CHANGE Distribution to: `o",
ORDER
AIA DOCUMENT G701 OWNER QX
ARCHITECT QX
CONTRACTOR Q
FIELD Q
OTHER 0
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 003
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE: 24-Mar-99
Job Number: 028-099 (Revised)
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description Adjustment
036 Add embeds for end Wall beams and raker beams per $839
revised drawings issued with ASI #1
TOTAL $839
Not valid until signed by bogs Owner and Amhitect
Signatum ofIn Contractor 'tl'atshis agreement herewiM'nclutlng any adjustment in the Conuam Sum or Conuact Time.
The original (G40;act- ) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders .............................................................
The (CentracRSum) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (6entmot Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (URchanged)
bythis Change Order.............................................................................................
The new (6eMRact-Sum) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (alcreaced) (decreased) (unchanged) by
The Date of Substantial Completion as of the date of this Change Order therefore is
Owner:
Eagle County —Facilities
1%CBox 850
By:
Cal
Contractor:
Evans -Mendel -Allison Construction, Inc.
P.O. B 6
Avo , CO 6 M
r
r/ B QL
Date: 3 -'O 1 T 7
$2,124,639
($55,879)
$2.068,760
$839
$2.069,599
0 Days
7099
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 915
Denver, CO 90202
BySE>4WAp4,a%$J14,
Date: ZAju_ar-jc)
THE AMERICAN INSTIME OF ARCHITECTS, 1735 NEW YORK AVE.. NW.. WASHINGTON. O.C. 20006 G701 -1978
k, tt
CHANGE Distribution to: *we
ORDER
AIA DOCUMENT G701 OWNER QX
ARCHITECT QX
CONTRACTOR QX
FIELD 0
OTHER Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 004
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE: 24-Mar-99
Job Number: 028-099 (Revised)
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description Adjustment
058 Provide material and labor to install "V-Line 32' metal and ($2,518)
translucent roof panels over the ramp area in lieu of the fiberglass
specified and "V-Line 32" metal over entire roof.
064 Delete (3) HM doors, frames and hardware; Delete (1) door and ($1,175)
hardware and add for 4" HM frame heads.
071 Delete all type "H" light fixtures at the concession booths and add (1) ($647)
type'H- light fixture over the ticket window. ? (-0 4A WYr'P-1
072 Provide (6) type "G' light fixtures in the ticket office and (2) type "G' $357) GfIAMaE
fixtures in the Electrical Room.
075 Delete (2) type'D" light fixtures, conduit and wiring; Credit for (8) ($767)
type'D' light fixtures. C
TOTAL C✓/�O %, ctU)
Not valid until signed by both Owner and Architeot.
signature of the Connmr - d' tes his g t hereafth. including any adjustment in the Contnot Sum or Contact Time.
The original (6entrae1Sum (Guaranteed Maximum Cost) was ............................................. $2.124,639
Net Change by previously authorized Change Orders ............................................................. ($55,040)
The (C"Ua44-uno) (Guaranteed Maximum Cost) prior to this Change Order was ................ $2.069,599
The (CoAka4) (Guaranteed Maximum Cost) will be (Rcreased) (decreased) (unchanged)
by this Change Order............................................................................................. ($4.756)
The new (Con4actSum) (Guaranteed Maximum Cost) including this Change Order will be ... $2,064,843
The Contract Time will be (mcreaced) (Pea aasad) (unchanged) by 0 Days
The Date of Substantial Completion a, of th+ date of this Change Order therefore is 719199
Owner: Contractor: Architect
r a ie County —Facilities Evans -Me el -Allison Construction, Inc. David Lynn Wise, AIA .
