No preview available
HomeMy WebLinkAboutC99-056 Evans-Mendel-Allison Constructiony. 's C-`�V5G-Y7 CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER 5 ARCHITECT OX CONTRACTOR OX FIELD 0 OTHER Q PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 001 (name, address) 0426 Fairground Road Eagle, CO 81631 INTITIATION DATE: 01.20.99 .lob Number: 028-099 TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECT'S PROJECT NO: P.O. Box 8266 Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands CONTRACT DATE: 11.09.98 You are directed to make the following changes in this Contract: CE No. Description Adiustment 004 Delete interior masonry wall footings at walkways at front of grandstands ($8,904) 010 Provide revised corner construction at the corners of the grandstands $0 per ASI #1, Item no. 3 014 Remove and replace 500 cy of arena material in lieu of 800 cy, per ASI #1 ($781) item no. 9, dated 11.25.98 016 Reduce footing depths 16" per Item no. 2 of ASI #2, dated 11.25.98 ($6,850) 019 Delete 6 inch dia steel tube at the north end of the roof trusses per Item ($3,495) no. 6 of ASI #2 dated 11.25.98 021 Provide steel vanity tops per Item no. 8 of ASI #2 dated 11.25.98 ($6,909) 023 Delete any new work with existing animal wash per Item no. 10a of ($7,972) ASI #2 dated 11.25.98 027 Delete light bollards at walkways per Item no. 19 of ASI #2 dated 11.25.98 ($2,591) 037 Change gutters and downspouts to steel and PVC ($11,442) 041 Provide CIP concrete and installation of embed plates at the first precast $0 bleacher section, in accordance with SA Miro response to RFI #047 042 Provide epoxy bonding agent between CIP steps and precast bleacher $1,041 sections per SA Miro response to RFI #050 046 Increase footing sizes at ends of 12" load bearing CMU walls $213 TOTAL ($47,690) - Not valid until signed by both Owner and Architect Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The originial (GentFaO Sum) (Guaranteed Maximum Cost) was ............................................. $2,124,639 Net Change by previously authorized Change Orders............................................................. $0 The (cGORtiaO SUFR) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2,124,639 The (Gentsast-Sum) (Guaranteed Maximum Cost) will be (insreased) (decreased) (uasbaRged) by this Change Order............................................................................................. ($47,690) The new (CentraO Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,076,949 The Contract Time will be (+rfea6ed) (decreased) (unchanged) by 0 Days The Date of Substantial Completion as of the date of this Change Order therefore is 07.09.99 Owner: Contractor: Architect: Eagle County --Facilities Evans -Mendel -Allison Construction, Inc. David Lynn Wise, AIA P.O. Box 860 P.O. B 2 6 73017th Street, Suite 915 e, C 8163 ' ` Avo , CO 620 Denver, CO 80202 . By: • B By L1C v Como D e: �� �'7 Date: �� Date: AIA Document G701 CHANGE ORDER April 1978 EDITION AIA COPYRIGHT 1978 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.. NW., WASHINGTON, D.C. 20006 G701 -1978 Change Event No. 004 1/29/99 2:47 PM Eagle County Rodeo Arena Grandstands SUBCONTRACT MATERIAL ITEMS QUANTITY U/P AMT U/P AMT E v a n s Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Mendel •Allison Avon, Colorado 81620 CONSTRUCTION (970) -845-0466 Change Estimate #: 004 JOB: Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:45 PM 29-Jan-99 PRICE SUMMARY Materials & Labor: ($8,825) Bond: ($79) Contractor's Overhead: $0 Contractor's Profit: $0 Grand Total: ($8,904) Change Estimate #: 004 Chance Estimate Pricing Breakdown 3.0% 2.0% ADDITIONAL NOTES: EXCLUSIONS: ALTERNATES: 1of1 LABOR I EQUIPMENT OTHER I subtotal AMT AMT U/P AMT TOTALI 9 cy -254.42 -2289.78 0.00 0.00 0.00 0.00 0.00 -228 1200.UU Continental West Continental West- add temp. bracing 1 Is 1200.00 1200.00 0.00 0.00 0.00 0.00 1500.00 Continental West -add rebar 1 Is 1500.00 1500.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 Vogelman West 1 Is -9235.00 -9235.00 0.00 0.00 0.00 0.00 -9235.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL -8824.78 0.00 0.00 0.00 0.00 -8824.78 TOTALS 4 -8824.78 0.00 0.00 0.00 0.00-8824.78 check:-8824.78 INNOVATIONS OGELMAN�*� I N S T O N E SINCE 1 981 ASSOCIATES, INC. CHANGE ORDER REQUEST #1 December 7, 1998 oe 4 W 0 A Evans Mendel -Allison Construction P. O. Box 8266 � Avon, Co 81620 RE: Eagle County Rodeo :Eliminate 8" CMU wall per Change Estimate letter 004, 12/1/98 Attn: Andy Bober Gentlemen, Owners / Contractor hereby authorizes Vogelman West Associates, Inc. to furnish all materials and perform all labor necessary to complete the following Additional Work / Changes in the plans and specifications. 