HomeMy WebLinkAboutC99-149 Evans-Mendel-Allison ConstructionCHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER
QX
ARCHITECT
QX
CONTRACTOR
QX
FIELD
Q
OTHER
0
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 011
(i.e. oddne ) 0426 Fairground Road
Eagle, CO 81631 tVTtTtATtON DATE: 12-Apr-99
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. DescriDHon Adnrsimerlt
055 Delete (6) PVC downspouts ($1,453)
057 Add 1 1/4' dia pipe to ADA ramps for curb $816
065 Add (2) yard hydrams -one at East Landscape area
& one at West Landscape area $5,364
DEG Provide Restmom awnings per DLW sketch Si dated 34-99
and noted "For review and pricing". $609
081 Provide labor and material to set transformer vault for
Holy Cross Electric $691
082 Provide labor & material to repair water line leak to exalting
conce"lon stand $3,227
TOTAL $12,654
Not valid until semd by tooth Owner and Architect.
Signature of the Contractor Indite[" his agreemard herewith, including any adjustment in the Contract Sum or Contract Time.
The original (GarWasFSum) (Guaranteed Maxinuun Cost) was
Net Change by previously authorized Change Orders .............................................. =...........
The (Cnntrast-Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (GGRtsstSum) (Guaranteed Maximum Cost) wit be (increased) (eleswaseel (uRspanged
bythis Change Order.............................................................................................
The new (Gostrast-Sum) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner
Eagle County —Facilities
P.O. Box 85D
Eagle, C9 81631
B'
e: k .Z/
Contractor
Evans -Mendel -Allison Construction, Inc
P.O.
agwem
Avo CO 8 620 i
B 4IL�fAA�vK.
Date:
S$124,6318
$12,279
$2,136,918
$12,654
$2,149.578 1.
6 Days
7/15199 0
Architect
David Lynn Wise, AIA
73017th Street, Suite 915
Demyne-iJO 80202
N
AIA Document G701 - CHANGE ORDER ' April 1978 EDITION • AIA COPYRIGHT 1978
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20DOS G701 -1978
CIq-/Y9-e7�
CHANGE
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name, address) 0426 Fairground Road
Eagle, CO 81631
Job Number: 02M99
TO (Contractor): Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, CO $1620
You are directed to make the following changes in this Contract:
CE No. Description
061 Provide winter protection 1-25-99 to 2-15-99
078 Provide winter protection 2-16-99 to 3-15-99
086 Provide winter ptrotection 3-16-99 to 4-1-99
Distribution to:
OWNER QX
ARCHITECT FX
CONTRACTOR 0
FIELD Q
OTHER Q
CHANGE ORDER NUMBER: 012
INTITIATION DATE: 12-Apr-99
ARCHITECT'S PROJECT NO:
CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
Adiustment
$5,281
$23,486
$1,407
TOTAL $30,174
Not calk until signed by both Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (6aRtra6t-Sdm) (Guaranteed Maximum Cost) was ..................................... I......
Net Change by previously authorized Change Orders ............................................... .-:..........
The (GontraGt-.�) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (Contrast Sum (Guaranteed Maximum Cost) will be (increased) (decreased) (URchaRged)
bythis Change Order.............................................................................................
The new (GaRtrasi-Sure) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner
Eagle County —Facilities
P.O. Box 860
Ea CO 631
By.
D e:
Contractor,
Evans -Mendel -Allison Construction, Inc.
P.O. B 6
Av , CO 8 620
By
Date: ! 1a? �T
$2,124,63f S
$42,453
$2,167,092
$30,174
$2,197,260 5
6 Days
7/15199
Architect:
David Lynn Wise, ALA
730 17th Street, Suite 915
Denv O 80202
By. �,t (k lw;�i
Date: L r? I ��
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORKAVE., NW., WASHINGTON, D.C. 2000E G701 -1978
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER
5_
ARCHITECT
QX
CONTRACTOR
QX
FIELD
0
OTHER
0
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER:
(name, addrass) 0426 Fairground Road
Eagle, CO $1631 INTITIATION DATE:
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR:
CONTRACT DATE:
You are directed to make the following changes in this Contract
CE No.
