HomeMy WebLinkAboutC99-161 Evans-Mendel-Allison Contruction_change order(-'919-/0/_ -/7
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER ❑X
ARCHITECT QX
CONTRACTOR ❑X
FIELD 0
OTHER 0
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 038
(name, address) 0426 Fairground Road
Eagle, CO B1631 INITIATION DATE: 18Jun-99
Job Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract
CE No.
Description
Adjustment
088R
Provide additional water hydrants in the stock pens per
$5,070
OAC Meeting of 5/12/99
10011
Provide infill for openings between tops of CMU walls and
$1,034
underside of precast in 2" blueboard.
101
Provide 42" h fence along Esplanade per DLW sketch SK36
$10.690
103
Provide additional chain link fence per Andy Montoya
$826
104
Provide 12" x 24" bronze plaque
$930
TOTAL $18,550
Not valid until signed by both Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (contract Sum) (Guaranteed Maximum Cost) was .............................................
$2,124,639
Net Change by previously authorized Change Orders .............................................................
$121,727
The (contract -Soar) )(Guaranteed Maximum Cost) prior to this Change Order was ................
$2,246,366
The (CoAt act Sum) (Guaranteed Maximum Cost) will be (increased)4daGmased) (uacbanged)
by this Change Order.............................................................................................
$18,550
The new (caatmi;t Sum) (Guaranteed Maximum Cost) including this Change Order will be ...
$2,264,916
The Contract Time will be (increased)) by
6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is
7/15199
Owner.
Eagle County --Facilities
P.O. Box 850
EagtQCO,81631
THE AMERICAN INSTITUTE
Contractor.
Evans -Mendel -Allison Construction, Inc.
P.O. 826
Av, , CO 81 20
e
B'
7 i
:! �/Q
';..�... Date: '''/ �
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 915
D O 80202
B b&
Date:
to
PISTR
T.-,C.pntract Book--`-
2.
3.-
4.
ies to:
1. Accounting
2.
3.
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER IX�
ARCHITECT I X
CONTRACTOR 1 X
FIELD I_I
OTHER 11
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER:
(name, address) 0426 Fairground Road
Eagle, CO 81631 INITIATION DATE:
Job Number: 028-099
039
18Jun-99
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description Adjustment
090 Provide shop painted and field touch up of handrails per DLW ($2,731)
Memo of 4-5.99
(Credit - because covered in Change Order No. 029)
TOTAL ($2,731)
Not valid until signed by both Owner and Architect.
Signature of the Contractor indimtes his agreement heremth, including any adjustment in the Contract Sum or Contract Time.
The original (GcntrasR5un1) (Guaranteed Maximum Cost) was .............................................
$2,124,639
Net Change by previously authorized Change Orders.............................................................
$140,277
The (6eWrxtSupl) (Guaranteed Maximum Cost) prior to this Change Order was ................
$2,264.916
The (6entracCSurra (Guaranteed Maximum Cost) Will be (increased) (decreased) (VAGhaRged)
by this Change Order.............................................................................................
($2,731)
The new (CeniracRSum (Guaranteed Maximum Cast) including this Change Orderwill be ...
$2,262,185
The Contract Time will be (increased)) by
6 Days
The Date of Substantial Completion as of the date of this Change Order therefore is
7/15/99
Owner. Contractor:
Architect:
Eagle County --Facilities Evans -Mendel -Allison Construction, Inc.
David Lynn Wise, AIA
P.O.. Box 85 P.O. Bo1 6
730 17th Street, Suite 915
Eag , C 1 1631 �, Avo O 81 20
D O 80202
By B :
r
B
te: � Date:
Date:
AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK
IM
DiSTRIBUTiON
Originals to:
1. Contract Book
2.
3.
4.
Cs to:
1. Accounting
2.
3.
4.