicated on Figure 1. The
property is located in a rural area where an OWS is required. Potable water is supplied to the lot by
a community well. The subject residence is served by an existing OWS which is permitted for a two
bedroom dwelling. Vegetation at the proposed drainfield area consists of a moderate cover of
grasses.
EXISTING CONSTRUCTION
There is an existing 2-bedroom residence. The design was performed by Glenwood Structural and
Civil under Job # 00066, dated August 30, 2002.There is an easement in place with the adjacent
neighbor, allowing the neighbor's drainfield on your lot.
The existing septic tank serving the subject residence is a 1000-gallon two -compartment septic tank.
There is an existing field in place for the two -bedroom dwelling with an infiltrative area of 372
square feet which includes an allowable 50% reduction for the use of chambers. The existing
drainfield chambers are the older model Infiltrator units that were 6.25-feet long by 3-feet wide,
having an allowable 15.5 SF of infiltrative area.
PROPOSED CONSTRUCTION
A two -bedroom addition to the existing single-family residence is proposed. In accordance with the
ISDS regulations, the sewage load for a four -bedroom residence is 600 gallons per day (GPD). The
peak sewage loading is 900 GPD using a 1.5 peaking factor. It is proposed to add a 1,000-gallon,
two -compartment septic tank in series with the existing septic tankto obtain the minimum tankage
required, and add two-40-foot chambered drainfield trenches, in series to the existing three
chambered trenches now serving the residence. The new drainfield trenches will use Infiltrator
Quick4 Standard units.
9590 West 14th Avenue Ste. 100, Lakewood, CO 80215 Voice 720-898-3434 FAX: 720-898-3455
Montalbano OWS Design, Job No. C555
Revised July 21, 2008, Page 2
SUBSURFACE CONDITIONS
Subsurface conditions were explored by drilling two profile borings in the proposed drainfield areas.
Subsurface conditions observed consisted of 6 inches of topsoil underlain to 8 feet by relatively
dense silty, clayey, sandy gravel with cobbles and boulders per Hepworth Pawlak Geotech Report,
Job No 100-761. Free water was not encountered in the profile boring.
Five percolation test holes were drilled at the locations indicated on Figure 1 to depths ranging from
approximately 30 to 32 inches. The percolation test results ranged from 22 to 120 minutes per inch
(MPI). The average percolation rate recommended by Hepworth-Pawlak was 40 MPI. The 120 MPI
test result was verified by Percolation Holes 4 & 5 due to a large rock in the bottom of the 120 MPI
percolation hole. Percolation results obtained from Holes 4 & 5 indicate that an average 40 MPI
percolation rate Is reasonable.
The soil gradation indicates that the soil was determined to have 31% gravel, 29% sand and 40%
silt and clay. The percolation results would appear to point to the clay fraction being less than the
weight required to constitute a clay loam classification. The fact that the one 120 MPI percolation
result was verified with two additional percolation tests that averaged 40 MPI provides a level of
confidence in classifying the soil as more of a sand loam, which will allow an application rate of 0.6
Gals/SF/Day. This classification matches the actual percolation test results more closely.
RECOMMENDATIONS
The OWS should be installed as specified in Figures 1-5. The system upgrade requires additional
septic tank capacity, a flow splitter basin and additional drainfield trench area.
ISDS regulations call for a minimum of a 1500 gallon septic tank capacity to serve a 4-bedroom
dwelling. There is an existing 1000-gallon tank in place. To satisfy the tankage requirement, the
addition of a second 1000-gallon, two -compartment tank should be installed in series, providing a
total tank capacity of 2000 gallons. To serve the field in a serial distribution design the installation of
an insulated, two -outlet flow splitter basin should be connected as identified in Figures 2 & 5.
Current ISDS regulations call for an infiltrative area for a four -bedroom dwelling of 1138 square feet.
Using an allowable 50% reduction for chambered trenches, a total of 569 square feet is required.
With an existing 372 SF of infiltrative area In the existing three chambered trenches, an additional
197 SF of infiltrative area is required. COWC proposes an additional 20 Quick 4 chambers in two
trenches, which will provide 197.4 square feet of usable area.
Vehicular movement over the drainfield can compact the soil, change the infiltrative capacity of the
receiving surface and cause early failure of the drainfield. No vehicular traffic over the drainfield
area shall be allowed during construction, or after the field has been installed.
The surface of the field should be seeded after installation of the system. A seed mix, such as
"Pasture, or Prairie" should be used. These mixes do not require irrigation and develop a growth 10
to 15 inches high. No automatic sprinkler system should be installed over the field.
INSTALLATION OBSERVATIONS
The installation of the OWS must be observed by the design engineer. The observations include
drainfield construction observations and other observations prior to backfill. At the times of the
observations, the septic tank is to be installed with risers on the tank, inlet and outlet connections
Montalbano OWS Design, Job No. C555
Revised July 21, 2008, Page 3
properly bedded, the flow splitter basin installed and connection to the field. The drainfield shall
have the Quick4 chambers in place and be ready backfilling. A final observation is required prior to
placing the OWS into service. Our office should be called at 720-898-3434 to observe the installation
of the OWS at least 24 hours in advance. These observations, any repeat observations, design
revisions, staking of drainfield or additional site visit requirements are not included with this design
and will be Invoiced at an additional unit rate fee.
OPERATION AND PREVENTATIVE MAINTENANCE SCHEDULE
The goal of an operation and maintenance schedule is to observe the operation and perform minor
maintenance to the OWS to allow for proper, long term functioning of the system. COWC suggests
an operation and maintenance schedule or contract with a private maintenance company exist.
Septic tanks: The scum and sludge accumulation in the septic tanks should be monitored
yearly. Once the scum or sludge thickness reaches 25% of the chamber depth, the entire
chamber should be pumped. We anticipate a pumping frequency of 1 to 3 years at design
flows. An alternative is a regular pumping frequency of every year.
Drainfield. The surface around the fields is to be observed monthly for signs of failure such
as lush vegetation growth or effluent ponding. Liquid levels in each field section are to be
observed through the observation pipes and levels recorded.
General: System users must realize an onsite wastewater system is different from public
sewer service. There are daily considerations such as not putting plastic or other non -
biodegradable material into the system. Water use should be monitored so toilets are not
allowed to run when seals malfunction. Allowing fixtures to flow continuously to prevent
water lines from freezing is not acceptable. Although the proposed system can accommodate
variable flows, spreading water use over several hours and eliminating peak flows is
recommended. To illustrate the point, a malfunctioning toilet can consume in excess of 1000
GPD. Excessive daily loading could flood and irreparably harm the OWS.
COWC cautions against installation of a water softener. The chemical and hydraulic loading
from the backwash of a water softener may be detrimental to the OWS and a separate
drywell should be constructed for the backwash waste, if a softener is installed. No land-
scaping or plastic can be used over the field, which will reduce performance of the field. The
design of the OWS 1s based on the treatment of domestic sewage only. Swimming pool or
spa water is not to be discharged into the OWS.
The proposed system design is based on the design wastewater flows stated In this report.
Increased wastewater flows or large wastewater flows over a short period of time may
hydraulically or organically overload the system and can cause premature failure.
LIMITATIONS
Our investigation, layout, design, and recommendations are based on data submitted. If conditions
considerably different from those described In this report are encountered, we should be called to
observe the conditions. If proposed construction is changed, we should be notified to evaluate the
effect of the changes on the wastewater system. All construction is to be in accordance with the
Individual Sewage Disposal System (ISDS) regulations. Pipe type and size, burial requirements, and
other specifications, which are not depicted in our report, are to conform to the requirements of the
ISDS regulations. The installer of the system is to be approved by the ECHD and is to have
demonstrated knowledge of the ISDS regulations and requirements.
Montalbano OWS Design, Job No. C555
Revised July 21, 2008, Page 4
If there are questions or if COWC can be of additional a sistance, please feel free to contact us at
your convenience.
Sincerely,
Robert W. Wright, PE
Project Engineer
Attachments
3 copies sent
Page 1 of 1
Ray Merry
From: Robert Wright [rwrig ht@cowc. info]
Sent: Friday, September 19, 2008 5:30 PM
To: Ray Merry
Subject: C555, Montalbano OWS Upgrade
Ray,
I stopped by at the Montalbano residence at 4995'/2 Frying Pan Road this afternoon at the request of Mike from
Excavation Services. They were setting the second 1,000 gallon septic tank.
I called and talked to Laura at your office, as I did not know that they had been issued a permit, as I have not
gotten the design revision to you yet. Mike didn't know either, but thought that Frank Montalbano had received
one.
After discussing the project with Laura, I instructed Mike to delete the flow splitter and to route the discharge from
the second tank into the first new chambered trench, and then serially pipe the two new trenches together, and
then to the inlet of the existing serial trenches.
We should be good to go.
I will have PDF copies of the modified drawings to you this weekend, with stamped copies mailed on Monday.
Please let me know if there are questions.
Thanks,
CHURCH Onsite Wastewater Consultants, LLC
Bob Wright, PE
Project Engineer
Phone 720.898.3434 Cell 720.272.6469
9/22/2008
CHURCH OC, LLC
Onsite Wastewater Consultants
September 23, 2008
Frank Montalbano
4559 1/2 Frying Pan Road
Basalt, Colorado 81621
Subject: OWS Design Upgrade
4559 1/2 Frying Pan Road
Eagle County, Colorado
COWC Job No. C555
Mr. Montalbano,
R8cpOv�b
sEP 9 0
'�'/'VjP ') ?Doi
At
� T
As requested, CHURCH Onsite Wastewater Consultants (COWC) has investigated the requested site
and conditions for preparation of an onsite wastewater system (OWS) upgrade design to augment
an existing drainfield to allow the addition of bedrooms to an existing residence. The design was
prepared for Individual Sewage Disposal System (ISDS) permit submittal to Eagle County Health
Department (ECHD).
SITE CONDITIONS
The investigated site is an approximate 1/2-acre lot. A site plan is indicated on Figure 1. The
property is located in a rural area where an OWS is required. Potable water is supplied to the lot by
a communitywell. The subject residence is served by an existing OWS which is permitted for a two
bedroom dwelling. Vegetation at the proposed drainfield area consists of a moderate cover of
grasses.
EXISTING CONSTRUCTION
There is an existing 2-bedroom residence. The design was performed by Glenwood Structural and
Civil under Job # 00066, dated August 30, 2002.There is an easement in place with the adjacent
neighbor, allowing the neighbor's drainfield on the subject site.
The existing septic tank serving the subject residence is a 1000-gallon two -compartment septic tank.
There is an existing field in place for the two -bedroom dwelling with an infiltrative area of 372
square feet which includes an allowable 50% reduction for the use of chambers. The existing
drainfield chambers are the older model Infiltrator units that were 6.25-feet long by 3-feet wide,
having an allowable 15.5 SF of infiltrative area.
PROPOSED CONSTRUCTION
A two -bedroom addition to the existing single-family residence is proposed. In accordance with the
ISDS regulations, the sewage load for a four -bedroom residence is 600 gallons per day (GPD). The
peak sewage loading is" 900 GPD using a 1.5 peaking factor. It is proposed to add a 1,000-gallon,
two -compartment septic tank in series with the existing septic tankto obtain the minimum tankage
required, and add two-40-foot chambered drainfield trenches, in series to the existing three
chambered trenches now serving the residence. The new drainfield trenches will use Infiltrator
Quick4 Standard units.
9590 West 14th Avenue Ste, 100, Lakewood, CO 80215 Voice 720-898-3434 FAX: 720-898-3455
Montalbano OWS Design, Job No. C555
Revised September 23, 2008, Page 2
SUBSURFACE CONDITIONS
Subsurface conditions were explored by drilling two profile borings in the proposed drainfield areas.
Subsurface conditions observed consisted of 6 inches of topsoil underlain to 8 feet by relatively
dense silty, clayey, sandy gravel with cobbles and boulders per Hepworth Pawlak Geotech Report,
Job No 100-761. Free water was not encountered in the profile boring.
Five percolation test holes were drilled at the locations indicated on Figure 1 to depths ranging from
approximately 30 to 32 inches. The percolation test results ranged from 22 to 120 minutes per inch
(MPI). The average percolation rate recommended by Hepworth-Pawlak was 40 MPI, The 120 MPI•
test result was verified by Percolation Holes 4 8& 5 due to a large rock in the bottom of the 120 MPI
percolation hole. Percolation results obtained from Holes 4 & 5 indicate that an average 40 MPI
percolation rate is reasonable.
The soil gradation indicates that the soil was determined to have 31% gravel, 29% sand and 400/0
silt and clay. The percolation results would appear to point to the clay fraction being less than the
weight required to constitute a clay loam classification. The fact that the one 120 MPI percolation
result was verified with two additional percolation tests that averaged 40 MPI provides a level of
confidence in classifying the soil as more of a sand loam, which will allow an application rate of 0.6
Gals/SF/Day. This classification matches the actual percolation test results more closely.
RECOMMENDATIONS
The OWS should be installed as specified in Figures 1-5. The system upgrade requires additional
septic tank capacity and additional drainfield trench area.
ISDS regulations call for a minimum of a 1500 gallon septic tank capacity to serve a 4-bedroom
dwelling. There is an existing 1000-gallon tank in place. To satisfy the tankage requirement, the
addition of a second 1000-gallon, two -compartment tank should be installed in series, providing a
total tank capacity of 2000 gallons, with at least half of the design flow volume in the first
compartment of the first tank.