DescrloNon
052R
Provide piers for relocated horse stalls In East Parking Lot
069
Provide new electric service to relocated horse stalls in East
Parking Lot
070
Provide new 1" dla water service to relocated horse stall in
East Parking Lot
013
12-Apr-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adjustment
$7,927
$5,323
$5.639
TOTAL $18,889
No valid until signed by bath Omu r and Architect.
Signature of the Cordrector Indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (GGRtr20-Si-In) (Guaranteed Maximum Cost) was ............................................
Net Change by previously authorized Change Orders ...........................................................
The (Gentras ) (Guaranteed Maximum Cost) priorto this Change Orderwas ................
The (CeRNaet Sum) (Guaranteed Maximum Cost) will be (increased) (Aesreased) (URehanged)
bythis Change Order.............................................................................................
The new (GORtrasRSuaa) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner,
Eagle County —Facilities
P.O. Box 850
Fte
Contractor
Evans -Mendel -Allison Construction, Inc.
P.O. 8
A , CO 820
B �
Date: '4-/a .11
$2,124,636 g
$72,627
$2,197,266
$18,889
$2,216,15! �}
6 Days
7115/99
Architect
David Lynn Wise, AIA
730 17th Street, Suite 915
DenvenCCO 80202
AIA Document G701 - CHANGE ORDER - April 1978 EDITION - AIA COPYRIGHT 1978
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.. NW.. WASHINGTON. D.C. 20006 G701 -1978
V lveU
Nei
cI�- IVY `17
CHANGE
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name, address) 0426 Fairground Road
Eagle, CO 81631
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, CO 81620
Distribution to:
OWNER M
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER' Q
CHANGE ORDER NUMBER:
INTITIATION DATE:
ARCHITECTS PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
You are directed to make the following changes in this Contract:
CE No. Descrlotlon
089 Provide Crane toilet fixtures in lieu of Kohler fixtures because
of the unavailibility of Kohler fixtures at this time
020
29-Apr-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adiustment
($223)
TOTAL (5223)
Not valid until signed by both Owner and Architect.
Signature of the Contradur Indicates his agreement herewM including any adlustmenl in the Contract Sum or Contract Time.
The original (CoRkaciSum) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders .............................................................
The (CoRgm-8 0um) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (Coplm-+Suss) (Guaranteed Maximum Cost) will be (I-srsacad) (decreased) (uRchaRgsd;
bythis Change Order.............................................................................................
The new (Con -act Sum (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased)) by
The Date of Substantial Completion as of the dale of this Change Order therefore is
Owner.
Eagle County —Facilities
P.O. Box 850
Ea , CO 1631
o
B'
ate:
Contractor.
Evans -Mendel -Allison Construction, Inc.
P.O. B 66
AvG CO 81620 _ /i i
Date: `{•gyp'( j
$2.124,6309
$109,527
$2,234,166
($223)
$2,233,949 2.
6 Days
7/15/99
Architect:
David Lynn Wise, AIA
73017th Street, Suite 915
;W= • s.
THE AMERICAN INSTITUTE OF ARCHITECTS 1735 NEW YORK AVE.. NW, WASHINGTON. D.C. 20006 G701 -1978
Gg9-1y9-y7
CHANGE
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name, address) 0426 Fairground Road
Eagle, CO 81631
Job Number: 028-099
TO (Contractor): Evans-Mendel-AIIIson Construction, Inc.
P.O. Box 8266
Avon, CO 81620
You are directed to make the following changes in this Contract:
CE No. Description
Distribution to:
OWNER
QX
ARCHITECT
QX
CONTRACTOR
QX
FIELD
Q
OTHER
0
CHANGE ORDER NUMBER:
INTITIATION DATE:
ARCHITECTS PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
068 Credit for removal and replacement of existing manhole
on Change Order No. 11
023
17-May-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adiustment
($3,400)
TOTAL ($3,400)
Not valid until signed by both Owner and Architect.
Signature or the Contra sor indicates his agreement herewith including any adjustment in the Contract Sum or Contract Time.
The original (GeRtraSt Sum) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders .............................................................
The (Gentmt;t-Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (GOAtvaO Sum) (Guaranteed Maximum Cost) will be (iRomassd) (decreased) (unghanged)
bythis Change Order.............................................................................................
