C-`�V5G-Y7
CHANGE
ORDER
AIA DOCUMENT G701
Distribution to:
OWNER 5
ARCHITECT OX
CONTRACTOR OX
FIELD 0
OTHER Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 001
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE: 01.20.99
.lob Number: 028-099
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECT'S PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No.
Description
Adiustment
004
Delete interior masonry wall footings at walkways at front of grandstands
($8,904)
010
Provide revised corner construction at the corners of the grandstands
$0
per ASI #1, Item no. 3
014
Remove and replace 500 cy of arena material in lieu of 800 cy, per ASI #1
($781)
item no. 9, dated 11.25.98
016
Reduce footing depths 16" per Item no. 2 of ASI #2, dated 11.25.98
($6,850)
019
Delete 6 inch dia steel tube at the north end of the roof trusses per Item
($3,495)
no. 6 of ASI #2 dated 11.25.98
021
Provide steel vanity tops per Item no. 8 of ASI #2 dated 11.25.98
($6,909)
023
Delete any new work with existing animal wash per Item no. 10a of
($7,972)
ASI #2 dated 11.25.98
027
Delete light bollards at walkways per Item no. 19 of ASI #2 dated 11.25.98
($2,591)
037
Change gutters and downspouts to steel and PVC
($11,442)
041
Provide CIP concrete and installation of embed plates at the first precast
$0
bleacher section, in accordance with SA Miro response to RFI #047
042
Provide epoxy bonding agent between CIP steps and precast bleacher
$1,041
sections per SA Miro response to RFI #050
046
Increase footing sizes at ends of 12" load bearing CMU walls
$213
TOTAL ($47,690) -
Not valid until signed by both Owner and Architect
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The originial (GentFaO Sum) (Guaranteed Maximum Cost) was ............................................. $2,124,639
Net Change by previously authorized Change Orders............................................................. $0
The (cGORtiaO SUFR) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,124,639
The (Gentsast-Sum) (Guaranteed Maximum Cost) will be (insreased) (decreased) (uasbaRged)
by this Change Order............................................................................................. ($47,690)
The new (CentraO Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,076,949
The Contract Time will be (+rfea6ed) (decreased) (unchanged) by 0 Days
The Date of Substantial Completion as of the date of this Change Order therefore is 07.09.99
Owner:
Contractor:
Architect:
Eagle County --Facilities
Evans -Mendel -Allison Construction, Inc.
David Lynn Wise, AIA
P.O. Box 860
P.O. B 2 6
73017th Street, Suite 915
e, C 8163 ' `
Avo , CO 620
Denver, CO 80202
.
By:
•
B
By L1C v Como
D e: �� �'7
Date: ��
Date:
AIA Document G701 CHANGE ORDER
April 1978 EDITION AIA COPYRIGHT 1978
THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.. NW., WASHINGTON, D.C. 20006
G701 -1978
Change Event No. 004 1/29/99 2:47 PM
Eagle County Rodeo Arena Grandstands
SUBCONTRACT MATERIAL
ITEMS QUANTITY U/P AMT U/P AMT
E v a n s Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Mendel •Allison Avon, Colorado 81620
CONSTRUCTION (970) -845-0466
Change Estimate #: 004
JOB: Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED: 2:45 PM 29-Jan-99
PRICE SUMMARY
Materials & Labor: ($8,825)
Bond: ($79)
Contractor's Overhead: $0
Contractor's Profit: $0
Grand Total: ($8,904)
Change Estimate #: 004
Chance Estimate Pricing Breakdown
3.0%
2.0%
ADDITIONAL NOTES:
EXCLUSIONS:
ALTERNATES:
1of1
LABOR I EQUIPMENT OTHER I subtotal
AMT AMT U/P AMT TOTALI
9 cy
-254.42
-2289.78
0.00
0.00
0.00
0.00
0.00
-228
1200.UU
Continental West
Continental West- add temp. bracing
1 Is
1200.00
1200.00
0.00
0.00
0.00
0.00
1500.00
Continental West -add rebar
1 Is
1500.00
1500.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
Vogelman West
1 Is
-9235.00
-9235.00
0.00
0.00
0.00
0.00
-9235.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
-8824.78
0.00
0.00
0.00
0.00
-8824.78
TOTALS
4
-8824.78
0.00
0.00
0.00 0.00-8824.78
check:-8824.78
INNOVATIONS
OGELMAN�*� I N S T O N E
SINCE 1 981
ASSOCIATES, INC.
CHANGE ORDER REQUEST #1
December 7, 1998 oe 4 W
0 A
Evans Mendel -Allison Construction
P. O. Box 8266 �
Avon, Co 81620
RE: Eagle County Rodeo :Eliminate 8" CMU wall per Change Estimate letter 004, 12/1/98
Attn: Andy Bober
Gentlemen,
Owners / Contractor hereby authorizes Vogelman West Associates, Inc. to furnish all materials
and perform all labor necessary to complete the following Additional Work / Changes in the
plans and specifications.
1) Eliminate 8" CMU center wall at front of East and West bleacher and
ramp areas.-$9,235.00
Total-$9,235.00
Notes:
Job name and address: Eagle County Rodeo Arena
P. O. Box 8266
All of the above work to be completed in a substantial and workmanlike manner
according to standard practices for the sum of:
CREDIT OF NINE THOUSAND TWO HUNDRED THIRTY FIVE AND NO/100S DOLLARS
Payments to be made as per contract.
Any alteration or deviation from the above specifications involving extra costs of material and (or)
labor will ;onl"be executed upon written orders for the same, and will become an extra charge
overthe m Mentioned in this contract. All agreements must be made in writing.
