HomeMy WebLinkAboutC99-195 Evans-Mendel-Allison Construction1— CHANGE Distribution to: ORDER AIA DOCUMENT G701 OWNER ❑X ARCHITECT Q CONTRACTOR E FIELD 0 OTHER 0 PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: (name, address) 0426 Fairground Road Eagle, CO 81631 INITIATION DATE: Job Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: CONTRACT DATE: You are directed to make the following changes in this Contract y— i JUL 2 9. 1999 A L--- EAGLE COUNTY ATTORNEY 044 12-Jul-99 Eagle County Rodeo Arena Grandstands 11.09.98 CE No. Description Adjustment 114 Provide labor and material to install steel edging at end of arena panels at gate locations where arena panels were cut. $437 115 Provide labor and material to reverse swing of 4'-0" gate at West side of Crow's Nest and revise 10'-0" gate East side of Craws Nest to swing 180 degrees. $268 122 Credit to 2" dia main water line service to permanent irrigation system in Change Order No. 41. ($3,236) 122R Provide labor and material to install a 1" dia main water line service for permanent irrigation system. $2,393 126 Provide labor and material to provide 2" x 6" pressure treated lumber below existing 2" x 10" at arena panels. $1,413 TOTAL $1,275 Not valid until signed by both Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment In the Contract Sum or Contract Time. The original (GoRtract-Sum) (Guaranteed Maximum Cost) was ............................................. $2.124.639 Net Change by previously authorized Change Orders............................................................. $157.120 The (CBRlraci.4um) )(Guaranteed Maximum Cost) prior to this Change Order was ................ $2,281,759 The (GaRtRicFSum) (Guaranteed Maximum Cost) will be (increased) (dscuaced) (uRch2mged) bythis Change Order............................................................................................. $1,275 The new (CeRhasi SUM) (Guaranteed Maximum Cost) including this Change Order will be ... $2,283,034 The Contract Time will be (increased) (dacrliuigad) (uRch2RgQd) by 6 Days The Data of Substantial Completion as of the date of this Change Order therefore is 7/15199 Owner: - Contractor: Architect: Eagle County —Facilities - Evans-Mendel-Alllson Construction, Inc. David Lynn Wise, AIA P.O.x 850 P.O. Box 8 730 17th Street, Suite 915 r1le, CO 31 Avon, 81 20 80202 y: By: B . ^,) Date: %'/Z' Qy Date: THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW., WASHINGTON, O.C. 20006 G701.1978 Originals to: I. Contract Book 2. 3. 4. `��-r# l Copies to: 1. Accounting 2. 3.