The new (GGRErast-Sull) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (Increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County —Facilities
P.O. Box 850
e, C 81631
s
B'
ate: (o�sv'79__
Contractor:
Evans -Me el -Allison Construction, Inc.
P.O. 828
Avo
B
Date:Z
$2,124,630 8
$92,854
$2,217,493
($3,400)
$2.214,090 7-
6 Days
7115/99
Architect.
David Lynn Wise, AIA
730 17th Street, Suite 915
Denver, CO 80202
ey p^,. q
Date L_L L�l / /
AIA Document G701 - CHANGE ORDER - Apol 1978 EDITION ' AIA COPYRIGHT 1978
THE ANIERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE.. NW.. WASHINGTON. D.C. 20006 G701 -1978
C-11 � Y�
CHANGE
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name. address) 0426 Fairground Road
Eagle, CO 81631
Job Number: 028-099
TO (Contractor):. Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, CO 81620
You are directed to make the following changes in this Contract:
CE No. Description
Distribution to:
OWNER
QX
ARCHITECT
QX
CONTRACTOR
QX
FIELD
Q
OTHER
Q
CHANGE ORDER NUMBER:
INTITIATION DATE:
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
052R2 Credit for actual length of horse stall pier foundations as
stated in Change Order No. 13
024
17-May-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adjustment
($1,198)
TOTAL ($1 9898)
Not valid until signed by troth Owner and Architect.
Signature of the Contractor indicates his egreemetd herrmth including any adjustm M in the ConO Sum or Contract Time.
The original (G9Rtrast• Sum) (Guaranteed Maximum Cost) was .............................................
$2,124,63: Q
Net Change by previously authorized Change Orders.............................................................
$89,454
The (SeRtmet-Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................
$2,214,093
The (6enkaSt Sully (Guaranteed Maximum Cost) will be (iRsreased) (decreased) (uRshaRged)
by this Change Order.............................................................................................
($1,193)
The new (Gestrast Swm) (Guaranteed Maximum Cost) including this Change Order will be ...
$2,212,89a 4
The Contract Time will be (increased) by
6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is
7/15/99
Owner: Contractor: Architect:
Eagle County —Facilities Evans -Mendel -Allison Construction, Inc. David Lynn Wise, AIA
P.O. Box 850 P.O. B 28 730 17th Street, Suite 915
E e CO 81831 � � Avo , CO 81 20 D�\�e�n/ver, C\Oy�80202
BY� B o>"----4��
Date: / - �/ Date: s "� Date: L 7
AIA Document G701 ' CHANGE ORDER Apnl 197E EDITION AIA COPYRIGHT 1978
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW.. WASHINGTON. D.C. 20006 G701 -1978
CHANGE
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name, address) 0426 Fairground Road
Eagle, CO 81631
Job Number: 028.099
TO (Contractor): Evans -Mendel -Allison Construction, Inc.
P.O. Box 8286
Avon, CO 81620
You are directed to make the following changes in this Contract:
Distribution to:
OWNER
Qx
ARCHITECT
QX
CONTRACTOR
Qx
FIELD
0
OTHER
Q
CHANGE ORDER NUMBER:
INTITIAT10N DATE:
ARCHITECTS PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
CE No. Description
097 Relocate arena fence along south side of arena, backfill existing
auger holes, revise west arena fence and gate layout, and revise
north fence and gate layout on each side of bucking chutes
TOTAL
025
17-May-99
Eagle County Rodeo Arena Grandstands
Not valid uMiI signed by both Owner and Archft c .
signature of the Contractor Indicates his agreement herewith, including any adjustment in the Contrad Sum or ConNact Time.