RespectfullyAubmitted,
By
Hale Moore
Estimator /Project Manager
19
S T O N 'E P L A S T E R S T O N E S A L E S
CORPORATE OFFICE • 910 NOTTINGHAm ROAD #N4 0 POST OFFICE BOX 921 9 AVON, COLORADO 81620
PHONE 970/949-4138 • FAx 970/845-7605 • ASPEN 970/945-2873 • EDWARDS YARD 970/926-5344 • GLENWOOD SPRINGS YARD 970/945-0260
x 0111KENTAL w
"Your Professional Partners in Construction"
Mr. Andy Bober
Evan, Mendall and Allison
P.O. Box 8266
Avon, Co 81620
December 10, 1998
Re: Pricing'changes for referenced "Change Estimate Letters"
Dear Andy,
To follow are pricing changes for the above mentioned.
C.E.L. #001 *Deduct $500.00 from line item #400.
C.E.L. #002 *Add $ 2,943.77 to line item#500.
*Add 1216 CY @ $2.81 per CY= $3,416.96 to line item #550.
*Deduct 421 CY @ $8.36 per CY= $3,519.56 from line item #600.
*Deduct 4016 CY @ $10.39 per CY=-$41,726.24 from line item #700.
*Deduct 2578 CY @ $4.24 per CY= $12,219.72 from line item #800.
Above based on Scenario #2 of Continental West Constructor's letter dated October 29, 1998.
41
C.E.L. #003 *Delete line item #2500. C•1 3)1i7
*A.S.I. Item 16 accounted from original estimate to second estimate.
C.E.L. #004 *Deduct 9 CY @ $ 254.42 per CY= 2,289.78 from line Item#1900.
*Add temporary bracing=$1,200.00.
*Add rebar =$ 1,500.00.
P.O. BOX 5840 A VON, CO 81820 070-040-1050 FAX 070-OU-8744
Change Event No. 010
Eagle County Rodeo Arena Grandstands
ITEMS QUANTITY
tvans
Aft
Mendel -Allison
CONSTRUCTION
Change Estimate #:
JOB:
1/29/99 2:41 PM
1of1
SUBCONTRACT MATERIAL LABOR EQUIPMENT OTHER subtotal
U/P AMT U/P AMT AMT AMT U/P AMT TOTAL
Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, Colorado 81620
(970) 845-0466
010
Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED: 2:41 PM 29-Jan-99
PRICE SUMMARY
Materials & Labor.
$0
Bond:
$0
Contractor's Overhead:
$0 3.0%
Contractor's Profit:
$0 2.0%
Grand Total:
$0
Change Estir>rlate # .: 010.
Change Estimate Pricina Breakdown
ADDITIONAL NOTES: 1. Revised structural drawings issued with ASI #1 added beams
2. Written ASI #1 item no. 3 deleted added beams.
EXCLUSIONS:
ALTERNATES:
Monroc Precast
0 Is
0.00
0.00
0.00
0.00
0.00
Delete East & West Raker Beams
0 ea
0.00
0.00
0.00
0.00
0.00
0.00
0.u0
0.00
(raker beams deleted in CE #011)
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
0Is
0.00
0.00
-0.00
0.00
Rocky Mountain Steel
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
Add W10 x 33 in Grandstand Comers
1 Is
1862.00 1862.00
0.00
0.00
0.00
0.00
1862.00
o is
0.00
0.00
0.00
0.00
0.00
0.00
Rocky Mountain Steel
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
Delete W10x33 in Grandstand Corners
1 Is
-1862.00-1862.00
0.00
0.00
0.00
0.00
-1862.00
SUBTOTAL
0.00
0.00
0.00
0.00
0.00
0.00
TOTALS
0.00
0.00
0.00
0.00
0.00 0.00
check: 0.00
��ived: 11 /18/98 9:55AM; 970 323 0480 -> Evans -Mendel -Allison Const. ; Page 2
• 0ROCKY MOUNTAIN STEEL Fax:970-323-0480 Nov 18 '98 10:37 P.02
M��NT�lM STEEL, iMC. a �
59833 Hwy 50 North
' P.O. Box 496
Oktje� Colomdo. 81425
USA,
pb" (970) 323-6323 Fax (970) 3 Z3-0480 November 1861999
EVANS Mendel & Allison Construction
Attu. Estimating
P.O. Box, 8266
Avon, CO. $1620
Phone: (970) 845-0466
Fax: (970) 845-0465
Re: Eagle County Grandstands End Wall Beams W 10 X 33
We purpose to provide the above listed project as described below:
i
Fabrication S 1,502.00 ce f
Erection
S 360.00 C� q
Embeds for End Wall Beans and Raiser Beams : Gis .5.
Fabrication S 790.00 (00%9)
l
Additional Diagnial Bracing • 3 $p
Fabrication $ 928.00 _
Erection S 552.00 —
Embed plate increase in 1211 CMU Walls from 1/2" to 5/9" Plate.
Fabrication $ 351.00 .aa•-4 p34
Additional w 1 J& isracmg in ruv,
Fabrication S 7,227.00
S 1,656.00 Erection
Purlin Cape 14ga Channels 6 places f
One additional row of Z purling 3 Att
Q A-rs
Fabrication $19$43.00 - CE .jb3 • t
Erection' $19,104.00
Crows Nest Additional Beams in Fir
Fabrication
S 1,721,00 u4
I`t
Erection $ 760.00 C-E IL030
Total $189794.00 4 214W C&I
�u
• � or' xu0
This is referanlce to plans received 11/16/98.
Very truly yours
Z� Zaw�
rnie D Lorimor
President
deceived: 11/30/98 12:03PM; 970 323 0480 -> Evans -Mendel -Allison Const.; Page 2
_y a i<bc Mw1Tml STEEL Fax = 970-323-0450 Nos., 30 ' 99 12 = 43 P. 02
USIR 11 SYEEL. [NC.
