HomeMy WebLinkAboutC99-161 Evans-Mendel-Allison Contruction_change order(-'919-/0/_ -/7 CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ❑X ARCHITECT QX CONTRACTOR ❑X FIELD 0 OTHER 0 PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 038 (name, address) 0426 Fairground Road Eagle, CO B1631 INITIATION DATE: 18Jun-99 Job Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands CONTRACT DATE: 11.09.98 You are directed to make the following changes in this Contract CE No. Description Adjustment 088R Provide additional water hydrants in the stock pens per $5,070 OAC Meeting of 5/12/99 10011 Provide infill for openings between tops of CMU walls and $1,034 underside of precast in 2" blueboard. 101 Provide 42" h fence along Esplanade per DLW sketch SK36 $10.690 103 Provide additional chain link fence per Andy Montoya $826 104 Provide 12" x 24" bronze plaque $930 TOTAL $18,550 Not valid until signed by both Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (contract Sum) (Guaranteed Maximum Cost) was ............................................. $2,124,639 Net Change by previously authorized Change Orders ............................................................. $121,727 The (contract -Soar) )(Guaranteed Maximum Cost) prior to this Change Order was ................ $2,246,366 The (CoAt act Sum) (Guaranteed Maximum Cost) will be (increased)4daGmased) (uacbanged) by this Change Order............................................................................................. $18,550 The new (caatmi;t Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,264,916 The Contract Time will be (increased)) by 6 Days The Date of Substantial Completion as of the date of this Change Order therefore is 7/15199 Owner. Eagle County --Facilities P.O. Box 850 EagtQCO,81631 THE AMERICAN INSTITUTE Contractor. Evans -Mendel -Allison Construction, Inc. P.O. 826 Av, , CO 81 20 e B' 7 i :! �/Q ';..�... Date: '''/ � Architect: David Lynn Wise, AIA 730 17th Street, Suite 915 D O 80202 B b& Date: to PISTR T.-,C.pntract Book--`- 2. 3.- 4. ies to: 1. Accounting 2. 3. CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER IX� ARCHITECT I X CONTRACTOR 1 X FIELD I_I OTHER 11 PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: (name, address) 0426 Fairground Road Eagle, CO 81631 INITIATION DATE: Job Number: 028-099 039 18Jun-99 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands CONTRACT DATE: 11.09.98 You are directed to make the following changes in this Contract: CE No. Description Adjustment 090 Provide shop painted and field touch up of handrails per DLW ($2,731) Memo of 4-5.99 (Credit - because covered in Change Order No. 029) TOTAL ($2,731) Not valid until signed by both Owner and Architect. Signature of the Contractor indimtes his agreement heremth, including any adjustment in the Contract Sum or Contract Time. The original (GcntrasR5un1) (Guaranteed Maximum Cost) was ............................................. $2,124,639 Net Change by previously authorized Change Orders............................................................. $140,277 The (6eWrxtSupl) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,264.916 The (6entracCSurra (Guaranteed Maximum Cost) Will be (increased) (decreased) (VAGhaRged) by this Change Order............................................................................................. ($2,731) The new (CeniracRSum (Guaranteed Maximum Cast) including this Change Orderwill be ... $2,262,185 The Contract Time will be (increased)) by 6 Days The Date of Substantial Completion as of the date of this Change Order therefore is 7/15/99 Owner. Contractor: Architect: Eagle County --Facilities Evans -Mendel -Allison Construction, Inc. David Lynn Wise, AIA P.O.. Box 85 P.O. Bo1 6 730 17th Street, Suite 915 Eag , C 1 1631 �, Avo O 81 20 D O 80202 By B : r B te: � Date: Date: AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK IM DiSTRIBUTiON Originals to: 1. Contract Book 2. 3. 4. Cs to: 1. Accounting 2. 3. 4.