Current ISDS regulations call for.an infiltrative area for a four -bedroom dwelling of 1138 square feet.
Using an allowable 50% reduction for chambered trenches, a total of 569 square feet is required.
With an existing 372 SF of infiltrative area in the existing three chambered trenches, an additional
197 SF of infiltrative area is required. COWC proposes an additional 20 Quick 4 chambers in two
trenches, which will provide 197.4 square feet of usable area.
Vehicular movement over the drainfield can compact the soil, change the infiltrative capacity of the
receiving surface and cause early failure of the drainfield. No vehicular traffic over the drainfield
area shall be allowed during construction, or after the field has been.installed.
The surface of the field should be seeded after installation of the system. A seed mix, such as
"Pasture, or Prairie" should be used. These mixes do not require irrigation and develop a growth 10
to 15 inches high. No automatic sprinkler system should be installed over the field.
INSTALLATION OBSERVATIONS
The installation of the OWS must be observed by the design engineer. The observations include
drainfield construction observations and other observations prior to backfill. At the times of the
observations, the septic tank. is to be installed with risers on the tank, inlet and outlet connections
Montalbano OWS Design, Job No. C555
Revised September 23, 2008, Page 3
properly bedded, and connection to the field. The drainfield shall have the Quick4 chambers in place
and be ready backfiiling. A final observation is required prior to placing the OWS into service. Our
office should be called at 720-898-3434 to observe the installation of the OWS at least 24 hours in
advance. These observations, any repeat observations, design revisions, staking of drainfield or
additional site visit requirements are not included with this design and will be invoiced at an
additional unit rate fee.
OPERATION AND PREVENTATIVE MAINTENANCE SCHEDULE
The goal of an operation and maintenance schedule is to observe the operation and. perform minor
maintenance to the OWS to allow for proper, long term functioning of the system. COWC suggests
an operation and maintenance schedule or contract with a private maintenance company exist.
Septic tanks. The scum and sludge accumulation in the septic tanks should be monitored
yearly. Once the scum or sludge thickness reaches 25% of the chamber liquid depth, the
entire chamber should be pumped. We anticipate a pumping frequency of 1 to 3 years at
design -flows. An alternative is a regular pumping frequency of every year.
Drainfreld.• The surface around the fields is to be observed monthly for signs of failure such
as lush vegetation growth or effluent ponding. Liquid levels in each field section are to be
observed through the observation pipes and levels recorded.
General: System users must realize an onsite wastewater system is different from public
sewer service. There are daily considerations such as not putting plastic or other non -
biodegradable material into the system. Water use should be monitored so toilets are not
allowed to run when seals malfunction. Allowing fixtures to flow continuously to prevent
water lines from freezing is not acceptable. Although the proposed system can accommodate
variable flows, spreading water use over several hours and eliminating peak flows is
recommended. To illustrate the point, a malfunctioning toilet can consume in excess of 1000
GPD. Excessive daily loading could flood and irreparably harm the OWS.
COWC cautions against installation of a water softener. The chemical and hydraulic loading
from the backwash of a water softener may be detrimental to the OWS and a separate
drywell should be constructed for the backwash waste, if a softener is installed. No land-
scaping or plastic sheeting can be placed over the field, which will reduce performance of
the field. The design of the OWS is based on the treatment of domestic sewage only.
Swimming pool or spa water is not to be discharged into the OWS.
The proposed system design is based on the design wastewater flows stated in this report.
Increased wastewater flows or large wastewater flows over a short period of time may
hydraulically or organically overload the system and can cause premature failure.
LIMITATIONS
Our investigation, layout, design, and recommendations are based on data submitted. If conditions
considerably different from those described in this report are encountered, we should be called to
observe the conditions. If proposed construction is changed, we.should be notified to evaluate the
effect of the changes on the wastewater system. All construction is to be in accordance with the
Individual Sewage Disposal System (ISDS) regulations: Pipe type and size, burial requirements, and
other specifications, which are not depicted in our report, are to conform to the requirements of the
ISDS regulations. The installer of the system is to be approved by the ECHD and is to have
demonstrated knowledge of the ISDS regulations. and requirements.
Montalbano OWS Design, Job No. C555
Revised September 23, 2008, Page 4
If there are questions or if COWC can be of additional assistance, please feel free to contact us at
your convenience.
Sincerely,
Robert W. Wright, PE
Project Engineer
Attachments
3 copies sent
aJw
°
w
LL
2�
�O
• 1w
OW
zW
¢
Et LO1
xy_
WU
8E'ESL
p
O
�
a
M�Z6�OS,fiES
a
0
0�
o
a
-
O
I 2 2
el y I 3
wl
�IQ
0
U) o 10 0 0
I
I O O p
I
z
avn3nia¢
I
W
y gn �I
Ca
1
p p
I1
8 I
i
i 8
I
psi r
1
4
1
1
°a
¢ Lu
� wo°waW"p zu�¢ yti
o-zow�aZ�X wow ao
0 oau�w°z=°�z
� �zrogw3�zy `�wS 2Z
lu
WJaVu;¢¢kW U. 02
W � m W W O a W w� W
Q h U~ W¢ U O a z z OLL O
O(9 TU O
05;: �-W_�RO jU�Q
oyjq�Wuwi'LJ¢¢o UJ tri�Z�CxO
2jl/Ji�u2�jmWU�J¢2 Z2��o0
¢ zZ y U��tiWLL
3>jkaZ22�0110 0ul
��8v�c�wa�¢wLLa°ti WQU �.y p:LL
a Z
w
00,0E
Z
g
z
0
J
U
2
w
W
0
z
C0
X
W
01
iN C In
U c OD
J�W8
m
� co
o °0 o
U�.YC
o�11)o
=a
=(D��m
�'1
U(1'=U)�
��c
W>�
:ao
T�roya
= U)
U0 o °
�0,>
.LO
C
0
¢w
ti
�q0
U
UOU
1=¢N
xx J y�
W Z
va
��
r
�
I I
I I
I le�
r-I
II
ri
r-I
II
II
8
k 4 I I -I 1.
1I1 I III III
I I I 1 101
Y
Uo
R
°mJ
wz�
=Uv�
2�W
E7 10l
Q
3 �
J
t
N��Z6AS.6HS
-
>r
��
8X 81
Iry
q(
LO N
In u1
UCE
N O C
�Iu� m
wlo O
m
mo
Z W
3 c'�iw
<(wF-
0
'N
cc
W
0
CO
O
W O
z 0
W W
0 U)
Fb w d
(E O
0
Q
m
J
F
z
i
EXIST 6:25'x4' INFILTRATOR STANDARD GRAVELLESS
CHAMBER, TYP OF 3
—NEW 4" SCH 40 EFFLUENT PIPE, TYP
, 50', TYP ,
z 3'x4' INFILTRATOR NEW SERIAL OVERFLOW
"JQUICK 4 GRAVELLESS PIPE SOLID 4" SCH
,CHAMBER 40 PVC
z 1 40'. TYP
m 7—NEW TRENCH, TYP j
NEW 4" SCH 40 EFFLUENT
PIPE, TYP
10 STD QUICK4 CHAMBERS, TYP
FIELD DETAIL PLAN
N.T.S
PIPE CAP, TYP
C- �4" OBSERVATION PIPE, TYP
EXISTING GRADE
INFILTRATOR QUICK4
GRAVELLESS CHAMBER
0
04
EXTENT OF � ��
EXCAVATION SERIAL OVERFLOW PIPE
FIELD DETAIL SECTION
N.T.S
DESIGN CRITERIA
RESIDENCE = 4 BEDROOMS
TOTAL LOADING = Q = 600 GPD
PERCOLATION RATE = 40 MPf
AREA = (1.5 X 600' X Y-40 )/5 = 1138SF
50% REDUCTION FOR TRENCHES =569 SF
EXIST TRENCH AREA= 15.5 SF/CHAMBER X 24= 372 SF
569 SF— 372 SF= 197 SF
197 SF/9.87 SF/CHAMBER= 19.96 CHAMBERS
USE 20 QUICK4 CHAMBERS IN NEW TRENCHES
6' MIN F 3' �I
(TYP) T (TYP) j
TRENCH SPECIFICATIONS
# Or OLD TRENCHES — 3
LENGTH OF OLD TRENCHES — 50 FEET, 8 CHAMBERS EA
WIDTH OF EACH TRENCH — 3 FEET
TOTAL # OF OLD CHAMBERS= 3 X 8= 24
TOTAL AREA OLD CHAMBERS= 24 X 15.5 SF= 372 SF
# OF NEW TRENCHES= 2
LENGTH OF NEW TRENCHES= 50',.10 CHAMBERS EA
TOTAL # OF NEW CHAMBERS= 2 X 10= 20
TOTAL AREA OF NEW CHAMBERS= 20 X 9.87 SF= 197
SF
IUTAL UKAIINPICLU AKtA= ')/Z zr -r 11:1/ JI-= OW3 Jr
CHURCH QWC, LLC VIONTALBANO RESIDENCE OWS UPGRADE
Onsite Wastewater Consultants FIELD DETAILS
Onsite Wastewater Engineering -Geological Engineering
9590 W. 14th Ave., Ste. 100, Lakewood, CO 80215
Voice: (720) 898-3434 Fax: (720) 898-3455 JOB NO. C555 DATE: 09/19/2008 FIGURE 3
-
E
?.
�
p
U
cE-
c
6 O
a
a0 fn a]
F�-
�
lL
Q
C
LO It
LLJ
U
�
z E
m
:3
E
v
v 0
E a ai
O p L
5
v
m
Q Q
L
m
yQ.
W N
W
N
LU
a
Q
❑
2
U
O
c
�f
O
w z
z
o
uJ c�
❑_
O._-.
F
cn
U L
LLJ
U
a+ 0
CA
a
O
CCU
cn
m
J
.t.-.
Q
z
0
O
�
O
m
-2
U
CD
l_
2
_
W
N
rL
o�
C—IL
>
v
Q
o
f%
x
v
W V
x
W
C N
ip
9 CO Lo
(Q}
COcm
{Lj
J
! W
UHF°�
W
E
!2 v
o
000o
C-5
Co
o J d
U
t6
Q
°>
ap
U
$
=
O 03
a
�
`^
H
>°
001)
w
O
z
u
�
Q
z
w W
p
JQ>-
Z0-n z
(na
L- L
M:Um
1V�
o
w �cnw
4W�-
F p d
= Cwi O0 C)>-w
mU) toFcn oo
GO
z� in ao aJ
L>wLLI
m LI-Cp5 Q
z�
w!(x Up �
�
Ox
Z �m mmo m EM m
O
_
F-
U
w
"' Lbcn
") w
UZ)
c; 0
m
�O
�cz
l
mm} }m ��)
ZZYD
�QW t
aoU�
00
oLLJ
p
° °O°
°° o
O
U
LLI
p ° ° ° `4 'v
° O � '
F-
(Qn
00o
O °° °o OO°
°
°O':Si''.i
° p
Q
i�
° O O
U
a
p
d.
o°
0
LOiI C 9
O
qj
En
w
ui
R UJ
L%O�
w
(Y in
w
viU�
LLI
~O >
CL
= Q
2w
gaQ-2L
❑
z m w
N H
ZQrno
o m
W
w 0
m
z
z
�
LL
O cn
x
o
0o
z
O
z
L
Q
Q
z
OQwUCL
U
JCL
�0J
Z
(n
ow
O ZOUZ
o
a
IL
° ° >
LL
� . U
g � (n
Ld
z
E-
zo E-
o > LL,U��
(L
Q=1�
O p
o
J
Of
�t�a
LLI
Oa
a �i]�OQ
Ua
w- 0-
m(L
M
O O~ m
g D
OU
J�
J w:
C*4 M
C.)
Q U 0.�
Q w
Q Z M Z
w. L�
O
(!)Ow��
O�
U) OpaOm
d
wdd Q
i-QF r-
zU 0o
�a
wa
Z � ZLLJ
m-' U z
am wUo=o
w a
O �
Q�Z QEU7
CAFE-.
Q
00 ° � Q}. �
❑ m
LLI
Ua= 0 D
w cL w
O Z
CLdo
¢Q O�OU
UJ
O O
�>w
F-j
CO
O
D
(if O
ZQmiLioj
>
Qmcy
w w m Z) w O j
N
W WJMa.=LL
m
Ld O
LO
C O
mv a.