59833 H%wy 30 Nath
P.O. Bax 486
010he. Colorado 81425
U3A
Phase (970) 323.6323 Fax (970) 323-MM November 3D I"S
EVANS Mendel & Allison Construction
Attn. Andrew Bober
P.O. Box 8266
Avon, CO. 81620
Pbone:(970) 845-0466
Fax: (970) 845-0465
Re: Eagle County Grandstands Change Estimate No. 002 Referance: ASI No. 2
We purpose to provide the above listed project as described below:
Item "
Deduct All Steel and Erection
Add Stair Handrailing
Add for the detailing already completed
Item 06
Deduct 6" pipe at roof Trusses
Item # 17
Deduct End Wall Beams
Very truly yours
Bernie D Lortmor
President
$ (89621.00) C
$ 39400.00 3`�V �
$ 560.00
s cs,a�.00> G�
es
�.s (19862.00)CE:� Old
Change Event No. 014
Eagle County Rodeo Arena Grandstands
ITEMS QUANTITY
Evans
Mendel•Allison
CONSTRUCTION
Change Estimate #:
JOB:
1129/99 2:42 PM
1of1
SUBCONTRACT MATERIAL LABOR EQUIPMENT OTHER subtotal
U/P AMT U/P AMT AMT AMT U/P AMT TOTAL
Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, Colorado 81620
(970) 845-0466
014
Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED: 2:41 PM
29-Jan-99
PRICE SUMMARY
0
I
'
ADDITIONAL NOTES:
Materials & Labor: ($774)
0
EXCLUSIONS:
Bond: ($7)
1
0
ALTERNATES:
Contractor's Overhead: $0
3.0% i
Contractor's Profit: $0
2.0% t
Grand Total: ($781)
j
Change Estimate #: 014
Channe Estimate Pricing Breakdown
Continental West Constructors 0 Is
0.00
0.00
0.00
0.00
0.00
0 Is
0.00
0.00
0.00
0.00
0.00
Credit for 300 yds arena material 0 Is
0.00
0.00
0.00
0.00
0.00
0.00
not removed to red barn 300 yd
-2.58
-774.00
0.00
0.00
0.00
0.00
-774.00
o Is
0.00
0.00
0.00
0.00
0.00
0.00
o is
0.00
0.00
0.00
0.00
0.00
0.00
o is
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
-774.00
0.00
0.00
0.00
0.00
-774.00
TOTALS-774.00 0.00 0.00 0.00 0.00-774.00
check:-774.00
1
i
C.E.L. #007 Based on S.A. Miro Grading Plan dated 11-18-98 and this C.E.L. and
revised east end grading plan (See Attached #1) the following line
items are affected:
*Deduct 972 CY. @ $2.81 per CY = $2,431.32 from- line item#550.
*Add 1412 CY. @ $10.39 per CY.=$14,670.68 to line item #700.
*Add 437 CY. @ $4.74 per CY. = $2,071:38 to line item #800.
# _ 47 �
C.E.L. #014 *No nge. C— 3CO GY X 2. S8 - (—? 774 ) Z-� •4
C.E.L. #015 *Add 190 tons @ $31.08 per ton=$5,905.20.
C.E.L. #016 *Deduct- $2,943.77 from line item #500.
C.E.L. #023 *Deduct $700.00 from line item #700.
00
C.E.L. #024 *Refer to C.E.L. #003 of this letter.
C.E.L. #036 Disregard verbal Andy Bober.
Sincerely,
Chet Elder
Continental West constructors, Inc.
Change Event No. 016
Eagle County Rodeo Arena Grandstands
ITEMS QUANTITY
Evans
Mendel•Allison
SUBCONTRACT
U/P AMT
Evans -Mendel -Allison C
P.O. Box 8266
Avon, Colorado 81620
CONSTRUCTION (970) 845-0466
Change Estimate #: 016
JOB: Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED: 2:42 PM 29-Jan-99
PRICE SUMMARY
I Materials & Labor: ($6,789)
I 1
Bond: ($61) 1
i
1 1
Contractor's Overhead: $0 3.0%
I- Contractor's Profit: $0 2.0% '
Change Estimate #: 016
Channe Estimate Pricina Breakdown
1 /29/99 2:42 PM
MATERIAL
U/P AMT
;tion. Inc.
ADDITIONAL NOTES:
EXCLUSIONS:
ALTERNATES:
LABOR EQUIPMENT
AMT AMT
1 of 1
OTHER subtotal
U/P AMT TOTAL
Continental West Constructiors
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-2944. U
Excavate footings
1 Is
-2944.00-2944.00
0.00
0.00
0.00
0.00
0.00
0 ea
0.00
0.00
0.00
Vogelman West Associates
0 ea
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-3845.00
Delete 16" CMU center bays
1 Is
-3845.00-3845.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
OIs
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
-6789.00
0.00
0.00
0.00
0.00
-6789.00
SUBTOTAL
TOTALS-6789.00 0.00 0.00 0.00 0.00-6789.00
check:-6789.00
C.E.L. #007 Based on S.A. Miro Grading Plan dated 11-18-98 and this C.E.L. and
revised east end grading plan (See Attached #1) the following line
items are affected:
*Deduct 972 CY. @ $2.81 per CY = $2,431.32 from- line item#550.
*Add 1412 CY. @ $10.39 per CY.=$14,670.68 to line item #700.
*Add 437 CY. @ $4.74 per CY. = $2,071.38 to line item #800.
C.E.L. #014 *No nge. GY X14 2• SS = (-) 774 Z-I •Q
) f
1
C.E.L. #015 *Add 190 tons @ $31.08 per ton=$5,905.20.
C.E.L. #016 *Deduct $2,943.77 from line item #500.
C.E.L. #023 *Deduct $700.00 from line item #700.
ao
C.E.L. #024 *Refer to C.E.L. #003 of this letter. C—)
C.E.L. #036 Disregard verbal Andy Bober.
Sincerely,
Chet Elder
Continental West constructors, Inc.
