AGREEMENT
THIS AGREEMENT is dated as of the V dayof , in the year 1999 by and
between
Board of County Commissioners
Eagle County, Colorado
(hereinafter called OWNER)
and
Elam Construction, Inc.
(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants set forth, agree as
follows:
ARTICLE 1 - WORK
\400, CONTRACTOR shall complete all work as specified or indicated in the Contract
Documents.. The work is generally described as follows:
Paving of Colorado River Road from approximately Mile Post 12.5 to
approximately Mile Post 14
ARTICLE 2 - ENGINEER
The Project has been designed by the Eagle County Engineer (an employee of Eagle
County), who is hereinafter called ENGINEER, and will assume all duties and
responsibilities, and will have the rights and authority assigned to ENGINEER in the
Contract Documents in connection with completion of the work in accordance with the
Contract Documents.
Agreement Page 1
ARTICLE 3 - CONTRACT TIME
3.1 The work will be substantially completed on or before September 30, 1999, and
completed and ready for final payment in accordance with paragraph 14.13 of the
General Conditions on or before September 30, 1999.
3.2 LIQUIDATED DAMAGES: OWNER and CONTRACTOR recognize that time is of
the essence of this Agreement and that OWNER will suffer financial loss if the
work is not substantially complete within the time specified in paragraph 3.1 above,
plus any extensions thereof allowed in accordance with Article 12 of the General
Conditions. They also recognize the delays, expense, and difficulties involved in
proving a legal or arbitration proceeding the actual loss suffered by OWNER if the
work is not substantially complete on time. Accordingly, instead of requiring such
proof, OWNER and CONTRACTOR agree that as liquidated damages for delay
(but not as a penalty) CONTRACTOR shall pay OWNER Nine Hundred Fifty
dollars ($950.00) for each day that expires after the time specified in paragraph
3.1 for substantial completion until the work is substantially complete.
ARTICLE 4 - CONTRACT PRICE
4.1 The funds appropriated for this project are equal to or in excess of the contract
amount. OWNER shall pay CONTRACTOR for performance of the work in
accordance with the Contract Documents in current funds as follows:
Item
1.
Description t Unit Unit Price Amount
Hot Bituminous Pavement
(Grading CX)
Colorado River Road
From approximate M.P. 12.5
to approximate M.P. 14
6,336'x 21'x 4"
2. Emulsified Asphalt
Diluted Material
(CSS-1 h or SS-1 h)
3. Materials Sampling, Testing
and Inspection
Agreement
3,253f Tons $ 30.00 $ 97,590.00
1,500f Gal $ 1.00 $ 1,500.00
Lump $1,750.00 $ 1,750.00
Sum
Page 2
Item Description QIY
4. Construction Zone
Traffic Control
TOTAL
ARTICLE 5 - PAYMENT PROCEDURES
Unit Unit Price Amount
Lump $2,500.00 $ 29500.00
Sum
$103, 340.00
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as
provided in the General Conditions.
5.1 PROGRESS PAYMENTS: OWNER shall make monthly progress payments on
account of the Contract Price on the basis of CONTRACTOR's Applications for
Payments as recommended by ENGINEER, as provided below. All progress
payments will be on the basis of the progress of the work measured by the
schedule of values provided for in paragraph 14.1 of the General Conditions.
5.1.1 Prior to Substantial Completion, progress payments will be in an amount equal
to:
90% of the work completed until fifty percent (50%) of the work is
performed, after which no additional retainage shall be withheld, and
90% of materials and equipment not incorporated in the work but
delivered and suitably stored, less in each case the aggregate of
payments previously made.
5.1.2 Upon Substantial Completion, OWNER shall pay an amount sufficient to
increase total payments to CONTRACTOR to 95% of the Contract Price, less
such amounts as ENGINEER shall determine in accordance with paragraph
14.7 of the General Conditions.
5.2 FINAL PAYMENT: Upon final completion and acceptance in , accordance with
paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of
the Contract Price as recommended by ENGINEER as provided in said paragraph
14.13. The final payment shall not be made until after final settlement of this
contract has been duly advertised at least ten days prior to such final payment by
Agreement Page 3
\qVW/
publication of notice thereof at least twice in a public newspaper of general
\..� circulation published in Eagle County, and the Board of County Commissioners
has held a public hearing, thereupon and complied with the Revised Statutes
1973, Section 38-26-107 as amended. Final payment shall be made in
accordance with the requirements of aforesaid statute.
ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to. enter into this Agreement CONTRACTOR makes the
following representations:
6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract
Documents, work, locality, and with all local conditions, and federal, state, and
local laws, ordinances, rules and regulations that in any manner may affect cost,
progress, or performance of the work.
6.2 CONTRACTOR has studied carefully all reports of investigations and tests of
subsurface and latent physical conditions at the site or otherwise affecting cost,
progress, or performance of the work which were relied upon by ENGINEER in the
preparation of the Drawings and Specifications, and which have been identified in
the Supplementary Conditions.
6.3 CONTRACTOR has made, or caused to be made, examinations, investigations,
and tests and studies of such reports and related data in addition to those referred
to in paragraph 6.2 as he deems necessary for the performance of the work at the
Contract Price, within the Contract Time, and in accordance with other terms and
conditions of the Contract Documents; and no additional examinations,
investigations, tests, reports, or similar data are, or will be required by
CONTRACTOR for such purposes.
6.4 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports, and data with the terms and conditions of the
Contract Documents.