1) Eliminate 8" CMU center wall at front of East and West bleacher and ramp areas.-$9,235.00 Total-$9,235.00 Notes: Job name and address: Eagle County Rodeo Arena P. O. Box 8266 All of the above work to be completed in a substantial and workmanlike manner according to standard practices for the sum of: CREDIT OF NINE THOUSAND TWO HUNDRED THIRTY FIVE AND NO/100S DOLLARS Payments to be made as per contract. Any alteration or deviation from the above specifications involving extra costs of material and (or) labor will ;onl"be executed upon written orders for the same, and will become an extra charge overthe m Mentioned in this contract. All agreements must be made in writing. RespectfullyAubmitted, By Hale Moore Estimator /Project Manager 19 S T O N 'E P L A S T E R S T O N E S A L E S CORPORATE OFFICE • 910 NOTTINGHAm ROAD #N4 0 POST OFFICE BOX 921 9 AVON, COLORADO 81620 PHONE 970/949-4138 • FAx 970/845-7605 • ASPEN 970/945-2873 • EDWARDS YARD 970/926-5344 • GLENWOOD SPRINGS YARD 970/945-0260 x 0111KENTAL w "Your Professional Partners in Construction" Mr. Andy Bober Evan, Mendall and Allison P.O. Box 8266 Avon, Co 81620 December 10, 1998 Re: Pricing'changes for referenced "Change Estimate Letters" Dear Andy, To follow are pricing changes for the above mentioned. C.E.L. #001 *Deduct $500.00 from line item #400. C.E.L. #002 *Add $ 2,943.77 to line item#500. *Add 1216 CY @ $2.81 per CY= $3,416.96 to line item #550. *Deduct 421 CY @ $8.36 per CY= $3,519.56 from line item #600. *Deduct 4016 CY @ $10.39 per CY=-$41,726.24 from line item #700. *Deduct 2578 CY @ $4.24 per CY= $12,219.72 from line item #800. Above based on Scenario #2 of Continental West Constructor's letter dated October 29, 1998. 41 C.E.L. #003 *Delete line item #2500. C•1 3)1i7 *A.S.I. Item 16 accounted from original estimate to second estimate. C.E.L. #004 *Deduct 9 CY @ $ 254.42 per CY= 2,289.78 from line Item#1900. *Add temporary bracing=$1,200.00. *Add rebar =$ 1,500.00. P.O. BOX 5840 A VON, CO 81820 070-040-1050 FAX 070-OU-8744 Change Event No. 010 Eagle County Rodeo Arena Grandstands ITEMS QUANTITY tvans Aft Mendel -Allison CONSTRUCTION Change Estimate #: JOB: 1/29/99 2:41 PM 1of1 SUBCONTRACT MATERIAL LABOR EQUIPMENT OTHER subtotal U/P AMT U/P AMT AMT AMT U/P AMT TOTAL Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Avon, Colorado 81620 (970) 845-0466 010 Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:41 PM 29-Jan-99 PRICE SUMMARY Materials & Labor. $0 Bond: $0 Contractor's Overhead: $0 3.0% Contractor's Profit: $0 2.0% Grand Total: $0 Change Estir>rlate # .: 010. Change Estimate Pricina Breakdown ADDITIONAL NOTES: 1. Revised structural drawings issued with ASI #1 added beams 2. Written ASI #1 item no. 3 deleted added beams. EXCLUSIONS: ALTERNATES: Monroc Precast 0 Is 0.00 0.00 0.00 0.00 0.00 Delete East & West Raker Beams 0 ea 0.00 0.00 0.00 0.00 0.00 0.00 0.u0 0.00 (raker beams deleted in CE #011) 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 0Is 0.00 0.00 -0.00 0.00 Rocky Mountain Steel 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 Add W10 x 33 in Grandstand Comers 1 Is 1862.00 1862.00 0.00 0.00 0.00 0.00 1862.00 o is 0.00 0.00 0.00 0.00 0.00 0.00 Rocky Mountain Steel 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 Delete W10x33 in Grandstand Corners 1 Is -1862.00-1862.00 0.00 0.00 0.00 0.00 -1862.00 SUBTOTAL 0.00 0.00 0.00 0.00 0.00 0.00 TOTALS 0.00 0.00 0.00 0.00 0.00 0.00 check: 0.00 ��ived: 11 /18/98 9:55AM; 970 323 0480 -> Evans -Mendel -Allison Const. ; Page 2 • 0ROCKY MOUNTAIN STEEL Fax:970-323-0480 Nov 18 '98 10:37 P.02 M��NT�lM STEEL, iMC. a � 59833 Hwy 50 North ' P.O. Box 496 Oktje� Colomdo. 81425 USA, pb" (970) 323-6323 Fax (970) 3 Z3-0480 November 1861999 EVANS Mendel & Allison Construction Attu. Estimating P.O. Box, 8266 Avon, CO. $1620 Phone: (970) 845-0466 Fax: (970) 845-0465 Re: Eagle County Grandstands End Wall Beams W 10 X 33 We purpose to provide the above listed project as described below: i Fabrication S 1,502.00 ce f Erection S 360.00 C� q Embeds for End Wall Beans and Raiser Beams : Gis .5. Fabrication S 790.00 (00%9) l Additional Diagnial Bracing • 3 $p Fabrication $ 928.00 _ Erection S 552.00 — Embed plate increase in 1211 CMU Walls from 1/2" to 5/9" Plate. Fabrication $ 351.00 .aa•-4 p34 Additional w 1 J& isracmg in ruv, Fabrication S 7,227.00 S 1,656.00 Erection Purlin Cape 14ga Channels 6 places f One