QGELMANN�' �� IN
VIN STONE
CHANGE ORDER REQUEST #3 S i NCE 1 9 8 1
VASSTUITES, INC.
ber 9, 1998
Evans Mendel -Allison Construction
P. O. Box 8266
Avon, CO 81620
RE: Eagle County Rodeo Arena; Re: Dist. Ltr. 040, ASI No. 2
Attn: Andy Bober
Gentlemen,
Owners / Contractor hereby authorizes Vogelman West Associates, Inc. to furnish all materials
and perform all labor necessary to complete the following Additional Work / Changes in the
plans and specifications.
Per item 2. ASI No. 2 b t
1) Reduce below grade CMU by 16" in center bays. C
-$3,845.00 1,0,4
Per item 3. ASI No. 2
2) Provide openings in walls*at Restrooms, Storage room, and Office. ('40
�,
Six 5' X V openings @ $320.00 $1,920.00 cE.A.btr AtOov
Credit for 8" CMU deleted for these openings.-$1,200.00 0 I,JD
Per Item 7 ASI No. 2
3) Installation of CMU caps in lieu of precast concrete at Restroom,
screen panels, and ticket windows.
Per item 10a ASI No. 2
4) Delete all work in animal wash area.
Total
$395.00 CE �ioZo l
W 49)
C� �QZ
(�)
44,135.00
-$6, 865.00
Notes: Excludes CMU caps at concession counters. Vogelman West
does not recommend this installation and cannot warrant them. Labor to
install precast tops is still included.
Job name and address: Eagle County Rodeo Arena
Eagle CO
All of the above work to be completed in a substantial and workmanlike manner
according to standard practices for the sum of:
CREDIT SIX THOUSAND EIGHT HUNDRED SIXTY FIVE AND NO/100 DOLLARS-$6,865.00.
Payments to be made as per contract.
Any alteration or deviation from the above specifications involving extra costs of material and (or)
labor will only be executed upon written orders for the same, and will become an extra charge
over the sunmentioned in this contract. All agreements must be made in writing.
Res pectfufty§ubmitted,
By
e Moore
stimator /Project Manager
S T O N E • P L A S T E R • S T O N E S A L E S
CORPORATE OFFICE • 910 NOTTINGHAM ROAD #N4 • POST OFFICE BOX 921 • AVON, COLORADO 81620
PHONE 970/949-4138 a FAx 970/845-7605 • ASPEN 970/945-2873 • EDWARDS YARD 970/926-5344 • GLENWOOD SPRINGS YARD 970/945-0260
Change Event No. 019
le County Rodeo Arena Grandstands
1 /29/99 2:42 PM
SUBCONTRACT MATERIAL
ITEMS QUANTITY U/P AMT U/P AMT
E v a n s Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Mendel•Allison Avon, Colorado 81620
GCON S T R U C T I O N (970) 845-0466
Change Estimate #: 019
JOB: Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED:
2:42 PM 29-Jan-99
PRICE_ SUMMARY I
ADDITIONAL NOTES:
Materials & Labor:
($3,464)
EXCLUSIONS:
Bond:
($31) j
0
ALTERNATES:
Contractor's Overhead:
$0 3.0% i
Contractor's Profit:
$0 2.0% 1
Grand Total:
($3,495)
1 of 1
LABOR I EQUIPMENT OTHER I subtotal
AMT AMT U/P AMT TOTAL
Change Estimate#:
019:
Change Estimate Pricing Breakdown
LU
Ols
0.00
0.00
0.00
0.00
0.00
Rocky Mountain Steel
1 Is
0.00
0.00
0.00
0.00
0.00
Delete 6" dia tube steel at trusses
1 Is
-3464.00-3464.00
0.00
0.00
0.00
0.00
-3464.00
0.00
0 ea
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
-3464.00
0.00
0.00
0.00
0.00
-3464.00
SUBTOTAL
TOTALS-3464.00 0.00 0.00 0.00 0.00-3464.00
check:-3464.00
,�.ii�elved: 12/ 7/98 11:46AM; 970 323 0480 -> Evans -Mendel -Allison Const.; Page 2
ROCKY MOUNTAIN STEEL. Fax:970-323-0480 Dec 7 '98 12:25 P.02
14 d \qnp�
NOW MIEMN STEEL, ING.
59833 Hwy 50 North
l P.O. Box 486
Olatbic, Colando. 91425
USA
Ph= (970) 323-63Z3 Fax (970) 323-0480 December 7,1998
EVANS Mendel & Allison Construction
Attn. Andrew Bober
P.O. Box 9266
G
Avon, CO.91620
Phone:(970) 945-0466
Fax: (970) 845-0465
Re: Eagle County Grandstands Change Estimate No. 019
We purpose to provide the above listed project as described below:
Response to your letter dated December 04,1998.
Delete the 6" dia steel tube at the north end of the roof trusses per item No. 6 of
,A►SI #2 Dateted November 199&
Deduct
Very truly yours
Berpie D Lorimor
�N�ideat
$ (39464.00)
Change Event No. 021 1/29/99 2:43 PM 1 of 1
Eagle County Rodeo Arena Grandstands
SUBCONTRACT MATERIAL LABOR EQUIPMENT---T OTHER subtotal •
ITEMS QUANTITY U/P AMT U/P AMT AMT AMT U/P AMT TOTAL
E v a n s Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Mendel•Allison Avon, Colorado 81620
CONSTRUCTION (970) 845-0466
Change Estimate #: 021
JOB: Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED: 2:43 PM 29-Jan-99
PRICE SUMMARY
Materials & Labor:
Bond:
Contractor's Overhead:
Contractor's Profit:
($6,848)
($61)
$0 3.0%
$0 2.0%
ADDITIONAL NOTES: Finish on all surfaces to be a powder coat paint, selectet from standard colors.
EXCLUSIONS:
ALTERNATES:
Grand Total:
($6,909) j
Change Estimate M
021
Chance Estimate Pricing Breakdown
Ols
0.00
0.00
0.00
0.00
0.00
06-06400 Architectural Woodwork
Delete corian counter top/installation
1 Is-11100.00
-11100.00
0.00
0.00
0.00
0.00
0.00
-11100.