Q
Ld
w
CO r
C
E-
_I LLF LL, Z Q 0
z U
pm
( l
0
C.)S R O
U
y CO—
co
Q
QzQ 'N
�a Z�W
o�,�
-' N
-jm0)oo
U O
Z—
N 1
O 0Y
> Q
U�Z
>
mwOO�O�O
uj z
cn Z
Z �
LL
o>�
W 0
< LL. Z N
mJ> o-yam
-��
� 0)
O�Eo
Q
F-QWz�_QF'O
-X�
_�(D
J
U(nm� g 0 Z
JU-�-
w
U
ZO
N c ai c�
rn co
U
cii �U0m M
z(nOQ�~a-V)
wz
nVs C:
Ci.���ol)
Q
/
QO❑O
Z.;sOwsp�WQZm�>L`'1
2 r
z:t?\,
=wmJ QOw
Z�w fkfa:wLwt,VZQU
z0=
CO
UO�
'/ /
c�
O Z m 2 Z LL- Q
c0
Q7 i>
I ff)(-FF
PROJECT Yz- _-FEV149 ?a-Vt -Rd-
P 4RJ E �Fr_aIYLV_ YAD A 4CJ b C� rL
project description A t�O-N,Tn
ow j,ohtvft&
6
date
task/action
follow-up
start
date
completion
date
4c
FLb
L"O Agaz&
""- Iv
01
0
U
-'A
4, U4,
J
v
4A
1"-(- 0-
'VL) (A YV Q( T_ LIJ
qXqh
4v,--b V__ -(/U,,)
r /I/ 7./b,-�— -i
'f f
awe
ZI
y
YLI
PROJECT CONTACTS
name
phone/fox
e-mail
7RO P9 9
i&G# 55
,aq->Wj 8L- F 7-
-7
� VA t
documents enclosed
LI
L
notes
INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
EAGLE COUNTY ENVIRONMENTAL HEALTH DIVISION
P.O. Box 179 - 500 Broadway • Eagle, CO 81631
Telephone: (970) 328-8755
COPY OF PERMIT MUST BE POSTED AT INSTALLATION SITE. PERMIT NO. 2228-02 BP NO.
OWNER: MIKE AND KAREN PEPPERS PHONE: 970-927-3440
MAILING ADDRESS: 4559 FRYING PAN RD., BASALT, CO 81621
APPLICANT: SAME PHONE:
SYSTEM LOCATION: 4559 FRYING PAN RD., BASALT, CO TAX PARCEL NO. 2467-023-00-008
LICENSED INSTALLER:_ CHENAULT PLUMBING, OLEN CHENAULT LICENSE NO. PHONE:
DESIGN ENGINEER:_ GLENWOOD STRUCTURAL AND CIVIL ENGINEERING, ADOLFO GORRA PHONE NO. 970-928-0135
INSTALLATION GRANTED FOR THE FOLLOWING: MINIMUM REQUIREMENTS FOR A 3 BEDROOM RESIDENCE
1250 GALLON SEPTIC TANK, 1488 SQUARE FEET OF ABSORPTION AREA CREDIT, VIA 48 INFILTRATOR UNITS AS PER
ENGINEER'S DESIGN
SPECIAL INSTRUCTIONS: INSTALL IN SERIAL DISTRIBUTION AS PER ENGINEER'S DESIGN DATED 9/4/02 WITH A
CLEANOUT BETWEEN THE TANK AND THE HOUSE, AND INSPECTION PORTALS IN EACH TRENCH RAKE ALL TRENCH
SURFACES TO PREVENT THE SMEARING OF SOILS, AND DO NOT INSTALL IN WET WEATHER. BE SURE TO MAINTAIN
ALL APPLICABLE SET BACK REQUIREMENTS, AND DO NOT BACK FILL WITH ANY ROCKS LARGER THAN 8 INCHES IN
DIAMETER. CALL EAGLE COUNTY ENVIRONMENTAL HEALTH AND THE DESIGN ENGINEER FOR THE FINAL IN-
SPECTION PRIOR TO BACK FILLING ANY PART OF THE INSTALLATION, OR WITH ANY QUESTIONS REGARDING
THE INSTALLATION.
ENVIRONMENTAL HEALTH APPROVAL: LAURA FAWCETT DATE: SEPTEMBER 13, 2002
CONDITIONS:
1. ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM
REGULATIONS, ADOPTED PURSUANT TO AUTHORITY GRANTED IN 25-10-104, 1973, AS AMENDED.
2. THIS PERMIT IS VALID ONLY FOR CONNECTION TO STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING
REQUIREMENTS. CONNECTION TO, OR USE WITH ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING
DEPARTMENTS SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT, AND WILL RESULT IN BOTH LEGAL ACTION
AND REVOCATION OF THE PERMIT.
3. CHAPTER IV, SECTION 4.03.29 REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM
TO BE LICENSED.
FINAL APPROVAL OF SYSTEM (TO BE COMPLETED BY INSPECTOR):
NO SYSTEM SHALL BE DEEMED TO BE IN COMPLIANCE WITH THE EAGLE COUNTY INDIVIDUAL SEWAGE
DISPOSAL SYSTEM REGULATIONS UNTIL THE SYSTEM IS APPROVED PRIOR TO COVERING ANY PORTION OF
THE SYSTEM.
INSTALLED ABSORPTION OR DISPERSAL AREA: 1488 SQUARE FEET (VIA 48 INFILTRATOR UNITS AS PER DESIGN )
INSTALLED CONCRETE SEPTIC TANK 1250 GALLONS LOCATED 90 DEGREES AND 7 FEET FROM THE EAST SIDE OF THE
BUILDING
COMMENTS: THE FINAL INSPECTION WAS DONE BY RICHARDS RIGOLI OF EAGLE COUNTY ENVIRONMENTAL
HEALTH AND THE DESIGN ENGINEER ON 9/18/02. THE ENGINEER'S FINAL CERTIFICATION WAS RECEIVED ON 9/25/03
THIS SYSTEM IS LARGE ENOUGH FOR A 3 BEDROOM RESIDENCE.
ANY ITEM NOT MEETING REQUIREMENTS WILL BE CO CTED BEFORE FINAL APPROVAL OF SYSTEM IS
MADE. ARRANGE A RE -INSPECTION WHE WORK S COMPLETED.
ENVIRONMENTAL HEALTH APPROVAL r / DATE: SEPTEMBER 25, 2003
INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
EAGLE COUNTY ENVIRONMENTAL HEALTH DIVISION
P.O. Box 179 - 500 Broadway • Eagle, CO 81631
Telephone: (970) 328-8755
COPY OF PERMIT MUST BE POSTED AT INSTALLATION SITE. PERMIT NO. 2228-02 BP NO.
OWNER: MIKE AND KAREN PEPPERS PHONE: 970-927-3440
MAILING ADDRESS: 4559 FRYING PAN RD., BASALT, CO 81621
APPLICANT: SAME PHONE:
SYSTEM LOCATION: 4559 FRYING PAN RD., BASALT, CO TAX PARCEL NO. 2467-023-00-008
LICENSED INSTALLER: CHENAULT PLUMBING, OLEN CHENAULT LICENSE NO. PHONE:
DESIGN ENGINEER: GLENWOOD STRUCTURAL AND CIVIL ENGINEERING, ADOLFO GORRA PHONE NO. 970-928-0135
INSTALLATION HEREBY GRANTED FOR THE FOLLOWING: MINIMUM REQUIREMENTS FOR A 3 BEDROOM RESIDENCE
1250 GALLON SEPTIC TANK, 1488 SQUARE FEET OF ABSORPTION AREA CREDIT, VIA 48 INFILTRATOR UNITS AS PER ENGINEER'S DESIGN
SPECIAL INSTRUCTIONS: INSTALL IN SERIAL DISTRIBUTION AS PER ENGINEER'S DESIGN DATED 9/4/02, WITH A CLEAN -OUT BETWEEN THE TANK
AND THE HOUSE, AND INSPECTION PORTALS IN EACH TRENCH. RAKE ALL TRENCH SURFACES TO PREVENT THE SMEARING OF SOILS AND DO
NOT INSTALL IN WET WEATHER. BE SURE TO MAINTAIN ALL APPLICABLE SET BACK REQUIREMENTS, AND DO NOT BACK FILL WITH ANY ROCKS
LARGER THAN 8 INCHES IN DIAMETER. CALL EAGLE COUNTY ENVIRONMENTAL HEALTH AND THE DESIGN ENGINEER FOR THE FINAL IN-
SPECTION PRIOR TO BACK FILLING ANY PART OF THE INSTALLATION, OR WITH ANY QUESTIONS REGARDING THE INSTALLATION. THE
BUILDING CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL THE SEPTIC SYSTEM HAS BEEN INSPECTED AND APPROVED.
ENVIRONMENTAL HEALTH APPROVAL: Lti DATE: SEPTEMBER 13, 2002
CONDITIONS:
1. ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS,
ADOPTED PURSUANT TO AUTHORITY GRANTED IN 25-10-104, 1973, AS AMENDED.
2. THIS PERMIT IS VALID ONLY FOR CONNECTION TO STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING
REQUIREMENTS. CONNECTION TO, OR USE WITH ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL
AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT, AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT.
3. CHAPTER IV, SECTION 4.03.29 REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM TO
BE LICENSED.
FINAL APPROVAL OF SYSTEM (TO BE COMPLETED BY INSPECTOR):
NO SYSTEM SHALL BE DEEMED TO BE IN COMPLIANCE WITH THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS UNTIL THE SYSTEM
IS APPROVED PRIOR TO COVERING ANY PORTION OF THE SYSTEM.
INSTALLED ABSORPTION OR DISPERSAL AREA: SQUARE FEET (VIA )
INSTALLED TANK: GALLONS IS LOCATED DEGREES AND FEET INCHES
FROM
COMMENTS:
ANY ITEM NOT MEETING REQUIREMENTS WILL BE CORRECTED BEFORE FINAL APPROVAL OF SYSTEM IS MADE. ARRANGE A RE -INSPECTION WHEN WORK IS
COMPLETED.
ENVIRONMENTAL HEALTH APPROVAL DATE:
Incomplete Applications Will NOT Be Accepted
(Site Plan MUST be attached)
ISDS Permit # �) job
Building Permit #
APPLICATION FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
ENVIRONMENTAL HEALTH OFFICE - EAGLE COUNTY
P. 0. BOX 179
EAGLE, CO 81631
Eagle (970)328-8755, Fax (970)328-0349, El Jebel (970)927-3823
****************************************************************************
* FEE SCHEDULE
* APPLICATION FEE $350.00
* THIS FEE INCLUDES THE ISDS PERMIT, SITE EVALUATION (PERCOLATION TEST,
* SOIL PROFILE OBSERVATION) AND FINAL INSPECTION
* ADDITIONAL FEES MAY BE CHARGED IF A REINSPECTION IS NECESSARY, OR A
* PRE -CONSTRUCTION SITE VISIT OR CONSULTATION IS NEEDED
* REINSPECTION FEE $47.00, PRE -CONSTRUCTION SITE VISIT FEE $85.00
* MAKE ALL REMITTANCE PAYABLE TO: "EAGLE COUNTY TREASURER"
****************************************************************************
PROPERTY OWNER:
ve-
MAILING ADDRESS: 'Y5 - /y` 7' �� °�'� �� PHONE: 7
APPLICANT/CONTACT PERSON: fj'J //C' ..e_ eoQ 5 PHONE:IV I
LICENSED SYSTEMS CONTRACTOR: �i��� i�� i PHONE: fiq-129,?
COMPANY/DBA: ��-Eay Cr,�G f- ADDRESS. a3 /-���ie✓r�c L°es
******************************************************************** ******
PERMIT APPLICATION IS FOR: NEW INSTALLATION ( ) ALTERATION ( ) REPAIR
LOCATION OF PROPOSED INDIVIDUAL SEWAGE DISPOSAL SYSTEM:
,Q 7-,/3ci;� OF 4,1". 0 IA,- 7-;e*tiF< Al -// a j tictssr SLr�:' 47
sov3�i, ReV66 T6 G✓e-sT or- 'T/iz �� ��,ei.�eif'�9� ;'�'1�,�%�9,� iAI7X4..
Legal Description:
/t, i •�i� t�F- o.
Tax Parcel Number: -2 44.7 e 2 3 0 Q o 0 53 Lot Size:
Physical Address:
BUILDING PE: (Check applicable category)
( Residential/Single Family
( ) Residential/Multi-Family*
( ) Commercial/Industrial*
Number
Number
Type _
OP14
of Bedrooms 3
of Bedrooms
*These systems require design by a Registered Professional Engineer
TYPE OF WATER, -,SUPPLY: (Check applicable category)
(Well ( ) Spring ( ) Surface
( ) Public Name of Supplier:
APPLICANT SIGNATURE: ,,�--- Date:
AMOUNT PAID: ��- RECEIPT #: DATE: 7 10 0�
CHECK #: CASHIER:
DEPARTMENT OF
ENVIRONMENTAL HEALTH
(970)328-8755
FAX: (970) 328-8788
TOLL FREE:800-225-6136
www.eagle-county.com
September 25, 2003
Mike and Karen Peppers
4559 Frying Pan Rd.
Basalt, CO 81621
EAGLE COUNTY
RAYMOND P. MERRY, REHS
Director
RE: Final of ISDS Permit #2228-02, Tax Parcel #2467-023-00-008. Properly location:
4559 Frying Pan Rd., Basalt, CO.
Dear Mr. and Mrs. Pepper:
This letter is to inform you that the above referenced ISDS Permit has been inspected and
finalized. Enclosed is a copy to retain for your records. This permit does not indicate
compliance with any other Eagle County requirements. Also enclosed is a brochure regarding
the care of your septic system.
Be aware that later changes to your building may require appropriate alterations of your septic
system.
If you have any questions regarding this permit, please contact the Eagle County Environmental
Health Division at (970) 328-8755.
Sincerely,
Janet Kohl
Eagle County Environmental Health Department
ENCL: Educational Brochure
Final ISDS Permit
cc: files, September 2003 Chrono file
OLD COURTHOUSE BUILDING, 551 Broadway, P.O. Box 179, Eagle, Colorado 81631-0179
DEPARTMENT OF
ENVIRONMENTAL HEALTH
(970)328-8755
FAX (970) 328-8788
TDD: (970) 328-8797
TOLL FREE: 800-225-8136
www.eagle-county.com
EAGLE COUNTY, COLORADO
Date: September 13, 2002
TO: Chenault Plumbing & Heating
Raymond P. Merry, REHS
Director
FROM: Environmental Health Division
RE: Issuance of Individual Sewage Disposal System Permit #2228-02. Tax Parcel
#2467-023-00-008. Property Location: 4559 Frying Pan Rd., Basalt, CO.,
Peppers main residence.
Enclosed is your ISDS Permit #2228-02, and a field copy of the engineer design stipulated on the
permit. It is valid for 120 days, or for the duration of your current building permit for this
property. The enclosed copy of the permit must be posted at the installation site. Any changes
in plans or specifications invalidates the permit unless otherwise approved. Please note any
special requirements that may have been added to the design by this department.
Systems designed by a Registered Professional Engineer must be certified by the Engineer
indicating that the system was installed as specified. Eagle County Environmental Health
must also view the installation prior to back filling. Please call well in advance for your
final inspection. Your TCO will not be issued until our office receives this certification
from the engineer, and views the installation.
Permit specifications are minimum requirements only, and should be brought to the property
owner's attention.
This permit does not indicate conformance with other Eagle County requirements. Please
notify this office if you have not been contracted to perform this installation.
If you have any questions, please feel free to contact the Environmental Health Division at 328-
8755.
cc: files
Glenwood Structural and Civil Engineering, Adolfo Gorra
OLD COURTHOUSE BUILDING, 551 Broadway, P.O. Box 179, Eagle, Colorado 81631-0179
ISDS Permit #�" ®2 ction Date (a. is.0 2
TAM Final Inane
C2=18tsnese Form
Tank is IZ JO gal. Tank Material
Tank is located ft. and 0 degrees from E S1©E car'. L--XI;T04(.7- pri'v� v?e
eps....ue l.eesk!
Tank is located f t . anddegrees #sera
grMu umt lauarsW
Tank set level Tank lids within 8" of finished grade.
size of field ft2 �itunits lineal ft.
'recnrav�.vy y .
Cleanout is installed in between tank and house(+ 1/I00ft). 3
There is a "T" that goes down 14 inches in the inlet and
` outlet of the tank.
V Inlet.and outlet is sealed with tar•:tapej rubber gasket tc.
T-Vjnk -bas two-:dompartments with the.:i1a�ger.,.cQ artment closest to the..:;..;,,
house_
m4sa;eure: distance and relative direpZ.sL� to.. -fA:eld.
/
Depth of field. _ ft _A VE446f �owffC�d , tN �"n+ vcr� TO fete° rz- G1-05e j'o ytii�}. ✓ s AD'a
Soil interface raked.
Inspection portals at the .end of each trench.,
Proper distance to setbacks.
Chambers properly installed as per manufacturer$ specifications.
(Chambers latched, end plates properly installed, rocks temoved from
trenches, etc.)
Type of pipe used for building sewer Line 35 , leach field
other
Inspection meets rjmiremeata.
Copy form to installer's file if reeoamandations for improvement. ►ere
suggested.
AC71ON TAKEN: E-�J&rINEEIC vILL SE -NO j0)* OS/G,51Z-jiFrGA-J7p,A `CTFE-R•
Setbacks
Well Potable House Property Lake Dry Tank Drain
Water Lines line Stream Gulch
Fied 100 25 20 10 s0 25 10 10
50 10 5 10 50 10 * 10
-EAGLE- -6OUNTY : HEALTH
P.O. BOX 179
EAGLE, CO 81631
POOOUGI M1(NAgN sheen) ZW-r (FMW*J MR ro ma Mrn EVIL mcc r-omr MV
.,DB 9,?49- 02
SHEET NO.
CALCULATED
CHECKED BY
of
DATE n 4 • 1N P%Z
DATE
RON : " M I k:A CONSTRUCT I '01J FAX f 40. 9709273-1.40
Oct. 04 '_-Woo 07:11PN P?
September 28, 2000
MINA' Construction
Attn: Mike Peppers
4559 Frying Pan Road
�> Basalt, Colorado 81621
!t);;�uctr: �1pculcC't.rnn:
Job No. 100 761
Subject: Subsoil Study for Foundation Design and Percolation Testing, Proposed
Residence, 4559 Frying Pan Road, Eagle County, Colorado.
Dear Mr. Peppers:
As requested, Hepworth Pawlak Geoteclmical, Inc, performed a subsoil study and
percolation testing for foundation and septic disposal designs at the subject site. The
study was conducted in accordance with our agreement for geotechnical engineering
services to you dated September 15, 2000. The data obtained, and our recommendations
based on the proposed construction and subsurface conditions encountered are presented
in this report.
Proposed Construction: The proposed residence will be a single story wood frame
structure over a crawlspace located on the site as shown on R.S. 1. The attached garage
floor will be slab -on -grade. Cut depths are expected to be up to about 6 feet.
Foundation loadings for this type of construction are assumed to be relatively light and
.typical of the proposed type -of construction. The septic disposal system is proposed to
be located about 80 feet downhill to the east of the proposed residence.
If building conditions or foundation loadings are significantly different from those
described above, we should be notified to re -evacuate the recommendations presented in
this report
Site Conditions: The lot was vacant at the time of our field work. The site is currently
a fenced pasture. The ground surface across the lot is hilly with a moderately steep
slope down the east- There is about 20 feet of elevation difference across the property.
An existing single story log residence with a basement is located on Lot 9 to the west.
A metal frame residence is located to the north on Lot 8A. The lot is vegetated with
grass and weeds_
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating two exploratory pits in the building area and one profile pit in the septic
disposal area at the approximate locations shown on Fig. 1. The logs of the pits are
presented on Fig. 2. The subsoils encountered, below about '/a foot of topsoil, consist
of relatively dense gravel, Cobbles and boulders in a silty sand matrix. Results of a
ROr9 : ' P1 I k:H CONSTP.UCT I M FHn 1,10. : 97092734-40 Oct:. 09 22000 07:12Pr9 P3
MIKA Construction
September 28, 2000
Page 2
gradation analysis performed on a sample of the gravel (minus 3 inch fraction) obtained
from the site are presented on Fig. 3. No free water was observed in the pits at the
time of excavation and the soils were slightly moist to moist.
Foundation Recommendations_ Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soil designed for an allowable soil bearing
pressure of 3,000 psf for support of the proposed residence. Footings should be a
minimum width of 16 inches for continuous walls and 2 feet for -columns. Loose and
disturbed soils and existing fill encountered at the foundation bearing level within the
excavation should be removed and the footing bearing level extended down to the
undisturbed natural gravels. Voids created by the removal of large rocks should be
backfilled with compacted sand and gravel or concrete. Exterior footings should be
provided with adequate cover above their bearing elevations for frost protection.
Placement of footings at least 42 inches below the exterior grade is typically used in this
area- Continuous foundation walls should be reinforced top and bottom to span Iocal
anomalies such as by assuming an unsupported length of at least 10 feet. Foundation
walls acting as retaining structures should be designed to resist a lateral earth pressure
based on an equivalent fluid unit weight of at least 45 pcf for the on -site gravels,
excluding oversized rock, as backfill.
Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support
lightly loaded slab -on -grade construction_ To reduce the effects of some differential
movement, floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints
should be used to reduce damage due to shrinkage cracking. The requirements for joint
spacing and slab reinforcement should be established by the designer based on
experience and the intended slab use- A minimum 4 Inch layer of free -draining gravel
should be placed beneath slabs to act as a leveling course and to facilitate drainage.
This material should consist of minus 2 inch aggregate With less than 50% passing the
No_ 4 sieve and less than. 2% passing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95 % of
maximum standard Proctor density at a moisture content near optimum. Required fill
can consist of the on -site soils devoid of vegetation, topsoil and oversized rock.
Underdrain System: Although free water was not encountered during our exploration,
it has been our experience in the area that local perched groundwater can develop
during tiles of heavy precipitation or seasonal runoff. Frozen ground during spring
runoff can create a perched condition. We recommend below grade construction, such
as retaining walls and crawispace areas, be protected from wetting and hydrostatic
H-P GEOTECH
?OM : ' 'M I M4 COfETP.UCT I ON
FH x: NO. : 9 7 09?7344o Oct. 09 2:033 07:12-P9 P4
MIKA Construction
September 28, 2000
Page 3
pressure buildup by an underdrain system_
The drains should consist of drainpipe placed in the bottom of the wall backfill
surrounded above the invert level with free -draining granular material. The drain
should be placed at each level of excavation and at least 1 foot below lowest adjacent
finish grade and sloped at a minimum 1 % to a suitable gravity outlet. Free -draining
granular material used in the underdrain system should contain less than 2% passing the
No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of
2 inches. The drain gravel backfill should be at least 1 y2 feet deep.
Surftw Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior back -fin should be adjusted to near optimum moisture and
compacted to at Ieast 95% of the maximum standard Proctor density in
Pavement and slab areas and to at least 90% of the maximum standard
Proctor density m landscape areas. Free -draining wall backfill should be
capped with about 2 feet of the on -site, finer graded soils to reduce
surface water infiltration.
3) The ground surface surrounding the exterior of the building should be
Sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 12 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement
and WaIkWaY areas. A swale may be needed uphill to direct surface
runoff around the residence.
d) Roof downspouts and drains should discharge well beyond the limits of
all back -fill.
Percolation Testing: Percolation tests were conducted on September 18, 2000 to
evaluate the feasibility of an infiltration septic disposal system at the site. One profile
pit and three percolation holes had been dug at the locations shown on Fig. 1. Test
holes had been dug at the bottom of shallow-backhoe pits and were soaked with water
by the client prior to testing. The soils exposed in the percolation holes are similar to
those exposed in the Profile Pit shown on Fig. 2 and consist of about L/x foot of topsoil
overlying relatively dense gravel, cobbles and boulders in a silty sand matrix to the pit
depth of 8 fleet_ The percolation test results are presented in Table I. The percolation
test results indicate an infiltration rate between about 30 and 120 minutes per inch. The
slower rate measured in test hole P-2 may have been due to a large rock in the bottom
of the hole_ Based on the subsurface conditions encountered and the percolation test
results, the tested area should be suitable for a conventional infiltration septic disposal
H-P GEOTEC14
ROM ':. M I KA COF JSTRUCT' 10PJ
FAX t 10. : 97093 : 34- 0 Oct. 09 '2000 07: 13P►9 PS
MIK.A Construction
September 28, 2000
Page 4
system designed for a percolation rate of about 40 minutes per inch.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles anus practices in this area at this time. We matte no
warranty either expressed or implied. The conclusions and recommendations submitted
in this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Fig_ 1, the proposed type of construction and our experience in
the area. Our findings include interpolation and extrapolation of the subsurface
" conditions identified at the exploratory pits and variations in the subsurface conditions
may not become evident until excavation is performed. If conditions encountered
during construction appear different from those described in this report, we should be
notified at. once so re-evaluation of the recommendations may be made.
Tbis report has been prepared for the exclusive use by our client for design purposes.
We are not responsible for technical interpretations by others of our information. As
the project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant. design
changes may require additional analysis or modifications to the recommendations
presented herein_ We recommend on -site observation of excavations and foundation
bearing strata and testing of structural fM by a representative of the geotechnical
engineer-
Ifyou have any questions or if we may be of further assistance, please let us know.
Sincerely,
HEPWORTH - PAWLAK
Jordy Z_ Adamson,
Reviewed by:
Daniel E. Hardin, P.E.
JZAAMW
attach eats
H-P GEOTEC14
IMRGMMM ANAL."M MEW AMALVEM
70a MCAOMM U.S. 5TAN"M SERKS VLLM *aUAAF apD"G9
2f MR. 7 RR
0 43 MO. 15 MM. 60 WN.19 MM, 4 M71. 7 MW. Imo 000 "a 03M #10 /8
�- zo �.d�
ROM :' MIKA CONSTRUCTI014
FAX NO. : 9709273440 Oct.. 09 , 2000 07:15PM P1
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE I
PERCOLATION TEST RESULTS
JOB NO. 1.00 761
HOLE NO.
HOLE DEPTH
(INCHES)
LENGTH OF
INTERVAL
(MIN)
WATER DEPTH
AT START OF
INTERVAL
(INCHES)
WATER. DEPTH
AT END OF
INTERVAL
(INCHES)
DROP IN
WATER
LEVEL
(INCHES)
AVERAGE
PERCOLATION
RATE
IMINJINCH►
P-1
51
1s
7
40
6
5
4 '1s
"A
P-2
P-3
48
49
15
15
7
6 "A
Yk
120
30
6 '/a
6
34
6
6
O
6
6
O
6
8
5 aA
5
'i4
5
4
4 '!:
4
'h
4
3 Ma
3 'A
3
3
2 'A
'A
Naze: Percolation .test holes were hand dug in the bottom of backhoe .pits and soaked by the
client. Percolation tests were conducted on September 18, 2000. The average
percolation rates were based on the last two readings of each test.
