HomeMy WebLinkAboutC22-375 Colorado Mtn. College_Shaw Builders Page 1 of 3 THIRD AMENDMENT TO COLORADO MOUNTAIN COLLEGE AND SHAW BUILDERS, LLC CM/GC AGREEMENT THIS THIRD AMENDMENT (the “Third Amendment”) is entered into by and between COLORADO MOUNTAIN COLLEGE (the “College” or “CMC”) and SHAW BUILDERS LLC (“CM/GC”). EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Third Amendment is intended to incorporate additional CM/GC services as described herein to add a second building at the Edwards Campus (“Phase 2”). FACTUAL RECITALS A. The parties entered into a CM/GC Agreement dated April 18, 2022, for the construction of a student housing project at the College’s Breckenridge, Edwards, Spring Valley and Steamboat Campuses which was subsequently amended by First Amendment dated May 3, 2022 and Second Amendment dated October 10, 2022 (together the “Agreement”). B. This Third Amendment is intended to set the amount appropriated for Edwards Phase 2, set the Fixed Limit of Construction Cost, incorporate the Guaranteed Maximum Price, and other amendments anticipated by the Agreement. The result is an increase in the Contract Sum. C. The design and construction of Edwards Phase 2 is on behalf of and for the benefit of the Eagle County Housing and Development Authority (“ECHDA”) and CMC is acting as the contracting party and primary contact with the CM/GC. D. Authority exists and funds have been budgeted, appropriated, and otherwise made available and a sufficient unencumbered balance thereof remains available for payment NOW THEREFORE, it is hereby agreed that AGREEMENT a. Consideration for this Third Amendment consists of the payments, which shall be made pursuant to this Third Amendment and the promises, and agreements herein set forth. 2. It is expressly agreed by the parties that this Third Amendment is supplemental to the Agreement, as amended, which is by this reference incorporated herein, that all terms, conditions, and provisions thereof, unless specifically modified herein, are to apply to this Third Amendment as though they were expressly re-written, incorporated, and included herein. 3. It is agreed the Agreement is and shall be modified, altered, and changed in the following respects only: a. The CM/GC’s scope of work shall be amended to add in all obligations of CM/GC services described in the Agreement and as supplemented by the Exhibits attached hereto and incorporated by reference. The CM/GC’s fee shall be as described on Exhibit A attached hereto and incorporated by reference. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Page 2 of 3 b. The Parties hereby agree that payment of any fees under this Third Amendment are to be paid exclusively from ECHDA funds and that ECHDA is a third party beneficiary to the Agreement and is the obligor to CM/GC with respect to payment of the additional fees stated herein. CMC shall not be liable to CM/GC for payment of the additional fees stated in this Third Amendment. c. The established Fixed Limit of Construction Cost is hereby increased by Nine Million Seven Hundred Sixty-Three Thousand Eight Hundred Seventy-Nine Dollars ($9,763,879) for a total Fixed Limit of Construction Cost of Forty-Eight Million Five Hundred Thirty-Nine Thousand Five Hundred Thirty-Nine Dollars ($48,539,539). d. This Third Amendment approves and incorporates the following Exhibits to the Agreement: • Exhibit I.1 Guaranteed Maximum Price Documents, Drawings, and Specifications including and Modifications (when approved by the College) for Phase 2. • Exhibit I.2 Addenda and Modifications • Exhibit I.3 Schedule of Values for Edwards Phase 2. • Exhibit I.4 Allowance Schedule for Edwards Phase 2. • Exhibit I.8 Notice to Proceed for Edwards Phase 2. • Exhibit I.9 Critical Path Method (CPM) Construction Schedule for Phase 2. Pre-Const. Services Fee Contractor Overhead & Fee General Conditions Liability/ Risk/Bond Contingency/ Escalation Direct Cost of Work Total Agreement $40,000 - $2,340,345 - - - $2,380,345 Amendment #1 $1,551,837 $195,030 $554,926 $3,684,904 $30,408,619 $36,395,316 Amendment #2 - - - - ($915,479) $915,478 ($1.00) Amendment #3 - $392,165 $507,258 $150,119 $666,600 $8,047,737 $9,763,879 Guaranteed Maximum Price (To Date): $48,539,539 Fixed Limit of Construction Cost (To Date:) $48,539,539 4. Except with respect to the “Special Provisions,” in the event of any conflict, inconsistency, variance, or contradiction between the provisions of this Third Amendment and any of the provisions of the Agreement, the provisions of this Third Amendment shall in all respects supersede, govern, and control. The “Special Provisions” shall always be controlling over other provisions in Agreement or Amendments. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Page 3 of 3 THE PARTIES HERETO HAVE EXECUTED THIS AMENDMENT Persons signing for CM/GC hereby swear and affirm that they are authorized to act on CM/GC’s behalf and acknowledge that the College is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. CONSTRUCTION MANAGER/ COLORADO MOUNTAIN COLLEGE GENERAL CONTRACTOR Shaw Builders LLC A Colorado limited liability company _____________________________________ __________________________________ By: __________________________________ By: Matt Gianneschi Title: _________________________________ Title: COO and Chief of Staff Date: _________________________________ Date: _____________________________ __________________________________ By: Julie S. Hanson Title: Director of Purchasing & Contracts Date: _____________________________ ACKNOWLEDGED AND AGREED TO: ECHDA hereby acknowledges and agrees to the terms and conditions stated herein and assumes obligation for payment of the additional fees agreed upon in this Third Amendment. ____________________________ By: Jeanne McQueeney Title: Commissioner Date: ________________________ DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B 10/27/2022 Sam Meyer - President 10/28/2022 Sam Meyer 11/8/2022 11/8/2022 Edwards - Phase 2 - 100% CD (06/30/22) Drawing No.Drawing Title Revision Drawing Date Received Date Set General 1 JUNE 30, 2022 0 06/30/2022 06/30/2022 100% CD (06/30/22) G-100-ED2 INDEX & ABBREVIATIONS - ED2 0 06/30/2022 06/30/2022 100% CD (06/30/22) G-101-ED CODE STUDY -ED 0 06/30/2022 06/30/2022 100% CD (06/30/22) G-102 CODE PLANS 0 06/30/2022 06/30/2022 100% CD (06/30/22) Civil C000-ED2 COVER SHEET 0 06/30/2022 06/30/2022 100% CD (06/30/22) C001-ED2 NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) C002-ED2 NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) C010-ED2 EXISTING CONDITIONS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C100-ED2 SITE, PAVING & SIGNAGE PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C110-ED2 HORIZONTAL CONTROL & STRIPING PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C111-ED2 SITE DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C112-ED2 SITE DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C200-ED2 OVERALL GRADING PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C201-ED2 DETAILED GRADING PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C300-ED2 OVERALL UTILITY PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C310-ED2 STORM PLAN & PROFILES 0 06/30/2022 06/30/2022 100% CD (06/30/22) C311-ED2 STORM PLAN & PROFILES 0 06/30/2022 06/30/2022 100% CD (06/30/22) C312-ED2 STORM DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C313-ED2 STORM DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C320-ED2 DETENTION PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C321-ED2 DETENTION POND DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C330-ED2 WATER PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C331-ED2 WATER TRACER WIRE PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C332-ED2 WATER DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C340-ED2 SANITARY PLAN & PROFILE 0 06/30/2022 06/30/2022 100% CD (06/30/22) C341-ED2 SANITARY TRACER WIRE PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C342-ED2 SANITARY DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C350-ED2 TRACER WIRE DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C400-ED2 EROSION CONTROL PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) C401-ED2 EROSION CONTROL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C402-ED2 EROSION CONTROL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) C403-ED2 EROSION CONTROL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) Shaw Construction Printed on Wed Sep 14, 2022 at 11:38 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 1 of 5 EXHIBIT I.1DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Drawing No.Drawing Title Revision Drawing Date Received Date Set C404-ED2 EROSION CONTROL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) Landscape L-102-ED2 PLANTING PLAN 1 06/30/2022 06/30/2022 100% CD (06/30/22) L-201-ED2 Details 0 06/30/2022 06/30/2022 100% CD (06/30/22) L-202-ED2 Details 0 06/30/2022 06/30/2022 100% CD (06/30/22) Structural S001-ED GENERAL NOTES - EDWARDS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S002 GENERAL NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) S003 GENERAL NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) S004-ED LOAD KEYS - EDWARDS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S005 TYPICAL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S006 TYPICAL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S007 TYPICAL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S008 TYPICAL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S101-ED FOUNDATION PLAN - EDWARDS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S102 LEVEL 2 FRAMING PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) S103 LEVEL 3 FRAMING PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) S104 ROOF FRAMING PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) S300 ENLARGED STAIR PLANS AND DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S301 SITE STRUCTURES 0 06/30/2022 06/30/2022 100% CD (06/30/22) S400 FOUNDATION DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S410 FLOOR FRAMING DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S420 ROOF FRAMING DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S421 ROOF FRAMING DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) S500 SCHEDULES 0 06/30/2022 06/30/2022 100% CD (06/30/22) S501 SCHEDULES 0 06/30/2022 06/30/2022 100% CD (06/30/22) Architectural A-100-ED2 SITE PLAN -ED2 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-101 PLAN -LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-102 PLAN -LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-103 PLAN -LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-105 PLAN -ROOF 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-111 REFLECTED CEILING PLAN - LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-112 REFLECTED CEILING PLAN - LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-113 REFLECTED CEILING PLAN - LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-121 FINISH PLAN -LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-122 FINISH PLAN -LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-123 FINISH PLAN -LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) Shaw Construction Printed on Wed Sep 14, 2022 at 11:38 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 2 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Drawing No.Drawing Title Revision Drawing Date Received Date Set A-201 EXTERIOR ELEVATIONS 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-202 EXTERIOR ELEVATIONS - FINISH SELECTION 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-301 BUILDING SECTIONS 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-401 ENLARGED PLAN & INT ELEVATIONS -2 BEDROOM - ACCESSIBLE 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-402 ENLARGED PLAN & INT ELEVATIONS -2 BEDROOM -TYPE 'A'& TYPE 'B'0 06/30/2022 06/30/2022 100% CD (06/30/22) A-403 ENLARGED PLAN & INT ELEVATIONS - STUDIO - ACCESSIBLE & TYPE 'B'0 06/30/2022 06/30/2022 100% CD (06/30/22) A-404 ENLARGED PLAN & INT ELEVATIONS -2 BR & STUDIO - STANDARD (LEVEL 2 & 3)0 06/30/2022 06/30/2022 100% CD (06/30/22) A-405 ENLARGED RCP -2 BR & STUDIO 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-406 