0.00
Ols
0.00
0.00
0.00
0.00
05-05500 Metal Fabrications
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4252.00
Add steel vanity tops
1 Is 4252.00
4252.00
0.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
-6848.00
0.00
0.00
0.00
0.00
-6848.00
SUBTOTAL
TOTALS-6848.00 0.00 0.00 0.00 0.00-6848.00
check:-6848.00
�— ROCKY MOUNTAIN STEEL Fax:970-323-0480 Dec 7 '98 12:45 P.02
Rociff HOW AIN STM 10. 59833 Hwy SO North
P.O. Box 436
Olz1hel Cajw lo. $142S
USA
"10= (970) 323-6323 Fax (970) 323-0480 December 7,1998
2!
EVAN S Mendel & Allison Construction
Atta. Andrew Bober C
F.O. Boz 9266 E
Avon, CO. $1620 p�
Phone:(970) 845-0466
Fax: (970) 345-0465
Re: Eagle County Grandstands Chadge Estimate No. 021
We purpose to provide the above listed project as described below:
Response. to your letter dated December 0491993.
4 Steel vanity tops per item No. 8, dated November 2591998. All edges are to be
ground smooth with slight radius. All wilds are to be ground smooth. Finish on all surfaces
( top, edges and underside ) including brackets is to be a powder coat paint, color to be
selected by Architect.
Fabric ition $39148.00
Erection 1,104.00 n%
Out �dr
Colors of choice Tan
Blue
Gray
Black
White
oeCa. [.(,CCLda CGL
Very truly yours
Bernie D Lorimor
President
.
Change Event No. 023
Eagle County Rodeo Arena Grandstands
ITEMS QUANTITY
Eva n s
Mendel *Allison
SUBCONTRACT
U/P AMT
Evans -Mendel -Allison C
P.O. Box 8266
Avon, Colorado 81620
CONSTRUCTION (970) 845-0466
Change Estimate #: 023
JOB: Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED:
2:43 PM 29-Jan-99
PRICE SUMMARY
Materials & Labor:
($7,901)
Bond:
($71)
Contractor's Overhead:
$0 3.0%
Contractor's Profit:
$0 2.0%
1 /29/99 2:43 PM 1 of 1
MATERIAL LABOR EQUIPMENT OTHER subtotal
U/P AMT AMT AMT U/P AMT TOTAL
ruction. Inc.
ADDITIONAL NOTES:
EXCLUSIONS:
ALTERNATES:
Change Estimate #:
023
Chance Estimate Pricing Breakdown
Vogelman West Associates
0 Is
0.00
0.00
0.00
0.00
0.00
,
Delete animal wash CMU work
1 Is
-4135.00-4135.00
0.00
0.00
0.00
0.00
0.00
-413
0.00
Ols
0.00
0.00
0.00
0.00
Lunsford Mechanical
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
Delete animal wash plumbing work
1 Is
-3066.00-3066.00
0.00
0.00
0.00
0.00
-3066.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
Continental West Constructors
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-700.00
Delete animal wash demo
1 Is
-700.00-700.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
-7901.00
0.00
0.00
0.00
0.00
-7901.00
TOTALS 7901.00 0.00 0.00 0.00 0.00-7901.00
check:-7901.00
•1 f.•.. 1'..'d !}5;1; '1 } / .�% tiC1 .j: ! f 1�1� .7/V CYG IV.JJY V CA IV$= 14� vi— I"%lii Q?V 11 VVI I;Zb rayv G
:t .'f1 �/ 998 16: 06 970-242-7634 LUNSFORD MECHANICAL PAGE 02
Lunsford Brothers Mechanical Contractoce, Inc.
2401 Commiiiiirc• Blvd.
Brand Junction, CO 81505
C KMGE ORDER 1 4-Nov-98
TO: Evans M-A Construction JOB It: 496
0101 Eagle Rd. Bldg. #7 PROJECT: Eagle County Rodeo
P.O Box 8266 Grandstands and Arena
Avon, CO 81620
1.k' A1-10,4..*0tN? FIEFEFRED TO ABOVE 1S HEREBY MODIFIED AS SET FORTH BELOW. EXECEPTING ONLY TPME TERNS SPECIFICALLY
WAI l Ik :%M;:NVrV HERZIN. ALL OF THE TERMS, CONDITIONS, PROVISIONS AND COVENANTS OF SAID AGREEMENTS S}{= REMAIN IN FULL
)*Cl*.. EF FF=. 1I ANY PORTION OF THIS QUU4GZ ORDER IS NOT ACCEPTABLE, YOU MOT FURNISH US WRITTEN
rr,: I } , : 1•-'7h OF Sl7^.14 NON -ACCEPTANCE AT THE ADDRPSS DESIGNATED BELOW WITHIN 8EVEN (7) DAYS Of ISSUE HERE OF. IN THE
; F '%X1.1 NO?:c:E OF NON -ACCEPTANCE, YOUR UNQUALIFIED ACCEPTANCE OF THIS Ci(M" ORDER WILL 8S DEEMED CONCLU31VE
:•t.'. l ^.AYV AFT ER ':'NE DATE OF ISSUE HEREOF.
.. •-A-.1--.- -----------.ti---.-.r- I►M w./b/... -. dVMV-../----tih1N�.�M1.•YMMNNM.1/.111ti/r1.YM/Y.YNY...titi MM�IM•V YIYNI�A. A.�VyyAI
DESCRIPTION OF THE CHANGE OR MODIFICATION:
Add water piping for animal wash area. No design provided for pricing. Assumed Intent is to run a
(1') galvanized Iron water line fastened to top of the two masonry wails as indicated In drawing
provided with Supplementary Instructions #3. There will be a total of (18) 1/7 hose Bibb (boiler
drams) stubbed off main lines. We are allowing for (T) of undergroung piping at the end of the (2)
uns. Note: Provisions will have to be made by -others for draining this piping in winter. Possibly a
yarc box with a 5' deep bury drain assembly in underground main by the site contractor.
