HomeMy WebLinkAbout230 Spring Creek Park Ranch Rd - 239110401002 - 1847-99ISINDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
EAGLE COUNTY ENVIRONMENTAL HEALTH DIVISION
P.O. Box 179 - 500 Broadway • Eagle, CO 81631
Telephone: (970) 328-8755
COPY OF PERMIT MUST BE POSTED AT INSTALLATION SITE. PERMIT NO. 1847-99 BP NO. 12408
OWNER: TERRY ROGERS PHONE: 970-544-0737
MAILING ADDRESS: P.O. BOX 2240, ASPEN, CO 81612
APPLICANT: JENSEN HOMES, KEN JONCKILA PHONE: 970-544-8036
SYSTEM LOCATION: LOT #5, SPRING PARK RANCHES, EL JEBEL TAX PARCEL NO. 2391-101-01-002
LICENSED INSTALLER: STUTSMAN/ GERBAZ, INC., CHARLES MONTOVER LICENSE NO. 9-99 PHONE: 970-923-2734
DESIGN ENGINEER: LKP ENGINEERING, LUIZA PETROVSKA PHONE NO. 970-926-9088
INSTALLATION HEREBY GRANTED FOR THE FOLLOWING:
1000 GALLON 3-COMPARTMENT CONCRETE SEPTIC TANK WITH A LIFT STATION, 390 SQUARE FEET OF MOUNDED ABSORPTION AREA,
WITH A BASAL AREA OF 3,132 SQUARE FEET, AS PER ENGINEER'S DESIGN.
SPECIAL REQUIREMENTS: INSTALL AS PER ENGINEER'S DESIGN DATED 7/8/99. ENGINEER IS RESPONSIBLE FOR FINAL INSPECTION.
BUILDING CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL THE SEPTIC SYSTEM HAS RECEIVED FINAL APPROVAL.
ENVIRONMENTAL HEALTH APPROVAL: MICHELE CURRAN DATE: JULY 16, 1999
CONDITIONS:
1. ALL INSTALLATIONS MUST COMPLY WITH ALL REQUIREMENTS OF THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS,
ADOPTED PURSUANT TO AUTHORITY GRANTED IN 25-10-104, 1973, AS AMENDED.
2. THIS PERMIT IS VALID ONLY FOR CONNECTION TO STRUCTURES WHICH HAVE FULLY COMPLIED WITH COUNTY ZONING AND BUILDING
REQUIREMENTS, CONNECTION TO OR USE WITH ANY DWELLING OR STRUCTURE NOT APPROVED BY THE ZONING AND BUILDING DEPARTMENTS
SHALL AUTOMATICALLY BE A VIOLATION OF A REQUIREMENT OF THE PERMIT BOTH LEGAL ACTION AND REVOCATION OF THE PERMIT.
3. CHAPTER IV, SECTION 4.03.29 REQUIRES ANY PERSON WHO CONSTRUCTS, ALTERS OR INSTALLS AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM TO
BE LICENSED.
FINAL APPROVAL OF SYSTEM (TO BE COMPLETED BY INSPECTOR):
NO SYSTEM SHALL BE DEEMED TO BE IN COMPLIANCE WITH THE EAGLE COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM REGULATIONS UNTIL
THE SYSTEM IS APPROVED PRIOR TO COVERING ANY PORTION OF THE SYSTEM.
INSTALLED ABSORPTION OR DISPERSAL AREA: 390 SQUARE FEET (VIA MOUNDED ABSORPTION AREA, AS PER ENGINEER'S DESIGN)
INSTALLED CONCRETE 2- COMPARTMENT SEPTIC TANK: 1000 GALLONS IS LOCATED 85 FEET FROM THE 2ND CLEANOUT
INSTALLED CONCRETE DOSING TANK: 500 GALLONS IS LOCATED DEGREES AND 10 FEET FROM THE LEACH FIELD
SEE SITE PLAN FOR SYSTEM COMPONENT LOCATIONS
COMMENTS: ENGINEER FINAL CERTIFICATION RECEIVED 1/31/00. THIS SYSTEM IS LARGE ENOUGH TO ACCOMMODATE A 3 BEDROOM
RESIDENCE.
ANY ITEM NOT MEETING REQUIREMENTS WILL BE CORRECTED BEFORE FINAL APPROVAL OF SYSTEM IS MADE. ARRANGE A RE -INSPECTION WHEN
WORK IS COMPLETED.
ENVIRONMENTAL HEALTH APPROVAL DATE: FEBRUARY 3, 2000
I;IL;omplete•Applications Will NOT Be Accepted
(Site Flan MUST be attached)
ISDS Permit # `� - 17
Building Permit # / _ Y 0 ?
APPLICATION FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT
ENVIRONMENTAL HEALTH OFFICE. --EAGLE COUNTY
P. 0. BOX 179
EAGLE, CO 81631
328-8755/927-3823 (Basalt)
* PERMIT APPLICATION FE $150.00 PERCOLATION TEST FEE $200.00
* MAKE ALL REMITTANCE PAYABLE'TO: "EAGLE COUNTY TREASURER'!
PROPERTY OWNER:
v
01
MAILING ADDRESS: T,22
-
���1�y� 1�.-`G� PHONE: 17lJ-.Sr/��7e
APPLICANT/CONTACPERSON: �/1�r3 �/Gw�/C�./oa �J�,,, c%tte• PHONE:
LICENSED SYSTEMS CONTRACTOR: PHONE:`
COMPANY/DBA: ADDRESS:.
PERMIT APPLICATION IS FOR: V() NEW INSTALLATION ( ) ALTERATION ( ) REPAIR
LOCATION OF PROPOSED INDIVIDUAL SEWAGE DISPOSAL SYSTEM:
Legal Description:
Tax Parcel Number: �� c� t - Lot Size: v]_L14l��
Physical Address: %
��
BUILDING TYPE:. (Check applicable category)
()0 Residential/Single Family Number of Bedrooms �.-
(.) Residential/Multi-Family* Number of Bedrooms.
( ) Commercial/Industrial* Type
TYPE OF WATER SUPPLY: (Check applicable category)
(j() Well ( ) Spring ( ) Surface
( ) Public Name of Supplier:
*These systems requir deg&ign b a Registered Professional Engineer
SIGNATURE: Date: 2-lb
******************* ************************ ******************************
AMOUNT PAID: l J/ RECEIPT DATE:
CHECK #: 307f4,P CASHIER:
Community Development Department
(970) 328-8730
FAX (970) 328-7185
TDD (970) 328-8797
Email: eccmdeva@vail.net
http: //www.eagle-county.com
February 3, 2000
EAGLE COUNTY, COLORADO
Eagle County Building
P.O. Box 179
500 Broadway
Eagle, Colorado 81631-0179
Terry Rogers
P.O. Box 2240
Aspen, CO 81612
RE: Final of ISDS Permit #1847-99, Tax Parcel #2391-101-01-002. Property location: 230
Spring Park Ranch Rd., El Jebel, CO.
Dear Mr Rogers:
This letter is to inform you that the above referenced ISDS Permit has been inspected and
finalized. Enclosed is a copy to retain for your records. This permit does not indicate.
compliance with any other Eagle County requirements. Also enclosed is a brochure regarding
the care of your septic system.
Be aware that later changes to your building may require appropriate alterations of your septic
system.
If you have any questions regarding this permit, please contact the Eagle County Environmental
Health Division at (970) 328-8755.
Sincerely,
Janet Kohl
Environmental Health Department
Eagle County Community Development
ENCL: Informational Brochure
Final ISDS Permit
cc: files
Community Development Department
(970)328-8730
FAX (970) 328-7185
TDD (970) 328-8797
Email: eccmdeva@vail.net
http: //www.eagle-county.com
EAGLE COUNTY, COLORADO
Date: July 14, 1999
TO: Stutsman/Gerbaz, Inc.
Eagle County Building
P.O. Box 179
500 Broadway
Eagle, Colorado 81631-0179
FROM: Environmental Health Division
_ RE:. Issuance of Individual Sewage Disposal_System Permit No. 1847-99. Tax Parcel.
# 2391-101-01-002. Property Location: 230 Spring Park Ranch Rd., Carbondale,
CO., Rogers caretaker unit.
Enclosed is your ISDS Permit No. 1847-99. It is valid for 120 days. The enclosed copy of the
permit must be posted at the installation site. Any changes in plans or specifications
invalidates the permit unless otherwise approved: -
Systems designed by a Registered Professional Engineer must be certified by the Engineer
indicating that the system was installed as specified. Eagle County does not perform final
inspections on engineer designed systems. Your TCO will not be issued until our office
receives this certification.
Permit specifications are minimum requirements only, and should be brought to the property
owner's attention.
This permit does not indicate conformance with other Eagle County requirements.
If you have any questions, please feel free to contact the Environmental Health Division at 328-
8755.
cc: files
LKP Engineering, Luiza Petrovska
1(+AKumar &Associates, Inc.°
Geotechnical and Materials Engineers 5020 County Road 154
and Environmental Scientists Glenwood Springs, CO 81601
phone: (970) 945-7988
""'�•� �' fax: (970) 945-8454
email: kaglenwood@kumarusa.com
An Employee Owned Company www.kumarusa.com
Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Sumni t County, Colorado
March 2, 2020
Greg Didier & Terry Rogers
c/o Divide Creek Builders
Attn: Max Filiss
75 N. 2nd Street, Suite B
Carbondale, Colorado 81623
max@dividecreekbuilders.com
Project No. 20-7-129
Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot 5, Spring Park
Ranches, Spring Park Ranch Road, Missouri Heights, Eagle County, Colorado
Dear Greg & Terry:
As requested, Kumar & Associates, Inc. performed a subsoil study for design of foundations at
the subject site. The study was conducted in accordance with our agreement for geotechnical
engineering services to you dated February 4, 2020. The data obtained and our
recommendations based on the proposed construction and subsurface conditions encountered are
presented in this report.
Proposed Construction: The proposed residence will be a one and two story structure over a
crawlspace with an attached garage, located on the site as shown on Figure 1. Ground floor will
be structural over crawlspace and slab -on -grade in the garage. Cut depths are expected to range
between about 3 to 5 feet. Foundation loadings for this type of construction are assumed to be
relatively light and typical of the proposed type of construction.
If building conditions or foundation loadings are significantly different from those described
above, we should be notified to re-evaluate the recommendations presented in this report.
Site Conditions: The building area was vacant and vegetated with oak and sage brush. There is
an existing two-story barn/residence to the southwest. The building area slopes moderately
down to the southeast. There was about 18 inches of snow on the site at the time of our field
exploration.
Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating
three exploratory pits at the approximate locations shown on Figure 1. The logs of the pits are
presented on Figure 2. The subsoils encountered, below about 1 to 2 feet of topsoil, consist of
mostly dense, clayey sand and gravel with cobbles and small boulders. There was two feet of
Jensen Homes
April20, 1999
Page 2
cobbles and boulders. Results of a gradation analyses performed on samples of the
gravels (minus 5 inch fraction) obtained from the site are presented on Fig. 3. No free
water was observed in the pits at the time of excavation and the soils were slightly moist
to moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural gravels designed for an allowable soil bearing
-pressure of 3,000 psf for support of the proposed residence. Footings should be a
minimum width of 16 inches for continuous walls and 2 feet for columns. Loose and
disturbed soils encountered at the foundation bearing level within the excavation should
be removed and the footing bearing level extended down to the undisturbed natural
gravels. Exterior footings should be provided with adequate cover above their bearing
elevations for frost protection. Placement of footings at least 42 inches below the
exterior grade is typically used in this area. Continuous foundation walls should be
reinforced top and bottom to span local anomalies such as by assuming an unsupported
length of at least 10 feet. Foundation walls acting as retaining structures should be
designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at
least 45 pcf for the on -site gravels, exclusive of oversized rock, as backfill.
Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support
lightly loaded slab -on -grade construction. To reduce the effects of some differential
movement, floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints
should be used to reduce damage due to shrinkage cracking. The requirements for joint
spacing and slab reinforcement should be established by the designer based on
experience and the intended slab use. A minimum 4 inch layer of free -draining gravel
should be placed beneath slabs -on -grade to facilitate drainage and act as a leveling
course. This material should consist of minus 2 inch aggregate with less than 50%
passing the No. 4 sieve and less than 2% passing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95 % of
maximum standard Proctor density at a moisture content near optimum. Required fill
can consist of the on -site soils devoid of vegetation, topsoil and oversized rock.
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95 % of the maximum standard Proctor density in
H-P GEOTECH
- - .- .1. JJ J rw JLV juwJ
"r,r GIYL7II`ICGICII`I47, 11`I4, rr4Ut U l
CIVUJOEo
January 31, 2000
Ms. Lisa.Haataja
3ensen Homes .
303 AAABC, Suite J J.
.Aspen, CO 81611
Dear Lisa:
,At your request, and s�
construction site on Lot 5, Sp>
visit was to observe the installat
during the installation of the sy
They installed the syst6i
991 17SD_DWG, dated July 8, V
The building sewer line comes t
cleanout was located 10 feet no!
the garage. The distance betw
tank was 85 feet. The septic tail
Compartment, precast, concrete+;
reviewed from the photdgraph&
11 Su llataon
Lot 5, Sgri �k'l'tes
Eagle Co�Go1n
Project 1t -No. IS47-99
Of Jeff Gerb 0 +0 er 15 1999 we visited the
III, 3 9
;hes, Eagle Co�iC1o: The purpose of our site
tic system_ Zu c►a wi i viewed photographs taken
r4ici +compliance wi
th stem was instal
,west side of th
. ,krance, and a se
aattouts was 50
v0" est from the b
A second AM
Umfls for the pump.
feet. v
The mound ditlmensions't1sod
were as slaoi
between the laterals was 5 afeetY'v the ainauu
capped at the ends. Inspection lied at both
�� do not hesib
If you have any cluestitl4' � ` ,.:
Ao
AT"
Sincerely,
LKP Engineerin , _z�,p•
�ulzen Petrovska, Pllll <'t` i"�..