additional row of Z purling 3 Att Q A-rs Fabrication $19$43.00 - CE .jb3 • t Erection' $19,104.00 Crows Nest Additional Beams in Fir Fabrication S 1,721,00 u4 I`t Erection $ 760.00 C-E IL030 Total $189794.00 4 214W C&I �u • � or' xu0 This is referanlce to plans received 11/16/98. Very truly yours Z� Zaw� rnie D Lorimor President deceived: 11/30/98 12:03PM; 970 323 0480 -> Evans -Mendel -Allison Const.; Page 2 _y a i<bc Mw1Tml STEEL Fax = 970-323-0450 Nos., 30 ' 99 12 = 43 P. 02 USIR 11 SYEEL. [NC. 59833 H%wy 30 Nath P.O. Bax 486 010he. Colorado 81425 U3A Phase (970) 323.6323 Fax (970) 323-MM November 3D I"S EVANS Mendel & Allison Construction Attn. Andrew Bober P.O. Box 8266 Avon, CO. 81620 Pbone:(970) 845-0466 Fax: (970) 845-0465 Re: Eagle County Grandstands Change Estimate No. 002 Referance: ASI No. 2 We purpose to provide the above listed project as described below: Item " Deduct All Steel and Erection Add Stair Handrailing Add for the detailing already completed Item 06 Deduct 6" pipe at roof Trusses Item # 17 Deduct End Wall Beams Very truly yours Bernie D Lortmor President $ (89621.00) C $ 39400.00 3`�V � $ 560.00 s cs,a�.00> G� es �.s (19862.00)CE:� Old Change Event No. 014 Eagle County Rodeo Arena Grandstands ITEMS QUANTITY Evans Mendel•Allison CONSTRUCTION Change Estimate #: JOB: 1129/99 2:42 PM 1of1 SUBCONTRACT MATERIAL LABOR EQUIPMENT OTHER subtotal U/P AMT U/P AMT AMT AMT U/P AMT TOTAL Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Avon, Colorado 81620 (970) 845-0466 014 Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:41 PM 29-Jan-99 PRICE SUMMARY 0 I ' ADDITIONAL NOTES: Materials & Labor: ($774) 0 EXCLUSIONS: Bond: ($7) 1 0 ALTERNATES: Contractor's Overhead: $0 3.0% i Contractor's Profit: $0 2.0% t Grand Total: ($781) j Change Estimate #: 014 Channe Estimate Pricing Breakdown Continental West Constructors 0 Is 0.00 0.00 0.00 0.00 0.00 0 Is 0.00 0.00 0.00 0.00 0.00 Credit for 300 yds arena material 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 not removed to red barn 300 yd -2.58 -774.00 0.00 0.00 0.00 0.00 -774.00 o Is 0.00 0.00 0.00 0.00 0.00 0.00 o is 0.00 0.00 0.00 0.00 0.00 0.00 o is 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL -774.00 0.00 0.00 0.00 0.00 -774.00 TOTALS-774.00 0.00 0.00 0.00 0.00-774.00 check:-774.00 1 i C.E.L. #007 Based on S.A. Miro Grading Plan dated 11-18-98 and this C.E.L. and revised east end grading plan (See Attached #1) the following line items are affected: *Deduct 972 CY. @ $2.81 per CY = $2,431.32 from- line item#550. *Add 1412 CY. @ $10.39 per CY.=$14,670.68 to line item #700. *Add 437 CY. @ $4.74 per CY. = $2,071:38 to line item #800. # _ 47 � C.E.L. #014 *No nge. C— 3CO GY X 2. S8 - (—? 774 ) Z-� •4 C.E.L. #015 *Add 190 tons @ $31.08 per ton=$5,905.20. C.E.L. #016 *Deduct- $2,943.77 from line item #500. C.E.L. #023 *Deduct $700.00 from line item #700. 00 C.E.L. #024 *Refer to C.E.L. #003 of this letter. C.E.L. #036 Disregard verbal Andy Bober. Sincerely, Chet Elder Continental West constructors, Inc. Change Event No. 016 Eagle County Rodeo Arena Grandstands ITEMS QUANTITY Evans Mendel•Allison SUBCONTRACT U/P AMT Evans -Mendel -Allison C P.O. Box 8266 Avon, Colorado 81620 CONSTRUCTION (970) 845-0466 Change Estimate #: 016 JOB: Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:42 PM 29-Jan-99 PRICE SUMMARY I Materials & Labor: ($6,789) I 1 Bond: ($61) 1 i 1 1 Contractor's Overhead: $0 3.0% I- Contractor's Profit: $0 2.0% ' Change Estimate #: 016 Channe Estimate Pricina Breakdown 1 /29/99 2:42 PM MATERIAL U/P AMT ;tion. Inc. ADDITIONAL NOTES: EXCLUSIONS: ALTERNATES: LABOR EQUIPMENT AMT AMT 1 of 1 OTHER subtotal U/P AMT TOTAL Continental West Constructiors 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2944. U Excavate footings 1 Is -2944.00-2944.00 0.00 0.00 0.00 0.00 0.00 0 ea 0.00 0.00 0.00 Vogelman West Associates 0 ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -3845.00 Delete 16" CMU center bays 1 Is -3845.00-3845.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 OIs 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 -6789.00 0.00 0.00 0.00 0.00 -6789.00 SUBTOTAL TOTALS-6789.00 0.00 0.00 0.00 0.00-6789.00 check:-6789.00 C.E.L. #007 Based on S.A. Miro Grading Plan dated 11-18-98 and this C.E.L. and revised east end grading plan (See Attached #1) the following line items are affected: *Deduct 972 CY. @ $2.81 per CY = $2,431.32 from- line item#550. *Add 1412 CY. @ $10.39 per CY.