No preview available
HomeMy WebLinkAboutC02-120 Granite Construction Company_change order 3EGE-2198 STATE OF: Colorado AIP PROJECT NO.: 3-08-0020-26 & 27 NAME OF AIRPORT: Eagle County Regional Airport LOCATION: Eagle, Colorado CONTRACTOR: Granite Construction Company SCHEDULE NO.: One 1 & Two 2 CHANGE ORDER NO. THREE (3) TO Granite Construction Company, CONTRACTOR: YOU ARE HEREBY ORDERED TO MAKE THE FOLLOWING CHANGE IN THE PLANS AND/OR SPECIFICATIONS FOR THE ABOVE DESIGNATED PROJECT. 1. DESCRIPTION OF CHANGE TO BE MADE: Final quantity adjustments to match final pay quantities and settlement. 2. REASON FOR ORDERING CHANGE: To adjust quantities to match cost estimate and settlement. 3. SETTLEMENT FOR THE COST OF THE MENTIONED CHANGE IS TO BE MADE AS FOLLOWS: See attachments for the descriptions of adjusted quantities. THIS CHANGE ORDER INCREASES DECREASES THE CONTRACT TIME BY 0 CALENDAR DAYS. 4. SUMMARY OF COSTS: NET (INCREASE) (DEGR€AS€) OF THIS CHANGE ORDER $ 299,338.47 TOTAL (INCREASE) (DECREASE) OF ALL PREVIOUS CHANGE ORDERS 1,424,088.00 (Revised) TOTAL (INCREASE) (PEGR€AS€) OF ALL CHANGE ORDERS TO DATE 1,723,426.47 TOTAL ESTIMATED CONTRACT COSTS $6,426,128.47 NOTE: THIS ORDER IS NOT EFFfFCTIVE UNTIL SIGNED BY THE ENGINEERING SECTION AIRPORTS DIVISION FEDERAL AVIATION ADMINISTRAT N. eid"AGREED TO BY: D SPONSOR'S AUTHORIZED R TITLE A AGREED TO BY: CONTRACTOR'S 77 REP. TITLE "IA T AGREED TO BY: _ ENGINEERING SECTION, AIRPORTS DIVISION, FAA TITLE DATE Page 1 m:lfonnsURcldEnginc«inglPcrodiccostEs Lxls Page 2 ; INVOICE NO.7 EAGLE COUNTY REGIONAL AIRPORT EAGLE COUNTY, COLORADO SPONSOR NAME: EAGLE COUNTY REGIONAL AIP Project No. 3-08-002A-26, 27 PAS JOB # 12234.902 CONTRACTOR: Granite Construction Company ESTIMATE NUMBER: 7 FINAL 1000 North Warm, S rin s Road PERIOD ENDING. December 1 2001 L _ A- \ , :{`•:�:.::}ti :'.{�':{':{{1\}{iy .:•{:L{\L{{::L�:�}}ti{},j} ••{S,S'::r{N{{/.{{�• tii:f i {�} WIN Y• '•}{'ti:•�.: t ti/}�.• •L:: f:•.•}.:•:'•.ti{"u:{•1..{•Lti}ti :J �}1�{L}.•.'�•.ti• 1ti}xYA\•.}1 ••1� .��.1}y K'i '.�•.,• N } � N N LY Y •.• NN\ K' • •Y • , \ N "`K ttt•.t •t :L:Y.Y.. h h::: X • •i lJfJJJ.Y.'.\1V.•.L 11 Lt,t,tL LL .�.�[.^��L��; • • )Jy}yy,� .•:51,�{� ... ...TM1T:{,•�1.�{NL�'.N}},}\{41\\N{NY.\t{tiff{{ ..1\}x'�•• . f'• ,,�} }• • Yn• .LLY.A•• ..... .. .. • •. .. . ...... ' . ... •. .. . .... . T�^.` J••�lt •IiR•••x•Y} -107a Remove/Reistall Existing Supplemental Wind Cone, 8 1 Ea. $1,600.00 $1,600.00 0.00 $0.00 1.00 $1,600.00 1.00 $1,600.00 100.00 Foot -107b Remtove/Reistall Existing Supplemental Wind Cone Power Frame 1 Ea. $1,200.00 $1,200.00 0.00 $0.00 1.00 $1,200.00 1.00 $1,200.00 100.00 -107c Install Windeono Power Frame (C.O. #1) 1 Ea. $3,000.00 $3.000.00 0.00 $0.00 1.00 $3,000.00 1.00 $3,000.00 100.0 ' -108a Install Cable,l/C #8, 5000V, L-824 C (C.O. #1) 53,200 L.P. $0.63 $33,516.00 0.00 $0.00 53,200.00 $33,516.00 53,200.00 $33,516.00 100.00 -108b