President
'-TI
yttelltt doSign, Drawing No.
M. the alcove -named drawing.
g, nAh ofthe entrmce. One
was A.'the northwest corner of
it Second cleanout to the septic
installe€ .1000-gallon, two-
instalTcd after our inspection, as
e to the 10ound system was 10
drt wjog, except the distance
i syOesn. The laterals were
-f bed.
cc: Nis_ Janet Kohl, Eagle *Dnmental Heal isi ax: 328 0349
.. .
{:t�ayr-Ilex\r_taeldoclWPDd{:S9A1;70di,a'pd _ .. _
.r,
P.O. Box 2837, Edwards, ►' '1AW`(970) 926-9098 f,4 -.`070J-901i9 Pax, E,maii: lkpeng@slloweap.net
.TAN-71 —PPRR MnKi MP • 4RPM Tn- Cnr-i r-' r~nl it i r v �I iS i ~LCGI TLJ onr_r. n
Flepworth-Pawlak Geotechnical, Inc.
5020 County Road 154
tec Glenwood Springs, Colorado 81601
Phone: 970-945-7988
Fax:970-945-8454
hpgeo@hpgeotech.com
April20, 1999
Jensen Homes
Attn: Ken Janckila
303 Aspen Airport Business Center, Suite J
Aspen, Colorado 81611 Job No. 199 266
Subject: Subsoil Study for Foundation Design and Percolation Test, Proposed
Garage/Barn, Lot 5, Spring Park Ranches, Eagle County, Colorado
Dear Mr. Janckila:
As requested, Hepworth-Pawlak Geotechnical, Inc. performed a subsoil study and
percolation test for foundation and septic disposal designs at the subject site. The study
was conducted in accordance with our agreement for geotechnical engineering services
to Jensen Homes dated March 25, 1999. The data obtained and our recommendations
based on the proposed construction and subsurface conditions encountered are presented
in this report.
Proposed Construction: The proposed garage/barn will be a two story wood frame
structure located on the site as shown on Fig. 1. Ground floor is proposed to be a dirt
barn on the lower level. A portion will have slab -on -grade for office. Cut depths are
expected to range between about 3 to 5 feet. Foundation loadings for this type of
construction are assumed to be relatively light and typical of the proposed type of
construction. The septic disposal system is proposed to be located about 175 feet to the
southwest of the proposed residence.
If building conditions or foundation loadings are significantly different from those
described above, we should be notified to re-evaluate the recommendations presented in
this report.
Site Conditions: The site was vacant at the time of our field work. The ground
surface in the building area is relatively flat with a moderate slope down to the
southwest at grades up to about 10%. There is about 4 to 6 feet elevation difference
across the building area. The Monarch Ditch is located about 60 feet downhill to the
southeast of the proposed building. The lot is vegetated with scruboak, sagebrush,
grass and weeds.
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating one exploratory pit in the building area and one profile pit in the septic
disposal area at the approximate locations shown on Fig. 1. The logs of the pits are
presented on Fig. 2. The subsoils encountered, below about 2'/2 feet of topsoil and 1 to
11/2 feet of clay and gravel consist of relatively dense slightly silty sandy gravel with
Jensen Homes
April20, 1999
Page 2
cobbles and boulders. Results of a gradation analyses performed on samples of the
gravels (minus 5 inch fraction) obtained from the site are presented on Fig. 3. No free
water was observed in the pits at the time of excavation and the soils were slightly moist
to moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural gravels designed for an allowable soil bearing
pressure of 3,000 psf for support of the proposed residence. Footings should be a
minimum width of 16 inches for continuous walls and 2 feet for columns. Loose and
disturbed soils encountered at the foundation bearing level within the excavation should
be removed and the footing bearing level extended down to the undisturbed natural
gravels. Exterior footings should be provided with adequate cover above their bearing
elevations for frost protection. Placement of footings at least 42 inches below the
exterior grade is typically used in this area. Continuous foundation walls should be
reinforced top and bottom to span local anomalies such as by assuming an unsupported
length of at least 10 feet. Foundation walls acting as retaining structures should be
designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at
least 45 pcf for the on -site gravels, exclusive of oversized rock, as backfill.
Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support
lightly loaded slab -on -grade construction. To reduce the effects of some differential
movement, floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints
should be used to reduce damage due to shrinkage cracking. The requirements for joint
spacing and slab reinforcement should be established by the designer based on
experience and the intended slab use. A minimum 4 inch layer of free -draining gravel
should be placed beneath slabs -on -grade to facilitate drainage and act as a leveling
course. This material should consist of minus 2 inch aggregate with less than 50 %
passing the No. 4 sieve and less than 2% passing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95 % of
maximum standard Proctor density at a moisture content near optimum. Required fill
can consist of the on -site soils devoid of vegetation, topsoil and oversized rock.
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95 % of the maximum standard Proctor density in
H-P GEOTECH
Jensen Homes
April20, 1999
Page 3
pavement and slab areas and to at least 90 % of the maximum standard
Proctor density in landscape areas. Free -draining wall backfill should be
capped with about 2 feet of the on -site, finer graded soils to reduce
surface water infiltration.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 12 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement
and walkway areas.
4) Roof downspouts and drains should discharge well beyond the limits of
all backfill.
Percolation Testing: Percolation tests were conducted on March 26, 1999 to evaluate
the feasibility of an infiltration septic disposal system at the site. One profile pit and
three percolation holes were dug at the locations shown on Fig. 1. The test ?toles
(nominal 12 inch diameter by 12 inch deep) were hand dug at the bottom of shallow
backhoe pits and were soaked with water one day prior to testing. The soils exposed in
the percolation holes are similar to those exposed in the Profile Pit shown on Fig. 2 and
consist of about 21/2 feet of topsoil and 11/2 feet of clay and gravel overlying dense
sandy gravel with cobbles and boulders. The percolation test results are presented in
Table I. The percolation test results indicated an infiltration rate between 60 and 180
minutes per inch with an average of 110 minutes per inch. The tests were conducted in
the clay and gravel soils. Due to the relatively slow percolation rate, the percolation
holes were deepened and additional percolation tests were conducted in the underlying
sandy gravels on April 6, 1999. The additional tests did not percolate. Eagle County
may require that a civil engineer design the infiltration septic disposal system.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
warranty either expressed or implied. The conclusions and recommendations submitted
in this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Fig. 1, the proposed type of construction and our experience in
the area. Our findings include interpolation and extrapolation of the subsurface
conditions identified at the exploratory pits and variations in the subsurface conditions
may not become evident until excavation is performed. If conditions encountered
during construction appear different from those described in this report, we should be
notified at once so re-evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes.
We are not responsible for technical interpretations by others of our information. As
the project evolves, we should provide continued consultation and field services during
H-P GEOTECH
Jensen Homes.
April 20, 1999
Page 4
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
presented herein. We recommend on -site observation of excavations and foundation
bearing strata and testing of structural fill by a representative of the geotechnical
engineer.
If you have any questions or if we may be of further assistance, please let us know.
Sincerely,
HEPWORTH - PAWLAK G
Jordy Z. Adamson, Jr. P
Reviewed By:
Daniel E. Hardin, P.E.
JZA/ksm
attachments
)TEC INC.
. n�P.p0 REG/s
,,.....,, ,cam
N A 2jS • ;��
ti
2977�,
NAI.•EN
H-P GEOTECH
APPROXIMATE SCALE
1" = 150'
ACCESS RANCH ROAD
�— EASEMENT SPRING PARK
80 / 80
�Q 70 /
/ PROPOSED I
/ GARAGE/BARN
/
P 3 70
0 N PIT 1
!/ PROFILE PIT /
\ P 2A OP 1
\ LOT 5
\\� BUILDING
0
s
LOT 6
ENVELOPE (
IILDING MONARCH
VELOPE IRRIGATION
• DITCH
199 266 1 GEOTECHNICAL, ZINC I ANDAPERCOLATION EXPLORATORY
HOLES S 1 Fig. 1 I
PIT 1
PROFILE PIT
0
0
5
+4--82
a.
..'j
1 +4--81
a
.'' Q•
f -200-7
f -200-9
10
10
LEGEND:
TOPSOIL; sandy silty clay, organic, medium stiff, moist, dark brown.
CLAY AND GRAVEL (CL—GC); silty, sandy, with cobbles and small boulders, stiff, slightly moist
to moist, brown to reddish brown.
' GRAVEL (GP —GM); sandy, slightly silty, with cobbles and boulders up to 1 1 /2 feet in size,
dense to very dense, slightly moist, reddish brown, subrounded rock.
2" Diameter hand driven liner sample.
--1
1 Disturbed bulk sample.
_J
NOTES:
1. Exploratory pits were excavated on March 25, 1999 with a backhoe.
2. Locations of exploratory pits were measured approximately by pacing from features on the site
plan provided.
3. Elevations of exploratory pits were not measured and logs of exploratory pits are drawn to depth.
4. The exploratory pit locations should be considered accurate only to the degree
implied by- the method used.
5. The lines between materials shown on the exploratory pit logs represent the approximate
boundaries between material types and transitions may be gradual.
6. No free water was encountered in the pits at the time of excavating.
Fluctuations in water level may occur with time.
7. Laboratory Testing Results:
+4 = Percent retained on No. 4 sieve
—200 = Percent passing No. 200 sieve
199 266 I HEPWORTH - PAWLAK' LOGS OF EXPLORATORY PITS Fig. 2
GEOTECHNICAL, INC. L --
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE 1
PERCOLATION TEST RESULTS JOB NO. 199 266
HOLE NO.
HOLE DEPTH
(INCHES)
LENGTH OF
INTERVAL
(MIN)
WATER DEPTH
AT START OF
INTERVAL
(INCHES)
WATER DEPTH
AT END OF
INTERVAL
(INCHES)
DROP IN
WATER
LEVEL
(INCHES)
AVERAGE
PERCOLATION
RATE
(MIN./INCH)
P-1
30
15
5 3/4
5
3/4
60
5
4 1/2
1/2
4 1/2
4 1/4
114
4 1/4
4
1/4
4
3 3/4
114
P-2
38
15
6 3/4
6
3/4
180
6
5314
1/4
5 3/4
5 1/2
1/4
5 1/2
5 1/2
0
5 1 /2
5 1 /2
0
P-3
42
15
7 3/4
71/2
1/4
90 11
71/2
71/2
0
71/2
71/2
0
71/2
7 1/4
1/4
7114
7
1/4
NOTE: Percolation tests were hand dug in the bottom of backhoe pits on March 25, 1999. Percolation tests were conducted
on March 26, 1999. The average percolation rate was based on the last three readings of each test.
Z-d - O. Cf c6w"
Hepworth-Pawlak Ceotechnical, Inc.
5020 County Road 154
Glenwood Springs, Colorado 81601
Phone: 970-945-7988
Fax:970-945-8454
hpgeo@hpgeotech.com
April20, 1999
Jensen Homes
Attn: Ken Janckila
303 Aspen Airport Business Center, Suite J
Aspen, Colorado 81611 Job No. 199 266
Subject: Subsoil Study for Foundation Design and Percolation Test, Proposed
Garage/Barn, Lot 5, Spring Park Ranches, Eagle County, Colorado
Dear Mr. Janckila:
As requested, Hepworth-Pawlak Geotechnical, Inc. performed a subsoil study and
percolation test for foundation and septic disposal designs at the subject site. The study
was conducted in accordance with our agreement for geotechnical engineering services
to Jensen Homes dated March 25, 1999. The data obtained and our recommendations
based on the proposed construction and subsurface conditions encountered are presented
in this report.
Proposed Construction: The proposed garage/barn will be a two story wood frame
structure located on the site as shown on Fig. 1. Ground floor is proposed to be a dirt
barn on the tower level. A portion will have slab -on -grade for office. Cut depths are
expected to range between about 3 to 5 feet. Foundation Ioadings for this type of
construction are assumed to be relatively light and typical of the proposed type of
construction. The septic disposal system is proposed to be located about 175 feet to the
southwest of the proposed residence.
If building conditions or foundation loadings are significantly different from those
described above, we should be notified to re-evaluate the recommendations presented in
this report.
Site Conditions: The site was vacant at the time of our field work. The ground
surface in the building area is relatively flat with a moderate slope down to the
southwest at grades up to about 10%. There is about 4 to 6 feet elevation difference
across the building area. The Monarch Ditch is located about 60 feet downhill to the
southeast of the proposed building. The lot is vegetated with scruboak, sagebrush,
grass and weeds.
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating one exploratory pit in the building area and one profile pit in the septic
disposal area at the approximate locations shown on Fig. 1. The logs of the pits are
presented on Fig. 2. The subsoils encountered, below about 21/2 feet of topsoil and 1 to
1'/2 feet of clay and gravel consist of relatively dense slightly silty sandy gravel with
Page 7
the septic tank. We recommend Valley Precast out of Buena Vista be contracted for start-up of the pumping
system.
Pump Table
Dose Range
Max = 118.5 gal. (450 GPD x
Min. 58 gal. (13 gal x 4) + 6 gal
25% + 6 gal drain back)
drain back
Dose Setting
75 gallons/dose
6 gallons drain back (60' / 1.5"
diameter pump line
Float Separation
1500 gallon 2-compartmet Valley
8" on/off float separation
Precast concrete septic tank
Pump Criteria
27.2 gallons per minute (GPM)
25.5 feet total dynamic head
TDH
Effluent will be pumped through a 1.5-inch diameter pump line from the pump chamber to an Orenco®
automatic distributing valve (ADV), model 6402. This pump line must have a minimum 1 % grade for proper
drain back into the tank after each pump cycle. The ADV must be placed a high point in the system and be
placed in an insulated riser with access from grade. Screened rock must be placed below the ADV to
support the ADV and to assure the clear pipes exiting the ADV remain visible for future inspection and
maintenance.
Effluent will be pressure dosed to a 12' x 58' partially mounded unlined sand filter. The excavation for the
sand filter will begin 2.0-foot below native grade. A minimum of 3-feet of sand filter material will be installed
in the over -excavated footprint, resulting in 1-foot of sand filter material extending above native grade. Sand
filter material must be clean, coarse sand, all passing a screen having four meshes to the inch. The sand
must have an effective size between 0.15 and 0.60 mm. The uniformity coefficient must be 7.0 or less.
Material meeting ASTM 33, for concrete sand, with three percent or less fines passing 200 mesh sieve may
be used. A gradation of the sand media must be provided.
Two laterals will be connected with a level manifold, creating two zones served by the Model 6402 ADV.
Laterals used to disperse the effluent must be surrounded by washed coarse screened gravel or crushed
stone. All of the gravel or stone must pass a 2'/z-inch screen and must be retained on a 3/-inch screen. The
manifold must be 1.5-inches in diameter. Laterals must be 1.5-inches in diameter with 5/32-inch diameter
orifices facing down, spaced 3-feet on center (OC). We recommend Orenco® Orifice Shields be installed on
the laterals at each orifice. Laterals will begin 2-feet from the edges of the filter, with 2-feet between each
zone. Each 1.5-inch diameter lateral must end in a sweeping ell facing up with a ball valve for flushing. A
soil separation fabric should be placed over the gravel layer followed by approximately 1-foot of topsoil or
other suitable soil able to support vegetative growth.
The mound must have a minimum 3:1 slope (horizontal:vertical); therefore, the basal area will extend
approximately 9-feet beyond the sand filter on all sides (with a mound height of 3-feet above native grade).
Soils in the sloped perimeter areas of the mound must be well draining and able to support vegetative
growth. The mound must be crowned in a manner to promote drainage off the STA.
Page 8
COMPONENT SPECIFICATIONS
The component manufacturers are typical of applications used by contractors and engineers in this area.
CBO Inc. must approve alternative components prior to installation of the OWTS. Requests must
be submitted, in writing, to our office for approval prior to installation. Component technical data
sheets are available upon request.
COMPONENT
MANUFACTURER
MODEL NO.
COMMENTS
Septic Tank
Valley Precast
Item # 1500T-2CP-HH
-compartment concrete
septic tank with high
head pump
Pump
Orenco®
PF300511 '/2 HP
120 Volt
Biotube ProPak Pump
Orenco®
BPP30DD
Vault, Filter, Control Panel
Package
demand dose
Tank Risers and Lids
Orenco®
Double -walled PVC Risers and
Lids (24" diameter)
ADV
Orenco®
V6402A
1.5" Inlet and Outlets
ADV Riser and Lid
Orenco®
Double -walled PVC Risers
and Lids 30" diameter
Orifice Shields
Orenco®
OS150
1.5 inch diameter 68 total
Flushing Assembly
Orenco®
1.5" diameter
(2) 45' or 90' long sweep only
4 total
Construction must be according to Eagle County On -Site Wastewater Treatment System Regulations, the
OWTS Permit provided by Eagle County Environmental Health Department, and this design.
INSTALLATION CONTRACTOR
CBO Inc. expects that the installer be experienced and qualified to perform the scope of work outlined in this
design. The installer must review this design thoroughly and coordinate with our office in advance of
installation. Any additional conditions in this design or county permit must be completed and documented
prior to final approval of the OWTS installation. Communication between the installer and this office is
expected throughout the installation.
INSTALLATION OBSERVATIONS
CBO Inc. must view the OWTS during construction. The OWTS observation should be performed before
backfill, after placement of OWTS components. Septic tanks, distribution devices, pumps, dosing
siphons, and other plumbing, as applicable, must also be observed. CBO Inc. should be notified 48 hours
in advance to observe the installation.
In an effort to improve the accuracy of the record drawing, we request that the installer provide a
sketch of the installation, including path of the sewer lines, water line installation (if applicable),
septic tank location, STA location, and measurements from building corners or another fixed
objects on the property. This sketch is most easily provided on Sheet W2.0 of the OWTS Design
Packet. Photographs of the installation and final cover are also requested to supplement our installation
documentation.
Page 9
REVEGETATION REQUIREMENTS
An adequate layer of good quality topsoil capable of supporting revegetation shall be placed over the entire
disturbed area of the OWTS installation. A mixture of native grass seed that has good soil stabilizing
characteristics (but without taproots), provides a maximum transpiration rate, and competes well with
successional species. No trees or shrubs, or any vegetation requiring regular irrigation shall be placed over
the area. Until vegetation is reestablished, erosion and sediment control measures shall be implemented
and maintained on site. The owner of the OWTS shall be responsible for maintaining proper vegetation
cover.
OPERATION INFORMATION AND MAINTENANCE
The property owner shall be responsible for the operation and maintenance of each OWTS servicing the
property. The property owner is responsible for maintaining service contracts for manufactured units,
alternating STAs, and any other components needing maintenance.
Geo-fabrics or plastics should not be used over the STA. No heavy equipment, machinery, or materials
should be placed on the backfilled STA. Machines with tracks (not wheels) should be used during
construction of the STA for better weight distribution. Livestock should not graze on the STA. Plumbing
fixtures should be checked to ensure that no additional water is being discharged to OWTS. For example, a
running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a STA.
If an effluent filter or screen has been installed in the OWTS, we recommend this filter or screen be cleaned
annually, or as needed. If the OWTS consists of a pressurized pump system, we recommend the laterals be
flushed annually, or as needed.
The homeowner should pump the septic tank every two years, or as needed gauged by measurement of
solids in the tank. Garbage disposal use should be minimized, and non -biodegradable materials should not
be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener
should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS.
Mechanical room drains should not discharge into the OWTS. The OWTS is engineered for domestic waste
only.
ADDITIONAL CONSTRUCTION NOTES
If design includes a pump, weep holes must be installed to allow pump lines to drain to minimize risk of
freezing. The pump shall have an audible and visual alarm notification in the event of excessively high
water conditions and shall be connected to a control breaker separate from the high-water alarm breaker
and from any other control system circuits. The pump system shall have a switch so the pump can be
manually operated.
Extensions should be placed on all septic tank components to allow access to them from existing grade.
Backfill over the STA must be uniform and granular with no material greater than minus 3-inch.
LIMITS:
The design is based on information submitted. If soil conditions encountered are different from conditions
described in report, CBO Inc. should be notified. All OWTS construction must be according to the county
regulations. Requirements not specified in this report must follow applicable county regulations. The
contractor should have documented and demonstrated knowledge of the requirements and regulations of
the county in which they are working. Licensing of Systems Contractors may be required by county
regulation.
Please call with questions.
Sincerely,
CBO Inc.
Carla Ostberg, MPH, REHS
Reviewed By:
Romeo A. Ba,
Page 10
r Pump Selection for a Pressurized System - Single Family Residence Project
C1593 / 230 Spring Park Ranch Road
Parameters
Discharge Assembly Size
1.25
inches
300
Transport Length Before Valve
60
feet
Transport Pipe Class
40
Transport Line Size
1.50
inches
Distributing Valve Model
6402
Transport Length After Valve
5
feet
Transport Pipe Class
40
Transport Pipe Size
1.50
inches
Max Elevation Lift
6
feet
250
Manifold Length
3
feet
Manifold Pipe Class
40
Manifold Pipe Size
1.50
inches
Number of Laterals per Cell
4
Lateral Length
58
feet
Lateral Pipe Class
40
Lateral Pipe Size
1.50
inches
Orifice Size
5/32
inches
200
Orifice Spacing
3
feet
d17
Residual Head
5
feet
ILL
Flow Meter
None
inches
-
'Addon' Friction Losses
0
feet
Tf
Calculations
Minimum Flow Rate per Orifice
0.68
gpm
150
Number of Orifices per Zone
40
Total Flow Rate per Zone
27.2
gpm
Number of Laterals per Zone
2
% Flow Differential Ist/Last Orifice
2.3
%
Transport Velocity Before Valve
4.3
fps
Transport Velocity After Valve
4.3
fps
Frictional Head Losses
100
Loss through Discharge
5.2
feet
Loss in Transport Before Valve
2.6
feet
Loss through Valve
6.1
feet
Loss in Transport after Valve
0.2
feet
Loss in Manifold
0.0
feet
Loss in Laterals
0.3
feet
Loss through Flowmeter
0.0
feet
'Add -on' Friction Losses
0.0
feet
Pipe Volumes
Vol of Transport Line Before Valve
6.3
gals
Vol of Transport Line After Valve
0.5
gals
Vol of Manifold
0.3
gals
Vol of Laterals per Zone
12.3
gals
Total Vol Before Valve
6.3
gals
Total Vol After Valve
13.1
gals
Minimum Pump Requirements
Design Flow Rate
27.2
gpm
Total Dynamic Head
25.5
feet
50
0
PumpData
PF3005 High Head Effluent Pump
30 GPM, 1/2HP
1151230V 10 601-1z, 200V 30 60Hz
PF3007 High Head Effluent Pump
30 GPM, 314HP
230V 10 60Hz, 200/460V 30 60Hz
PF3010 High Head Effluent Pump
30 GPM, IHP
230V 10 601-1z, 2001460V 30 60Hz
PF3015 High Head Effluent Pump
30 GPM, 1-1/2HP
230V 10 601-1z, 20012301460V 30 60Hz
Net Discharge (gpm)
Legend
tiystem curve:
Pum r�Curve:
Pump OptimaLapnge:
Operatihn ant:
Desiaoint:
J
n -omDOODppo
-i(o
m,0zK °-
� o�oA�o
I I�
\
D
mm Z�N
�i mwW Sm a pAZ
p'0000 amuCil ymD<� \ CJ.1 �..
yma�' iN�m. o�F�m �I -7 ` \
Ervm 'OC ?<oxp �
un
A0 z i
I\ zm3 (I
Zm�o
\ \1
X m m 2
m p 0 m y \
1 r� Cm] Z p m .._...__. 1 ,.
\0 m
2,m*c ONUS�3 1
m m o �l �dManla°
M,
U' k
Qx m r v�
" ��u
04W ;a - I'
-a--- c D
p \ z ..
L
D N
4-1
ID
to
Z I oC�m
A C p O
IOUZO
�M mo
m 3 m
+
cy o <
= Z
ono o m
m
d<y m
m
a a �w I n
o v o T
0. N
� o
m0 N m
� S o
CD ` o
p O
I
:oi w
0(
-0
0
M
a
C) a
3 0
0
WO
3
0
M,om
C: m
"o
OXM 0
m +
�\�\ c 22 • /
rn
m C)
O
>
10
Z M
------------
to
m BUDDING E lQpE N D
----- -- ...
fD
- - -- --------- ---------- - - ---------------
C) 2. 0\0 0
CD
U) z
0 0
CD
09 m -
0 Z�
z 0 c
awo �n �=c �<Z\\ o -_w�=ot0n0D -Oo../
CD n
0 Cf) M. am
p m -n 2 ... ... ........ ........
m ;o 0
m M 0, z -M o U) ;a M> G)
< Z ' m 0 Z M z T 4:
X 0 a>) -0 1 cn
0
:2 > 0 0 --j 0 UG
-u M M<
Z -0 u > (j) < w m
m 0 a X0 m
rKz 02 > E ij >r 8
m n m M, --i C) - :E 0
, \,,,, zv
-> o
0 0 o >
G) > 0
0
X 'ZZ
m
(n f m m G) C:
0 m -.1 OZ -M
m
m U) C')
m m m
u -0 MZ
0 0 S2 , E:
0
>OC) :E C MZ
0
z z O
0� z Xcf)
c 0 z >
z
;r KO* 0
a - m> -q
�10 a: K > --I
m z X
0
0 z
0
(n
ono o m
O S2.
CD Q
Ix CID
cr
O'<
C)N SS
X 0 >
C3 M
0
RFE�- z
o
co
C2
-n
cl,
yy�
y
O Zam
..F
m,op�
+
<moD
m
oG1�0
DComm
D Z
�v 10 10
pax
O�mmp
m mD
m o o O
Z A=
D O 0 O D �-'
y r Z 0
j
m Oa O
p
CNN
0 ZX
ZT 00fn
G G)
mp1m5
�m S
to
To
G)mo �T-1
pp-<
DZ��
onm
Noo
X z
D
�z2p
pZ.5
m-rip
:E9 ( ;a(M.
G)<>�
�DOr
3 N
�•m owmQ
N co N N
O0
Z 1 5 D.-. m
DxZ 3C
<wZ
m
WDNT
O
z
O
'2N!
�OmoZm
v
D
,T
D3
m
0*0
0Tm-1D0
9
DTOAz
v =Znv
O�r
Pm(DW
0
=Z
D
A
TOI
Ac
m =Nm
"z
p^'inwz
D0K0 Gi
CO�mp
vpp m0
—3
W
TZN
NO
_ ? m O
D D
O O
o
L
mK
m
F
m
n
:.
z
;o
r
M ....:
v
D
m
O
0
.;,:
::titmo
D = t
A
�
Z
�'4
D
%•`:
{
SLOPE 3:1
X:
_
Z
O
p
\
Z
m
O
f
ll
I 0z T
m
N
D
N
W
i ;M
I
T
/V
O
I m n =
7
N
to
i A z
I
N
N
mo z
Z
>
r
33C) D z <
zz� Z T
v
O m U) N
N m< 0 O G
D
_.