=$14,670.68 to line item #700. *Add 437 CY. @ $4.74 per CY. = $2,071.38 to line item #800. C.E.L. #014 *No nge. GY X14 2• SS = (-) 774 Z-I •Q ) f 1 C.E.L. #015 *Add 190 tons @ $31.08 per ton=$5,905.20. C.E.L. #016 *Deduct $2,943.77 from line item #500. C.E.L. #023 *Deduct $700.00 from line item #700. ao C.E.L. #024 *Refer to C.E.L. #003 of this letter. C—) C.E.L. #036 Disregard verbal Andy Bober. Sincerely, Chet Elder Continental West constructors, Inc. QGELMANN�' �� IN VIN STONE CHANGE ORDER REQUEST #3 S i NCE 1 9 8 1 VASSTUITES, INC. ber 9, 1998 Evans Mendel -Allison Construction P. O. Box 8266 Avon, CO 81620 RE: Eagle County Rodeo Arena; Re: Dist. Ltr. 040, ASI No. 2 Attn: Andy Bober Gentlemen, Owners / Contractor hereby authorizes Vogelman West Associates, Inc. to furnish all materials and perform all labor necessary to complete the following Additional Work / Changes in the plans and specifications. Per item 2. ASI No. 2 b t 1) Reduce below grade CMU by 16" in center bays. C -$3,845.00 1,0,4 Per item 3. ASI No. 2 2) Provide openings in walls*at Restrooms, Storage room, and Office. ('40 �, Six 5' X V openings @ $320.00 $1,920.00 cE.A.btr AtOov Credit for 8" CMU deleted for these openings.-$1,200.00 0 I,JD Per Item 7 ASI No. 2 3) Installation of CMU caps in lieu of precast concrete at Restroom, screen panels, and ticket windows. Per item 10a ASI No. 2 4) Delete all work in animal wash area. Total $395.00 CE �ioZo l W 49) C� �QZ (�) 44,135.00 -$6, 865.00 Notes: Excludes CMU caps at concession counters. Vogelman West does not recommend this installation and cannot warrant them. Labor to install precast tops is still included. Job name and address: Eagle County Rodeo Arena Eagle CO All of the above work to be completed in a substantial and workmanlike manner according to standard practices for the sum of: CREDIT SIX THOUSAND EIGHT HUNDRED SIXTY FIVE AND NO/100 DOLLARS-$6,865.00. Payments to be made as per contract. Any alteration or deviation from the above specifications involving extra costs of material and (or) labor will only be executed upon written orders for the same, and will become an extra charge over the sunmentioned in this contract. All agreements must be made in writing. Res pectfufty§ubmitted, By e Moore stimator /Project Manager S T O N E • P L A S T E R • S T O N E S A L E S CORPORATE OFFICE • 910 NOTTINGHAM ROAD #N4 • POST OFFICE BOX 921 • AVON, COLORADO 81620 PHONE 970/949-4138 a FAx 970/845-7605 • ASPEN 970/945-2873 • EDWARDS YARD 970/926-5344 • GLENWOOD SPRINGS YARD 970/945-0260 Change Event No. 019 le County Rodeo Arena Grandstands 1 /29/99 2:42 PM SUBCONTRACT MATERIAL ITEMS QUANTITY U/P AMT U/P AMT E v a n s Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Mendel•Allison Avon, Colorado 81620 GCON S T R U C T I O N (970) 845-0466 Change Estimate #: 019 JOB: Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:42 PM 29-Jan-99 PRICE_ SUMMARY I ADDITIONAL NOTES: Materials & Labor: ($3,464) EXCLUSIONS: Bond: ($31) j 0 ALTERNATES: Contractor's Overhead: $0 3.0% i Contractor's Profit: $0 2.0% 1 Grand Total: ($3,495) 1 of 1 LABOR I EQUIPMENT OTHER I subtotal AMT AMT U/P AMT TOTAL Change Estimate#: 019: Change Estimate Pricing Breakdown LU Ols 0.00 0.00 0.00 0.00 0.00 Rocky Mountain Steel 1 Is 0.00 0.00 0.00 0.00 0.00 Delete 6" dia tube steel at trusses 1 Is -3464.00-3464.00 0.00 0.00 0.00 0.00 -3464.00 0.00 0 ea 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 -3464.00 0.00 0.00 0.00 0.00 -3464.00 SUBTOTAL TOTALS-3464.00 0.00 0.00 0.00 0.00-3464.00 check:-3464.00 ,�.ii�elved: 12/ 7/98 11:46AM; 970 323 0480 -> Evans -Mendel -Allison Const.; Page 2 ROCKY MOUNTAIN STEEL. Fax:970-323-0480 Dec 7 '98 12:25 P.02 14 d \qnp� NOW MIEMN STEEL, ING. 59833 Hwy 50 North l P.O. Box 486 Olatbic, Colando. 91425 USA Ph= (970) 323-63Z3 Fax (970) 323-0480 December 7,1998 EVANS Mendel & Allison Construction Attn. Andrew Bober P.O. Box 9266 G Avon, CO.91620 Phone:(970) 945-0466 Fax: (970) 845-0465 Re: Eagle County Grandstands Change Estimate No. 019 We purpose to provide the above listed project as described below: Response to your letter dated December 04,1998. Delete the 6" dia steel tube at the north end of the roof trusses per item No. 6 of ,A►SI #2 Dateted November 199& Deduct Very truly yours Berpie D Lorimor �N�ideat $ (39464.00) Change Event No. 021 1/29/99 2:43 PM 1 of 1 Eagle County Rodeo Arena Grandstands SUBCONTRACT MATERIAL LABOR EQUIPMENT---T OTHER subtotal • ITEMS QUANTITY U/P AMT U/P AMT AMT AMT U/P AMT TOTAL E v a n s Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Mendel•Allison Avon, Colorado 81620 CONSTRUCTION (970) 845-0466 Change Estimate #: 021 JOB: Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:43 PM 29-Jan-99 PRICE SUMMARY Materials & Labor: Bond: Contractor's Overhead: Contractor's Profit: ($6,848) ($61) $0 3.0% $0 2.0% ADDITIONAL NOTES: Finish on all surfaces to be a powder coat paint, selectet from standard colors. EXCLUSIONS: ALTERNATES: Grand Total: ($6,909) j Change Estimate M 021 Chance Estimate Pricing Breakdown Ols 0.00 0.00 0.00 0.00 0.00 06-06400 Architectural Woodwork Delete corian counter top/installation 1 Is-11100.00 -11100.00 0.00 0.00 0.00 0.00 0.00 -11100. 