P.O. Box 850 P.O. 82 730 171h Street, Suite 915
Eagle, Cp. 81631 Av , CO 620 Denver, CO 80202
I
B wlloir,
3�+(- �r 7 'OP Date: Dater �JLC Z
03/29/1999 13:37 3034460201 DAVIDLYNNWISE
MAR-29-98 12:55 FROM,EC BUtLDImcq as GROUNDS 10:8703WU7720
PAGE 02
PACE 2/2
CKANGE
ORDER
AA OQC%J'W&NT CrMl
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
PROJECT: 68919 9011111110 Real" May OIWWV&"b
CKAMM ORDER NUMBER:
"..4 462111 Fabround kmad
Ealsk = 41401
INTrT[*'t;Oh PATE:
Job mairibimr: Qp4"
Add
paw -se
(Revised)
TO (G(Xdyamt)' 9vmn&4fiwWd*As*n Camrvimnitsm W- ARCHrTler.1 p*04CT NO
P.O. a" 92"
Avon. CO 91 $20 CONTRACT I -OR: Esigis Cmw" Red" Aiwim Owdstimmils
CONTRACT DATE: 111.411-11141
You am directed W —k- the baumns owwsui this ccrjTiQ
DE Na. bat
042 Owommoavallm of wawa not $ootwma P&t drooJon of sob snprumir,
m0pw,*mm-pV*,(wx
TOTAL
Adwrmas :Fit
ril WV" (GURldrd"d LICAAMURM C40) Wall ............................................ .
Not Change by pi*AsuWy w4wited Change Orders .............. . ....... . .. I ....... I ....I.-.............
The (C*Nm"U&M) (CubillibbW Mama 0"0 woo, to this Clear" Order umis ........... — 52AM94
Th- (Qowboas7 ) Mutuincemal Mamemmm Cost) wit be (urAmemall SHueesnuii fW41011,111644
bw this Clow"s DOW ...... ....... ...................... ... L .................. L ..................... .... .. 41,91D
The mau, 10*WsQ"4A* tGuawarlieed lillsomm" Cial).makulkig mis C"s Ordw%vg be..
c
The CoAnwoft T�fte WA be flftamalan* (��/) twdurviul) bV Aw
a Dave
The OM w st.b`ullllmlld CIFIX11411WI " Op ll. 1. .1 at t" 011000 Oldw "WAIIIII 4 Tlaw
L:2r,�naPc, Aeheari:
Edge COL"-w-ciiiii- "Vrw"�2LAelAtimewi Cohnniction liw Pavia Lynn Villga, mii
P-Q, a" Wall I. P`A� 730 117th 9&%mC 9wft 110
CO al A CO $20 ngw*QLAMZ
now,
CHANGE `.0e Distribution to: +M�
ORDER
AIA DOCUMENT G701 OWNER
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 005
(name. address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE: 24-Mar-99
Job Number: 028-099 (Revised)
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
.CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description Adjustment` N
� '� IG~ e,j
082 Overexcavation of crows nest footing per direction of soils engineer, $1,932 1
Hepworth-Pawiack.
TOTAL $1,932
Not whd until signed by both Owner and Architect
Signatune of the Contractorinditnutes his agreement h remth including any adjustment in the Contract Sum or Contract Time.
The original (CentrasFSum) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders .............................................................
The (6eatmat-Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (Gontract-Sam) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged)
bythis Change Order.............................................................................................
The new (6eatracRSam) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increastvb) (4asreaced) (unchanged) by
The Date of Substantial Comp�ecor. at, oa the date of this Change Order therefore is
Owner:
Is County —Facilities
s R0,1 '850
`'t nEa ,p4� 1631
41
Coco ty'
1735
'ontractor:
Evans -Mendel -Allison Construction, Inc
P.O,.86'x-8116
Av n, CO TP620 /
$2.124,639
($59,796)
$2,064,843
$1.932
52,066,775
0 Days
7/9/99
Architect:
David Lynn Wise, AIA
T3017th Street, Suite 915
Denver, CO 80202
By:
Date:
CHANGE *'wl
Distribution to, 'wow
ORDER
AIA DOCUMENT G701
OWNER EX
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER Q
PROJECT: Eagle County Rodeo Arena Grandstands CHANGE ORDER NUMBER: 006
(name, address) 0426 Fairground Road
Eagle, CO 81631 INTITIATION DATE: 24-Mar-99
Job Number: 028-099 (Revised)
TO (Contractor): Evans -Mendel -Allison Construction, Inc. ARCHITECTS PROJECT NO:
P.O. Box 8266
Avon, CO 81620 CONTRACT FOR: Eagle County Rodeo Arena Grandstands
.CONTRACT DATE: 11.09.98
You are directed to make the following changes in this Contract:
CE No. Description- Adjustment
060 Provide structural steel brackets for arena lighting at the face $1,877
of the Granstand ramp roofs.