Z o�
>
zzm
Oz xxr m -I
Z
�
�c mrmiim D
�U _a
m�- CD
1p,)
>
mm =
,. C)
<z3
mom 0
I I
\
Cn m0 CD
mSD G)
Zm
N
w o o Q.
aaT
oo
w
n
mom
o�
yr
— —pz
OZ- _=
G
0
y7A
$�
p
N
m 0
x
CD
¢o!N
i
>y
oA
r
m
D
Z
�O
oe
D
<
m
n
e
kao
g❑�,
�n
3
m
mcNi
PyPo
O
D
N
x
<In m
S
Z
D
2 0
wo3
O
N
D�
O
00, 3
0
m
1
OC
Dm
Z
mD rn Ov
mo
-�N O-0
0,
DF ow 00
*m
T
m5 OZ
o Z
A 0w �<
�°
zp
x I
�m 4iT
m
0 C(<
m
;NT21
m Oj
yD
o
N
z
NnCDO
Z1
m
4-,92
0
mz
z
O X
o� o o
: O
OD
OZ
r
m,Ov
'T Op x21
O
C
o
0
m
�mD 1ZT.
m
7D)
m0 N
p
Nzox 00 m ca
r m
m
S
^O1
m
zo MC7 m r
Co 1m
DZ m
Im
00
J
o
m
m O
A
-
DEPTH - FEE
T
)\§\)/\)
\)/k
\
M.
-
)`§- ;4/
m®2e
j
]xo
�0>$
��p
@mo
E3
_
-0 2
- P )/®
§)\
;q!
}c
) \��)
§)
\\]
'
\\
)
k(
\0,
0 Er
Ij
M.
&()�
\:
;y0
»
( ;^)
)§
cK`
\)}E
o�
° £
`
* !®
)q�e
�2
)!
)
_
\ \
§G
)§
>
G
02
(°)0
-
\
{((
e
/
! 2 e
9
\
/
\/
-
\ /`(
/
d
§3
`
w
)
j
}
§ ;
k
�
m
>
KOO
!
2
:1
e
-
Gk\
Co
) !
)
-
a §
.
of
J
0
0-0
:
`
_
§
\§
®
22
00
0m
m
uk
0.
}/} v
/ \($
qa(�
e(:
§00
=g
§
<§)
m-�
e°
)�
§
}\�
\G /
!!G
!4
f \ -
]2 )
{\
22 ))7
j�
8u \
m
co
$ /§\
@/
:04
k>{
\\
Col)
m
\�
n O
\
\
\
\)
�
�)
!
!
2
)
)\
)
§
m
)
&
§
)\
,
/
§
,
/
/[
2
e\
)\
m)
y/
0812412020 20:43:48
28
Wildfire Hazard Rating
EAGLE COUNTY
Sustainable
Communities
0812412020 - TBD Upper Cattle Creek (Spring Park Ranch Rd.) Carbondale, CO 81623 -
2391-104-01-002
Completed by - Eric Lovgren, Wildfire Mitigation Coordinator
Property Photo(s) : accountPicture - Eric Lovgren.ipg
Address : TBD Upper Cattle Creek (Spring Park Ranch Rd.) Carbondale, CO 81623
Parcel ID : 2391-104-01-002
Fire District : Roaring Fork Fire and Rescue
Date Completed : 08/24/2020
Overall Wildfire Hazard Rating: Moderate Hazard
0812412020 20:43:48
28
Wildfire Hazard Map : _NO HARM2 Eric - Eric Lovgren.ipy
Predominant Vegetation Type : mixed tall shrub / aspen, with native grass. (35 points)
Average slope (within 200 ft of structure) : 8% to 20% (15 points)
Additional Wildfire Hazards:
Wildfire Hazards Score (Vegetation + Slope + Hazards) : 50
Building Construction :
Access and Infrastructure : One primary road, one emergency access (limited capacity). (3 points),
Maintained road base — gravel, 0% to 8% average grade (1 point), Within 100 feet of fairway, water
source (stream, lake, pond), or other natural/man-made barrier (3 points), Pond/river/natural water source
within 1000 ft (1 point)
Improvements Score (Building Construction + Access and Infrastructure) : 8
Overall Wildfire Hazard Rating [Wildfire Hazards - Improvements] : Moderate Hazard [21 to 45 points]
Additional Hazards/Observations:
Images/Additional Files:
0812412020 20:43:48
28
Defensible Space Requirements: A pre -construction meeting may be required, contact EC Wildfire
Mitigation upon issuance of building permit (970-328-8742)
Zone 1: Is the area of maximum modification and treatment. The intent of Zone 1 is to reduce fuels that are
immediately adjacent to flammable elements of the structure, and to provide a clear access for firefighting
operations. Zone 1 is an area measured 30 feet from the edges of the structure. Ideally, all trees within Zone 1
should be removed to reduce the fire hazard. If a tree or cluster of trees must remain, it will be considered as an
integral part of the structure and Defensible Space will be measured from the drip line of the tree or tree cluster.
Decorative rock or irrigated, mowed grass creates an attractive, easily maintained nonflammable ground cover. All
branches that interfere with the structure's roof or chimney must be removed. All ladder fuels (small shrubs, trees,
tree limbs and other materials that allow fire to climb into the tree crown) must be removed from beneath the tree or
tree cluster.
Zone 2: Within this zone, the continuity and arrangement of vegetation is modified to reduce the intensity of any fire
approaching the structure. Zone 2 is an area measured 30-100 feet from the edges of the structure (or to
property boundaries on smaller lots). Trees and shrubs must be thinned so that there is a minimum of 10 feet
between crowns. Crown separation is measured from the furthest branch of one tree to the nearest branch on the
next tree. All ladder fuels from under these trees must be removed. All trees must be pruned to at least: 10 feet
above the ground, but no more than 1/3 the overall height of the tree (Aspen trees, individual spruce, fir and pine
specimens are exempt). The inner portions of Zone 2 must be more heavily thinned than the outer portions. Isolated
shrubs may remain provided they are not under tree crowns. These shrubs must be pruned and maintained for
vigorous growth. Dead stems and shrubs must be removed. Dead trees, which can fall onto a structure or block an
access, must be removed.
0812412020 20:43:48
28
Construction Guidelines for Wildfire Hazard Areas
Wildfire Hazard Rating
Roofing
Decking
Soffits/Eaves
Siding
Low Hazard
No Limitations
No Limitations
No Limitations
No Limitations
Moderate Hazard
Class B fire
Ignition resistant
Any soffit, eave, or
No Limitations
rated assembly;
construction for
roof -extension
roof venting in
beams, posts, joists,
projecting over 48"
the soffit shall
and decking (trim,
from the structure
be in the outer
fascia, guards and
shall be of ignition
1/3, with
handrails are
resistant
non-combustible
exempt). Materials
construction.
vent covers and
shall be rated Class
metal screening
B or better (ASTM
with openings
E-84 flame spread
less than
ratio of 26-70) and
inch.
listed for exterior
use
High - Extreme Hazard
Class A fire
Ignition resistant
Any soffit, eave, or
The exterior of the
rated assembly;
construction for
roof -extension
structure is to be of
roof venting in
beams, posts, joists,
projecting from the
non-combustible or
the soffit shall
and decking (trim,
structure shall be of
ignition resistant
be in the outer
fascia, guards and
ignition resistant
material (excluding
1/3, with
handrails are
construction.
trim).
non-combustible
exempt). Materials
vent covers and
shall be rated Class
metal screening
A or better (ASTM
with openings
E-84 flame spread
less than
ratio of 0-25) and
inch.
listed for exterior
use
Fire Rating (Roof)=
Fire ratings for roof coverings are classified either A, B, C or nonrated (Required Standard. (ASTM) E-108).
Ignition Resistant Deck Construction -
(Required Standard. ASTM E84 and listed for exterior use)
Class A Deck Construction (High Hazard Areas)
• Decks completely built with non-combustible materials.
• Construct a waterproof deck and protect the underside with 5/8" type X gypsum board. Decking can be of
any material allowed by code with this method.
• Build deck using Type IV (Heavy Timber) construction (Chapter 6 of the 2009 IBC) Joist and beams to be
minimum 6"x 10" Decking to be minimum 4"x in depth Posts to be minimum 8"x 8"
• Any structural members and decking materials having a flame spread of less than 25. Some accepted
materials: Ipe, aka: ironwood, Brazilian Redwood and Brazilian Walnut, Brazilian Koa; Kayu Batu
hardwood decking; FRX Exterior fire -retardant treated wood; Exterior FireX by Hoover Mfg.; Sensibuilt
Composite Decking by Fiberon.
Class B Deck Construction (Moderate Hazard Areas)
• Any structural members and decking materials having a flame spread of 26-75. Some accepted materials:
Redwood, Douglas -fir, Sitka Spruce (minimum one inch nominal thickness); Trex Transcends FR composite
decking; Advantage Ipe® decking by Advantage Lumber.
0812412020 20:43:48
28
Fire Resistive Soffit Construction -
• Any option listed above for decks can be used to protect soffits, eaves or roof -projections.
• Under Type IV (Heavy Timber) construction, open rafters can be 4"x 6" min. and sheathing can be 2"x T&G
Posts supporting roof only, can be 6"x 6".
Fire Resistive Siding (some examples include)-
• Non-combustible material (ie. stone, brick, cement fiber board, etc.)
• 1-hour listed assembly (5/8" type X gypsum board under combustible siding)
• Cement Stucco (1/2" min. thickness)
• 6+" diameter logs
Building Inspection Process - New Building Construction / Exterior Modification / Additions — for all
properties in unincorporated Eagle County
4 Initial Site Inspection (Wildfire 1) — In areas of moderate, high, and extreme wildfire hazard you will
need to have defensible space established around the new or existing structure. An initial site inspection by
the Eagle County wildfire mitigation specialist will determine the parameters for the creation of defensible
space on your property. This must be completed prior to footing or foundation inspections. You will need the
following prior to this site -visit:
• Approved field set of site plans available.
• Building corners marked with stakes outlining the approximate footprint of any new structures,
drive -way, septic, etc.
-i Second Site Inspection (Wildfire 2) — A second visit to your construction site by the wildfire mitigation
specialist may be required during the building process. This visit is to confirm that defensible space around
the structure is in place prior to adding combustible material to the site. All vegetation marked for removal
during the initial site visit must be gone in order to move on to the next step in the mitigation process.
4 Final wildfire inspection (Wildfire Final) — Prior to issuance of Temporary Certificate of Occupancy
(TCO) or Certificate of Occupancy (CO), you must be approved by the wildfire mitigation specialist during
your final wildfire inspection. The following will be examined to ensure:
• That any new landscaping complies with requirements for defensible space (must have approved
landscaping plans on site if not complete)
• That information about the building, location of water for fire suppression, access, and defensible
space boundaries are captured
• That no new factors contribute to the overall wildfire hazards on the site
Contact Information:
Eric Loygren - Wildfire Mitigation Coordinator
Eagle County Sustainable Communities
(970) 328-8742
Eric. Loyaren(a)eaplecounty. us
INF'
DESIGN NOTES
• Design per performance test per ASTM
C1227
• Top surface area 62.33 ft'
• fc ® 28 days; concrete = 6,000 PSI
Min.
Installation:
• Tank to be set on 5" min. sand bed
or pea gravel
• Tank to be backfilled uniformly on all
sides in lifts less than 24" and
mechanically compacted
• Excavated material may be used for
backfill, provided large stones are
removed
• Excavation should be dewatered and
tank filled with water prior to being
put in service for installation with
water table less than 2' below grade
• Meets C1644-06 for resilient
connectors
• Inlet and Outlet identified above pipe
• Delivered complete with internal piping
• Control Panel to be mounted in sight
line of tank
• 4' Maximum bury depth
ALLOWABLE BURY
(Based on Water Table)
WATER TABLE
ALLOWABLE
EARTH FILL
0' — 0"
3' — 0"
1' — 0"
3' — 0"
2' — 0"
4' — 0"
3'— 0"
4'-0"
DRY
4' — 0"
Top
View
2V ClserAccass
CL—
.: I TANK
24" Minimum
/ Riser Height
fteeuick Dh oonnect
Flexible b Ball V"
Boot Risers to Grade �
�„ D�rgs
., HeW
Rubber
1 Saeent
6
4
*SeMae conf rats availabb for malnianance
Section
View
Pump:
• Lowers TSS and improves eftient
quality to tleld
• Complete Installation (wiring, panel,
mounting and start-up procedures)
• Complete warranty
Digging Specs
Invert
Dimensions
Net Capacity
Net Weight
13' Long x 8' Wide
Inlet
Outlet
Length
Width
Min.
Height
Inlet Side
Outlet
Total
Lid
Tank
Total
56" below inlet
56"
54"or73"
132"
68"
92"
1002 gal
507 gal
1509 gal
3600 Ibs
11180 Ibs
14980 Ibs
Double Walled PVC Riser & Lid Options
Poly Lid
(Static load tested to 5000 Ibs)
• Skid resistance surface
• Available in green
• Highest level of UV Protection included
• Includes a foam gasket for airtight and
watertight applications
• Includes square drive screws to discourage
unauthorized entry
• Insulation panels achieve R-10 insulation rating
Double Walled PVC Riser
�ItiLy)W�W/v�V1/v1yl�
2w of Insulation
Standard
Orenco ® Durafter m Access Lids (FLD)
Not recommended for vehicular traffic
24" and 30" Diameters
• Solid, resin -infused fiberglass construction
• 20,000-lb breaking strength
• Standard green or brown colors
• Available with or without urethane lid gasket
• Available with carbon filtration
• 4 stainless steel flathead socket cap screws & hex
•
• Available in 24" and 30" Diameter
• Cut to length
• Sold in +/- 2" increments
• Must be cut between ribs
key wrench
Insulated lids available - 2" or 4"
(719) 3954764 28005 Co. Rd. 317
P.O. Box925
Fax: (719) 395.3727 Buena VkA% CD 81211
Webelie: www.valleyprec astoom
Email: frontdesk@valleyprecastcom
BiotubeO ProPak Pump Packager""
60-Hz Series Pump Packages
Float
brack
Suppi
Pumt
Float
Float:
Float
Vault
4-in.
turbir
Biotul
cartrii
Control panel
External splice box Riser lid
(Optional; internal splice (not included)
Biotube® ProPakTm pump package components.