Install Counterpoise Wire Including Ciround Rods and Ground Connectors 440 L.P. $2.90 $1,276.00 0.00 $0.00 450.00 $1,305.00 450.00 $1,305.00 102.27 -108c Install Cable, LC #8, Bare Copper (C.O. #1) 16,600 L.F. $0.75 $12,450.00 0.00 $0.00 16,600.00 $12,450.00 16,600.00 $12,450.00 100.00 -110a Install 1-2 Inch PVC Duct (DEB) (C.O. #1) 24,795 L.P. $3.00 $74,385.00 0.00 $0.00 25,439.00 $76,317.00 25,439.00 $76,317.00 102.60 -110b Install 1-2 Inch PVC Duct (CE) 830 L.F. $9.50 $7,885.00 0.00 $0.00 891.00 $8,464.50 891.00 $8,464.50 107.35 110e Install 1-2 Inch PVC Duct (CE) iuExisting Pavement (C.O. #1) 1,293 L.F. $30.00 $38,790.00 0.00 $0.00 1,293.00 $38,790.00 1,293.00 $38,790.00 100.00 -110d Install 2-3 Inch PVC Duct (CE) (C.O. #1) Install 2-3 Inch PVC Duct (CIE) In Existing Pavement 797 L.F. $16.00 $12,75100 0.00 $0.00 890.00 $14,240.00 890.00 $14,240.00 111.67 86.76 110e 110f L-110g 110h (C.O. #1) Install 4-3 Inch PVC Duct (CE) (C.O. #1) Install 4-3 Inch PVC Duct (CE) In Existing Pavement Install 1 2 Inch PVC Duct (CE) in Existing Pavement For Future CL Lights C.O. #1 355 220 200 4,875 L.F. L.P. L.F. L.P. $35.00 $32.00 $50.00 $30.00 $12,425.00 $7,040.00 $10,000.00 $146,250.00 0.00 0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 308.00 220.00 210.00 4,875.00 $10,780.00 $7,040.00 $10,500.00 $146,250.00 308.00 22.0.00 210.00 4,875.00 $10,780.00 $7,040.00 100.00 $10,500.00 105.00 $146,250.00 100.00 -110i 125a -125b Install 4-4 Inch PVC Duct (CE) (C.O. #1) Remove Exisitu L-861 Runway Ede Light (C.O. #1) Reinstall Existing L-861 Runway Edge Light On New Base (C.O. #1 100 79 71 L.F. Ea. Ea. $36.00 $121.09 $679.00 $3,600.00 $9,559.00 $48,209.00 0.00 0.00 0.00 $0.00 $0.00 $0.00 100.00 79.00 79.00 $3,600.00 $9,559.00 $53,641.00 100.00 79.00 $3.600.00 $9,559.00 100.00 100.00 79.00 $53,641.00 111.27 125e Remove/Reinstall L-861 Runway Threshold Light On New Base 8 Ea. $467.00 $3,736.00 0.00 $0.00 8.00 $3,736.00 8.00 $3.736.00 100.0 -125d RemovelReinstall L-858 Taxiway Sign, (2P,S1) on New Base (C.O. #1) 15 Ea. $824.00 $12,360.00 0.00 $0.00 14.00 $11,536.00 14.00 $11,536.00 93.33 125e Remove/Reinstall L-858 Taxiway Sign, (3P,S1) on New Base 5 Ea. $886.00 $4,430.00 0.00 $0.00 5.00 $4,430.00 5.00 $0430.00 100.00 125f RemAove/Reinstall MR RDR Sign, (1P,S4) on New Base 5 Ea. $886.00 $4,430.00 0A0 $0.00 5.00 $4,430.00 5.00 $4,430-00 100.00 L-125g RemoveL-867 Junction Box (C.O. #1) Install L-867 Junction Box, Size D, 4-Hub, Complete 24 Ea. $79.00 $1,896.00 0.00 $0.00 22.00 $1.738.00 22.00 $1,738A0 91.6? 