:ZOrI : ,'M I kA CONSTFUCT I ON FAX NO. 9709273440 Oct. 09 ' 2000 07:16PM P2
1
LOT 12
PROPOSED
RESIDENCE
■
PIT 1
JOT SA
APPROXIMATE SCALE
V 30,
PROFILE 01
PIT Q 1
LOT 13
r
100 761 HEPWORTH - PAWLAK LOCATION OF EXPLORATORY PITS Fig 1
GEOTECHNICAL, INC. AND PERCOLATION TEST HOLES
wq. M I K-1 COUISTPucT 1014 FAX NO. 9709273440
Oct. 09 -MOO 07:16PM P3
PIT 1 PIT 2 PROFILE PIT
D 0
s to• :�
l ' -•
5 •.s• _ •,e. • n 5
_ J +4=31
m 20os40- • A•
LL=24
4 ..
10 .. 10
LEGEND:
TOPSOIL; sandy day, organic, loose, slightly moist, red.
_• GRAVEL, COBBLES AND BOULDERS (GM); ' In a silty sand matrix, dense. slightly moist. red.
.n-
_ 1 Disturbed bulk sample.
NOTES:
1. Exploratory pits were excavated on • $eptember 18 and 19. 2000 with a backhoe.
Z Locations of exploratory pits were measured approximately by pacing from features
on the site plan provided.
3_ Elevations of exploratory pits were not measured and logs of exploratory pits are drawn to depth.
4. The exploratory pit locations should be considered accurate" only to the degree
Implied by the method used.
5. The lines between materials shown an the exploratory pit logs represent the approximats
boundaries between material types and transitions may be gradual.
S. No free ,rater was encountered in the pits at the time "of excavating.
Fluctuations An water level may occur with time.
7. Laboratory Testing Results:
+4 = Percent retained on No. 4 sieve
—200 = Percent passing No. 200 sieve
LL = Liquid Limit ( X )
PI = Plasticity Index ( X )
100 761 HEPWORTH — PAWLAK LOGS OF EXPLORATORY PITS Fig. 2
GEOTECHNICAL, INC.
__ Ci���l'dL1I111
'�1�1IA111r:\
�• :1�I�Z�1�/Iwl�[
March 8, 2001
MIKA Construction
4559 Frying Pan Road
Basalt, CO 81621
Attn: Mike Peppers
Re: Mallinger Residence
Additional Percolation Testing and Septic System Design
Dear Mr. Peppers:
This is to relay the . results of additional percolation tests and to present the septic system design.
Additional testing was conducted due to concerns regarding previous test results. Please refer to the
Subsoil Study for Foundation Design and Percolation Testing by HP Geotech Job 100 761 dated
September 28, 2000. Therein, holes P-1 and P-3 had rates of 40 and 30 minutes per inch, respectively.
Hole P-2, however, had a rate of 120 minutes per inch that may have been due to a large rock in the
bottom of the hole. HP Geotech concluded that "the tested area should be suitable for a conventional
infiltration septic disposal system designed for a percolation rate of about 40 minutes per inch."
As an additional measure, two additional percolation tests were conducted. Holes P-4 and P-5
respectively averaged 53 and 22 minutes per inch. These test holes were hand dug at the bottom of
back hoe pits and had been pre-soaked by the Client. Our test observations are presented in the
accompanying table. The location of these additional tests are shown on the accompanying Septic
System Design drawing dated March 8, 2001. Based on the overall testing and in keeping with the
previous recommendations, we have prepared the design based on an infiltration rate of 40 minutes per
inch.
Please contact our office should any questions arise or if we may be of further assistance.
Thank You,
• J F% f- " I
Adol O. Gorra, P.E.
President
RAWAND;.� -7 ,ZINC.
p AGo
•Q 90
2S-9S4
0
� e
NA1.
cc: Jordy Adamson c@ HP Geotechnical
File
A 11-n I . PL --- !G'7n% Q7SR-n I qG • F.. ica-7n) 9�R_9F5n4
Mika Construction/Mike Peppers
Mallinger Residence
Additional Percolation Testing and Septic System Design
Page2.of 2
ADDITIONAL PERCOLATION TEST RESULTS
P-4 a@ 49"
5:19 PM
5
-
5:37
4-5/8
3/8
5:55
4-3/8
1/4
5:58
8
-
Water Added
due to rocks
sliding into hole
6:18
7-1/2
..1 /2
P-5 @ 42"
5:17
5-3/4
-
5:36
4-3/4
1
5:55
4
3/4
6:18
13.,
1
4A6111111lirilil+ltl�
September 25, 2003
Eagle County Environmental Health Division
500 Broadway, P.O. Box 179
Eagle, CO 81631-0179
Sent Via Fax # 328-8788
Attrt. Janet Kohl
Re: Peppers Residence Septic
!SDS Permit No. 2228-02
Dear Ms, Kohl:
Project No. 02066
This is to confirm that Glenwood Structural and Civil, Inc. had the opportunity to observe the installation
of the plumbing and infiltrator chambers for the above septic system prior to backf ill. This observation was
conducted on September 18, 2002_ This is to certify that the system was installed in accordance with the
plans prepared by this office dated August 30, 2002 and approved by the County.
Our apologies for the inconvenience caused by the delay in forwarding this information. Please contact
us if anything further is required.
Thank You,
GLENWOOD STRUCTURAL AND CIVIL, INC.
Adolf 0. Gorra, M.S., P.E.
Presi ent
r;��o
�131�q/s���
s f 0'•
29954
61�N AL
cc: Mika Construction via fax # 927-3440
File
0:\ehares\data\Jobs\Stared Projects\2002\02M-Mika Septic\1atEag1ato030925,wpd
2425 5. Grand Ave., Ste 102 • Glenwood 5prircj5, C081 GO f Phone (970) 928-0135 * Fax (9 %0) 928-9304
CCv_n5_arir� Tul I MQ- 1 nnfll Tr)- C:nr-f C i-ni IKITY C:K11 t Wr-701 Tu v0(.:'C• n
■
a 51 KC;-UKAL-
Engineers • Constructors
September 25, 2003
Eagle County Environmental Health Division
500 Broadway, P.O. Box 179
Eagle, CO 81631-0179
Sent Via Fax # 328-8788
Attn: Janet Kohl
Re: Peppers Residence Septic Project No. 02066
ISDS Permit No. 2228-02
Dear Ms. Kohl:
This is to confirm that Glenwood Structural and Civil, Inc. had the opportunity to observe the installation
of the plumbing and infiltrator chambers for the above septic system prior to backfill. This observation was
conducted on September 18, 2002. This is to certify that the system was installed in accordance with the
plans prepared by this office dated August 30, 2002 and approved by the County.
Our apologies for the inconvenience caused by the delay in forwarding this information. Please contact
us if anything further is required.
Thank You,
GLENWOOD STRUCTURAL AND CIVIL, INC.
�
•R.G�s"),
0.
�
Ov��•�r
fOi
U.
Q29954 •<
M.S., P.E.
�SDG���
NgLC�G
cc: Mika Construction via fax # 927-3440
File
C:\shares\data\Jobs\Stored Projects\2002\02066-Mika Septic\IetEag1eCo030925:wpd
2425 5. Grand Ave., Ste 102 Glenwood 5pring5, C06I GO I •:Phone (970) 928-0 135 Fax (970) 926-9804 ■
JOB NAME_ 2228-02 Tax #2467-023-00-008
4559 Frying Pan: Rd., PEPPERS
Basalt
JOB NO.
DATE STARTED•
• •
■ - •
i
HIVIC NOW NOW5111
MEN!
Ulm
p'l
WAINA 4
NO
J`
1
_
I Milk
._SUMMARY
_ ME
TOTALw PRICE
��
F�Npw
"m 0,111 - �mdml -w
-Ap.
TOTAL MATERIAL
0
UM
COSTS
TOTAL JOB COST
GROSSMISC.
PROFIT
LESS OVERHEAD COSTS
% OF SELLING PRICE
_■
JOB FOLDER Product 278
JOB FOLDER
Ffted In USA.
TRENCH INFORMATION
GENERAL NOTES: � " C�
CALCULATIONS V�
SEPTIC SYSTEM CA y
G SURVEYING LTD TOTAL 48 EA "INFILTRATOR"
SOIL PROFILE 1. SURVEY PROVIDED IN ELECTRONIC FORMAT BY HIRED UN
+ oil STANDARD 34" CHAMBERS IN
/z foot tops SEPERATE 3 WIDE TRENCHES IN _
+/ to 8 feet relatively dense gravel, cobbles and boulders in a silty sand matrix CONSTRUCTION SHALL BE CARRIED OUT IN CONFORMANCE WITH CHAPTER IV
e encountered 2. ALL CONSTR NATIVE SOIL W/ 6" MIN. COVER
No groundwat r EAGLE COUNTY LAND USE REGULATIONS FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEMS
AND 3' MAX TRENCH DEPTH "
(ISDS) RAKE SOIL INTERFACE
GRADATION RESULTS
31% Gravel, 29% sand, 40% silt and clay. 3. REFER TO HP GEOTECH JOB NO. 100-761- SUBSOIL STUDY FOR FOUNDATION INLET ELEV.= 102.E
DESIGN AND PERCOLATION TESTING O INVERT= 102.0
PERCOLATION TEST RESULTS -
Perc. # 1 - 40 minutes per inch
(provide additional tests 4 & 5 due to large rock bottom of hole) 4. PERCOLATIO
Perc. # 2 -120 minutes per inch (pN TEST RESULTS OF 40 MINUTES PER INCH USED IN DESIGN 2 INLET ELEV.= 101.E
Perc. # 3 - 30 minutes per inch 5. SOIL CONSISTS OF 31 % GRAVEL, 29 % SAND, AND 40 % SILT AND CLAY INVERT= 101.0
Perc. # 4 - 53 minutes per inch
Perc. # 5 - 22 minutes per inch 6. YARD GRADES TO REMAIN EXISTING EXCEPT AS NOTED INLET ELEV.= 100.E
-30 INVERT= 100.0
Recommended percolation rate T used for design = 40 minutes per inch 7. ALL SEWER PIPING TO BE 4" SDR35 AND SHALLHAVE A MINIMUM COVER OF 12"
4 INLET ELEV.= 99.4 ;
DESIGN FLOW CALCULATIONS 8. INSTALLER SHALL COMPLETE "ISDS FINAL INSPECTION COMPLETENESS FORM" INVERT= 98.8 14.75 50.00 10.81
Number of bedrooms =, PRIOR TO INSPECTION
Number of occupants=6
Design Flow = Q 9. COORDINATE WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS FOR REQUIRED 5 INLET ELEV. 98.8
= Q = 6 persons x 75 gpd/person = 450 gpd P OXIMITY TO BUILDING O INVERT= 98.2
P BACKFILL IN R -.;
Maximum Flow = Qmax = Q x 1.5 f =,
Qmax = 675 gpd INLET ELEV. 98.5 - - .
6 INVERT= 97.9 �i u
SEPTIC TANK vi , 1 R - - r
V -Qma x 30 hrs 124 hrs -
844 gallonsi1l'.-
on 3 bedrooms) --
o
Minimum capacity 1000 gallons based . i
-c m artment b Front Range Precast
Use 1,200 Gallon 2 o p Y
ABSORPTION AREA BASED ON MAXIMUM FLOWAND PERCOLATION RATE
A = (Qmax/5)m z - (675/5)(40) s -854 s.f.
a ber S stem in a trench configuration is allowed a 50 %reduction in the absorpon area. Use a�, 15 L.F. +/- N
Standard Infiltrator Ch m y O O = O __� _ _ ..- O
MAl TA1N
4 i.
conservative reduction of 30 % for this criteria - �, \ 1�'MIN.
_ 13 L.F. +/- F ---- - 100 -� O Z
Areduced = A x 0.70 = 598 s.f. - - - - --= - - '�
area per it filtrat�r chamber =15:5 s.f.71
Surface a p _ O O
Number of Infiltrator Chambers = .598 s.f. 115.5 s.f. 39 chambers t�
1D 13 L.F.
TERM ACCEPTANCE RATE S=9%
ON AREA BASED ON MAXIMUM FLOW AND LONG
ABSORPTION 4 - -•
o
A = Qmax / L.T.A.R = 675 gpd / 0.45 gpd / sf (EPA Table 7-2) T # ❑
�k �.
=1,500 sf � �t.. �,•
13 L. F.
For Standard Infiltrator Chambers, use permitted area reduction of 50 %. S=8%
Areduced = A x 0.5 = 1,500 x 0.5 = 750 > 598 s.f. above (Govern) O O
Number of Infiltrator Chambers = 750 s.f. 115.5 s.f. = 48 chambers i ' VS; EGTIOr�` p�R 1
2 13 L.F. +/- � ��
,$ E - +�
o EXISTING r�C1Li .:,Et,i }' , pi.� � (TY G) P•.