General
Orenco's Biotube° ProPak'' is a complete, integrated pump package for
filtering and pumping effluent from septic tanks. And its patented pump
vault technology eliminates the need for separate dosing tanks.
This document provides detailed information on the ProPak pump vault
and filter, 4-in. (100-mm) 60-Hz turbine effluent pump, and control panel.
For more information on other ProPak components, see the following
Orenco technical documents:
of . Float Switch Assemblies (NSU-MF-IVF-1)
t)
• Discharge Assemblies (NTD-HV-HV-1)
ge • Splice Boxes (NTD-S13-SB-1)
'ly • External Splice Box (NTD-S13-SB-1)
Applications
The Biotube ProPak is designed to filter and pump effluent to either
gravity or pressurized discharge points. It is intended for use in a septic
tank (one- or two -compartment) and can also be used in a pump tank.
The Biotube ProPak is designed to allow the effluent filter to be removed
for cleaning without the need to remove the pump vault or pump, simpli-
fying servicing.
Complete packages are available for on -demand or timed dosing sys-
tems with flow rates of 20, 30, and 50-gpm (1.3, 1.9, and 3.2 Usec),
as well as with 50 Hz and 60 Hz power supplies.
Standard Models
BPP20DD, BPP20DD-SX, BPP30TDA, BPP30TDD-SX, BBPP50TDA,
BPP50TDD-SX
Product Code Diagram
BPP ❑ ❑ - ❑❑
nd I Standard options:
Blank = 57-in. (1448-mm) vault height, internal
splice box, standard discharge assembly
68 = 68-in. (1727-mm) vault height
SX = external splice box
CW = cold weather discharge assembly
DB = drainback discharge assembly
Q = cam lock
MFV = non -mercury float
notor Control panel application:
DD = demand -dosing
TDA = timed -dosing, analog timer
TDD = timed dosing, digital timer, elapsed time
meter & counters
Pump flow rate, nominal:
20 = 20 gpm (1.3 Usec)
30 = 30 gpm (1.9 Usec)
50 = 50 gpm (3.2 Usec)
I Biotubeg ProPak" pump vault
Orenco Systems® Inc., 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-BPP-1
Rev.1.2, © 08/14
Page 1 of 4
ProPaWm Pump Vault Biotube® Filter Cartridge
Materials of Construction
Materials of Construction
Vault body
Polyethylene
Filter tubes
Polyethylene
Support pipes
PVC
Cartridge end plates
Polyurethane
Dimensions, in. (mm)
Handle assembly
PVC
A - Overall vault height
57 (1448) or 68 (1727)
Dimensions, in. (mm)
B - Vault diameter
17.3 (439)
A - Cartridge height
18 (457)
C - Inlet hole height
19 (475)
B - Cartridge width
12 (305)
D - Inlet hole diameter (eight holes total)
2 (50)
Performance
E - Vault top to support pipe bracket base
3 (76)
Biotube® mesh opening
0.125 in. (3 mm)*
F - Vault bottom to filter cartridge base
4 (102)
Total filter flow area
4.4 ft2 (0.4 m2)
Total filter surface area 14.5 ft2 (1.35 m2)
Maximum flow rate 140 gpm (8.8 Usec)
'0.062-in. (1.6-mm) filter mesh available
f
1-0 B0. 1-4B �I
ProPakTm pump vault (shown with Biotube filter and effluent pump) Biotube® filter cartridge (shown with float switch assembly)
NTD-BPP-1 Orenco Systems® Inc., 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com
Rev.1.2, © 08/14
Page 2 of 4
4-in. (100-mm) Turbine Effluent Pumps
Orenco's 4-in. (100 mm) Turbine Effluent Pumps are constructed of
lightweight, corrosion -resistant stainless steel and engineered plastics;
all are field -serviceable and repairable with common tools. All 60-Hz
PF Series models are CSA certified to the U.S. and Canadian safety
standards for effluent pumps, and meet UL requirements.
Power cords for Orenco's 4-in. (100-mm) turbine effluent pumps are
Type SOOW 600-V motor cable (suitable for Class 1, Division 1 and 2
applications).
Materials of Construction
Discharge:
Stainless steel or glass -filled polypropylene
Discharge bearing:
Engineered thermoplastic (PEEN
Diffusers:
Glass -filled PPO
Impellers:
Acetal (20-, 30-gmp), Noryl (50-gpm)
Intake screens:
Polypropylene
Suction connection:
Stainless steel
Drive shaft:
300 series stainless steel
Coupling:
Sintered 300 series stainless steel
Shell:
300 series stainless steel
Lubricant:
Deionized water and propylene glycol
Specifications
Nam. flow, Length
gpm (Usec) in. (mm)
Weight Discharge Impellers
lb (kg) in., nominal'
20(1.3) 22.5 (572)
26 (11) 1.25 4
30 (1.9) 21.3 (541)
25 (11) 1.25 3
50(3.2) 20.3 (516)
27 (12) 2.00 2
Performance
Nom. flow, hp (kW)
gpm (Usec)
Design Rated Min liquid
flow amps cycles/day level, in. (mm) 2
20(1.3) 0.5 (0.37)
12.3 300 18 (457)
30(1.9) 0.5 (0.37)
11.8 300 20 (508)
50(3.2) 0.5 (0.37)
12.1 300 24 (610)
Discharge is female NPT threaded, U.S. nominal size, to accommodate Orencoo discharge
hose and valve assemblies. Consult your Orenco Distributor about fittings to connect discharge
assemblies to metric -sized piping.
2 Minimum liquid level is for single pumps when installed in an Orenco Biotube® ProPakTM Pump
vault.
Pump Curves
Pump curves, such as those shown here, can help you determine
the best pump for your system. Pump curves show the relationship
between flow (gpm or Usec) and pressure (TDH), providing a graphical
representation of a pump's performance range. Pumps perform best
at their nominal flow rate, measured in gpm or Usec.
140
a
120
,C
100
a
m
80
n
E
60
c 40
20
Flow in liters per second (L/sec)
0.63 1.26 1.89 2.52 3.15 3.79 4.42
10 20 30 40 50 60 70
Flow in gallons per minute (gpm)
43
m
37 as
I;
,c
30 Z
0
a
24 m
r
0
18 R
a
12 w
t�
6
Orenco Systems® Inc., 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-BPP-1
Rev.1.2, © 08/14
Page 3 of 4
Control Panel (Demand Dose)
Orenco's ProPak'" demand dose control panels are specifically engineered
for the ProPak pump package and are ideal for applications such as
demand dosing from a septic tank into a conventional gravity drainfield.
Control Panel (Timed Dose)
Orenco's ProPak timed dose control panels are specifically engineered for
the ProPak pump package and are ideal for applications such as timed
dosing from a septic tank into a pressurized drainfield or mound. Analog or
digital timers are available.
Materials of Construction
Materials of Construction
Enclosure
UV -resistant fiberglass, UL Type 4X
Enclosure
UV -resistant fiberglass, UL Type 4X
Hinges
Stainless steel
Hinges
Stainless steel
Dimensions, in. (mm)
Dimensions, in. (mm)
A - Height
11.5 (290)
A - Height
11.5 (290)
B - Width
9.5(240)
B - Width
9.5(240)
C - Depth
5.4(135)
C - Depth
5.4(135)
Specifications
Specifications
Panel ratings
120 V, 3/4 hp (0.56 k",14 A, single phase, 60 Hz
Panel ratings
120 V, 3/4 hp (0.56 k",14 A, single phase, 60 Hz
1. Motor -start contactor
16 FLA,1 hp (0.75 kW), 60 Hz; 2.5 million cycles
Dual -mode
Programmable for timed- or demand -dosing
at FLA (10 million at 50% of FLA)
(digital timed -dosing panels only)
2. Circuit
120 V, 10 A, OFF/ON switch, Single pole breakers
1 a. Analog timer
120 V, repeat cycle from 0.05 seconds to 30
3. Toggle switch
Single -pole, double -throw HOA switch, 20 A
(not shown)
hours. Separate variable controls for OFF and
ON time periods
4. Audio alarm
dB at 24 in. (600 mm), warble tone sound, UL
Type 4X
Ty
1 b. Digital timer
120-V programmable logic unit with built-in LCD
(shown below)
screen and programming keys. Provides control
5. Audio alarm
120 V, automatic reset, DIN rail mount silence
functions and timing for panel operation
relay
2. Motor -start contactor
16 FLA, 1 hp (0.75 k", 60 Hz; 2.5 million cycles
6. Visual alarm
7/8-in. (22-mm) diameter red lens, "Push -to -silence,"
at FLA (10 million at 50% of FLA)
120 V LED, UL Type 4X
3. Circuit breakers
120 V, 10 A, OFF/ON switch. Single pole 120 V
4. Toggle Switch
Single -pole, double -throw HOA switch, 20 A
5. Audio alarm
95 dB at 24 in. (600 mm), warble -tone sound, UL
Type 4X
6. Visual alarm
7/8-in. (22-mm) diameter red lens, "Push -to -silence",
120 V LED, UL Type 4X
Control panel, demand -dose
© _GA
O
4
Control panel, timed -dose (digital timer model shown)
NTD-BPP-1 Orenco Systems® Inc., 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com
Rev. 1.2, © 08114
Page 4 of 4
PF Series 4-inch (100-mm)
Submersible Effluent Pumps
Applications
Our 4-inch (100-mm) Submersible Effluent Pumps are designed to
transport screened effluent (with low TSS counts) from septic tanks or
separate dosing tanks. All our pumps are constructed of lightweight,
corrosion -resistant stainless steel and engineered plastics; all are field -
serviceable and repairable with common tools; and all 60-Hz PF Series
models are CSA certified to the U.S. and Canadian safety standards for
effluent pumps, meeting UL requirements.
Orenco's Effluent Pumps are used in a variety of applications, including
pressurized drainfields, packed bed filters, mounds, aerobic units, effluent
irrigation, effluent sewers, wetlands, lagoons, and more. These pumps
are designed to be used with a Biotube® pump vault or after a secondary
treatment system.
— Discharge Connection
Bypass Orifice
Franklin
Liquid End
— Suction Connection
Franklin
Super Stainless
Motor
Powered by
S�® Franklin Electric
C us
LR80980
LR2053896
Features/Specifications
To specify this pump for your installation, require the following:
• Minimum 24-hour run -dry capability with no deterioration in pump life
or performance'
• Patented 1/8-inch (3-mm) bypass orifice to ensure flow recirculation
for motor cooling and to prevent air bind
• Liquid end repair kits available for better long-term cost of ownership
• TRI-SEALTM floating impeller design on 10, 15, 20, and 30 gpm
(0.6,1.0, 1.3, and 1.9 Usec) models; floating stack design on 50 and
75 gpm (3.2 and 4.7 Usec) models
• Franklin Electric Super Stainless motor, rated for continuous use and
frequent cycling
• Type SOOW 600-V motor cable
• Five-year warranty on pump or retrofit liquid end from date of manu-
facture against defects in materials or workmanship
" Not applicable for 5-hp (3.73 kM models
Standard Models
See specifications chart, pages 2-3, for a list of standard pumps. For
a complete list of available pumps, call Orenco.
Product Code Diagram
PF❑❑❑❑-❑
TC,rd length, ft (m):t
Blank = 10 (3) 20 = 20 (6)
30 = 30 (9) 50 = 50 (15)
Voltage, nameplate:
1 = 115' 200 = 200
2 = 230t 4 = 460
Frequency:
1 = single-phase 60 Hz
3 = three-phase 60 Hz
5 = single-phase 50 Hz
Horsepower (k":
03 = 'h hp (0.25) 05 = %2 hp (0.37)
07 = a/a hp (0.56) 10 = 1 hp (0.75)
15 = 1-'h hp (1.11) 20 = 2 hp (1.50)
30 = 3 hp (2.24) 50 = 5 hp (3,73)
Nominal flow, gpm (Usec):
10 = 10 (0.6) 15 = 15 (1.0)
20 = 20 (1.3) 30 = 30 (1.9)
50 = 50 (3.2) 75 = 75 (4.7)
Pump, PF Series
"/z-hp (0.37kq only
220 volts for 50 Hz pumps
,Note: 20-foot cords are available only for single-phase pumps through 1-1h hp
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PD-PF-1
Rev. 2.2, © 09/14
Page 1 of 6
Specifications, 60 Hz
L
Q
Cm O
WIlN
Pump Model
m
-0,
�
CM
Ea
N
C
O
�
O
O
Cm 0
'y Q
E
CA
C
cc
X
d
• N Z.