6.5 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, or
discrepancies that he has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7 - CONTRACT DOCUMENTS
Agreement Page 4
The Contract Documents which comprise the entire Agreement, made a part hereof, and
consist of the following:
7.1 This Agreement (Pages 1 to 7, inclusive).
7.2 Invitation to Bid consisting of 1 page.
7.3 Instructions to Bidders (Pages 1 to 7, inclusive).
7.4 Performance and other Bonds, identified as exhibits , and consisting of
pages.
7.5 Notice of Award, Notice to Proceed.
7.6 General Conditions (Pages 1 to 50, inclusive).
7.7 Specifications bearing the title and consisting of 3 divisions and 3 pages,
as listed in the table of contents thereof.
7.8 Drawings, consisting of sheets.
7.9 Addenda numbers to , inclusive.
7.10 Documentation submitted by CONTRACTOR prior to Notice of Award (Pages _
to , inclusive).
7.11 Any modification, including Change Orders, duly delivered after execution of
Agreement.
There are no Contract Documents other than those listed above in this Article 7. The
Contract Documents may only be altered, amended, or repealed by a Modification (as
defined- in Section 1 of the General Conditions).
ARTICLE 8 - MISCELLANEOUS
8.1 The terms used in this Agreement which are defined in Article 1 of the General
Conditions shall have the meanings indicated in the General Conditions.
8.2 No assignment by a party hereto of any rights under, or interests in the Contract
Documents will be binding on another party hereto without the written consent of
'"W", Agreement Page 5
...
0-2
the party sought to be bound; and specifically, but without limitation, moneys that
may become due and moneys that are due may not be assigned without such
consent (except to the extent that the effect of this restriction may be limited by
law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty
or responsibility under the Contract Documents.
8.3 OWNER and CONTRACTOR each binds himself, his partners, successors,
assigns and legal representatives to the other party hereto, in respect to all
covenants, agreements, and obligations contained in the Contract Documents.
8.4 ATTORNEY'S FEES: In the event of litigation between the parties hereto
regarding the interpretation of this Agreement, or the obligations, duties or rights
of the parties hereunder, or if suit otherwise is brought to recover damages for
breach of this Agreement, or an action be brought for injunction or specific
performance, then and in such events, the prevailing party shall recover all
reasonable costs incurred with regard to such litigation, including reasonable
attorney's fees.
8.5 APPLICABLE LAW: This Agreement shall be governed by the laws of the State
of Colorado. Jurisdiction and venue of any suit, right, or cause of action arising
under, or in connection with this Agreement shall be exclusive in Eagle County,
Colorado.
IN WITNESS WHEREOF, the parties hereto have signed this Agreement in triplicate. One
counterpart each has been delivered to OWNER, CONTRACTOR, and ENGINEER. All
portions of the Contract Documents have been signed or identified by OWNER and
CONTRACTOR, or by ENGINEER on their behalf.
This Agreement will be effective ordQa& 1999.
OWNER: Eagle County Board of
County Commissioners
BY:
Jhairman
CONTRA-.
;�C�
(CORPORATE SEAL)
*..
Agreement Page 6
Lt
ATTEST
CpCOMvv
Address forgiving notices:
Eagle County Board of
County Commissioners
P.O. Box 850
Eagle, Colorado 81631
ATTEST
Stephen J. Kaspar, Assistant Secretary
Address for giving notices:
1225 South 7th Street
Grand Junction, GO 81501
Agreement Page 7
� ��r
:�'�:
Dininctsvc I,rrvrnnce
Ltd.
Scniccr
P.O. BoH 467d� Ave., Ste 44;
Englewood, Co 80150
303/761-0085 • Fax 3031788-1817
THE AMERICAN INSTITUTE OE ARCHITECTS
Bond No. 929102850 to
ISSUED IN FOUR PARTS
AIA Document A311
Performance Bond
KNOW ALL MEN BY THESE PRESENTS: that Elam Construction, Inc.
1225 South 7th Street (Here insert full name and address ar legal title of Contractor)
Grand Junction, CO 81501
gar' as Principal, hereinafter called Contractor, and,American Casualty Company of Reading, Pennsylvania
10333 E. Dry Creek Road, Suite 220 (Here insert fall name and address or legal title of Surety)
Englewood, CO 80112
as Surety, hereinafter called Surety, are held and firmly bound untoEagle County, Colorado
P.O. Box 850, 500 Broadway (Here insert full name and address or legal title of Owner)
Eagle, CO 81631
as Obligee, hereinafter called Owner, in the amount of
One Hundred Three Thousand Three Hundred
Forty —Dollars & 00/100------------------
Dollars(8103,340.00------- ).
for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators,
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS,
Contractor has by written agreement dated9icAj`', entered into a contract with Owner for
(Here insert full name. address and description of projectl Q
Colorado River Road Paving Project
Eagle County, CO
in accordance with Drawings and Specifications prepared by
712 Castle Drive, P.O. Box 250
Eagle, CO 81631
Eagle County Engineering Dept.
(Here insert full name and address or legal title of Architect)
V.10V which contract is by reference made a part hereof, and is hereinafter referred to as the Contract.
AIA DOCUMENT A311 • PERFORMANCE 80N0 AND LABOR AND MATERIAL PAYMENT BOND • AIA 8 .a
IEBRUARY 10-0 ED. • THE AMFRIC AN INSTITUTE OF ARCHITECTS. 171i N.Y. AVF.. N.W.. WASHINGTON, D. C. 20006
WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution.