CHANGE ORDER NUMBER 1
CONTRACTOR: Site Resource Management, Inc.
Contract for Lake Creek Bridge Abutments and Bridge Installation Project
Contract Date December 14, 1998
TO: Chris Fedrizzi, Site Resource Management, Inc.
You are directed to make the changes noted below in the Subject
Contract. County represents that lawful appropriations to cover the
costs of the additional work described in this change order have
been made.
EAGL OU BOARD OF COUNTY COMMISSIONERS
Y
By.
9hairman
Date: I -- /5;; Zy �W
Nature of Changes:
DESCRIPTION INCREASE DECREASE
Sub -Excavation of East Footing $3543.00
including Installation of Approved Fill Material
as per the recommendations of
Hepworth-Pawlak Geotechnical and
Jerry Brasher of Eagle County
L�
Change Order No. 1
Page 2
These changes result in the following adjustment of Contract Price and Contract Time:
Contract Price Prior to this Change Order $ 49,460
Net Increase Resulting from this Change Order $ 3,543
Current Contract Price Including this Change Order $ 53,003
Contract Time Prior to this Change Order Jan. 29, 1999
Net Resulting from this Change Order no change
Current Contract Time Including this Change Order Jan. 29, 1999
The above changes are recommended:
*4"t g�A
Ellie Caryl
Project Manager
Eagle County Regional Transportation Authority
Jerry Bt;gineer
sher
•, Project
Eagle County Engineering
The above changes are accepted:
Contractor
Title: V P:i-e_ S
Date: f —77 — } y
EAGLE'6OARD OF COUNTY COMMISSIONERS
AGENDA REQUEST & STAFF RECOMMENDATION FORM
TITLE Change Order for Lake Creek Pedestrian and Bicycle Bridge Project
LOCATION Lake Creek and Highway 6 in West Edwards
STAFF CONTACT/PRESENTER Ellie Caryl and Jerry Brasher
DEPARTMENT Eagle County Regional Transportation Authority
and Eagle County Engineering Department
REQUESTED HEARING DATE Jan.19,1999
CONSENT CALENDAR Yes
LENGTH OF TIME REQUESTEDIREQUIRED n/a
HAVE THE DOCUMENTS TO BE SIGNED BEEN REVIEWED & APPROVED BY THE
COUNTY ATTORNEY? Yes
IF THIS IS A CONTRACT OR OTHER ITEM REQUIRING AN EXPENDITURE, IS THE
FULL AMOUNT TO COVER THIS REQUEST IN THE CURRENT APPROVED
BUDGET? Yes
PROJECT/CONTRACT DESCRIPTION: The Contract for the Lake Creek Bridge
Abutment Construction and Installation was approved on December 14, 1998. Work
was progressing until a pocket of unstable soils and groundwater were encountered
under the east abutment site. The soils engineer recommended that the soils be over -
excavated and fill material imported to correct the problem. The cost of the change
order is $3,543.
STAFF RECOMMENDATION: Approval
BASIS FOR RECOMMENDATION:
The Project Engineer and the Project Manager concurred with the Soils Engineer that
the foundation for the abutments would be seriously affected if the recommended
remedy was not pursued and pursued immediately to prevent continuous saturation of
the excavation site and several other negative consequences.
PROPOSED MOTION
I move that the chairman be authorized to sign the Change Order for the Lake Creek
Pedestrian and Bicycle Bridge Abutments and Installation project in the amount of
$3,543.