�
L
v�
_
�
^
Cr
,C �
a
M
LM
\C
T
PF100511
10(0.6)
0.50 (0.37)
1
115
120
12.7
12.7
6
1 1/4 in. GFP
23.0 (660)
16 (406)
26 (12)
300
PH 00512
10(0.6)
0.50 (0.37)
1
230
240
6.3
6.3
6
1 1/4 in. GFP
23.0 (660)
16 (406)
26 (12)
300
PF10053200
10(0.6)
0.50 (0.37)
3
200
208
3.8
3.8
6
1 1/4 in. GFP
23.0 (660)
16 (406)
26 (12)
300
PH 00712 4.5
10(0.6)
0.75 (0.56)
1
230
240
8.3
8.3
8
1 1/4 in. GFP
25.9 (658)
17 (432)
30 (14)
300
PF10073200 4,5
10(0.6)
0.75 (0.56)
3
200
208
5.1
5.2
8
1 1/4 in. GFP
25.4 (645)
17 (432)
31 (14)
300
PH 01012 5.6
10(0.6)
1.00 (0.75)
1
230
240
9.6
9.6
9
1 1/4 in. GFP
27.9 (709)
18 (457)
33 (15)
100
PH 0103200 5.6
10(0.6)
1.00 (0.75)
3
200
208
5.5
5.5
9
1 1/4 in. GFP
27.3 (693)
18 (457)
37 (17)
300
PH 02012 5, 6, 7, a
10(0.6)
2.00 (1.49)
1
230
240
12.1
12.1
18
1 1/4 in. SS
39.5 (1003)
22 (559)
48 (22)
100
PF102032 5.6.8
10(0.6)
2.00 (1.49)
3
230
240
7.5
7.6
18
1 1/4 in. SS
37.9 (963)
20 (508)
44 (20)
300
PH 0203200 s, 6. 8
10(0.6)
2.00 (1.49)
3
200
208
8.7
8.7
18
1 1/4 in. SS
37.9 (963)
20 (508)
44 (20)
300
PF150311
15 (1.0)
0.33 (0.25)
1
115
120
8.7
8.8
3
1 1/4 in. GFP
19.5 (495)
15 (380)
23 (10)
300
PF150312
15 (1.0)
0.33 (0.25)
1
230
240
4.4
4.5
3
1 1/4 in. GFP
19.5 (495)
15 (380)
23 (10)
300
PF200511
20 (1.3)
0.50 (0.37)
1
115
120
12.3
12.5
4
1 1/4 in. GFP
22.3 (566)
18 (457)
25 (11)
300
PF200512
20 (1.3)
0.50 (0.37)
1
230
240
6.4
6.5
4
1 1/4 in. GFP
22.5 (572)
18 (457)
26 (12)
300
PF20053200
20 (1.3)
0.50 (0.37)
3
200
208
3.7
3.8
4
1 1/4 in. GFP
22.3 (566)
18 (457)
26 (12)
300
PF201012 4.5
20 (1.3)
1.00 (0.75)
1
230
240
10.5
10.5
7
1 1/4 in. GFP
28.4 (721)
20 (508)
33 (15)
100
PF20103200 4.5
20 (1.3)
1.00 (0.75)
3
200
208
5.8
5.9
7
1 1/4 in. GFP
27.8 (706)
20 (508)
33 (15)
300
PF201512 4,5
20 (1.3)
1.50 (1.11)
1
230
240
12.4
12.6
9
1 1/4 in. GFP
34.0 (864)
24 (610)
41 (19)
100
PF20153200 4.5
20 (1.3)
1.50 (1.11)
3
200
208
7.1
7.2
9
1 1/4 in. GFP
30.7 (780)
20 (508)
35 (16)
300
PF300511
30 (1.9)
0.50 (0.37)
1
115
120
11.8
11.8
3
1 1/4 in. GFP
21.3 (541)
20 (508)
28 (13)
300
PF300512
30 (1.9)
0.50 (0.37)
1
230
240
6.2
6.2
3
1 1/4 in. GFP
21.3 (541)
20 (508)
25 (11)
300
PF30053200
30 (1.9)
0.50 (0.37)
3
200
208
3.6
3.6
3
1 1/4 in. GFP
21.3 (541)
20 (508)
25 (11)
300
PF300712
30 (1.9)
0.75 (0.56)
1
230
240
8.5
8.5
5
1 1/4 in. GFP
24.8 (630)
21 (533)
29 (13)
300
PF30073200
30 (1.9)
0.75 (0.56)
3
200
208
4.9
4.9
5
1 1/4 in. GFP
24.6 (625)
21 (533)
30 (14)
300
PF301012 4
30 (1.9)
1.00 (0.75)
1
230
240
10.4
10.4
6
1 1/4 in. GFP
27.0 (686)
22 (559)
32 (15)
100
PF30103200 4
30 (1.9)
1.00 (0.75)
3
200
208
5.8
5.8
6
1 1/4 in. GFP
26.4 (671)
22 (559)
33 (15)
300
PF3015121.5
30 (1.9)
1.50 (1.11)
1
230
240
12.6
12.6
8
1 1/4 in. GFP
32.8 (833)
24 (610)
40 (18)
100
PF30153200 4.5
30 (1.9)
1.50 (1.11)
3
200
208
6.9
6.9
8
1 1/4 in. GFP
29.8 (757)
22 (559)
34 (15)
300
PF301534 4.5
30 (1.9)
1.50 (1.11)
3
460
480
2.8
2.8
8
1 1/4 in. GFP
29.5 (685)
22 (559)
34 (15)
300
PF302012 5,6-'
30 (1.9)
2.00 (1.49)
1
230
240
11.0
11.0
10
1 1/4 in. SS
35.5 (902)
26 (660)
44 (20)
100
PF30203200 5,6
30 (1.9)
2.00 (1.49)
3
200
208
9.3
9.3
10
1 1/4 in. SS
34.0 (864)
24 (610)
41 (19)
300
PF303012 5,6,1.E
30 (1.9)
3.00 (2.23)
1
230
240
16.8
16.8
14
1 1/4 in. SS
44.5 (1130)
33 (838)
54 (24)
100
PF303032 5.6,8
30 (1.9)
3.00 (2.23)
3
230
240
10.0
10.1
14
1 1/4 in. SS
44.3 (1125)
27 (686)
52 (24)
300
PF305012 5.6,1.8
30 (1.9)
5.00 (3.73)
1
230
240
25.6
25.8
23
1 1/4 in. SS
66.5 (1689)
53 (1346)
82 (37)
100
PF305032 5.6.8
30 (1.9)
5.00 (3.73)
3
230
240
16.6
16.6
23
1 1/4 in. SS
60.8 (1544)
48 (1219)
66 (30)
300
PF30503200 5,6.8
30 (1.9)
5.00 (3.73)
3
200
208
18.7
18.7
23
1 1/4 in. SS
60.8 (1544)
48 (1219)
66 (30)
300
PF500511
50(3.2)
0.50 (0.37)
1
115
120
12.1
12.1
2
2 in. SS
20.3 (516)
24 (610)
27 (12)
300
PF500512
50(3.2)
0.50 (0.37)
1
230
240
6.2
6.2
2
2 in. SS
20.3 (516)
24 (610)
27 (12)
300
PF500532
50(3.2)
0.50 (0.37)
3
230
240
3.0
3.0
2
2 in. SS
20.3 (516)
24 (610)
28 (13)
300
PF50053200
50(3.2)
0.50 (0.37)
3
200
208
3.7
3.7
2
2 in. SS
20.3 (516)
24 (610)
28 (13)
300
PF500534
50(3.2)
0.50 (0.37)
3
460
480
1.5
1.5
2
2 in. SS
20.3 (516)
24 (610)
28 (13)
300
PF500712
50(3.2)
0.75 (0.56)
1
230
240
8.5
8.5
3
2 in. SS
23.7 (602)
25 (635)
31 (14)
300
PF500732
50(3.2)
0.75 (0.56)
3
230
240
3.9
3.9
3
2 in. SS
23.7 (602)
25 (635)
32 (15)
300
PF50073200
50(3.2)
0.75 (0.56)
3
200
208
4.9
4.9
3
2 in. SS
23.1 (587)
26 (660)
32 (15)
300
NTD-PU-PF-1 Orenco Systems® Inc., 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com
Rev. 2.2, © 09/14
Page 2 of 6
Specifications, 60 Hz (continued)
~-
E N
N
N@
E
N
y
C.
c^ c
y
cm
H
E
(D
rn°
M
c
a
aE
C
"-
N
Q
fA N i
j 1Gam..
cc
ECM M +
,E
(aLM
C.
'O
A R
C
e
^2
.�..
G =
Pump Model
Z>
Q
G cE6
J
C
PF500734 50(3.2) 0.75 (0.56)
3
460
480
1.8
1.8
3
2 in. SS
34.8 (884)
25 (635)
31 (14)
300
PF501012 50(3.2) 1.00 (0.75)
1
230
240
10.1
10.1
4
2 in. SS
27.0 (686)
26 (660)
35 (16)
100
PF50103200 50(3.2) 1.00 (0.75)
3
200
208
5.7
5.7
4
2 in. SS
26.4 (671)
26 (660)
39 (18)
300
PF501034 50(3.2) 1.00 (0.75)
3
460
480
2.2
2.2
4
2 in. SS
26.4 (671)
26 (660)
39 (18)
300
PF5015124 50(3.2) 1.50 (1.11)
1
230
240
12.5
12.6
5
2 in. SS
32.5 (826)
30 (762)
41 (19)
100
PF501532004 50(3.2) 1.50 (1.11)
3
200
208
7.0
7.0
5
2 in. SS
29.3 (744)
26 (660)
35 (16)
300
PF503012 4.1.7, 8 50(3.2) 3.00 (2.23)
1
230
240
17.7
17.7
8
2 in. SS
43.0 (1092)
37 (940)
55 (25)
100
PF50303200 4-5.8 50(3.2) 3.00 (2.23)
3
200
208
13.1
13.1
8
2 in. SS
43.4 (1102)
30 (762)
55 (25)
300
PF503034 4, 5. 8 50(3.2) 3.00 (2.23)
3
460
480
5.3
5.3
8
2 in. SS
40.0 (1016)
31 (787)
55 (25)
300
PF505012 5,6,7,8 50(3.2) 5.00 (3.73)
1
230
240
26.2
26.4
13
2 in. SS
65.4 (1661)
55 (1397)
64 (29)
300
PF505032 5,6,7,8 50(3.2) 5.00 (3.73)
3
230
240
16.5
16.5
13
2 in. SS
59.3 (1506)
49 (1245)
64 (29)
300
PF751012 75(4.7) 1.00 (0.75)
1
230
240
9.9
10.0
3
2 in. SS
27.0 (686)
27 (686)
34 (15)
100
PF751512 75(4.7) 1.50 (1.11)
1
230
240
12.1
12.3
4
2 in. SS
33.4 (848)
30 (762)
44 (20)
100
Specifications, 50 Hz
Pump Model
PF100552 10(0.6) 0.50 (0.37)
1
220
230
3.9
4.1
6
1 '/4 in. GFP
23.0 (584)
17 (432)
26 (12)
300
PF100752 4. 5 10(0.6) 0.75 (0.56)
1
220
230
6.2
6.2
9
1 '/4 in. GFP
26.8 (658)
17 (432)
30 (14)
300
PF101552 5.6 10(0.6) 1.50 (1.11)
1
220
230
10.5
11.4
18
1 '/ in. SS
39.5 (1003)
22 (559)
46 (21)
300
PF300552 30(1.9) 0.50 (0.37)
1
220
230
4.1
4.1
4
1 '/4 in. GFP
22.5 (572)
19 (483)
26 (12)
300
PF300752 30(1.9) 0.75 (0.56)
1
220
230
6.1
6.1
5
1 '/4 in. GFP
24.8 (630)
19 (483)
29 (13)
300
PF301052 30(1.9) 1.00 (0.75)
1
220
230
7.4
7.4
7
1 '/4 in. GFP
28.4 (721)
20 (508)
32 (15)
100
PF301552 4,5 30(1.9) 1.50 (1.11)
1
220
230
9.3
9.3
8
1 '/4 in. GFP
35.4 (899)
24 (610)
40 (18)
100
PF500552 50(3.2) 0.50 (0.37)
1
220
230
4.0
4.0
2
2 in. SS
20.3 (516)
25 (635)
29 (13)
300
PF500752 50(3.2) 0.75 (0.56)
1
220
230
6.3
6.4
3
2 in. SS
23.7 (602)
25 (635)
31 (14)
300
PF501052 50(3.2) 1.00 (0.75)
1
220
230
7.3
7.4
4
2 in. SS
27.0 (686)
26 (660)
35 (16)
100
PF501552 50(3.2) 1.50 (1.11)
1
220
230
9.1
9.1
5
2 in. SS
32.5 (826)
30 (162)
42 (19)
100
PF751052 75(3.2) 1.00 (0.75)
1
220
230
7.3
7.3
4
2 in. SS
30.0 (762)
27 (686)
34 (15)
100
1 GFP = glass -filled polypropylene; SS = stainless steel. The 1 N-in. NPT GFP discharge
is 2 718 in. octagonal across flats; the 1 N-in. NPT SS discharge is 2 118 in. octagonal across flats; and the
2-in. NPT SS discharge is 2 718 in. hexagonal across flats.
Discharge is female NPT threaded, U.S. nominal size, to accommodate OrencoO discharge hose and valve assemblies. Consult your Orenco
Distributor about fittings to connect hose and valve assemblies to metric -sized piping.
2 Minimum liquid level is for single pumps when installed
in an
Orenco BiotubO Pump Vault or Universal Flow Inducer.
In other applications, minimum liquid level should be top of pump. Consult
Orenco for more information.
3 Weight includes carton and 1 D-ft (3-m) cord.
4 High-pressure discharge assembly required.
5 Do not use cam -lock option (0) on discharge assembly.
6 Custom discharge assembly required for these pumps. Contact Orenco.
7 Capacitor pack (sold separately or installed in a custom
control panel) required for this
pump. Contact Orenco.
8 Torque locks are available for all pumps, and are supplied with 3-hp and 5-hp
pumps.