0.00 Ols 0.00 0.00 0.00 0.00 05-05500 Metal Fabrications Ols 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4252.00 Add steel vanity tops 1 Is 4252.00 4252.00 0.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 -6848.00 0.00 0.00 0.00 0.00 -6848.00 SUBTOTAL TOTALS-6848.00 0.00 0.00 0.00 0.00-6848.00 check:-6848.00 �— ROCKY MOUNTAIN STEEL Fax:970-323-0480 Dec 7 '98 12:45 P.02 Rociff HOW AIN STM 10. 59833 Hwy SO North P.O. Box 436 Olz1hel Cajw lo. $142S USA "10= (970) 323-6323 Fax (970) 323-0480 December 7,1998 2! EVAN S Mendel & Allison Construction Atta. Andrew Bober C F.O. Boz 9266 E Avon, CO. $1620 p� Phone:(970) 845-0466 Fax: (970) 345-0465 Re: Eagle County Grandstands Chadge Estimate No. 021 We purpose to provide the above listed project as described below: Response. to your letter dated December 0491993. 4 Steel vanity tops per item No. 8, dated November 2591998. All edges are to be ground smooth with slight radius. All wilds are to be ground smooth. Finish on all surfaces ( top, edges and underside ) including brackets is to be a powder coat paint, color to be selected by Architect. Fabric ition $39148.00 Erection 1,104.00 n% Out �dr Colors of choice Tan Blue Gray Black White oeCa. [.(,CCLda CGL Very truly yours Bernie D Lorimor President . Change Event No. 023 Eagle County Rodeo Arena Grandstands ITEMS QUANTITY Eva n s Mendel *Allison SUBCONTRACT U/P AMT Evans -Mendel -Allison C P.O. Box 8266 Avon, Colorado 81620 CONSTRUCTION (970) 845-0466 Change Estimate #: 023 JOB: Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:43 PM 29-Jan-99 PRICE SUMMARY Materials & Labor: ($7,901) Bond: ($71) Contractor's Overhead: $0 3.0% Contractor's Profit: $0 2.0% 1 /29/99 2:43 PM 1 of 1 MATERIAL LABOR EQUIPMENT OTHER subtotal U/P AMT AMT AMT U/P AMT TOTAL ruction. Inc. ADDITIONAL NOTES: EXCLUSIONS: ALTERNATES: Change Estimate #: 023 Chance Estimate Pricing Breakdown Vogelman West Associates 0 Is 0.00 0.00 0.00 0.00 0.00 , Delete animal wash CMU work 1 Is -4135.00-4135.00 0.00 0.00 0.00 0.00 0.00 -413 0.00 Ols 0.00 0.00 0.00 0.00 Lunsford Mechanical 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 Delete animal wash plumbing work 1 Is -3066.00-3066.00 0.00 0.00 0.00 0.00 -3066.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 Continental West Constructors 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -700.00 Delete animal wash demo 1 Is -700.00-700.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL -7901.00 0.00 0.00 0.00 0.00 -7901.00 TOTALS 7901.00 0.00 0.00 0.00 0.00-7901.00 check:-7901.00 •1 f.•.. 1'..'d !}5;1; '1 } / .�% tiC1 .j: ! f 1�1� .7/V CYG IV.JJY V CA IV$= 14� vi— I"%lii Q?V 11 VVI I;Zb rayv G :t .'f1 �/ 998 16: 06 970-242-7634 LUNSFORD MECHANICAL PAGE 02 Lunsford Brothers Mechanical Contractoce, Inc. 2401 Commiiiiirc• Blvd. Brand Junction, CO 81505 C KMGE ORDER 1 4-Nov-98 TO: Evans M-A Construction JOB It: 496 0101 Eagle Rd. Bldg. #7 PROJECT: Eagle County Rodeo P.O Box 8266 Grandstands and Arena Avon, CO 81620 1.k' A1-10,4..*0tN? FIEFEFRED TO ABOVE 1S HEREBY MODIFIED AS SET FORTH BELOW. EXECEPTING ONLY TPME TERNS SPECIFICALLY WAI l Ik :%M;:NVrV HERZIN. ALL OF THE TERMS, CONDITIONS, PROVISIONS AND COVENANTS OF SAID AGREEMENTS S}{= REMAIN IN FULL )*Cl*.. EF FF=. 1I ANY PORTION OF THIS QUU4GZ ORDER IS NOT ACCEPTABLE, YOU MOT FURNISH US WRITTEN rr,: I } , : 1•-'7h OF Sl7^.14 NON -ACCEPTANCE AT THE ADDRPSS DESIGNATED BELOW WITHIN 8EVEN (7) DAYS Of ISSUE HERE OF. IN THE ; F '%X1.1 NO?:c:E OF NON -ACCEPTANCE, YOUR UNQUALIFIED ACCEPTANCE OF THIS Ci(M" ORDER WILL 8S DEEMED CONCLU31VE :•t.'. l ^.AYV AFT ER ':'NE DATE OF ISSUE HEREOF. .. •-A-.1--.- -----------.ti---.-.r- I►M w./b/... -. dVMV-../----tih1N�.�M1.•YMMNNM.1/.111ti/r1.YM/Y.YNY...titi MM�IM•V YIYNI�A. A.