INTERIOR ELEVATIONS - CORRIDOR & LAUNDRY 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-407 ENLARGED PLANS & SECTIONS - STAIR 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-408 ENLARGED PLANS & SECTIONS - STAIR 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-409 ENLARGED FINISH PLANS - CORRIDOR 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-411 ENLARGED PLAN & ELEVATIONS -TRASH ENCLOSURE 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-501 FINISH AND CASEWORK SCHEDULE 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-502 DOOR SCHEDULE 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-503 WINDOW SCHEDULE 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-601 EXTERIOR WALL, SOFFIT, ROOF, & INT FLOOR ASSEMBLIES 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-602 PARTITION TYPES 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-603 PARTITION, CEILING, INT FLOOR & DOOR DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-604 INTERIOR DETAILS AT RATED ASSEMBLIES 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-611 WALL SECTIONS 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-612 WALL SECTIONS 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-621 EXTERIOR DETAILS - FOUNDATION 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-622 EXTERIOR DETAILS - WINDOWS 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-623 EXTERIOR DETAILS - DOORS 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-624 EXTERIOR DETAILS - ROOF & PORCH 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-625 EXTERIOR DETAILS - FIBER CEMENT 0 06/30/2022 06/30/2022 100% CD (06/30/22) A-626 EXTERIOR DETAILS - METAL PANEL 0 06/30/2022 06/30/2022 100% CD (06/30/22) Mechanical M-001 -ED2 MECHANICAL LEGENDS & NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) M-002 -ED2 MECHANICAL SCHEDULES 0 06/30/2022 06/30/2022 100% CD (06/30/22) M-101 -ED2 HVAC PLAN -LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) M-102 -ED2 HVAC PLAN -LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) M-103 -ED2 HVAC PLAN -LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) M-104 -ED2 HVAC PLAN -ROOF 0 06/30/2022 06/30/2022 100% CD (06/30/22) M-401 -ED2 MECHANICAL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) Plumbing P-001 -ED2 PLUMBING LEGENDS & NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) Shaw Construction Printed on Wed Sep 14, 2022 at 11:38 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 3 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Drawing No.Drawing Title Revision Drawing Date Received Date Set P-002 -ED2 PLUMBING SCHEDULES 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-101 -ED2 DOMESTIC WATER PLAN - LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-102 -ED2 DOMESTIC WATER PLAN - LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-103 -ED2 DOMESTIC WATER PLAN - LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-110 -ED2 WASTE & VENT PLAN SERIES - FOUNDATION 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-111 -ED2 WASTE & VENT PLAN SERIES - LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-112 -ED2 WASTE & VENT PLAN SERIES - LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-113 -ED2 WASTE & VENT PLAN SERIES - LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-114 -ED2 PLUMBING PLAN SERIES - ROOF 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-301 -ED2 PLUMBING ENLARGED PLANS 0 06/30/2022 06/30/2022 100% CD (06/30/22) P-401 -ED2 PLUMBING DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) Electrical E-001 -ED2 ELECTRICAL LEGENDS & NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-002 -ED2 ELECTRICAL SCHEDULES 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-011 -ED2 ELECTRICAL ONE-LINE DIAGRAM 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-100 -ED2 ELECTRICAL SITE PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-101 -ED2 LIGHTING PLAN -LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-102 -ED2 LIGHTING PLAN -LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-103 -ED2 LIGHTING PLAN -LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-111 -ED2 POWER PLAN -LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-112 -ED2 POWER PLAN -LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-113 -ED2 POWER PLAN -LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-121 -ED2 FIRE ALARM PLAN -LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-122 -ED2 FIRE ALARM PLAN -LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-123 -ED2 FIRE ALARM PLAN -LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-201 -ED2 SNOW & ICE MELT PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-301 -ED2 ELECTRICAL PANEL SCHEDULES 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-302 -ED2 ELECTRICAL PANEL SCHEDULES 0 06/30/2022 06/30/2022 100% CD (06/30/22) E-401 -ED2 ELECTRICAL DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) Fire Protection F-001 -ED2 FIRE PROTECTION LEGENDS & NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) F-101 -ED2 FIRE PROTECTION PLAN - LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) F-102 -ED2 FIRE PROTECTION PLAN - LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) F-103 -ED2 FIRE PROTECTION PLAN - LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) Interior I-102 Irrigation Details 0 06/30/2022 06/30/2022 100% CD (06/30/22) Resource r0 PLANTING PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) Shaw Construction Printed on Wed Sep 14, 2022 at 11:38 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 4 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Drawing No.Drawing Title Revision Drawing Date Received Date Set Telecommunications T-001 -ED2 TECHNOLOGY LEGENDS & NOTES 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-100 -ED2 TECHNOLOGY SITE PLAN 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-101 - ED2 TECHNOLOGY PATHWAY PLAN - LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-102 - ED2 TECHNOLOGY PATHWAY PLAN - LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-103 - ED2 TECHNOLOGY PATHWAY PLAN - LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-111 - ED2 TECHNOLOGY FLOOR PLAN - LEVEL 1 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-112 - ED2 TECHNOLOGY FLOOR PLAN - LEVEL 2 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-113 - ED2 TECHNOLOGY FLOOR PLAN - LEVEL 3 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-401 - ED2 TECHNOLOGY DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) T-403 - ED2 SINGLE DOOR SECURITY DETAILS 0 06/30/2022 06/30/2022 100% CD (06/30/22) Shaw Construction Printed on Wed Sep 14, 2022 at 11:38 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 5 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B 100%CD Edwards Phase 2 Specifications Number Description Revision Issued Date Received Date Set 00 - Procurement and Contracting Requirements 000110 Table of Contents 2 100%CD Edwards Phase 2 01 - General Requirements 01 10 00 SUMMARY 2 100%CD Edwards Phase 2 01 23 00 ALTERNATES 2 100%CD Edwards Phase 2 01 25 00 SUBSTITUTION PROCEDURES 2 100%CD Edwards Phase 2 01 26 00 CONTRACT MODIFICATION PROCEDURES 2 100%CD Edwards Phase 2 01 29 00 PAYMENT PROCEDURES 2 100%CD Edwards Phase 2 01 31 00 PROJECT MANAGEMENT AND COORDINATION 2 100%CD Edwards Phase 2 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION 2 100%CD Edwards Phase 2 01 32 33 PHOTOGRAPHIC DOCUMENTATION 2 100%CD Edwards Phase 2 01 33 00 SUBMITTAL PROCEDURES 2 100%CD Edwards Phase 2 01 40 00 QUALITY REQUIREMENTS 2 100%CD Edwards Phase 2 01 42 00 REFERENCES 2 100%CD Edwards Phase 2 01 43 39 MOCKUPS 2 100%CD Edwards Phase 2 01 50 00 TEMPORARY FACILITIES AND CONTROLS 2 100%CD Edwards Phase 2 01 57 13 TEMPORARY EROSION AND SEDIMENTATION CONTROL 0 100%CD Edwards Phase 2 01 60 00 PRODUCT REQUIREMENTS 2 100%CD Edwards Phase 2 01 73 00 EXECUTION 2 100%CD Edwards Phase 2 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 2 100%CD Edwards Phase 2 01 77 00 CLOSEOUT PROCEDURES 2 100%CD Edwards Phase 2 01 78 23 OPERATION AND MAINTENANCE DATA 2 100%CD Edwards Phase 2 01 78 39 PROJECT RECORD DOCUMENTS 2 100%CD Edwards Phase 2 