(105') galvanized steel T & C pipe
Ftgs , nipples, hose bibos, hangers
25%0&P
Labor (52) nrs. a 49.50
1`+ CONSIDER
;it THE AMOUN
Z•"NTRACT PRI
AD.7'1S7FD CON
ACCEPTE"1✓
-IR.X:
2- .
CIE -4oZ3
�0&
ids Z-qb
0101 Eagle Rd. Bldg. #7
PO Box 8266
Avon, CO 81620
,Avtl+:rized Signature)
BY:
NAME:
rpctntpal
TITLE
lFrt)/tvdl
$144.90
$248.70
$98.40
$2,574. t
AL, THIS CHANGE $ 3,066.0S01
� I CREA_4ED
3 3,066.00
3 _
PY PROMPTLY
1N31PORD BROTHERS MECHMICAL
2481 COMMERCE BLVD .
GRAND JUNCTIpf, CO 81505
Tom Vagell
Project Manager
Change Event No. 027
1 /29/99 2:44 PM
1 of 1
Eagle County Rodeo Arena Grandstands
SUBCONTRACT
MATERIAL LABOR EQUIPMENT___7
OTHER subtotal
ITEMS QUANTITY
U/P AMT
U/P AMT AMT AMT
U/P AMT TOTAL
E v a n s
Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Mendel•Allison
Avon, Colorado 81620
CONSTRUCTION
(970) 845-0466
Change Estimate M 027
JOB: Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED: 2:44 PM
29-Jan-99
PRICE SUMMARY
I
I
ADDITIONAL NOTES:
Materials & Labor. ($2,568)
I
EXCLUSIONS:
I Bond: ($23)
I
ALTERNATES:
I
' Contractor's Overhead: $0
3.0%
Contractor's Profit: $0
2.0% I
Grand Total: ($2,591)
Change Estimate M
027
Change Estimate Pricing Breakdown
Ols
0.00
0.00
0.00
0.00
0.00
Tri-Phase Electric
1 Is
0.00
0.00
0.00
0.00
0.00
'
Delete walkway bollard fixtures
12 ea
-214.00-2568.00
0.00
0.00
0.00
0.00
-2568.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
TOTALS .
-2568.00 0.00 0.00 0.00 0.00-2568.00
-2568.00 0.00 0.00 0.00 0.00-2568.00
check:-2568.00
llm� ZAL 1qWW
1
TRi PHASE ELECTRIC (;0
CONTRACTORS & ENGINEERS
Residential * Commercial • Industrial
(970) 524-7135
FAX (970) 524-7640
December 4. 1998
TO: Evans Mendel Allison — Andy Bober
Re: ASI #2 — Light fixture deletions
Eagle County Rodeo Grandstands
1. Walkway light bollards — cost per fixture including pipe, wire and labor: b 2
Gr
$214.00 per fixture 2, = 21 S(p$� G P�roiT • DOW&
2. Pendant fixtures Type D; Cost per fixture including pipe, wire and labor:
$125.00 per fixture
If you have any questions or need further information, please let me know.
John er
Project oordinator
0325 Hardscrabble Rd. • Gypsum, CO 81637
E v a n � � 0101 Eagle Road, Bldg #7
P.O. Box 8266
"Aft
Mendel o Allison Avon, CO 81620
ph: 970.845.0466
CONSTRUCTION fax: 970.845.0465
Wednesday, February 24, 1999
Mr. Rich Cunningham
Eagle County - Facilities
PO Box 850
Eagle, CO 81631
Fax: 970-328-7720
Re: Project Name: Eagle County Rodeo Arena Grandstands, Project No: 028-099
Change Estimate Letter No: 037R
Dear Rich:
Please find the attached cost impact breakdown to provide steel gutters and PVC downspouts.
Total Cost: ($11,442)1
The schedule impact will be (TBD) working days.
Please review and sign below to authorize this work to proceed. This cost will be incorporated into the next change
order.
Please feel free to contact me with any questions that you may have with regard to this change event.
a
Andrew Bober
Duly Authorized
cc: CE #037R
Casey Brown
David Wise, AIA 303-446-0201
r
Change Event No. 037 2/24/99 8:30 AM
Eagle County Rodeo Arena Grandstands
SUBCONTRACT MATERIAL
ITEMS QUANTITY UP AMT UP AMT
Ev a n s Evans -Mendel -Allison Construction, Inc.
,� P.O. Box 8266
Mendel Allison Avon, Colorado 81620
CONSTRUCTION (970) 845-0466
Change Estimate #: 037
JOB:
Eagle County Rodeo Arena Grandstands
LAST REVISEDWRINTED:
8:30 AM 24-Feb-99
I PRICE SUMMARY I
I
Materials & Labor.