Application Rate 675 gpd / (48 chambers x 15.5 sf/chamber x 2) = 0.45 gpd/s.f. - i DIST Ui ION S i�STF;L'i - TOi/zt. ?SEA -�
PP ,'` "I,NI ILTPA7-OR" STANDARD 34" CHAMBERS
59 L.F. O
Use 6 trenches in serial distribution w/ 8 chambers each
(48 chambers total) FIELD FIT GRADES & SLOPE
SURFACE W/ 12" MIN. COVER & 2% MIN �.�
CLE�NOUTS ONPORT
PROVIDE i l NR RISER I(TYP OF 6)
SPLASHPLATE
AT INLET _ IL
c -
SURFACE��.� `�. FINE GRADE SWALEAS REQ'D
CLEANOUT __ - -Tfi0 DIRECT SURFACE DRAINAGE Ag R RP REp,
37 L.F. +/-
O 0 1200 GALLON 1 AWAY FROM LEACHING AREA RpDE URFP ��G P
2- COMPARTMENT '`� ,
DO SEPTIC TANK FIN DIREG OM ►-�'
BY FRONT RANGE TO Y FR
$ ��•�. PEA
PRECAST W/
i MANHOLE GRADE EXTENSIONS
- 1000 GALLON 2-Ct}rv'PART �;7
FIELD FIT ELEVATIONS SEPTIC Alai-
1 EXISTING
t+ PROPOSED RESIDENCE
FF 132' 0 RESIDINCE TO BE ,
r DEMOLISHED
t. p ,
EXISTING�IpN - -
j Q A.D.U. - pIRC-�'
Cn E?III I 0,41fP-
\
F ORFP
t
�1" S
co
40.00 46.00 40�A
I ;
CS
1
- '500c'�00'00'"E
-- - _ � � ._ ,..- - - - ; .;e...� rks::�t_-�.s=ax����-.....,�Fs,:x�.e+<.-..,,-w�csfr+wr:•...... __.�.:�..�;�-F-�.:;s.a.�.s-.rA-e•� - sa c+�.�-,:aas� - - =..,.t..tar.:.��.ams.-�t.�ea-v;a•�ae.4. �-'.=-•>=w'm^..a,^:,sf�Ea z.� .<:.rer�c....:�.�,;�;..,- - - -
s
28A.00
- TEM- P
SCA.E: 1 = 10
These documents are intended
for the exclusive use of the
project specified below. The
use of these documents for any
other purpose is not authorized.
Written authorization from
Glenwood Structural and Civil
must be obtained for any other
use. This document is to be
used within one year of the date
of preparation. Use after that
period is not authorized.
MIKA
CONSTRUCTION
PEPPERS
RESIDENCE -
SEPTIC -
SYSTEM
Scale:
1" = 10'
REVISIONS
Description
Date
1
2
3
4
ANP CIVIL. INC,
�nglneers • Constructors
60411-!c5t 12t� Street
Glenwood 5princp, CO
(970) 928-0135
Fax 928-9804
Job Number
00066
Engineer
AG
Date
8/30/02
•�0 .• c/s
2 4 G
•
•
Sheet
Of : '�
r
INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
EAGLE COUNTY ENVIRONMENTAL HEALTH DIVISION
P.O. Box 179 - 500 Broadway • Eagle, CO 81631
Telephone: (970) 328-8755
COPY OF PERMIT MUST BE POSTED AT INSTALLATION SITE. PERMIT NO. 2071-01 BP NO. 13521
OWNER: MIKE PEPPERS PHONE: 970-927-3440
MAILING ADDRESS: 4559 FRYING PAN ROAD, BASALT, CO 81621
APPLICANT: SAME PHONE:
SYSTEM LOCATION: 4559 FRYING PAN ROAD, BASALT, CO TAX PARCEL NO. 2467-023-00-008
LICENSED INSTALLER: CHENAULT PLUMBING & HEATING, OLEN CHENAULT LICENSE NO. 44-01 PHONE: 970-948-1288
DESIGN ENGINEER: GLENWOOD STRUCTURAL AND CIVIL, INC., ADOLFO GORRA PHONE NO. 970-928-0135
INSTALLATION HEREBY GRANTED FOR THE FOLLOWING: MINIMUM REQUIREMENTS FOR A 1 BEDROOM RESIDENCE
1000 GALLON 2 COMPARTMENT SEPTIC TANK, 744 SQUARE FEET OF ABSORPTION AREA CREDIT, VIA 24 INFILTRATOR UNITS AS PER DESIGN
SPECIAL REQUIREMENTS: INSTALL AS PER ENGINEER'S DESIGN DATED 3/15/01, IN SERIAL DISTRIBUTION IN TRENCHES, WITH A CLEANOUT BET-
WEEN THE TANK AND THE HOUSE AND INSPECTION PORTALS IN EACH TRENCH. BE SURE TO MAINTAIN ALL APPLICABLE SET BACK REQUIRE-
MENTS, AND RESTRICT VEHICULAR AND LIVESTOCK TRAFFIC OVER LEACH FIELD. RAKE ALL TRENCH SURFACES TO PREVENT THE SMEARING
OF SOILS, DO NOT BACK FILL WITH ANY COBBLES LARGER THAN 8 INCHES IN DIAMETER, AND DO NOT INSTALL IN WET WEATHER. ENGINEER
IS RESPONSIBLE FOR FINAL CERTIFICATION, BUT EAGLE COUNTY ENVIRONMENTAL HEALTH WILL ALSO INSPECT THE INSTALLATION.
PLEASE CALL 48 HOURS IN ADVANCE FOR YOUR FINAL INSPECTION. THE BUILDING CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED
UNTIL THE SEPTIC SYSTEM HAS BEEN INSPECTED AND APPROVED. ANY CHANGES IN THE DESIGN OF THIS SYSTEM NEED TO BE REVIEWED
AND APPROVED PRIOR TO CONSTRUCTION.
ENVIRONMENTAL HEALTH APPROVAL: /4ti(/Y ( (4AA DATE: APRIL 3, 2001
CONDITIONS:
1. ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS,
ADOPTED PURSUANT TO AUTHORITY GRANTED IN 25-10-104, 1973, AS AMENDED.
2. THIS PERMIT IS VALID ONLY FOR CONNECTION TO STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING
REQUIREMENTS. CONNECTION TO, OR USE WITH ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS SHALL
AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT, AND WILL RESULT IN BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT.
3. CHAPTER IV, SECTION 4.03.29 REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM TO
BE LICENSED.
FINAL APPROVAL OF SYSTEM (TO BE COMPLETED BY INSPECTOR):
NO SYSTEM SHALL BE DEEMED TO BE IN COMPLIANCE WITH THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS UNTIL THE SYSTEM
IS APPROVED PRIOR TO COVERING ANY PORTION OF THE SYSTEM.
INSTALLED ABSORPTION OR DISPERSAL AREA: 744 SQUAREFEET(VIA 24 BIODIFFUSER UNITS )
INSTALLED CONCRETENK: 1000 GALLONS IS LOCATED 80 DEGREES AND i 3— FEET INCHES
FROM THE CLEANOUT TO THE FIRST LID OF THE TANK
COMMENTS: THE FINAL INSPECTIONS WERE DONE BY LAURA FAWCETT OF EAGLE COUNTY FNVTRoNMFNTAT TIFATTH
AND THE DESIGN ENGINEER ON OCTOBER 5, 2001. THE ENGINEER'S FINAL CERTIFICATION WAS RECETVED
ON JUNE 24, 2002. THIS SYSTEM IS LARGE ENOUGH FOR A ONE BEDROOM RF.STT)FNCF_
ANY ITEM NOT MEETING REQUIREMENTS WILL BE CORRECTED BEFORE FINAL APPROVAL OF SYSTEM IS MADE. ARRANGE A RE -INSPECTION WHEN WORK IS
COMPLETED.
ENVIRONMENTAL HEALTH APPROVA DATE: DUNE 25, 2002
Incomplete Applications Will NOT Be Accepted
(Site Plan MUST be attached)
ISDS Permit # �.b ��- U
Building Permit # 135c�-j
r•.
APPLICATION FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
ENVIRONMENTAL HEALTH OFFICE - EAGLE COUNTY
P. 0. BOX 179
EAGLE, CO 81631
Eagle (970)328-8755, Fax (970)328-0349, E1 Jebel (970)927-3823
**************************************************************************
* FEE SCHEDULE
* PERMIT APPLICATION FEE $150.00
* PERCOLATION TEST/SOIL PROFILE AND SITE EVALUATION FEE $200.00
* SITE VISIT/CONSULTATION FEE $85.00
* REINSPECTION FEE $47.00
* MAKE ALL REMITTANCE PAYABLE TO: "EAGLE COUNTY TREASURER"
**************************************************************************
PROPERTY OWNER:
MAILING ADDRESS:
APPLICANT/CONTAC
LICENSED SYSTEMS
COMPANY/DBA:
T
CONTRACTOR: AJAA 4XAJk ' I
ADDRESS.
/.
PERMIT APPLICATION IS FOR: (V) NEW INSTALLATION ( ) ALTERATION ( ) REPAIR
LOCATION OF PROPOSED INDIVIDUAL SEWAGE DISPOSAL SYSTEM:
Legal Description:
Tax Parcel Number: c�!�7 - (�o��J - 66 -"M 9 - /Lot Size:
154 IK 142 �
Physical Address:�Zy'I �!. 7ltT"
BUILDING TYPE: (Check applicable category)
(� Residential/Single Family
( ) Residential/Multi-Family*
( ) Commercial/Industrial*
Number
Number
Type _
of Bedrooms
of Bedrooms
*These systems require design by a Registered Professional Engineer
TYPE OF WATER SUPPLY: (Check applicable category)
(-V Well ( ) Spring ( ) Surface
( ) Public Name of �ier:
APPLICANT SIGNATURE: Date:
***************************************************************************
AMOUNT PAID: 3s V RECEIPT # l < 57 is DATE: 3 IC116
CHECK #: 101- CASHIER:
FROr 1 1 1 I KA CONSTRUCTION FRX 140. 97092 73440
ILI
September 28, 2000
Oct. 09 2'000 07:11Pr9 P?
1 .9i tt�ti.n7aj tipr'if:�•:, a.. �-+:�:::a� :,c+r:;�
i�itnsirl 97D-945-79S ,
Yxc
ItPgk:(: hpg'c:Atccat,cnn:
MIItiA Construction
Attn: Mike Peppers
4559 Frying Pan Road
Basalt, Colorado 81621 Job No. 100 761
Subject: Subsoil Study for Foundation Design and Percolation Testing, Proposed
Residence, 4559 Frying Pan Road, Eagle County, Colorado.
Dear Mr. Peppers:
As requested, Hepworth Pawlak Geotechnical, Inc. performed a subsoil study and
percolation testing for foundation and septic disposal designs at The subject site. The
study was conducted in accordance with our agreement for geotechnical engineering
services to you dated September 15, 2000. The data obtained and our recommendations
based on the proposed construction and subsurface conditions encountered are presented
in this report -
Proposed Construction: The proposed residence will be a single story wood frame
structure over a erawlspace located on the site as shown on Fig. 1. The attached garage
floor will be slab -on -grade. Cut depths are expected to be up to about 6 feet.
Foundation loadings for this type of construction are assumed to be relatively light and
typical of the proposed type of construction. The septic disposal system is proposed to
be located about 80 feet downhill to the east of the proposed residence.
If buildinb conditions or foundation loadings are sigoifficantly different from those
described above, we should be motified to re-evaluate the recommendations presented in
this report -
Site Conditions. The lot was vacant at the time of our field work. The site is currently
a fenced pasture. The ground surface across the lot is hilly with a moderately steep
slope down the east- There is about 20 feet of elevation difference across the property.
An existing single story log residence with a basement is located on Lot 9 to the west -
A metal frame residence is located to the north on Lot 8A. The lot is vegetated with
grass and weeds -
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating two exploratory pits in the building area and one profile pit in the septic
disposal area at the approximate locations shown on Fisz 1. The logs of the pits are
presented on Fig. 2. The subsoils encountered, below about %, foot of topsoil, consist
of relatively dense gravel, cobbles and boulders in a silty sand matrix. Results of a
FROM : M I KA CONSTRUCTION FAX 1,10. : 9709273440 Oct. 09 =000 O 7 : 1?PM P3
MIKA Construction
September 28, 2000
Page 2
gradation analysis performed on a sample of the gravel (minus 3 inch fraction) obtained
from the site are presented on Fig. 3. No free water was observed in the pits at the
time of excavation and the soils were slightly moist to moist_
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soil designed for an allowable soil bearing
pressure of 3,000 psf for support of the proposed residence. Footings should be a
minimum width of 16 inches for continuous walls and 2 feet for columns. Loose and
disturbed soils and existing fill encountered at the foundation bearing level within the
excavation should be removed and the footing bearing level extended down to the
undisturbed natural gravels. Voids created by the removal of large rocks should be
back -filled with compacted sand and gravel or concrete_ Exterior footings should be
provided with adequate cover above their bearing elevations for frost protection.
Placement of footings at least 42 inches below the exterior grade is typically used in this
area_ Continuous foundation walls should be reinforced top and bottom to span local
anomalies such as by assuming an unsupported length of at least 10 feet_ Foundation
walls acting as retaining structures should be designed to resist a lateral earth pressure
based on an equivalent fluid unit weight of at least 45 pcf for the on -site gravels,
excluding oversized rock, as bacl�il.
Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support
lightly loaded slab -on -grade construction_ To reduce the effects of some differential
movement, floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints
should be used to reduce damage due to shrinkage cracking_ The requirements for joint
spacing and slab reinforcement should be established by the designer based on
experience and the intended slab use_ A minimum 4 .loch layer of free -draining gravel
should be placed beneath slabs to act as a leveling course and to facilitate drainage.
This material should consist of minus 2 inch aggregate with less than 50 o passing the
No_ 4 sieve and less than. 2% passing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum standard Proctor density at a moisture content near optimiun. Required fill
can consist of the on -site soils devoid of vegetation, topsoil and oversized rock.