11.09.98
Adlustment
$2,948
$2,948
The original(GenNaGt Sum)(Guaranteed Maximum Cost) was ............................................. $2,124,636%
Net Change by previously authorized Change Orders............................................................. $88,256
The (GeRkact Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,212,895
The (Gont aO Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (wAGhanged)
by this Change Order............................................................................................. $2,948
The new (COMM tSum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,215,8M Z
The Contract Time will be (increased) by 6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is 7/15/99
Owner. Contractor: Architect,
Eagle County —Facilities Evans -Mendel -Allison Construction, Inc. David Lynn Wise, AIA
P.O. Box 850 P.O. B . 6 730 17th Street, Suite 915
CO 1831 Av , CO 81 20 De CO e0202
i
B B. B
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20008 G701 -1978
CHANGE Distribution to:
ORDER
AIA DOCUMENT G701 OWNER QX
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER Q
PROJECT:
Eagle County Rodeo Arena Grandstands
CHANGE ORDER NUMBER:
026
(name, address)
0426 Fairground Road
Eagle, CO 81631
INITIATION DATE:
20-May-99
Job Number: 028-099
TO (Contractor):
Evans -Mendel -Allison Construction, Inc.
ARCHITECT'S PROJECT NO:
P.O. Box 8266
Avon, CO 81620
CONTRACT FOR:
Eagle County Rodeo Arena Grandstands
CONTRACT DATE:
11.09.98
You are directed to make the following changes in this Contract:
CE No. Description Adjustment
093 Provide hard surfaces (6" concrete) and landscaping for the new $17,890
Esplanade Plan, as detailed on Sketch SK36, prepared by
DLW dated 4-21-99
(Note: this Change Order does not include a main water source for the
permanent irrigation system, this will be invoiced on unit cost per
lineal foot; Change Order does not include fence along river edge,
this will be incorporated into a Change Order upon receipt of
final pricing)
TOTAL $17,890
Not valid until signed by both Owner and Architect
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract rime.
The original (Contra444m) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders ............................................................
The (Gainkast Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (GeREragt Sum) (Guaranteed Maximum Cost) will be (increased) (deereased) (unchanged)
bythis Change Order.............................................................................................
The new (Gentmat-Sum) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County —Facilities
P.O. Box 850
Ea CO 631
ey
ate:
Contractor:
Evans -Mendel -Allison Construction, Inc.
P.O. B 6
Avoif CO 0620
Bk_�
Date: 5 -aff
$2,124,630 g
$91,204
$2,215,843
$17,890
$2,233,736 2
6 Days
7/15199
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 915
Date: Z / /�(1� `1�
THE AMERICAN INSnME OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 G701 -1978
Z
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER FX
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 027
(name. address) 0426 Fairground Road
Eagle, CO 81631 INITIATION DATE: 27-May99
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description
061 Credit for winter conditions as outlined in letter to Andrew
Montoya dated May 19, 1999.
Adjustment
($1,999)
TOTAL (51,999)
Not valid until signed by both Owner and Architect
Signature of the Contractor indicates his agreement herewith, including any adjuebment in the Contract Sum or Contract Time.
The original (ContastSuum) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders .............................................................
The (CoMractSum) (Guaranteed Maximum Cost) prior to this Change Order eyes ................
The (Contrast Sum) (Guaranteed Maximum Cost) will be (iaereased) (decreased) (unchanged)
bythis Change Order.............................................................................................
The new (6enHastSUM) (Guaranteed Maximum Cost) Including this Change Order will be ...
The Contract Time will be (increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County —Facilities
P.O. Box 860
Ea , CO 81631 i
By.
te:
Contractor:
Evans -Mendel -Allison Construction, Inc
P.O. B
Avo , CO 81420
B' c"
Date:• I Q
$2,124,6329
$109.094
$2,233,733
($1,999)
$2,231,734
6 Days
7/15/99
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 916
THE AMERICAN INSTRUTE OF ARCHITECTS, 1735NEW YORK AVE., NW., WASHINGTON, D.C. 20008 G701 .1978
10_eJ
,,
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER QX
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER' Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 028
(name, address) 0426 Fairground Road
Eagle, CO 81631 INITIATION DATE: 27-May-99
Job Number: 0284199
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 111.09,98
You are directed to make the following changes in this Contract:
CE No. Description Adjustment
050 Provide fire caulking at precast joints which exceed the design width $1,477
of 1/2" but less than 1" as required by code.
TOTAL
$1,477
Not valid untl signed by both Owner and Architect
Signature of the Combactor indicates his agreement herewith, including any adjustment in Me Correct Sum or Contact Time.