�VyyAI DESCRIPTION OF THE CHANGE OR MODIFICATION: Add water piping for animal wash area. No design provided for pricing. Assumed Intent is to run a (1') galvanized Iron water line fastened to top of the two masonry wails as indicated In drawing provided with Supplementary Instructions #3. There will be a total of (18) 1/7 hose Bibb (boiler drams) stubbed off main lines. We are allowing for (T) of undergroung piping at the end of the (2) uns. Note: Provisions will have to be made by -others for draining this piping in winter. Possibly a yarc box with a 5' deep bury drain assembly in underground main by the site contractor. (105') galvanized steel T & C pipe Ftgs , nipples, hose bibos, hangers 25%0&P Labor (52) nrs. a 49.50 1`+ CONSIDER ;it THE AMOUN Z•"NTRACT PRI AD.7'1S7FD CON ACCEPTE"1✓ -IR.X: 2- . CIE -4oZ3 �0& ids Z-qb 0101 Eagle Rd. Bldg. #7 PO Box 8266 Avon, CO 81620 ,Avtl+:rized Signature) BY: NAME: rpctntpal TITLE lFrt)/tvdl $144.90 $248.70 $98.40 $2,574. t AL, THIS CHANGE $ 3,066.0S01 � I CREA_4ED 3 3,066.00 3 _ PY PROMPTLY 1N31PORD BROTHERS MECHMICAL 2481 COMMERCE BLVD . GRAND JUNCTIpf, CO 81505 Tom Vagell Project Manager Change Event No. 027 1 /29/99 2:44 PM 1 of 1 Eagle County Rodeo Arena Grandstands SUBCONTRACT MATERIAL LABOR EQUIPMENT___7 OTHER subtotal ITEMS QUANTITY U/P AMT U/P AMT AMT AMT U/P AMT TOTAL E v a n s Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Mendel•Allison Avon, Colorado 81620 CONSTRUCTION (970) 845-0466 Change Estimate M 027 JOB: Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:44 PM 29-Jan-99 PRICE SUMMARY I I ADDITIONAL NOTES: Materials & Labor. ($2,568) I EXCLUSIONS: I Bond: ($23) I ALTERNATES: I ' Contractor's Overhead: $0 3.0% Contractor's Profit: $0 2.0% I Grand Total: ($2,591) Change Estimate M 027 Change Estimate Pricing Breakdown Ols 0.00 0.00 0.00 0.00 0.00 Tri-Phase Electric 1 Is 0.00 0.00 0.00 0.00 0.00 ' Delete walkway bollard fixtures 12 ea -214.00-2568.00 0.00 0.00 0.00 0.00 -2568.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL TOTALS . -2568.00 0.00 0.00 0.00 0.00-2568.00 -2568.00 0.00 0.00 0.00 0.00-2568.00 check:-2568.00 llm� ZAL 1qWW 1 TRi PHASE ELECTRIC (;0 CONTRACTORS & ENGINEERS Residential * Commercial • Industrial (970) 524-7135 FAX (970) 524-7640 December 4. 1998 TO: Evans Mendel Allison — Andy Bober Re: ASI #2 — Light fixture deletions Eagle County Rodeo Grandstands 1. Walkway light bollards — cost per fixture including pipe, wire and labor: b 2 Gr $214.00 per fixture 2, = 21 S(p$� G P�roiT • DOW& 2. Pendant fixtures Type D; Cost per fixture including pipe, wire and labor: $125.00 per fixture If you have any questions or need further information, please let me know. John er Project oordinator 0325 Hardscrabble Rd. • Gypsum, CO 81637 E v a n � � 0101 Eagle Road, Bldg #7 P.O. Box 8266 "Aft Mendel o Allison Avon, CO 81620 ph: 970.845.0466 CONSTRUCTION fax: 970.845.0465 Wednesday, February 24, 1999 Mr. Rich Cunningham Eagle County - Facilities PO Box 850 Eagle, CO 81631 Fax: 970-328-7720 Re: Project Name: Eagle County Rodeo Arena Grandstands, Project No: 028-099 Change Estimate Letter No: 037R Dear Rich: Please find the attached cost impact breakdown to provide steel gutters and PVC downspouts. Total Cost: ($11,442)1 The schedule impact will be (TBD) working days. Please review and sign below to authorize this work to proceed. This cost will be incorporated into the next change order. Please feel free to contact me with any questions that you may have with regard to this change event. a Andrew Bober Duly Authorized cc: CE #037R Casey Brown David Wise, AIA 303-446-0201 r Change Event No. 037 2/24/99 8:30 AM Eagle County Rodeo Arena Grandstands SUBCONTRACT MATERIAL ITEMS QUANTITY UP AMT UP AMT Ev a n s Evans -Mendel -Allison Construction, Inc. ,� P.O. Box 8266 Mendel Allison Avon, Colorado 81620 CONSTRUCTION (970) 845-0466 Change Estimate #: 037 JOB: Eagle County Rodeo Arena Grandstands LAST REVISEDWRINTED: 8:30 AM 24-Feb-99 I PRICE SUMMARY I I Materials & Labor. I ($11,340) ' I I Bond: ($102) I 1 ' Contractor's Overhead: $0 3.0% ' Contractor's Profit: $0 2.0% I Grand Total: ($11,442) j Change Estimate #: 037 Chance Estimate Pricing Breakdown ADDITIONAL NOTES: EXCLUSIONS: ALTERNATES: AMT 1of1 EQUIPMENT OTHER I subtotal AMT U/P AMT TOTAL 0 Sondrup Sheet Metal Ols 0.00 0.00 0.00 0.00 0.00 I_ JO Ols 0.00 0.00 0.00 0.00 0.00 0.00 Delete copper gutter & downspouts 1 Is -11340.00 -11340.00 0.00 0.00 0.00 0.00 -11340.00 0 cy 0.00 0.00 0.00 0.00 0.00 0.00 Add for Kynar gutter 1 Is 500.00 500.00 0.00 0.00 0.00 0.00 500.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 Delete for PVC downspouts 1 sf -3000.00 -3000.00 0.00 0.00 0.00 0.00 -3000.