I
($11,340) '
I
I
Bond:
($102)
I
1
' Contractor's Overhead:
$0 3.0% '
Contractor's Profit:
$0 2.0% I
Grand Total:
($11,442)
j
Change Estimate #:
037
Chance Estimate Pricing Breakdown
ADDITIONAL NOTES:
EXCLUSIONS:
ALTERNATES:
AMT
1of1
EQUIPMENT OTHER I subtotal
AMT U/P AMT TOTAL
0
Sondrup Sheet Metal
Ols
0.00
0.00
0.00
0.00
0.00
I_ JO
Ols
0.00
0.00
0.00
0.00
0.00
0.00
Delete copper gutter & downspouts
1 Is
-11340.00
-11340.00
0.00
0.00
0.00
0.00
-11340.00
0 cy
0.00
0.00
0.00
0.00
0.00
0.00
Add for Kynar gutter
1 Is
500.00
500.00
0.00
0.00
0.00
0.00
500.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
Delete for PVC downspouts
1 sf
-3000.00
-3000.00
0.00
0.00
0.00
0.00
-3000.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
Delete Alternate No. 5
1 Is
2500.00
2500.00
0.00
0.00
0.00
0.00
2500.00
SUBTOTAL
-11340.00
0.00
0.00
0.00
0.00
-11340.00
TOTALS-11340.00
0.00
0.00
0.00
0.00-11340.00
check:-11340.00
Change Event No. 041
Eagle County Rodeo Arena Grandstands
ITEMS QUANTITY
tva n s
Mendel•Allison
CONSTRUCTION
Change Estimate #:
JOB:
1/29/99 2:45 PM 1 of 1
SUBCONTRACT MATERIAL LABOR EQUIPMENT OTHER subtotal
U/P AMT U/P AMT AMT . AMT U/P AMT TOTAL
Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, Colorado 81620
(970) 845-0466
041
Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED: 2:45 PM 29-Jan-99
PRICE SUMMARY I
ADDITIONAL NOTES:
Materials & Labor:
$0
EXCLUSIONS:
Bond:
$0
j
'
I
ALTERNATES:
Contractor's Overhead:
$0
3.0%
,
Contractor's Profit:
$0
2.0%
Grand Total:
$0
j
Change Estimate #:
041
Change Estimate Pricing Breakdown
0 Is
0.00
0.00
0.00
0.00
0.00
Vogelman West Associates
Delete 4" x 8" CMU at front of
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
0.00
..
-2750.00
grandstand seating.
1 Is
-2750.00
-2750.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
Continental West Constructors
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Add CIP concrete at front of
0 Is
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2750.00
grandstand seating.
1 Is
2750.00
2750.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0 ea
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
0.00
0.00
TOTALS
0.00
0.00
0.00
0.00
0.00
0.00
check:
0.00
A
v
N
VOGELMAK..,
ASSOCIATES, INC.
Andy Bober
Evans Mendel -Allison Construction
P. O. Box 8266
Avon, Co 81620
INNOVATIONS
IN STONE
SINCE 1 981
Job Name: Eagle County Rodeo Arena
Eagle County Fairgrounds
DATE: November 5,1998
VOGELMAN WEST ASSOCIATES, INC.
1) 8" and 12" Concrete block walls where specified at East,
Center and West bleacher areas including installation of
steel lintels (under 150 lbs.) where required. Corbeled counters
at concession booths and installation of precast caps at
rest room entrance walls, ticket windows, and screen areas
at East and West bleachers is included.
2) Add 41X 8" filler block at front of grandstand seating.
3) Add an 8" block wall and infill wall at existing animal wash.
Labor to cut two openings in existing walls.
Alternate:
1) Provide 13 2' X 2' reinforced CMU columns to serve in lieu of
prestressed concrete columns.
2) Provide CMU spandrels at ramp walls and at walls above
restroom entries to railing height.
PRICING
$ 197,730.00
$ 2,750.00
$ 4,135.00
$37,440.00
$18,600.00
Total $ 204,600.00
CLARIFICATIONS:
1) Vogelman West Associates, Inc. standard Addendum A is attached.
2) Winter protection and temporary heating are excluded.
3) Payment terms: Mobilization fee, 0% retainage, 30 day draws.
4) Scheduled Start Date: January 1999
5) Flashing, caulking and sealants are excluded.
6) Excludes all pre -cast concrete.
7) All steel lintels to be supplied by others. VWA to install loose lintels
under 150 pounds.
8) Welding at all steel column/masonry Dur-a-wall reinforcement
locations by others.
9) All water barriers by others.
10) All CMU to be standard gray block. Excludes split face or decorative CMU.
11) Excludes grouting at hollow metal door frames.
Estimated by: Hale Moore
Bid per plans dated 10/22/1998. S1.1, S2.1 and S2.2 dated 9/4/1998.
S T O N E P L A S T E R • S T O N E S A L E S
CORPORATE OFFICE • 910 NOTTINGHAM ROAD #N4 • POST OFFICE BOX 921 • AVON, COLORADO 81620
PHONE 970/949-4138 • FAx 970/845-7605 0 ASPEN 970/945-2873 • EDWARDS YARD 970/926-5344 • GLENWOOD SPRINGS YARD. 970/945-0260
op PReceived: 12/16/98 3:51PM; 949 6744 -� Evans -Mendel -Allison Const.; Page 2
Dec-16-98 16:.29 Cc inantal Wast �9-6744 P.02
�oil
SENTAL We
Ti
&&& IV
.2-
"Your Professional Partners in Construction"
Mr. Andy Bober
Evans, Mendel, Allison
P.O. Box 8266
Avon, Co 81620
December 16, 1998
Re: R.N.'s #037, #047, # 047, # 050 and CEL #040.
To follow are rice considerations to be considered for the above R.F.I.'s.�
p 3C
• R. F. I.'s #037 J
Add $3,000.00Add $2.700.00O�j• R. F. I. s #047 C —�• R. F. I.'s #050 `� +° Add $ 980.QQ— c 04 Z COeOL
Totar $ 6,680.00
To follow is a breakdown of project cost for winter conditions as requested in C.E.L. #040. This
item should -be used as an allowance with the following assumptions to be considered.
• Additional blankets will be a one time job cost of $ 75.00 each if needed.
• 1.5 HRS/DAY for crew to place and remove blankets
3 HRS/WEEK for snow removal by loader and crew.
• Doesn't include any time spent excavating or processing frozen ground.
• Doesn't include any cost for temporary enclosures or heating of same. Assume
General Contractor will provide these items if needed.
Invoices will be written daily for snow removal and blanket protection.
• A 3000 SQ. FT. ground heater will cost $ 500.00/DAY If needed.