14.00 $4,858.00 82.35 125h (C.O. #1) Install L-850C Semi Plush Runway Edge Light, Complete 17 Ea. $347.00 $5,899.00 0.00 $0.00 14.00 $4,858.00 $4,620.00 $3,736.00 $4,200.00 $1,580.00 $1,240.00 2.00 8.00 8.00 79.00 62A0 $4,620.00 $3,736.00 $4,200.00 $1,580.00 $1.240.00 100.00 100.00 140.00 100.00 100A0 -125i (C.O. #1) -125' Adjust L-861SE Runway Threshold Light -125k InstallL-868 Junction Box, Size C. Complete -126a RemoveL-853 RetroretlectiveMarker in Soil (C.O. #1) -126b Reinstall L-853 Retroreflective Marker in Soil C.O. #I 2 8 5 79 62 Ea. Ea. Ea. Ea. Ea. $2,310.00 $467.00 $600.00 $20.00 $20.00 .620.001 3,736.001 $3,000.00 $1,580.00 $1.?j10.0Q 0.00 0.00 0.00 0,00 0.00 $0.00 $0.00 $0.00 $0.00 $0.001 2.00 8.00 7.00 79.00 62.00 ru %fm=UR eldFngine«ing%Pcro&cCostFstxts Page 3 $105,0.0 $60,060.00 $90,150.00 $78,960.00 $135,300.00 $9.79 $1,300.00 $4,560.00 $836,689.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.Q0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1.32 $138,60000 F-630a 110d- Mobilization Unclassified Excavation (C.O. #1 Sub de Pr aration (C.O. #1) Place and Co act 909 ' ' Tani C.O. #1 BituminousPav' Course, (1-1/4InchMix) Bituminous Paving Course, (1 Inch Mtx) C.O. #1) Modified Bituminous Material C.O. #1) Tack Coat Insta112-3 Inch PVC Duct CE SCE[EDULE II TOTAL 1 23,100 60,100 15,040 4,100 10,950 979 2,000 285 L.S. C.Y. S.Y. C.Y. Ton Ton Ton Ohl, L.F. $105,000.00 $2.60 $1.50 $5.25 $33.00 $33.00$361,350.00 $0.01 $0.65 $16.00 1.32 $138,6- 132.00 23,100.00 60,100.00 15040.00 4,100.00 $60,060.00 $90,150.00 $78,960.00 $135,300,00 23,100.00 60,100.00 15,040.00 4,100,OQ $60.060.00 $90,ISO.QO $78,960.00 $135,300.Q0 100.00 100.00 100,00 100.00 1Q950.00 900,00 2,000.00 285.00 $361,350.0010,950.00 $9,00 $1,3$9.00 70289.00 $870,289.00 900.00Bituminous 2,000.00 285.00 $361,350.00 $9.00 $1,300.00 $4,560.00 $870289.00 100.00 91.93 100A0 100.00 104,02% LI CERTIFiCi it aVl \ W4 L = R .. n r L;L"KLIL4 Y Mat t$e work pedorined and the materials supplied to date, as shown on this periodic cost accomplishment under the terms of this contract in conformitywith approved plans and P � went the actual value of PPr P specifications; that the quantities shown were properly dettcm = been full compliance with 111abor provisi included in the contract identified above, and in all subcontracts made under this contract, BY: �Z 0/ shill Divisi ytheo Infrastructure Fme. Da a BY: &ON m:lfo=%SReldEngineminglperodiceDstEsLxls 10-29-01; 4:21PM;EAGLE COUNTY AIRPORT Isblll ;9705248247 # 1/ 'r2RR111TE �•►' formerly Gibbons & Reed Company C(InsirRucirion s compou SINCE 1922 October 24, 2001 Eddie Storer Airport Manager Eagle County Regional Airport PO Box 850 Eagle, CO 81631 Re: Eagle County Airport AIP No- 3-08-0020-27 Mr. Storer, of We are in receipt of your letter of October 16 and accept your settlement terms. Please include the additional $96,168.48 on the final estimate along with our retention and we will sign and return the estimate to you. Sin ly, Carter Ro u Project M ge Utah Operations Warm Springs Office mailing Ogden Office Mailing 1000 North Warm Springs Road RO Box 30429 1555 South 1900 West P.O. Box 1477 Salt Lake City, Utah 84116 Salt Lake City, Utah 84130 West Haven, Utah 84401 Ogden, Utah 84402 (801) 526-6000 (801) 731-3181