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 Delete Alternate No. 5 1 Is 2500.00 2500.00 0.00 0.00 0.00 0.00 2500.00 SUBTOTAL -11340.00 0.00 0.00 0.00 0.00 -11340.00 TOTALS-11340.00 0.00 0.00 0.00 0.00-11340.00 check:-11340.00 Change Event No. 041 Eagle County Rodeo Arena Grandstands ITEMS QUANTITY tva n s Mendel•Allison CONSTRUCTION Change Estimate #: JOB: 1/29/99 2:45 PM 1 of 1 SUBCONTRACT MATERIAL LABOR EQUIPMENT OTHER subtotal U/P AMT U/P AMT AMT . AMT U/P AMT TOTAL Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Avon, Colorado 81620 (970) 845-0466 041 Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:45 PM 29-Jan-99 PRICE SUMMARY I ADDITIONAL NOTES: Materials & Labor: $0 EXCLUSIONS: Bond: $0 j ' I ALTERNATES: Contractor's Overhead: $0 3.0% , Contractor's Profit: $0 2.0% Grand Total: $0 j Change Estimate #: 041 Change Estimate Pricing Breakdown 0 Is 0.00 0.00 0.00 0.00 0.00 Vogelman West Associates Delete 4" x 8" CMU at front of 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 0.00 .. -2750.00 grandstand seating. 1 Is -2750.00 -2750.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 Continental West Constructors 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Add CIP concrete at front of 0 Is 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2750.00 grandstand seating. 1 Is 2750.00 2750.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0 ea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL 0.00 0.00 TOTALS 0.00 0.00 0.00 0.00 0.00 0.00 check: 0.00 A v N VOGELMAK.., ASSOCIATES, INC. Andy Bober Evans Mendel -Allison Construction P. O. Box 8266 Avon, Co 81620 INNOVATIONS IN STONE SINCE 1 981 Job Name: Eagle County Rodeo Arena Eagle County Fairgrounds DATE: November 5,1998 VOGELMAN WEST ASSOCIATES, INC. 1) 8" and 12" Concrete block walls where specified at East, Center and West bleacher areas including installation of steel lintels (under 150 lbs.) where required. Corbeled counters at concession booths and installation of precast caps at rest room entrance walls, ticket windows, and screen areas at East and West bleachers is included. 2) Add 41X 8" filler block at front of grandstand seating. 3) Add an 8" block wall and infill wall at existing animal wash. Labor to cut two openings in existing walls. Alternate: 1) Provide 13 2' X 2' reinforced CMU columns to serve in lieu of prestressed concrete columns. 2) Provide CMU spandrels at ramp walls and at walls above restroom entries to railing height. PRICING $ 197,730.00 $ 2,750.00 $ 4,135.00 $37,440.00 $18,600.00 Total $ 204,600.00 CLARIFICATIONS: 1) Vogelman West Associates, Inc. standard Addendum A is attached. 2) Winter protection and temporary heating are excluded. 3) Payment terms: Mobilization fee, 0% retainage, 30 day draws. 4) Scheduled Start Date: January 1999 5) Flashing, caulking and sealants are excluded. 6) Excludes all pre -cast concrete. 7) All steel lintels to be supplied by others. VWA to install loose lintels under 150 pounds. 8) Welding at all steel column/masonry Dur-a-wall reinforcement locations by others. 9) All water barriers by others. 10) All CMU to be standard gray block. Excludes split face or decorative CMU. 11) Excludes grouting at hollow metal door frames. Estimated by: Hale Moore Bid per plans dated 10/22/1998. S1.1, S2.1 and S2.2 dated 9/4/1998. S T O N E P L A S T E R • S T O N E S A L E S CORPORATE OFFICE • 910 NOTTINGHAM ROAD #N4 • POST OFFICE BOX 921 • AVON, COLORADO 81620 PHONE 970/949-4138 • FAx 970/845-7605 0 ASPEN 970/945-2873 • EDWARDS YARD 970/926-5344 • GLENWOOD SPRINGS YARD. 970/945-0260 op PReceived: 12/16/98 3:51PM; 949 6744 -� Evans -Mendel -Allison Const.; Page 2 Dec-16-98 16:.29 Cc inantal Wast �9-6744 P.02 �oil SENTAL We Ti &&& IV .2- "Your Professional Partners in Construction" Mr. Andy Bober Evans, Mendel, Allison P.O. Box 8266 Avon, Co 81620 December 16, 1998 Re: R.N.'s #037, #047, # 047, # 050 and CEL #040. To follow are rice considerations to be considered for the above R.F.I.'s.� p 3C • R. F. I.'s #037 J Add $3,000.00Add $2.700.00O�j• R. F. I. s #047 C —�• R. F. I.'s #050 `� +° Add $ 980.QQ— c 04 Z COeOL Totar $ 6,680.00 To follow is a breakdown of project cost for winter conditions as requested in C.E.L. #040. This item should -be used as an allowance with the following assumptions to be considered. • Additional blankets will be a one time job cost of $ 75.00 each if needed. • 1.5 HRS/DAY for crew to place and remove blankets 3 HRS/WEEK for snow removal by loader and crew. • Doesn't include any time spent excavating or processing frozen ground. • Doesn't include any cost for temporary enclosures or heating of same. Assume General Contractor will provide these items if needed. Invoices will be written daily for snow removal and blanket