Underdrain System: Although free water was not encountered during our exploration,
it has been our experience in the area that local perched groundwater can develop
during times of heavy precipitation or seasonal runoff. Frozen ground during spring
runoff can create a perched condition- We recommend below -grade construction, such
as retaining walls and crawispace areas, be protected from wetting and hydrostatic
H-P GEOTECH
FROM : t`I I KH CONSTRUCTION FAX' HO. : 9709273440 Oct. 09 2000 07: 12PM P4
MIKA Construction
September 28, 2000
Page 3
pressure buildup by an underdrain system.
The drains should consist of drainpipe placed in the bottom of the wall backfill
surrounded above the invert level with free -draining granular material. The drain
should be placed at each level of excavation and at least 1 foot below lowest adjacent
finish grade and sloped at a minimum 1 % to a suitable ,gravity outlet. Free -draining
granular material used in the underdrain system should contain Iess than 2% passing the
No. 200 sieve, less than 50 % passing the No. 4 sieve and have a maximum size of
2 inches. The drain gravel backfill should be at least 1 L/z feet deep.
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at Ieast 95 % of the maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas. Free -draining wall backfill should be
capped with about 2 feet of the on -site, finer graded soils to reduce
surface water infiltration.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 12 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement
and walkway areas. A swale may be needed uphill to direct surface
runoff around the residence.
4) Roof downspouts and drains should discharge well beyond the limits of
all backfill.
Percolation Testing: Percolation tests were conducted on September 18, 20M to
evaluate the feasibility of an infiltration septic disposal system at the site. One profile
pit and three percolation holes had been dug at the locations shown on Fig. 1 _ Test
holes had been dug at the bottom of shallow backhoe pits and were soaked with water
by the client prior to testing_ The soilss exposed in the percolation holes are similar to
those exposed in the Profile Pit shown ou Fig. 2 and consist of about 1/� foot of topsoil
overlying relatively dense gravel, cobbles and boulders in a silty sand matrix to thpit
depth of 8 feet_ The percolation test results are presented in Table I. The percolation e
test results ,indicate an infiltration rate between about 30 and 120 minutes per inch. The
slower rate measured in test hole P-2 may have been due to a large rock i.0 the bottom
of the hole_ Based on the subsurface conditions encountered and the percolation test
results, the tested area should be suitable for a conventional infiltration septic disposal
H-P GEOTECH
FROM : 111 I KH COVISTPUCT I 01•J FAX HO. : 970927.3440 Oct.. 09 2000 O 7 : 13pf4 Ps
MIKA Construction
September 28, 2000
Page 4
system designed for a percolation rate of about 40 minutes per inch.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time- We make no
warranty either expressed or implied_ The conclusions and recommendations submitted
in this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Fig_ 1, the proposed type of construction and our experience in
the area_ Our findings include interpolation and extrapolation of the subsurface
conditions identified at the exploratory pits and variations in the subsurface conditions
may not become evident until excavation is performed. If conditions encountered
during construction appear different from those described in this report, we should be
notified at once so re-evaluation of the recommendations may be Ynade_
This report has been prepared for the exclusive use by our client for design purposes.
We are not responsible for technicalinterpretations by others of our information_ As
the project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recorntuendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
presented herein. We recommend on -site observation of excavations and fotindation
beating strata and testing of structural till by a representative of the geotechnical
engineer.
If you have any questions or if we may be of further assistance, please let us know_
Sincerely,
HEPWORTH - PAWLAK G£ IN
co�4A a.o;;,
Jordy Z_ Adamson. , P I+ 07
Reviewed by: ac 1zgl •Gl`'
FSSjONAI-�
0
Daniel E. Hardin. P.F_
JZAllcsw
attachments
H-P GEOTECH
"MROME, "Ad- or. 9ENE MALIrms
-nue WIZAbN= U S_ SrANDAM SERIES CLEAR SWARE �PENINGs
2i MR. 7 NX
O 45 WN. 15 MIN. 130 MIN_19 MIN. 4 1✓7N. 7 MN. /2W WOO jp50 030 #16 Oa is 3/g't/2'3/4' 1 1/2.' V S E- 6'10
FP.ON : h 1 k_A CONSTPUCT I 011
FAX NO. : 9709= 73440 Oct. 09 20013 07: 15PN P1
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE I
PERCOLATION TEST RESULTS
JOB NO. 100 761
HOLE NO.
HOLE DEPTH
(INCHES)
LENGTH OF
INTERVAL
(MIN)
WATER DEPTH
AT START OF
INTERVAL
(INCHES)
WATER DEPTH
AT END OF
INTERVAL
(INCHES)
DROP IN
WATER
LEVEL
(INCHES)
AVERAGE
PERCOLATION
RATE
(MINANCH)
P-1
51
15
7
6 %
'/a
40
6 "/x
6
'/x
6
rJ '/a
5
4 '/x
'/s
P-2
48
15
7
it
120
6 '/a
6
34
6
6
0
6
6
0
6
5 a/a
%<
P-3
49
15
8
5
1 30
5
4 '/z
'f2
4 "/z
4
4
3 '/1
%
3 'A
3
•'/a
3
2 "/2
"/s
Note: Percolation test holes were hand dug in the bottom of backhoe pits and soaked by the
client. Percolation tests were conducted on September 18, 2000. The average
percolation rates were based on the last two readings of each test.
MON Ti <-H CONSTP.UCT I ON
FAX NO. : 97092 73 340 Oct. 09 2000 0 7 : 16P9 P2
LOT 12
1n5^f>e%cc,l
.OT SA
LOT 13
APPROXIMATE SCALE
I' = 30,
PROFILE
PIT A
100 761 HEPWORTH - PAWLAK LOCATION OF EXPLORATORY PITS Fig 1
GEOTECHNICAL, INC. AND PERCOLATION TEST HOLES
FROM Ltd KH CONSTRUCT I OH Ff;X 140. : 97092 7 3440 Oct. 09 2000 0 7 ' 16PM P3
e
PIT 1
PIT 2
PROFILE PIT
• D
0
eo- _
_
LL
3
i�
��•°
s
C
0
J 1-4-31
-200w40
o-
• 4 •
o
(L=24
/
U
P1=5
10
10
LEGEND-
® TOPSOIL,
sandy clay,
organic, loose, slightly moist, red.
GRAVEL,
COBBLES AND
BOULDERS (GM);
in a silty sand
matrix, dense, slightly moist,
red.
,a.
1 Disturbed bulk sample.
NOTES:
1. Exploratory pits were excavated on -September 18 and 19, 2000 with a backhoe-
2- Locations of exploratory pits were measured approximately by pacing from features
on the site plan provided-
3- Elevations of exploratory pits were not measured and logs of exploratory pits are drawn to depth_
4. The exploratory pit locations should be considered accurate only to the degree
implied by the method used.
S. The lines between materials shown on the exploratory pit logs represent the approximate
boundaries between material types and transitions may be gradual.
6. No free water was encountered in the pits at the time of excavating.
Fluctuations in water level may occur with time.
7- Laboratory Testing Results:
+4 = Percent retained on No. 4 sieve
—200 = Percent passing No. 200 sieve
LL = Liquid Limit ( % )
PI = Plasticity Index ( % )
100 761 HEPWORTH — PAWLAK LOGS OF EXPLORATORY PITS Fig. 2
GEOTECHNICAL, INC.
E
011110"i
:1�I�jI�►r11�1�[
ssa
Engineers • Constructors
March 8, 2001
MIKA Construction
4559 Frying Pan Road
Basalt, CO 81621
Attn: Mike Peppers
Re: Mallinger Residence
Additional Percolation Testing and Septic System Design
Dear Mr. Peppers:
This is to relay the results of additional percolation tests and to present the septic system design.
Additional testing was conducted due to concerns regarding previous test results. Please refer to the
Subsoil Study for Foundation Design and Percolation Testing by HP Geotech Job 100 761 dated
September 28, 2000. Therein, holes P-1 and P-3 had rates of 40 and 30 minutes per inch, respectively.
Hole P-2, however, had a rate of 120 minutes per inch that may have been due to a large rock in the
bottom of the hole. HP Geotech concluded that "the tested area should be suitable for a conventional
infiltration septic disposal system designed for a percolation rate of about 40 minutes per inch."
As an additional measure, two additional percolation tests were conducted. Holes P-4 and P-5
respectively averaged 53 and 22 minutes per inch. These test holes were hand dug at the bottom of
back hoe pits and had been pre-soaked by the Client. Our test observations are presented in the
accompanying table. The location of these additional tests are shown on the accompanying Septic
System Design drawing dated March 8, 2001. Based on the overall testing and in keeping with the
previous recommendations, we have prepared the design based on an infiltration rate of 40 minutes per
inch.
Please contact our office should any questions arise or if we may be of further assistance.
Thank You,
Adollb O. Gorra, P.E.
President
RA P / INC.
v o� p 0. G0. ®Q =
29954oz
9 `�
° . I-Q
• e �
cc: Jordy Adamson @ HP Geotechnical
File
5'z'P57W' -lam` rirt
le. (- F-T fe �r wt --c
r+- [ 2,tM-
&o1+ l z1�-
G04 West 1 2`h Street • Glenwood Springs, Colorado 81 GO I • Phone (970) 928-0135 • Fax (970) 928-9804 0
E
'�f{III�I11�:1
�WON0 �1�[
® :%
March 28, 2001
County of Eagle Environmental Health
500 Broadway, P.O. Box 179
Eagle, CO 81631-0179
Attn: Laura Fawcett
Re: Mallinger Residence Septic System
Dear Ms. Fawcett:
40
�LDO
4-1"
In accordance with our conversation, this is to transmit the required data and calculations for the
referenced project. These follow in the suggested format.
SOIL PROFILE
%2 foot topsoil
%2 to 8 feet relatively dense.gravel, cobbles and boulders in a silty sand matrix
Nogroundwaterencountered .
GRADATION RESULTS
31 % Gravel, 29% sand, 40% silt and clay
PERCOLATION TEST RESULTS
Perc. # 1 - 40 minutes per inch
Perc. # 2 - 120 minutes per inch (provide additional tests 4 & 5 due to large rock @ bottom of hole)
Perc. # 3 - 30 minutes per inch
Perc. # 4 - 53 minutes per inch
Perc. # 5 - 22 minutes per inch
Recommended percolation rate T used for design = 40 minutes per inch
DESIGN FLOW CALCULATIONS
Number of bedrooms = 1
Minimum occupancy = 3.5 persons (Governs)
Design Flow = Q
Q = 3.5 persons x 75 gpd/person = 263 gpd
Maximum Flow = Qmax = Q x 1.5
Qmax = 263 gpd x 1.5 = 394 gallons per day
SEPTIC TANK
V = Qmax / 24 hrs x 30 hrs = 492 gallons
Minimum capacity = 750 gallons
Use 1,000 Gallon 2-compartment by Front Range Precast or Norwesco
G04 West 1 21h Street • Glenwood Springs, Colorado 81 GO 1 0 Phone (970) 928-01 35 • Fax (970) 928-9804 0
Eagle County Environmental Health, page2, March 28, 2001
ABSORPTION AREA BASED ON MAXIMUM FLOW AND PERCOLATION RATE
A = (Qmax/5)V T = (394/5)V 40 = 498 s.f.
Standard Infiltrator Chamber System in a trench configuration is allowed a 50% reduction in the
absorption area. Use a conservative reduction of 25% for this criteria.
Areduced = A x 0.75 = 498 s.f. x .75 = 374 s.f.
Surface area per infiltrator chamber = 15.5 s.f.
Number of Infiltrator Chambers = 374 s.f. / 15.5 s.f. = 24 chambers
Use 3 trenches in serial distribution w/ 8 chambers each.
ABSORPTION AREA BASED ON DESIGN FLOW AND LONG TERM ACCEPTANCE RATE
A = Q / L.T.A.R. - Using Daily Flow Q in lieu of Maximum Flow Qmax due to 1 bedroom dwelling and
use of 3.5 persons minimum in Daily Flow
A = 263 gpd / 0.4 gpd/sf (state) = 658 s.f. (Governs)
Or
A = 263 gpd / 0.45 gpd/sf (EPA) = 585 s.f.
For Standard Infiltrator Chambers, use permitted area reduction of 50%.
Areduced = A x 0.5 = 658 s.f. x 0.5 = 329 s.f. < 374 s.f. above OK
Application Rate = 263 gpd / (24 chambers x 15.5 sf/chamber x 2) = 0.35 gpd/s.f.
Your help and input with this project is greatly appreciated. Please call if there are any questions or if
we can be of any assistance.
Thank You,
GLENWOD6 SAUCTU
Adolfo Gorra, P.E.
President
cc: Mike Peppers
File
tAL INC.
0� R"E
0,� a o
2995
LANAL ���
Mika Construction/Mike Peppers
Mallinger Residence
Additional Percolation Testing and Septic System Design
Page 2 of 2
ADDITIONAL PERCOLATION TEST RESULTS
....
....
....
.... .......
. . .......... .........
..........
......
.
. ........ .
...... ... ...........
. ....
... .. ..........
........... ......
. ..... ..................
........
.........
...
..
. .............. . . X;
...
...
. ... .........
..... ..........
.......... .........
.........
X . ....
:X.- ...
... . .....
......
................
........
. ..... .... ........
.... ...... . ... .............
.... ....
.... .. .............
.... ..... .... ...... ......
... .............
.......... . .....
.......
......
.....
.....
. ..
. . ......
.. ......
..
.. . :: ...........
. ..........
P-4 @ 49"
5:19 PM
5
-
5:37
4-5/8
3/8
5:55
4-3/8
1/4
5:58
8
-
Water Added
due to rocks
sliding into hole
6:18
7-1/2
1/2
. . .