063 Provide structural steel light brackets over each of the toilet entrance $238
doorways.
TOTAL $2,115
Not valid until signed by both Owner and AmhneaL
SignaNre of the Contractor indicates his agreement herewith Including any adjustment in the Contract Sum at Contact Time.
The original (GaRtAKt$um) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders.............................................................
The (re6Rtraot,% r ) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (re6Rtraet-$ ) (Guaranteed Maximum Cost) Will be (increased) (decreased) (unchanged)
bythis Change Order.............................................................................................
The new (CaRtmat R-m) (Guaranteed Maximum Cost) including this Change Order will be ...
The Contract Time will be (increased) (0. R aasod) (unchanged) by
The Date of Substantial Completior, N, of rho dale of this Change Order therefore is
Owner: Uontractor:
Eagle County —Facilities Evans -Mendel -Allison Construction, Inc.
"-F O�Box 850 P.O. 8 6
,,I, Ea CO 81631 AV , CO 620
By. L1��1/lr2i e .
Date:
$2,124,639
($57.864)
$2.066,775
$2.115
$2,068,890
7/9/99
0 Days
Architect:
David Lynn Wise, AIA
73017th Street, Suite 915
Denver, CO 80202
Date: z+ Mow
THE AMERICAN INSIIn7rE OF ARCHITECTS, 1735 NEW YORK AVE., NW.. WASHINGTON, O.C. 20008 G701-1978
M9S
CHANGE "e
ORDER
AIA DOCUMENT G701
PROJECT: Eagle County Rodeo Arena Grandstands
(name, address) 0426 Fairground Road
Eagle, CO 81631
Job Number: 02MBS
TO (Contractor): Evans -Mendel -Allison Construction, Inc.
P.O. Box 8266
Avon, CO 81620
You are directed to make the following changes in this Contract:
CE No. Description
Distribution to:
OWNER QX
ARCHITECT QX
CONTRACTOR QX
FIELD Q
OTHER Q
CHANGE ORDER NUMBER:
INTITIATION DATE:
ARCHITECTS PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
067 Change chain link gates from 10'-0" openings to 20'-0" openings
1M
007
24 dar-99
Eagle County Rodeo Arena Grandstands
11.09.98
Adiustment
$388
TOTAL $388
Not wlid until signed by both Ovmer and Amhdect
Signawfe &me ContraeUx eidicaivsA g nt heremalh.'ncluding any adjustment in the Combed Sumo, Contract Time.
The original (C oAta4L ) (Guaranteed Maximum Cost) was .............................................
Net Change by previously authorized Change Orders.............................................................
The (CaRlgiat Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................
The (ConuaciZu ) (Guaranteed Maximum Cost) will be (increased) (desroaead) (uRchaR9ed)
bythis Change Order.............................................................................................
The new (Contact -Sum) (Guaranteed Maximu.-n Cost) including this Change Order Will be ...
The Contract Time will be (increased) (d:ahsasale7 (unchanged) by
The Date of Substantial Completion as nt the d.;:e of this Change Order therefore is
Contractor:
Evans -Mendel -Allison Construction, Inc.
Av , CO 620
Date: -WA 49
$2,124,639
($55,749)
$2,068,890
$388
52,069.278
0 Days
7/9/99
Architect:
David Lynn Wise, AIA
730 17th Street, Suite 916
Denver, CO 80202
B/ H.a. (I11tiec.,
Date: z a MQ:01
AIA Document G701 - CHANGEORDER - Apn11978EDITION - AIA COPYRIGHT1978
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW.. WASHINGTON. D.C. 20DO6 G701 .1978