protection. • A 3000 SQ. FT. ground heater will cost $ 500.00/DAY If needed. $ 220.00/DAY $ 1,100.001WEEK 19 Thank You, Tim Carpenter Continental West Constructors, Inc. P.o, Box Wo Avow, Co 81820 070-040-108 FAN e70a4"74f Change Event No. 042 Eagle County Rodeo Arena Grandstands ITEMS QUANTITY Evans Mendel•Ailison CONSTRUCTION Change Estimate M JOB: LAST REVISED/PRINTED: 1 /29/99 2:45 PM SUBCONTRACT MATERIAL LABOR EQUIPMENT I OTI U/P AMT U/P AMT AMT AMT U/P Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 Avon, Colorado 81620 (970) 845-0466 042 Eagle County Rodeo Arena Grandstands 2:45 PM 29-Jan-99 PRICE SUMMARY j I ADDITIONAL NOTES: Materials & Labor: $980 EXCLUSIONS: Bond: $9 I I ALTERNATES: Contractor's Overhead: $31 3.0% Contractor's Profit: $21 2.0% t Grand Total: $1,041 i Change Estimate M 042 Change Estimate Pricing Breakdown 1of1 I subtotal AMT TOTAL Continental West Constructors Ols 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0. u Provide epoxy bonding agent Ols 0.00 0.00 0.00 0.00 0.00 0.00 between P/C & CIP per RFI No. 050 Ols 0.00 0.00 0.00 0.00 0.00 980.00 response from SA Miro 1 Is 980.00 980.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 0 sf 0.00 0.00 0.00 0.00 0.00 0.00 0 ea 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL 980.00 0.00 0.00 0.00 0.00 980.00 TOTALS 980.00 0.00 0.00 0.00 0.00 980.00 check: 980.00 4 v a o Dac-16-98 16 :029 . Cont i n0nta l Wost 949-6744 ' P. w 41 Adkdk -(`Your Professional Partners in Construction" Mr. Andy Bober Evans, Mendel, Allison P.O. Box 8266 . Avon, Co 81620 December 16, 1998 Re: R.N. s #037, #047l # 047. # 050 and CEL #040. considerations to be considered for the above R.F.I.'s. 7) To follow are price ?j • R. F. Ls #037 J Add $2,700.00 -- 40 CS �� 4 - Add $3,000.00 -- • R. F. I. s #04T C ? R. F.1.'s #O50 '� Q �°O Add $ 980. QQ G a4 Z' Lv) ? cap Total $ 6,680.00 To follow is a breakdown of project cost for winter conditions as requested in C.E.L. #040. This item should be used as an allowance with the following assumptions to be considered. • Additional blankets will be a one time job cost of $ 75.00 each if needed. - • 1.5 HRSIDAY for crew to place and remove blankets • 3 HRSIWEEK for snow removal by loader and crew. • Doesn't Include any time spent excavating or processing frozen ground. • Doesn't include any cost for temporary enclosures or heating of same. Assume General Contractor will provide these items If needed. • Invoices will be written daily for snow removal and blanket protection. • A 3000 SQ. FT. ground heater will cost $ 500.00/DAY if needed. $ 220.00/DAY • $ 1,100.00 WEEK 19 Thank You. Tim Carpenter Continental West Constructors, Inc. P.o. Box We Avow, Co $1020 070.04048119 FAIX 070-04"744 Change Event No. 046 e County Rodeo Arena Grandstands 1/29/99 2:45 PM SUBCONTRACT MATERIAL ITEMS QUANTITY U/P AMT U/P AMT Evans Evans -Mendel -Allison Construction, Inc. P.O. Box 8266 13 Mendel -Allison Avon, Colorado 81620 CONSTRUCTION (970) 845-0466 Change Estimate #: 046 JOB: Eagle County Rodeo Arena Grandstands LAST REVISED/PRINTED: 2:45 PM 29-Jan-99 PRICE SUMMARY Materials & Labor: $200 Bond: $2 Contractor's Overhead: $6 3.0% Contractor's Profit: $4 2.0% rrnnri Tntal- $213 Change Estirnate # 046 Change Estimate Pricing Breakdown ADDITIONAL NOTES: EXCLUSIONS: ALTERNATES: 1 of 1 LABOR EQUIPMENT OTHER subtotal AMT AMT U/P AMT TOTAL Continental West Constructors Ols 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 1-t 200.00 Increase footing size at 12" CMU 1 Is 200.00 200.00 0.00 0.00 0.00 0.00 Ols 0.00 0.00 0.00 Ols 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL 200.00 0.00 0.00 0.00 0.00 200.00 TOTALS 200.00 0.00 0.00 0.00 0.00 200.00 check: 200.00 A w6 - 02�99 ,15 : 11 Cont i nanta l West 949 - 6744 N ire TAL Aift& "Your Professional Partners in Consducdon" Mr. Andy Bober Evans. Mendell, Aflison P.O. Box 8266 Avon, Co 81620 January 4, 1999 Re: C. E.L's # 046, #044, #008. # 047. • C.E.L. # 008 • C.E.L. # 044 • C.E.L. # 046 • C.E.L. # 047 ADD $ '1,800.00 No Change ADD $ 200.00 No Change Total $ 2.000.00 Pricing of C.E.L. # 008 assumes six pilasters will have to be Installed to protect existing sewer line. If existing sewer location shown on prints Is Incorrect, the number of pilasters required could change. C.E.L. # 047 will be no change provided General Contractor provides sleeving. Sincerely, Chet Elder. Continental West Constructors, Inc. P_02 P.O. eox 5840 avOY, cv 81020 e70-e4e-108 ffx 070-04 AW IQL AL f. DISTRIBUTION Originals tc: 1. Qnt act Book - 2. +�— 3. Conies to: 1. Accounting 2. 3. 4.