HomeMy WebLinkAboutC99-187 Evans-Mendel-Allison ConstructionCHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER �X ARCHITECT FX CONTRACTOR Q FIELD Q OTHER Q PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 015 (name, address) 0426 Fairground Road Eagle, CO 81631 INTITIATION DATE: 15-Apr-99 Job Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands CONTRACT DATE: You are directed to make the following changes in this Contract: CE No. Description 087 Provide lighting and switching per DLW memo dated 1-29-99 and site lighting revisions per revised drawings A17 & A18 revised Feb. 10 & 14, 1999. TOTAL 11.09.98 Adiustment $16,564 $16,564 Not valid until signed by both Owner and Architect. Signature of the Contractor indiwles his agreement herewith including any adjustment in the Ccntmd Sum or Contract Time. The original (6eniraaLSum) (Guaranteed Maximum Cost) was ............................................. $2,124,639 Net Change by previously authorized Change Orders............................................................. $93,769 The (6eatcact-sum) )(Guaranteed Maximum Cost) prior to this Change Order was ................ $2,218,408 The (6eatmatbum) )(Guaranteed Maximum Cost) will be (Increased)(desreaced}(andaaaged) by this Change Order............................................................................................. $16,564 The new (CaRtc2c4S, m) (Guaranteed Maximum Cost) including this Change Order will be ... $2,234,972 The Contract Time will be (increased) (gloarsacad) (uAch2Rq-d) by 6 Days The Date of Substantial Completion as of the date of this Change Order therefore is 7/15199 Owner Eagle County --Facilities P.O. Box 850 - Ea , CO 1631 - � By: is 1 D e: .._- . Contractor: Evans -Mendel -Allison Construction, Inc. P.O. B Avo CO 81 20 Dale: Architect: David Lynn Wise, AIA 730 17th Street, Suite 915 Date:3 CP "9 C146r- DISTRIBUTION Originals to: 1. Contract Boo 3. a.�y_ l Ce ins to: i, Accounting -mow CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER M ARCHITECT QX CONTRACTOR QX FIELD 0 OTHER Q PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 040 (name. address) 0426 Fairground Road Eagle, CO 81631 INITIATION DATE: 18-Jun-99 Job Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands CONTRACT DATE: 11.09.98 You are directed to make the following changes in this Contract: CE No. Description 064R Provide labor and material for conduit and wiring for the revised sound system sketches prepared by CS Productions received in EMAC offices on 4/19/99 Adjustment $5,286 TOTAL $5,286 Not wlid until signed by both Owner and Architect Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (CeRtrast-Surn) (Guaranteed Maximum Cost) was ............................................. Net Change by previously authorized Change Orders ............................................................. The (Centmst-Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................ The (Contract Sum) (Guaranteed Maximum Cost) will be (increased){decreased) (vAGhaRged) bythis Change Order............................................................................................. The new (CentraOSum) (Guaranteed Maximum Cost) including this Change Order will be ... The Contract Time will be (increased) by The Date of Substantial Completion as of the date of this Change Order therefore is Owner: Eagle County —Facilities P.O. Box 850 Ea ,CJ81631 By P.O. Date: 4�p •d Construction, Inc. $2,124,639 $137.546 $2,262,185 $5,286 $2,267,471 6 Days 7/16199 Architect: David Lynn Wise, AIA 730 17th Street, Suite 916 D CO 80202 �_._ . //A THE AMERICAN INSTIIl OF ARCHREOTS, 1735 NEW YORK AVE. NW. WASHINGTON D.C. 20006 0701-1970 J 1;Iem, originals to-. 1. Contract Boo 2. C-i�C 4. Copies to.- 1. Accounting a