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTO-PU-PF-1
Rev. 2.2, © 09/14
Page 3 of 6
Materials of Construction
Discharge Glass -filled polypropylene or stainless steel
Discharge bearing Engineered thermoplastic (PEEK)
Diffusers Glass -filled PPO (Noryl GFN3)
Impellers Celcon® acetal copolymer on 10-, 20, and 30-gpm models; 50-gpm impellers are Noryl GFN3
Intake screen Polypropylene
Suction connection Stainless steel
Drive shaft 7/16 inch hexagonal stainless steel, 300 series
Coupling Sintered stainless steel, 300 series
Shell Stainless steel, 300 series
Motor Franklin motor exterior constructed of stainless steel. Motor filled with deionized water and propylene glycol for constant lubrication. Hermetically
sealed motor housing ensures moisture -free windings. All thrust absorbed by Kingsbury -type thrust bearing. Rated for continuous duty. Single-
phase motors and 200 and 230 V 3-phase motors equipped with surge arrestors for added security. Single-phase motors through 1.5 hp
(1.11 k" have built-in thermal overload protection, which trips at 203-221 ° F (95-105° C).
Using a Pump Curve
A pump curve helps you determine the best pump for your system. Pump curves show the relationship between flow (gpm or Usec) and pressure
(total dynamic head, or TDH), providing a graphical representation of a pump's optimal performance range. Pumps perform best at their nominal
flow rate — the value, measured in gpm, expressed by the first two numerals in an Orenco pump nomenclature. The graphs in this section show
optimal pump operation ranges with a solid line. Flow flow rates outside of these ranges are shown with a dashed line. For the most accurate
pump specification, use Orenco's PumpSelect'" software.
Pump Curves, 60 Hz Models
800
700
c 600
500
a
�c 400
300
-tam
200
1�
100
MIN
0
160
PF15 Series, 60 Hz, 0.3 hp
140
c 120
100
a
80
60
a 40
w
1°
20
0L
2 4 6 8 10 12 14 Of 0 3 6 9 12 15 18 21 24
Flow in gallons per minute (gpm) Flow in gallons per minute (gpm)
NTD-PU-PF-1 Orenco Systems® Inc., 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com
Rev. 2.2, © 09/14
Page 4 of 6
60 Hz Models (continued)
400
350
w
m
c 300
250
a
200
150
a 100
50
0L
0
450
400
m
350
,C
300
C"
a 250
R
as
200
= 150
ate.
v 100
F°
50
0L
0
i
PF20 Series, 60 Hz, 0.5 -1.5 hp
5 10 15 20 25 30 35 40
Flow in gallons per minute (gpm)
PF50 Series, 60 Hz, 0.5 - 5.0 hp -
10 20 30 40 50 60 70 80 90
Flow in gallons per minute (gpm)
auu
800
w
m
700
600
500
m
t
400
300
a
200
F°
100
i
PF3050 -- PF36 Series, 60 Hz, 0.5 - 5.0 h
01 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-1 1 1
0 5 10 15 20 25 30 35 40 45
Flow in gallons per minute (gpm)
100
90
a�
.ti 80
,c
70
O
60
a
ce
= 50
c�
40
�n
Cz.
a 30
c 20
a
I
PF75 Series, 60 Hz,1.0 -1.5 hp -
10
0L-1- -11-1 11 H- I - 1+1�-+1411-
0 10 20 30 40 50 60 70 80 90 100
Flow in gallons per minute (gpm)
Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com NTD-PU-PF-1
Rev. 2.2, © 09/14
Page 5 of 6
Pump Curves, 50 Hz Models
Flow in gallons per minute (gpm), nominal
180 1.6 3.2 4.8 6.3 7.9 9.5 11 13
160
y
w 149
m
.c 120
Z
C
�100
a
aRi
c 80
EE
e 60
c 40
20
0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
Flow in liters per second (L/sec)
Flow in gallons per minute (gpm), nominal
45 7.9 16 24 32 40 48 56 63
40
35
E
30
C
25
a
R
m
20
15
a
c10
oEL.1--EL� I fl± +Im
0 0.5 1.0 1.5 20 2.5 3.0 3.5 4.0 4.5
Flow in liters per second (L/sec)
120
Flow in gallons per minute (gpm), nominal
6.3 13 19 25 32
525
m
-
- -
c 100
y
459 c
w
c Q
m �
394 ,m E 80
PF301552
328 =
--._._........_._.
w 60
PF301052
262 Uc
UQ U
197 c 40
PF300752
_
...
PF300552
137 a''
m
_........,_;
__......._._
66 20
3
2
0L
0
I
PF30 Series, 50 Hz, 0.37 -1.11 kW
328 c
0
c
262 w
.c
197 C
a
d
v
131
e
66
0.4 0.8 1.2 1.6 20 24
Flow in liters per second (L/sec)
Flow in gallons per minute (gpm), nominal
10 19 29 38 48 57 67 76 86
PF75 Series, 50 Hz, 0.75 kW
89
.c
79 c
e
69
59
0
49
a
m
39
U
30
C
20 a
0 0.6 1.2 1.8 2.4 3.0 3.6 4.2 4.8 5.4 6.0
Flow in liters per second (L/sec)
a
NTD-PU-PF-1 Orenco Systems® Inc. , 814 Airway Ave., Sutherlin, OR 97479 USA • 800-348-9843 • 541-459-4449 • www.orenco.com
Rev. 2.2, © 09114
Page 6 of 6
This article may describe design criteria that was in effect at the time the article was written. FOR CURRENT DESIGN
CRITERIA, call Orenco Systems, Inc. at 1-800-348-9843.
P
Orenco Automatic Distributing
Valve Assemblies
For Wastewater Effluent Systems
Introduction
Orenco's automatic distributing valve assemblies, pressurized with small high -head effluent
pumps, are useful for distributing effluent to multiple zones. These zones can be segments
of sand filter manifolds, drainfields, or other effluent distribution systems. Distributing
valve assemblies can substantially simplify the design and installation of a distribution sys-
tem and reduce installation costs. This is particularly true where a distributing valve assem-
bly is used instead of multiple pumps and/or electrically operated valves. Additionally, a
reduction in long term operation and maintenance costs is realized due to a reduced size
and/or number of pumps. More even distribution can be achieved on sloping sites by zoning
laterals at equal elevations. This eliminates drainback to lower lines and the unequal distrib-
ution of effluent that occurs at the beginning of a cycle.
Valve Operation
The valve itself has only a few moving parts, requires no electricity, and alternates automati-
cally each cycle. Refer to Figure 1 for the following valve operation description. The flow
of the incoming effluent forces the rubber flap disk O to seat against the valve bottom ©.
The opening © in the rubber flap disk aligns with an opening in the valve bottom to allow
flow to only one valve outlet. The stem O houses a stainless steel spring which pushes the
rubber flap disk away from the valve bottom after the flow of effluent stops. The stem acts
as a cam follower and rotates the rubber flap disk as the stem is raised and lowered through
the cam ©. The force from the flow of effluent pushes the stem down through the cam and
the stainless steel spring pushes the stem back up through the cam when the flow of effluent
stops. Each linear motion of the stem allows the rubber flap disk to rotate half the distance
necessary to reach the next outlet. When there is no flow, the rubber flap disk is in the "up"
position and is not seated against the valve bottom.
Figure 1:
6000 Series Valve
----------1
.MNLIV
asp
Orenco Systems'
Incorporated
1-800-348-9843
NTP-VA-1
Rev.1.2, ©11/03
Orenco Systems®, Inc.
Page 1 of 6
Figure 2:
Orenco Distributing Valve Assembly (6000 Series Valve)
The Distributing Valve Assembly
The Orenco Automatic Distributing Valve Assembly combines the distributing valve itself and sever-
al other components to give a complete preassembled unit that is easy to install, monitor, and main-
tain. Figure 2 shows a complete assembly. Because distributing valves with several outlets can be
difficult to line up and glue together in the field, the discharge lines in the assemblies are glued in
place at Orenco. The unions (1) allow removal and maintenance of the valve. The clear PVC pipe
sections (2) give a visual check of which discharge line is being pressurized. The inlet ball valve (3)
allows a quick, simple method to test for proper valve cycling. The ball valve also stops the flow of
effluent in case the pump is activated unexpectedly during maintenance or inspection. Check valves
may be necessary on the discharge lines. Use of check valves is discussed in the valve positioning
section.
Valve Assembly Hydraulics
Liquid flowing through the valve assembly must pass through fairly small openings and make several
changes in direction. Because of this, headlosses through the valve assembly are fairly high. Table 1
gives the headloss equations for several different assemblies and Figure 3 shows the graphical repre-
sentations of these equations. Orenco recommends that high -head turbine pumps be used to pressur-
ize the valve assemblies to ensure enough head is available for proper system operation. High -head
turbine pumps are also recommended because the use of a distributing valve usually requires more
frequent pump cycling. The high -head turbine pumps are designed for high cycling systems and will
outlast conventional effluent pumps by a factor of 10 or more in a high cycling mode. Furthermore,
the high -head turbine pump intake is 12 inches or more above the bottom of the pump and tends to
prevent any settled solids from being pumped into the distribution valve and obstructing its opera-
tion. A minimum flow rate through the distributing valve is required to ensure proper seating of the
rubber flap disk. Minimum flow rates for the various models are given in Table 1.
NTP-VA-1
Rev.1.2, ©11/03
Orenco Systems®, Inc.
Page 2 of 6
Table 1. Automatic Distributing Valve Assembly Headloss Equations
Model Series F4uation Operating Range (0m),
V4400A HL =
0.085 x Q 1.45 10 - 40
V4600A HL =
0.085 x Q1.58 10-25
V6400A HL =
0.0045 x Q2 + 3.5 x (1- e 0.06Q) 15 - 70
V6600A HL = 0.0049 x Q2 + 5.5 x (1 - e 0.1Q) 15 - 70
35
30
E
U) 25
Q
20
a 15
10
0
0
—j 5
ca
0 0
V6600A
V4400A 000000, V6400A
V4600A
= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
Flow (gpm)
Figure 3:
Automatic distributing valve assembly headloss curves
The Pumping System
Although the distributing valve was designed for the irrigation industry, it has started to gain fairly
wide acceptance in the effluent pumping industry. However, because of the mechanical movements
of the valve, it is necessary to take steps to prevent solids from reaching the distributing valve that
may impede the operation of the valve. Orenco Biotube® Pump Vaults — when properly sized and
installed — provide the necessary protection to prevent valve malfunction. The Biotube® pump vault
accepts effluent only from the clear zone between a tank's scum and sludge layers and then filters
this effluent through a very large surface area screen cartridge. Without this protection in effluent
systems, the valve has very little chance of reliable long-term operation.
NTP-VA-1
Rev. 1.2, ©11/03
Orenco Systems®, Inc.
Page 3 of 6
Valve Positioning
The physical position of the valve in relation to the pump and the discharge point is very important
for proper valve operation. The most reliable operation occurs when the valve is placed at the high
point in the system and as close to the pump as possible. The transport line between the pump and
valve should be kept full if possible. If the line is empty at the beginning of each cycle, pockets of
air during filling can cause random rotation of the valve. The valve is particularly vulnerable to this
erratic rotation with empty lines that are long and not laid at a constant grade. An ideal valve loca-
tion is shown in Figure 4.
If the final discharge point is more than about 2 feet above the valve and the system does not drain
back into the dosing tank, check valves should be installed on the lines immediately following the
valve and a pressure release hole or line should be installed just prior to the valve. This pressure
release hole or line can go into a return line to the dosing tank or to a "minidrainfield" near the valve.
In order for the valve to rotate reliably, no more than about 2 feet of head should remain against the
valve to allow the rubber flap disk to return to its up position. In many cases, it may take from one
minute to several minutes for the pressure in the valve to be lowered enough for proper rotation to
occur. Special care should be taken when installing systems controlled by programmable timers to
ensure cycling does not occur too rapidly. Figure 5 illustrates a valve assembly using check valves.
Pumping downhill to the valve should be avoided unless the transport line is very short and the ele-
vation between the discharge line out of the tank and the valve is less than about 2 feet. If the valve
is located many feet below the dosing tank, random cycling may occur while the transport line drains
through the valve at the end of the cycle. A pressure sustaining valve located just before the distrib-
uting valve may overcome this problem in some instances.
Transport Line
Dosing Tank
Figure 4:
Ideal valve location
Distributing Valve Assembly
Discharge
NTP-VA-1
Rev.1.2, ©11/03
Orenco Systems®, Inc.
Page 4 of 6
System Startup
Refer to the Hydrotek Valve booklet that is provided with the distributing valve assembly for the
sequencing of the valve outlets. The transport line should always be flushed with clean water before
installing the valve. Any sand, gravel, or other foreign objects that may have been in the pipe during
installation can easily become lodged in the distributing valve, causing malfunction.
With the pump running, alternately close and open the ball valve on the distributing valve assembly
to check proper rotation of the valve. (Note: If check valves are used on the lines after the distribut-
ing valve, the pump may need to be turned on and off to allow the pressure to be released from the
valve.) If visual operation of which zone is operating is not possible, watch the clear pipe on each
line for indication of which zone is operating.
Figure 5:
Valve assembly below final discharge point
Maintenance
Annually check for proper operation by following procedures listed in the Hydrotek Valve booklet
and system startup procedures listed above.
Troubleshooting
1. PROBLEM: Valve does not change or cycle to next zone or outlet
CAUSE: The stem and disk assembly is not rotating when water flow is turned off and then
back on.
SOLUTION 1: Ensure that there is no debris inside the cam. Clean and carefully reinstall the cam.
SOLUTION 2: If fewer than the maximum number of outlets are being used, check the installation
of the cam. Ensure that the stem and disk assembly is not being held down by an
improperly installed cam. Refer to the cam replacement instructions.
NTP-VA-1
Rev.1.2, ©11/03
tlrenco Systems', Inc.