The original (GGRtraet4uan) (Guaranteed Maximum Cost) was .............................................
$2.124.639 D
Net Change by previously authorized Change Orders.............................................................
$107,095
The (CenhaGk%um) (Guaranteed Maximum Cost) prior to this Change Order was ................
$2,231.734
The (GoAtiactSum) (Guaranteed Maximum Cost) will be (increased) (deswased) (uRGhallpd)
bythis Change Order.............................................................................................
The new (CeRfrast-Sum) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time Will be (increased) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County —Facilities
P.O. Box 89
pw
CO1631
Contractor:
Evans -Mendel -Allison Construction, Inc.
P.O. B
AvonrCO 81020
Bye . s��
Date: 5'027f f
$1,477
$2,233,211
6 Days
7/15/99
Architect:
David Lynn Wise, AIA
730171h Street, Suite 915
Date: /
nY,,, ... .. ...
THE AMERICAN INSITn7TE OF ARCHITECTS, 1735 NEW YORK AVE., NW.. WASHINGTON, D.C. 20006 G701 -1978
pv �
CHANGE
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name, address) 0428 Fairground Road
Eagle, CO 81631
Job Number: 02"99
TO (Contractor): Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, CO 81620
Distribution to:
OWNER QX
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER Q
CHANGE ORDER NUMBER:
INITIATION DATE:
ARCHITECTS PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
You are directed to make the following changes in this Contract:
CE No. Description
090 Provide shop painting and field touch up in field after installation
all handrails and guardrails on the job and related metalwork and
connections, per David Lynn Wise Memo dated April 5, 1999.
029
27-May-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adjustment
$2,731
TOTAL $2,731
Not valid until signed by both Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (Gentra4) (Guaranteed Maximum Cost) was .............................................
p
$2,124,634 b
Net Change by previously authorized Change Orders.............................................................
$108,572
The (CeatraG1.4 m) (Guaranteed Maximum Cost) prior to this Change Order was ................
$2,233,211
The (Gontmgt Sum) (Guaranteed Maximum Cost) will be (increased) (deereased) (Unchanged)
by this Change Order............................................................................................. $2,731
The new (CantrelSum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,235,942
The Contract Time will be (increased) by 6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is 7115199
Owner:
Eagle County —Facilities
P.O. Box 8 0
E C 1fi3110
B
ate: 1Z 411q'f
Contractor.
Evans -Mendel -Allison Construction, Inc.
P.O.Jed117821f
Av , CO 8 2
Date: y'
Architect:
David Lynn Wise, AIA
73017th Street, Suite 916
B r , CO 02
THE AMERICAN INSTITl1TE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 G701 -197a
u
CHANGE
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name, address) 0426 Fairground Road
Eagle, CO 81631
Job Number: 028-099
Distribution to:
OWNER FX
ARCHITECT QX
CONTRACTOR Qx
FIELD Q
OTHER Q
CHANGE ORDER NUMBER: 030
INITIATION DATE: 27-May-99
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description Adiustment
091 Provide preparation and painting of the structural steel columns $2,799
supporting the main roof and related metal work and connections;
Crow's Nest columns, stair stringers and handrails per DLW
Memo dated April 5, 1999.
Not valid until signed by both Owner and Aohitec
Signature of the Gonbactor indicates his agreement herewith. includ i,
The original (CentractSum) (Guaranteed Maximum Cost) w
Net Change by previously authorized Change Orders ...........
The (Centraef-Sum) (Guaranteed Maximum Cost) prior to this
The (6entmGt-Sum) (Guaranteed Maximum Cost) will be (ncrer
by this Change Order ........................................................
The new (GantscbSum) (Guaranteed Maximum Cost) Including b -.,d be ...
The Contract Time will be (increased) by
The Date of Substantial Completion as of the date of this Change Orc .. therefore is
Owner:
Eagle County —Facilities
P.O. Box 81
E CO 631
r
e. eg&1A
te: it w
Contractor:
Evans -Mendel -Allison Construction, Inc.
P.O. B 6
Avo
B C 9
Date:
_,0,942
$2,799
$2,238,741
6 Days
7115199
Architect,
David Lynn Wise, AIA
73017th Street, Suite 916
Date: /
G701-1978