$ 220.00/DAY
$ 1,100.001WEEK
19
Thank You,
Tim Carpenter
Continental West Constructors, Inc.
P.o, Box Wo Avow, Co 81820 070-040-108 FAN e70a4"74f
Change Event No. 042
Eagle County Rodeo Arena Grandstands
ITEMS QUANTITY
Evans
Mendel•Ailison
CONSTRUCTION
Change Estimate M
JOB:
LAST REVISED/PRINTED:
1 /29/99 2:45 PM
SUBCONTRACT MATERIAL LABOR EQUIPMENT I OTI
U/P AMT U/P AMT AMT AMT U/P
Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, Colorado 81620
(970) 845-0466
042
Eagle County Rodeo Arena Grandstands
2:45 PM 29-Jan-99
PRICE SUMMARY j
I ADDITIONAL NOTES:
Materials & Labor: $980
EXCLUSIONS:
Bond: $9 I
I
ALTERNATES:
Contractor's Overhead: $31 3.0%
Contractor's Profit: $21 2.0% t
Grand Total: $1,041 i
Change Estimate M 042
Change Estimate Pricing Breakdown
1of1
I subtotal
AMT TOTAL
Continental West Constructors
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0. u
Provide epoxy bonding agent
Ols
0.00
0.00
0.00
0.00
0.00
0.00
between P/C & CIP per RFI No. 050
Ols
0.00
0.00
0.00
0.00
0.00
980.00
response from SA Miro
1 Is
980.00 980.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
0 sf
0.00
0.00
0.00
0.00
0.00
0.00
0 ea
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL 980.00 0.00 0.00 0.00 0.00 980.00
TOTALS 980.00 0.00 0.00 0.00 0.00 980.00
check: 980.00
4
v
a
o Dac-16-98 16 :029 . Cont i n0nta l Wost 949-6744 ' P.
w
41
Adkdk
-(`Your Professional Partners in Construction"
Mr. Andy Bober
Evans, Mendel, Allison
P.O. Box 8266 .
Avon, Co 81620
December 16, 1998
Re: R.N. s #037, #047l # 047. # 050 and CEL #040.
considerations to be considered for the above R.F.I.'s. 7)
To follow are price ?j
• R. F. Ls #037 J
Add $2,700.00 -- 40 CS ��
4 - Add $3,000.00 --
• R. F. I. s #04T C ?
R. F.1.'s #O50 '� Q �°O Add $ 980. QQ G a4 Z'
Lv)
? cap
Total $ 6,680.00
To follow is a breakdown of project cost for winter conditions as requested in C.E.L. #040. This
item should be used as an allowance with the following assumptions to be considered.
• Additional blankets will be a one time job cost of $ 75.00 each if needed. -
• 1.5 HRSIDAY for crew to place and remove blankets
• 3 HRSIWEEK for snow removal by loader and crew.
• Doesn't Include any time spent excavating or processing frozen ground.
• Doesn't include any cost for temporary enclosures or heating of same. Assume
General Contractor will provide these items If needed.
• Invoices will be written daily for snow removal and blanket protection.
• A 3000 SQ. FT. ground heater will cost $ 500.00/DAY if needed.
$ 220.00/DAY
• $ 1,100.00 WEEK
19
Thank You.
Tim Carpenter
Continental West Constructors, Inc.
P.o. Box We Avow, Co $1020 070.04048119 FAIX 070-04"744
Change Event No. 046
e County Rodeo Arena Grandstands
1/29/99 2:45 PM
SUBCONTRACT MATERIAL
ITEMS QUANTITY U/P AMT U/P AMT
Evans Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
13 Mendel -Allison Avon, Colorado 81620
CONSTRUCTION (970) 845-0466
Change Estimate #: 046
JOB: Eagle County Rodeo Arena Grandstands
LAST REVISED/PRINTED:
2:45 PM 29-Jan-99
PRICE SUMMARY
Materials & Labor:
$200
Bond:
$2
Contractor's Overhead:
$6 3.0%
Contractor's Profit:
$4 2.0%
rrnnri Tntal-
$213
Change Estirnate # 046
Change Estimate Pricing Breakdown
ADDITIONAL NOTES:
EXCLUSIONS:
ALTERNATES:
1 of 1
LABOR EQUIPMENT OTHER subtotal
AMT AMT U/P AMT TOTAL
Continental West Constructors Ols
0.00
0.00
0.00
0.00
0.00
0.00
u.uu
0.00
1-t
200.00
Increase footing size at 12" CMU 1 Is
200.00 200.00
0.00
0.00
0.00
0.00
Ols
0.00
0.00
0.00
Ols
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL
200.00
0.00
0.00
0.00
0.00
200.00
TOTALS 200.00 0.00 0.00 0.00 0.00 200.00
check: 200.00
A
w6 - 02�99 ,15 : 11 Cont i nanta l West 949 - 6744
N ire
TAL
Aift&
"Your Professional Partners in Consducdon"
Mr. Andy Bober
Evans. Mendell, Aflison
P.O. Box 8266
Avon, Co 81620
January 4, 1999
Re: C. E.L's # 046, #044, #008. # 047.
• C.E.L. # 008
• C.E.L. # 044
• C.E.L. # 046
• C.E.L. # 047
ADD $ '1,800.00
No Change
ADD $ 200.00
No Change
Total $ 2.000.00
Pricing of C.E.L. # 008 assumes six pilasters will have to be Installed to protect existing
sewer line. If existing sewer location shown on prints Is Incorrect, the number of pilasters
required could change. C.E.L. # 047 will be no change provided General Contractor provides
sleeving.
Sincerely,
Chet Elder.
Continental West Constructors, Inc.
P_02
P.O. eox 5840 avOY, cv 81020 e70-e4e-108 ffx 070-04 AW
IQL AL f.
DISTRIBUTION
Originals tc:
1. Qnt act Book -
2. +�—
3.
Conies to:
1. Accounting
2.
3.
4.