01 79 00 DEMONSTRATION AND TRAINING 2 100%CD Edwards Phase 2 03 - Concrete 03 30 00 CAST-IN-PLACE CONCRETE 2 100%CD Edwards Phase 2 03 54 13 GYPSUM CEMENT UNDERLAYMENT 2 100%CD Edwards Phase 2 05 - Metals 05 50 00 METAL FABRICATIONS 1 100%CD Edwards Phase 2 05 73 00 DECORATIVE METAL RAILINGS 2 100%CD Edwards Phase 2 06 - Wood, Plastics, and Composites 06 10 00 ROUGH CARPENTRY 2 100%CD Edwards Phase 2 06 10 53 MISCELLANEOUS ROUGH CARPENTRY 2 100%CD Edwards Phase 2 Shaw Construction Printed on Wed Sep 14, 2022 at 11:21 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 1 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Number Description Revision Issued Date Received Date Set 06 16 00 SHEATHING 2 100%CD Edwards Phase 2 06 17 33 Wood I-Joists 2 100%CD Edwards Phase 2 06 17 53 SHOP-FABRICATED WOOD TRUSSES 2 100%CD Edwards Phase 2 06 20 13 Exterior Finish Carpentry 2 100%CD Edwards Phase 2 06 20 23 INTERIOR FINISH CARPENTRY 2 100%CD Edwards Phase 2 06 40 23 INTERIOR ARCHITECTURAL WOODWORK 2 100%CD Edwards Phase 2 06 61 13 CAST MARBLE TUB AND SHOWER PANEL SYSTEM 2 100%CD Edwards Phase 2 07 - Thermal and Moisture Protection 07 11 13 BITUMINOUS DAMPPROOFING 2 100%CD Edwards Phase 2 07 13 26 SELF-ADHERING SHEET WATERPROOFING 2 100%CD Edwards Phase 2 07 21 00 THERMAL INSULATION 2 100%CD Edwards Phase 2 07 26 00 VAPOR RETARDERS 2 100%CD Edwards Phase 2 07 31 13 ASPHALT SHINGLES 2 100%CD Edwards Phase 2 07 41 13 Metal Roof Panels 2 100%CD Edwards Phase 2 07 42 13 Metal Wall Panels 2 100%CD Edwards Phase 2 07 46 46 FIBER-CEMENT SIDING 2 100%CD Edwards Phase 2 07 62 00 SHEET METAL FLASHING AND TRIM 2 100%CD Edwards Phase 2 07 72 53 SNOW GUARDS 2 100%CD Edwards Phase 2 07 84 13 PENETRATION FIRESTOPPING 2 100%CD Edwards Phase 2 07 84 43 JOINT FIRESTOPPING 2 100%CD Edwards Phase 2 07 92 00 JOINT SEALANTS 2 100%CD Edwards Phase 2 08 - Openings 08 11 13 HOLLOW METAL DOORS AND FRAMES 2 100%CD Edwards Phase 2 08 14 16 FLUSH WOOD DOORS 1 100%CD Edwards Phase 2 08 16 00 MOLDED COMPOSITE DOORS 2 100%CD Edwards Phase 2 08 31 13 ACCESS DOORS AND FRAMES 2 100%CD Edwards Phase 2 08 53 13 VINYL WINDOWS AND DOORS 2 100%CD Edwards Phase 2 08 71 00 DOOR HARDWARE 2 100%CD Edwards Phase 2 08 80 00 GLAZING 1 100%CD Edwards Phase 2 08 88 13 FIRE-RESISTANT GLAZING 2 100%CD Edwards Phase 2 09 - Finishes 09 21 16 Gypsum Board Assemblies 2 100%CD Edwards Phase 2 09 22 16 NON-STRUCTURAL METAL FRAMING 1 100%CD Edwards Phase 2 09 29 00 GYPSUM BOARD 2 100%CD Edwards Phase 2 09 65 13 RESILIENT BASE AND ACCESSORIES 2 100%CD Edwards Phase 2 09 65 19 RESILIENT TILE FLOORING 2 100%CD Edwards Phase 2 09 68 13 TILE CARPETING 2 100%CD Edwards Phase 2 Shaw Construction Printed on Wed Sep 14, 2022 at 11:21 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 2 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Number Description Revision Issued Date Received Date Set 09 91 13 EXTERIOR PAINTING 2 100%CD Edwards Phase 2 09 91 23 INTERIOR PAINTING 2 100%CD Edwards Phase 2 10 - Specialties 10 14 19 DIMENSIONAL LETTER SIGNAGE 2 100%CD Edwards Phase 2 10 14 23 PANEL SIGNAGE 2 100%CD Edwards Phase 2 10 26 00 WALL AND DOOR PROTECTION 2 100%CD Edwards Phase 2 10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES 2 100%CD Edwards Phase 2 10 44 13 FIRE PROTECTION CABINETS 2 100%CD Edwards Phase 2 10 44 16 FIRE EXTINGUISHERS 2 100%CD Edwards Phase 2 10 55 00 Postal Specialties 2 100%CD Edwards Phase 2 11 - Equipment 11 30 13 RESIDENTIAL APPLIANCES 2 100%CD Edwards Phase 2 12 - Furnishings 12 21 13 LOUVER BLINDS 2 100%CD Edwards Phase 2 12 32 16 MANUFACTURED PLASTIC-LAMINATE-FACED CASEWORK 2 100%CD Edwards Phase 2 12 36 61 Simulated Stone Countertops 2 100%CD Edwards Phase 2 21 - Fire Suppression 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION 2 100%CD Edwards Phase 2 21 10 00 WATER BASED FIRE PROTECTION 2 100%CD Edwards Phase 2 22 - Plumbing 22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 2 100%CD Edwards Phase 2 22 05 19 METERS AND GAUGES FOR PLUMBING PIPING 2 100%CD Edwards Phase 2 22 05 23 GENERAL DUTY VALVE FOR PLUMBING 2 100%CD Edwards Phase 2 