Page 5 of 6
SOLUTION 3: Remove the valve top and check for proper movement of stem and disk assembly.
Check for and remove any debris or foreign objects that may jam or retard the
movement of the disk.
SOLUTION 4: Check for freedom of movement of stem and disk assembly up and down over the
center pin in bottom of valve. Scale deposits may build up on the pin and hold stem
and disk assembly down. Clean pin and again check for freedom of movement.
SOLUTION 5: Be sure that all operating outlets are not capped and that the flow to operating zones
is not restricted in any manner. This would cause pressure to build up in the valve
and lock the stem and disk assembly in the down position.
SOLUTION 6: The backflow of water from uphill lines may be preventing the valve from cycling
properly. This can happen when the valve is placed too far below an elevated line.
If the valve cannot be placed close to the high point of the system, a check valve
should be installed near the valve in the outlet line that runs uphill from the valve
and a drain line installed just prior to the valve to relieve the pressure.
2. PROBLEM: Water comes out of all the valve outlets
CAUSE: Stem and disk assembly not seating properly on valve outlet.
SOLUTION 1: Check for sufficient water flow. A minimum flow rate is required to properly seat
the disk as shown in Table 1.
SOLUTION 2: Remove the valve top and check the inside walls to ensure that nothing is interfering
with the up and down movement of the stem and disk assembly inside the valve.
SOLUTION 3: Make sure that the operating outlets are not capped and that the flow to the operat-
ing zones are not restricted in any manner.
3. PROBLEM: Valve skips outlets or zones
CAUSE: Pumping into an empty transport line — especially downhill — may cause the valve
to skip outlets from pockets of air allowing the rubber flap disk to raise during a
cycle.
SOLUTION 1: Keep the transport line full.
SOLUTION 2: If the line must remain empty between cycles, use a larger diameter transport line
laid at a constant grade to prevent air pockets from forming.
CAUSE: The stem and disk assembly is being advanced past the desired outlet.
SOLUTION 1: Ensure that the correct cam for the desired number of zones is installed and that the
outlet lines are installed to the correct outlet ports of the valve as indicated by the
zone numbers on the top of the cam.
NTP-VA-1
Rev.1.2, 011/03
Orenco Systems®, Inc.
Page 6 of 6
PIP
Distributing Valves
Applications
Automatic Distributing Valve Assemblies are used to pressurize
multiple zone distribution systems including textile filters, sand
filters and drainfields.
cle
Side View
Bottom View
Specifications
Submittal
Data Sheet
General
w
Orenco Systems®
Incorporated
1-800-348-9843
Orenco's Automatic Distributing Valve Assemblies are
mechanically operated and sequentially redirect the
pump's flow to multiple zones or cells in a distribution
field. Valve actuation is accomplished by a combination
of pressure and flow. Automatic Distributing Valve
Assemblies allow the use of smaller horsepower pumps
on large sand filters and drainfields. For example, a large
community drainfield requiring 300 gpm can use a six -line
Valve Assembly to reduce the pump flow rate requirement
to only 50 gpm.
Orenco only warrants Automatic Distributing Valves when
used in conjunction with High -Head Effluent Pumps with
Biotube® Pump Vaults to provide pressure and flow
requirements, and to prevent debris from fouling valve
operation. An inlet ball valve and a section of clear pipe
and union for each outlet are provided for a complete
assembly that is easy to maintain and monitor. Ideal
valve location is at the high point in the system. Refer to
Automatic Distributing Valve Assemblies (NTP-VA-1) for
more information.
Standard Models
V4402A, V4403A, V4404A, V4605A, V4606A, V6402A, V6403A,
V6404A, V6605A, V6606A.
Nomenclature
00 00 A
T T TIndicates assembly
Number of active outlets
Model series:
44 = 4400 series (2-4 outlets)
46 = 4600 series (5-6 outlets)
64 = 6400 series (2-4 outlets)
66 = 6600 series (5-6 outlets)
'Distributing valve
Materials of Construction
All Fittings: Sch. 40 PVC per ASTM specification
Unions: Sch. 80 PVC per ASTM specification
Ball Valve: Sch. 40 PVC per ASTM specification
Clear Pipe: Sch. 40 PVC per ASTM specification
V4XXX Distributing Valves: High -strength noncorrosive ABS polymer and stainless steel
V6XXX Distributing Valves: High -strength noncorrosive ABS polymer, stainless steel, and die cast metal
NSU-SF-VA-1
Rev. 3.0, © 4/03
Page 1 of 2
Distributing Valves (continued)
_ 35
a 30 V6600A
.c
E
y 25
y
Q
.� 20 V4400A V6400A
as
a
0 15 V4600A
H
y 10
0
� 5
as
CD
x
0Jill fil If!
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Flow (gpm)
Model
Inlet Size (in.)
Outlets Size (in.)
Flow range (gpm)
Max Head (ft.)
Min. Enclosure
V4402A
1.25
1.25
10 - 40
170
V B 1217
V4403A
1.25
1.25
10 - 40
170
VB1217
V4404A
1.25
1.25
10 - 40
170
V B 1217
V4605A
1.25
1.25
10-25
170
RR2418
V4606A
1.25
1.25
10-25
170
RR2418
V6402A 1.5 1.5 15 -100 345 RR2418
V6403A 1.5 1.5 15 -100 345 RR2418
V6404A 1.5 1.5 15 -100 345 RR2418
V6605A 1.5 1.5 15 -100 345 RR2418
V6606A 1.5 1.5 15 -100 345 RR2418
NSU-SF-VA-1
Rev. 3.0, © 4/03
Page 2 of 2
Is K# Orenco° Flushing Assemblies
Flushing Assemblies
Orenco° flushing assemblies provide easy
access for lateral maintenance. Flushing
assembly kits include a PVC sweep with ball
valve and a polyethylene valve box enclosure.
OrencoO flushing assemblies are available in the
following sizes:
• 1" diameter
• 1.25" diameter
• 1.5" diameter
• 2" diameter
Valve Boxes
Orencoo valve boxes are used to provide access
to flushing assemblies. Constructed of
polyethylene.
Valve Box, 7-in. diameter round enclosure
Note: Kits include VB7 valve box enclosure.
Water & (719) 395-6764 28005 County Road 317
VeFALLEY
Wastewater P.O. Box 925
• Systems Fax: (719) 395-3727 Buena Vista, CO 81211
• Products Website: http://valleyprecast.com/
RECAST, Inc. Service Email: frontdesk@valleyprecast.com
104/-YY laxif L3yl-lUl-U1-UUG
Lot #5. Spring Park ROGERS
JOP- NAME Ranches
JOB NO, 8 Pr a '�74D F
0
LOCATION
1
BILL TO
DATE STARTED
i
DATII COMPLETED
DATE BILLED
11w4rim.�m/
MOM-
i
/
irk/J.�//�i1•a�Y
' ► �/J
tit HX
ME I NO
w.
M� 01WROIK "WA
wpm "mm"N- M/f /"d'�WlW07XA11—WA'[0lfA'
11 -All W, I v
_ COST SUMMARY
TOTAL SELLING PRICE
S
ME%
J
• •_.-
-E
■
Misc. COSTS
TOTAL JOB COST
GROSS PROFIT
LESS OVERHEADN
�■
JOB FOLDER Product 277
JOB FOLDER
w
Printed In U.SA
J
k"y-
C1
LDESIGN-,-CALCULA77ONS FOR A MOUND SYSTEM
esign percolation rate T = 110 minutes -per inch
1. The building sewer line from the house to the septic tank shall have a maximum slope of 114 inch per
foot. Bends in the building sewer shall be limited to 45 degrees.
2. The septic tank shall be installed level. The tank shall have removable covers or manholes to within 8
inches of the finished grgde, for inspection and cleaning.
J. Avoid vehicle traffic over the system.
526 4. All installations shall meet the rul and regulations of the Eagle County Environmental Health Division, for
Individual Sewage Disposal Systemq.-
86,*31/27"
603112711W
The Septic System lnst:�atinn
5 e Septic System Instakeition shall be inspected by the Design Engineer prior to bnckfillinn
Due to the slow percolation rate, o-MOUND TYPE SYSTEM with a pressurized distri-tut/66-
network is designed for this -site. Loading Rate for a Sand/Sandy Loa ixture = 1.2 gpd/sf 25
Number of bedrooms = 2 - / %��
Maximum doily FloW---= Qmox
Qmox = 2 bdrrrls x 2 persons/bdrm x 75 gollons1person/doy x 1509
Qmax_ z�!>450 gpd 1000 GALLON ELECTRIC JJFT SEPTIC TANK
SEPTIC TANK TYPICAL SOIL PROFILE
Soil Profile and Percolation
V = Qmoxl24hrs x 30 hrs Test done by HP Geotech, Job
V = 563 gallons Use 1000 Gallon Lift St9tion by Front Range Precast Concrete or equivalent. No. 199 266, doted April 20,1999.
A aCQPP TInAL _AREA ,
r n
A = Qmaxl1.2gpdlsf
A = 45011.2 = 375 S. f Amax = 375 s.f.-
-The abs�o rp_tion bed dimension within the Mound System Wbe 6 feet wide by 65 feet long.
The absorptionbed sh-C11--be parallel to the surface contours.
The perimeter of the mound shall be 87 feet I qg and 36 feet wide.
Site Preparation
Stake out the mound perimeter. -Cut and remove any excessive vegetation. Install the delivery
pipe from the pump chamber to the mound, providing 'drainage of the effluent from the
pipes, after the pump shuts off, either back to the,.-p'bmp chamber or into the gravel of the
mound. Backfill and compact the pipe trench. Plow the area within the mound perimeter.
Plowing should not be done when the soil is too wet. Grade the uneven areas.
Fill Plocemen
-Place the fill material over the prepared site. The fill material should consist of Sand/Sandy
Loom Mixture with the following characteristics:
88- 9JZ Sand
7-12110 Finer Grained material
The infiltration rate of a Sond/Sandy Loom Mixture is 1.2 gpd/sf. The height off -the sand
I top of the absorption bed. Shape the sides
fill should be the elevation of ffie of-1he mound
to the recommended slope, as shown on the details.
T_m
-Distribution Network Placement
Carefully place the coarse aggregate on the bed. The coarse aggregate shall consist of 314
to 2-712 inch rock. Level the aggregate to a minimum depth of 6 inches. Assemble the
distribution network over the aggregate. The distribution network shall consist of four 32-feet___.______---
laterals, 1-114 inch diameter (two on each side of a 1-1/2-inch diameter ,center manifold).
The inverts of-th-i laterals shall be perforated with 1/4-inch holes spaced every 30 inches.
For-fhe pressure distribution network use schedule 40 pvc (ASTM D 2665) or ABS (ASTM
2661) pipe.
The laterals shall be laid level and capped at th-e-ends. Place additional aggregate over the
crown of the pipes of at least 2 inchess�th-. Place a suitable bockfill barrier, such as filter
fabric, over the aggregate.
-
Covering of the Mound,.System
Place a finer textured soil, such as clay or silt loom over the- top of the bed, to a minimum
thickness of 6 inches.
Place 6 inches of good quality topsoil over the entire surface. Plant grosses adaptable
to the climate over the mound system.
Pump Selection
A pump capable of delivering 54 gpm against 10 feet of head canbeused. The elevations
between the pump invert and the manifold invert should be field verified. The pumping system
must also include -pump controls and an alarm syst_em-(AUDIBLE AND VISUAL). The pump will
be set to, four cycles at 112 gallons per dose
---
Inspection Pine
\1
Install a 4 inch diameter inspection pipe on both ends of the Gravel Bed. The pipe shaltt-6e
open on the bottom. The bottom of the pipe shall be at the some eleva-r16-n-as the bottom
of the gravel bed. The bottom 8 inches of the inspection pipeshoi/ be perforated. The pipe
shall be covered with a vent cap.
4-inch Diameter Building Sewer
CLEANOU T
43
TC'
MO UND DIMENSIONS
DESCRIPTION
SYMBOL
DIMENSION
(fee t)
BED WID TH
i v A
6.0
BED LENGTH
V B
65.0
MOUND DEPTH
D
1.0
MOUND DEPTH
E
1.4
BED DEPTH
1VF
0.75
CAP AT EDGE OF BED
V G
7.0
CAP AT CENTER OF BED
DOWNSLOPE SETBACK
\v H
V /
1.5
22.0
UPSLOPE SETBACK
j
&0
SIDESLOPE SETBACK
1 K
11.0
MOUND LENGTH
L
\SIN
87.0
MOUND WID TH
36.0
.01
Mound Perimeter
1-114-inch Diameter Lateral
Perforated with 1/4-inch holes
spaced at 30 inches.
100
3-inch Diameter Del' ery Pipe 1001
Con
Absorption Bed with
1-1/2-inch Diameter
Cen tral Manifold
94'
9"
Dk"W"i.m
C*—W-
Of St.6b.
IF
L
H
A I
D
it' - 41
51 - 91
as
3W
im
,o
NOM Yho abow *Wtk to* J& preAmed by front ROW PF"W L-~W0
GRAPHIC SCALE
20 0 10 20 40
IN FEET
I inch = 20 ft.
1-114 INCH PERFORATED LATERALS
FIL TER FABRIC
CLAY FILL OR TOPSOIL
TOPSOIL
1-1/2-INCH DIAMETER MANIFOLD PIPE
314TO 2-112- ROCK
SA NDISA ND Y LOAM FROM PUMP
CLEARED AND RAKED SUBGRADE
'S SECTION A —A
NOT TO SCALE
80
M.-
CL
0
cil
Z
W.. M
DRAWN BY L. P.
CHECKED BY-
L.P.
PROJECT NO.:
99117
DAM 07-08-99
DRAWING NO.:
99117SD.DWG
SHEET 1
OF 1