HomeMy WebLinkAboutC99-195 Evans-Mendel-Allison Construction1—
CHANGE Distribution to:
ORDER
AIA DOCUMENT G701 OWNER ❑X
ARCHITECT Q
CONTRACTOR E
FIELD 0
OTHER 0
PROJECT:
Eagle County Rodeo Arena Grandstands
CHANGE ORDER NUMBER:
(name, address)
0426 Fairground Road
Eagle, CO 81631
INITIATION DATE:
Job Number: 028-099
TO (Contractor):
Evans -Mendel -Allison Construction, Inc.
ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620
CONTRACT FOR:
CONTRACT DATE:
You are directed to make the following changes in this Contract
y— i JUL 2 9. 1999 A
L---
EAGLE COUNTY ATTORNEY
044
12-Jul-99
Eagle County Rodeo Arena Grandstands
11.09.98
CE No. Description
Adjustment
114 Provide labor and material to install steel edging at end of arena
panels at gate locations where arena panels were cut.
$437
115 Provide labor and material to reverse swing of 4'-0" gate at West
side of Crow's Nest and revise 10'-0" gate East side of Craws
Nest to swing 180 degrees.
$268
122 Credit to 2" dia main water line service to permanent irrigation
system in Change Order No. 41.
($3,236)
122R Provide labor and material to install a 1" dia main water line
service for permanent irrigation system.
$2,393
126 Provide labor and material to provide 2" x 6" pressure treated
lumber below existing 2" x 10" at arena panels.
$1,413
TOTAL
$1,275
Not valid until signed by both Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment In the Contract Sum or Contract Time.
The original (GoRtract-Sum) (Guaranteed Maximum Cost) was .............................................
$2.124.639
Net Change by previously authorized Change Orders.............................................................
$157.120
The (CBRlraci.4um) )(Guaranteed Maximum Cost) prior to this Change Order was ................
$2,281,759
The (GaRtRicFSum) (Guaranteed Maximum Cost) will be (increased) (dscuaced) (uRch2mged)
bythis Change Order.............................................................................................
$1,275
The new (CeRhasi SUM) (Guaranteed Maximum Cost) including this Change Order will be ...
$2,283,034
The Contract Time will be (increased) (dacrliuigad) (uRch2RgQd) by
6 Days
The Data of Substantial Completion as of the date of this Change Order therefore is
7/15199
Owner: - Contractor:
Architect:
Eagle County —Facilities - Evans-Mendel-Alllson Construction, Inc.
David Lynn Wise, AIA
P.O.x 850 P.O. Box 8
730 17th Street, Suite 915
r1le, CO 31 Avon, 81 20
80202
y:
By:
B .
^,) Date: %'/Z' Qy
Date:
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW., WASHINGTON, O.C. 20006 G701.1978
Originals to:
I. Contract Book
2.
3.
4. `��-r# l
Copies to:
1. Accounting
2.
3.