I I ...
.. ......
. .. . ......... .
. .... .....
.........
. ....
- -----
...
....
.. ...
. ........ ..........
........... . ........
.......... - ....
..... ............
............
... . ... ............
......
... .. . ........ .
. ........... ... . . .......... .........
..........
.............
.......
. ....... ........
....... ....
....
........ ... ..............
......... :.: ............
............................. ... .......
....... . .....
. ...... . ......
P-5 @ 42"
5:17
5-3/4
5:36
4-3/4
5:55
4
3/4
6:18
3
..............
.............
...........
...... ..
......
.. ......... ........
.....................
.. ......................
.................
..................
......... ....... -- ....... ....
................
.......... ....
:::: 1.
. ......... . ....
...... ....
......... ..........
.................. I............................
. ........ ............
,
. ............... ------------- .....
.. ..........
PROJECT CC: --
SUBJECT
DATE BY
SHEET No. - of
.......:,,:»....................... ,...»� ;............._......
., ,, H »
...
i:::: .... ..., u
s.3 .0. ... � .... ....... i. ,..... ..........rA..... .......ku......a.::..: .., ...,
� to
i
iw ...��.��......... .0 .. ' . . ....... f ...:f.........u... a ....;.,:a : .aa ,N.
z 3
a
x
z 's
i
3 ££
.` ,
,
k.....::::.:�..... ,.»..,...� ��'.....,. R�'���C^��r"`Y!f`:.: ... :. ..............:..:...<a•.,.......�...,...... �......=u:..wk..y' ».., .:, as aaai.:..:..... � a...,...a.%:a.......:.w..vu::. � ...:.aaaaf.::.,.....<
i
E E
s i
AT
3
i
i k
k 3
»
i z
i §
3
.... ....�.:. .... .... 2.,.........k::v..aa::.=k:.................:i....aava...g.........�
i
3 i :
3 i
t
i
E
3
i ....
i
, s
i
s s
........... .::::::::.3..:........
# � j
3
u..u.....i:...u..u..�,:..vw.a.},..uuu u..s u.. uu .a.. �. w. .:. .....1......::::.muu...(.uu....u..uv...ua4..uuu.... <: .0 ... au
i
S u 2
3
�:..:..:u:...uC...uu.0 u...uuu<:uu..0 j .....+.::� .uu.uuaaa.»..u,•::u...uuu2.....uuua'.,�.....uu.�uu :u<.:
2 i
u v ..., u=..u, u ...u..k.w..vuu a....... .'... .. .... .aaa ..., u ..., w. ,.., .. ' 2# ' .......... ....va .... avaa.... ..£., aa.........vaavaa..........a.a.a,...a......s............... ....avaau . „2..........:,yf.v.a....ae
3
?..........a t..... ., ut....., u. ...,..a .. ....... .... aaa , ... .... ...
<..,...,.....,............ ....... ...........� ... 3
; i
s
•• ,,,a,..,»...
# .a.........K
2 .
• � x s t
v
x
, »
.. . ...... . ...
z 3 i 3
., ....�. .... . .........<.... ...... ..vaa ,`
.,»» ......,
:
x
,
£ � x z
,
I t
`2
' 2
j 3 { 3 � 7
z...........::...........:...........3............i........... c.................................i ........... i............i........... E............I........... t.......................>............F...........>...................... s.................................5...........?............2...........3...................................I.......................:
Community Development Department
(970)328-8730
FAX (970) 328-7185
TDD (970) 328-8797
Email: eccmdeva@vail.net
http: //www.eagle-county.com
EAGLE COUNTY, COLORADO
Date: April 3, 2001
TO: Chenault Plumbing & Heating
Eagle County Building
P.O. Box 179
500 Broadway
Eagle, Colorado 81631-0179
FROM: Environmental Health Division
RE: Issuance of Individual Sewage Disposal System Permit No.2071-01. Tax Parcel
#2467-023-00-008. Property Location: 4559 Frying Pan Road, Basalt, CO.,
Peppers residence.
Enclosed is your ISDS Permit No. 2071-01, and a field copy of the engineer design stipulated on
the permit. It is valid for 120 days, or for the duration of your current building permit for this
property. The enclosed copy of the permit must be posted at the installation site. Any changes
in plans or specifications invalidates the permit unless otherwise approved. Please note any
special requirements that may have been added to the design by this department.
Systems designed by a Registered Professional Engineer must be certified by the Engineer
indicating that the system was installed as specified. Eagle County Environmental Health
must also view the installation prior to back filling. Please call well in advance for your
final inspection. I Your TCO will not be issued until our office receives this certification
from the engineer, and views the installation.
Permit specifications are minimum requirements only, and should be brought to the property
owner's attention.
This permit does not indicate conformance with other Eagle County requirements. Please
notify this office if you have not been contracted to perform this installation.
If you have any questions, please feel free to contact the Environmental Health Division at 328-
8755.
cc: files
Glenwood Structural and Civil, Inc., Adolfo Gorra, P.E.
ISDS Permit # a0-71. v I
Date -[Q-Y '0
ISDS Final InsRection
Q=leteness Form
V Tank is b 00 gal. Tank Material
lie( � o
/Tank is located ft. and b degrees from
(permanent landmark)
Tank is located ft. and degrees from
% Iparmmneat landmark)
Tank set level. Tanks lids within 6" of finished grade.
Size of field ft2 units lineal ft.
< Technology ) o d i u aid"
installed in between tank and house + 1 100ft
Cleanout is ( / )
There is a "T" that goes down 14 inches in the inlet and
outlet of the tank:
Inlet -and outlet is sealed with tar -,tape,+ rubber gasket etc.
►� ink ;has two compartments with the.;!3;arger...,.CpMpartment closest to the
hou e.
.0
Measure distance and relative direict.
i g
Depth of field.. ft.
NIL .Soil interface raked.' - �/ ..
C' S 2,f
`� Inspection portals at the_end of each trench..
Proper distance to setbacks.
Chambers properly installed as per manufacturers specifications.
(Chambers latched, end plates properly installed, rocks removed from
trenches, etc.)
Type of pipe used for building sewer Line 5 h P- -�"�" leach field_,
V nr1,Ar U v dTG�'l 11 Y� S�P�2 GTt l`� YJD s 791. t 5 1 r� It.G���11- 1 E?
V Inspection meets 2=irements.
Copy form to installer's file if recommendations for improvement were
suggested.
ACTION TAKEN:
Setbacks
Well Potable House Property Lake Dry Tank Drain
Water Lines line Stream Gulch
Field 100 25 20 10 50 25 10 10
TAZ�. 50 10 5 10 50 10 * 10
DEPARTMENT OF
ENVIRONMENTAL HEALTH
(970) 328-8755
FAX (970) 328-8788
TDD: (970) 328-8797
• TOLL FREE: 800-225-8136
www.eagle-county.com
EAGLE COUNTY, COLORADO
June 25, 2002
Mike Peppers
4559 Frying Pan Rd.
Basalt, CO 81621
Raymond P. Merry, REHS
Director
RE: Final of ISDS Permit #2072-01, Tax Parcel #2467-023-00-008. Property
location: 4559 Frying Pan Rd., Basalt, CO.
Dear Mr. Peppers:
This letter is to inform you that the above referenced ISDS Permit has been inspected and
finalized. Enclosed is a copy to retain for your records. This permit does not indicate
compliance with any other Eagle County requirements. Also enclosed is a brochure regarding
the care of your septic system.
Be aware that later changes to your building may require appropriate alterations of your septic
system.
If you have any questions regarding this permit, please contact the Eagle County Environmental
Health Division at (970) 328-8755.
Sincerely,
i
Janet Kohl
Eagle County Environmental Health Department
ENCL: Informational Brochure
Final ISDS Permit
cc: files
OLD COURTHOUSE BUILDING, 551 Broadway, P.O. Box 179, Eagle, Colorado 81631-0179
C1���Iri�llll]I�
'�i violM PA1M
114
:,k 11111�/Im1k a1
Engineers • Constructors
June 24, 2002
Eagle County Environmental Health Division
500 Broadway, P.O. Box 179
Eagle, CO 81631-0179
Sent Via Fax # 328-8788
Attn: Janet Kohl
Re: Peppers Residence Septic Project No. 00047
ISDS Permit No. 2071-01
Dear Ms. Kohl:
This is to confirm that Glenwood Structural and Civil, Inc. had the opportunity to observe the installation
of the plumbing and infiltrator chambers for the above septic system prior to backf ill. This observation was
conducted on October 5, 2001. The system was installed in accordance with the design prepared by this
office and approved by the County.
We regret any inconvenience caused by the delay in forwarding this information to your office. If anything
further is required, please contact us.
Thank You,
GLENWOODATRUCTURAL AND
OHO �;p
29954
O. Gorra, M.S., P.E.
,-nt
cc: Mika Construction via fax # 927-3440
File
■
0 Phone (970) 928-01 35 0 Fax (970) 928-9604 0
2071-01 Tax #2467-023-00-0b8 n
JOB NAME. 4559 Frying Pan Rd. PEPPERS JOB NO. �"
Basalt
- nsoo
BILL TO
DATE STARTED
DATE COMPLETED
DATE BILLED
' ' -L -01 It-j rpou, hav
ur 7 .
V-�
1-b 7'
'� 1 if rA
� j- 4 . JlLw I L�eu �aqm ow-6b -3
hAavA Aw 9 "J'-n
dLl?
- 7qq 4- c
y� c d . D K -�O A&Lc Max
,4:. CQ Lc�
/
-' ("'-1 . �'y �•i
�_�� ,
Cc •� � � c,�,Q2 �
� �1�� �; d
L,f "LL JOB COST
SUMMARY
TOTAL SELLING
PRICE
7
"
TOTAL MATERIAL
TOTAL LABOR
k
INSURANCE
tQ _X—) _
SALES TAX
MISC. COSTS
l G c .+,vdf- Z4 r wkZL = 4 t4 Z
TOTAL JOB
COST
J
+O�,�t414;t_o
GROSS PROFIT
6 —
,1 '�� / (,! 1 I� r f /
7� 1..� � �-(} (,�,(�(� (y-(,��� y�/+'l — (;Lt,((�Lti•
. LESS OVERHEAD COSTS
117'l /o OF SELLING PRICE
NET PROFIT
JOB FOLDER Product 278 bvd- �^e%_,i^ �►i0 %/► (A/ d(i` 1 1 7 ;OBE ' �'■ wyvt�Yr�� (� C�p� Printed in USA
r
... ?.,r
i •
T J
P&vi, RgL
b ct 3 frmdlora D $ 6""'C
go?/-O 2-067-0a3-oo-008 Peppers
456R FrV o%j Pars Rrt.
Ba�a.lf r i spurs
I 10000 hv-C�
4
✓ � l75 Co
ft
Recycled Content
10% Post•Consumer
r389`501
ZW
102,28
FXSS1w'Lnnf:7SXd6k?C:k
is
These documents are intended
for the exclusive use of the
project specified below. The
use of these documents for any
other purpose is not authorized.
Written authorization from
Glenwood Structural and Civil
must be obtained for any other
use. This document is to be
used within one year of the date
of preparation. Use after that
period is not authorized.
MIKA
CONSTRUCTION
MALLINGER
RESIDENCE
SEPTIC
SYSTEM
Scale:
1 " = 10'
REVISIONS
0 Description
Date
1
Serial Distribution
3/14/01
2
3
4
^
Ej......,_.
W
ONC tftUK .UM �cri1U ►Hwr� rsT ►VUKVVC0UV (rv�TMCK)
RESIDENeE 10 L. LOR FRONT RANGE PRECAST
O
O
O
INV T IN = 99.3
or
r
S= 48° W/ MANHOLE GRADE EXTENSIONS
i
I
INVE T IN = 101.6
INVERT 1N = 105.75
-
QINVERT
OUT = 105.50
PRO DE SPLASH PLA
E
p
GENERAL NOTES:
1. SURVEY PROVIDED /N ELECTRONIC FORMAT BY HIRED GUN SURVEYING, LTD
2. ALL CONSTRUCTION SHALL BE CARRIED OUT IN CONFORMANCE WITH CHAPTER IV
EAGLE COUNTY LAND USE REGULATIONS FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEMS
(ISDS)
3. REFER TO HP GEOTECH JOB NO. 100-761 - SUBSOIL STUDY FOR FOUNDATION
DESIGN AND PERCOLATION TESTING
4. PERCOLATION TEST RESULTS OF 40 MINUTES PER INCH USED IN DESIGN
5. SOIL CONSISTS OF 31 % GRAVEL, 29% SAND, AND 40% SILT AND CLAY
6. YARD GRADES TO REMAIN EXISTING EXCEPT AS NOTED
7. ALL SEWER PIPING TO BE 4" SDR35 AND SHALL HAVE A MINIMUM COVER OF 12"
8. INSTALLER SHALL COMPLETE "ISDS FINAL INSPECTION COMPLETENESS FORM"
PRIOR TO INSPECTION
9. COORDINATE WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS FOR REQUIRED
BACKFILL /N PROXIMITY TO BUILDING
0 0111
I
N
engineers - Constructors
604 West 12th 5Veet
Glenwood Springs, CO
C 970 928-0135
Fax 92(5-9804
Job Number
00047
Engineer
AG
Date
3/8/01
Sheet 1
Of