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 2 100%CD Edwards Phase 2 22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 2 100%CD Edwards Phase 2 22 07 00 PLUMBING INSULATION 2 100%CD Edwards Phase 2 22 10 23 PLUMBING PUMPS 2 100%CD Edwards Phase 2 22 11 16 DOMESTIC WATER PIPING 2 100%CD Edwards Phase 2 22 11 19 DOMESTIC WATER PIPING SPECIALTIES 2 100%CD Edwards Phase 2 22 13 16 SANITARY WASTE AND VENT PIPING 2 100%CD Edwards Phase 2 22 13 19 SANITARY WASTE PIPING SPECIALTIES 2 100%CD Edwards Phase 2 22 30 00 WATER HEATERS 2 100%CD Edwards Phase 2 22 40 00 PLUMBING FIXTURES 2 100%CD Edwards Phase 2 220500 COMMON WORK RESULTS FOR PLUMBING 2 100%CD Edwards Phase 2 23 - Heating, Ventilating, and Air Conditioning (HVAC) 23 05 00 COMMON WORK RESULTS FOR MECHANICAL 2 100%CD Edwards Phase 2 23 05 07 MOTORS, DRIVES, MOTOR CONTROLLERS AND ELECTRICAL REQUIREMENTS 2 100%CD Edwards Phase 2 Shaw Construction Printed on Wed Sep 14, 2022 at 11:21 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 3 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Number Description Revision Issued Date Received Date Set 23 05 09 MECHANICAL FIRE STOPPING 2 100%CD Edwards Phase 2 23 05 29 HANGERS AND SUPPORTS FOR MECHANICAL PIPING &ampampamp EQUIPMENT 2 100%CD Edwards Phase 2 23 05 53 IDENTIFICATION FOR MECHANICAL SYSTEMS 2 100%CD Edwards Phase 2 23 05 93 TESTING, ADJUSTING AND BALANCING FOR MECHANICAL SYSTEMS 2 100%CD Edwards Phase 2 23 07 00 INSULATION FOR MECHANICAL SYSTEMS 2 100%CD Edwards Phase 2 23 09 93 SEQUENCES OF OPERATION FOR MECHANICAL SYSTEMS 1 100%CD Edwards Phase 2 23 31 13 METAL DUCTS 2 100%CD Edwards Phase 2 23 33 00 AIR DUCT ACCESSORIES 2 100%CD Edwards Phase 2 23 34 00 HVAC FANS 2 100%CD Edwards Phase 2 23 37 13 DIFFUSERS, REGISTERS &ampampamp GRILLES 2 100%CD Edwards Phase 2 23 81 19 SELF CONTAINED AIR CONDITIONERS 2 100%CD Edwards Phase 2 26 - Electrical 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL 2 100%CD Edwards Phase 2 26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 2 100%CD Edwards Phase 2 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 2 100%CD Edwards Phase 2 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 2 100%CD Edwards Phase 2 26 05 33 RACEWAY AND WIREWAY FOR ELECTRICAL SYSTEMS 2 100%CD Edwards Phase 2 26 05 34 CABINETS, BOXES AND FITTINGS 2 100%CD Edwards Phase 2 26 05 37 SNOW AND ICE MELT SYSTEMS 2 100%CD Edwards Phase 2 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS 2 100%CD Edwards Phase 2 26 05 83 WIRING CONNECTIONS 2 100%CD Edwards Phase 2 26 09 23 LIGHTING CONTROL DEVICES 2 100%CD Edwards Phase 2 26 24 13 SWITCHBOARDS 2 100%CD Edwards Phase 2 26 27 26 WIRING DEVICES 2 100%CD Edwards Phase 2 26 28 00 LOW VOLTAGE CIRCUIT PROTECTIVE DEVICES 2 100%CD Edwards Phase 2 26 43 13 SURGE PROTECTIVE DEVICE (SPD)2 100%CD Edwards Phase 2 26 50 00 LIGHTING 2 100%CD Edwards Phase 2 262416 PANELBOARDS 2 100%CD Edwards Phase 2 27 - Communications 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS 2 100%CD Edwards Phase 2 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 2 100%CD Edwards Phase 2 27 05 44 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND 2 100%CD Edwards Phase 2 27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS 2 100%CD Edwards Phase 2 27 06 00 SCHEDULES FOR COMMUNICATIONS 2 100%CD Edwards Phase 2 27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS 2 100%CD Edwards Phase 2 27 11 16 COMMUNICATIONS CABINETS, RACKS, FRAMES, AND ENCLOSURES 2 100%CD Edwards Phase 2 27 15 00 COMMUNICATIONS HORIZONTAL CABLING 2 100%CD Edwards Phase 2 Shaw Construction Printed on Wed Sep 14, 2022 at 11:21 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 4 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Number Description Revision Issued Date Received Date Set 28 - Electronic Safety and Security 28 31 11 FIRE DETECTION AND ALARM 2 100%CD Edwards Phase 2 31 - Earthwork 31 10 00 SITE CLEARING 0 100%CD Edwards Phase 2 31 20 00 EARTH MOVING 0 100%CD Edwards Phase 2 31 23 33 TRENCHING AND BACKFILLING 0 100%CD Edwards Phase 2 31 63 29 DRILLED CONCRETE PIERS AND SHAFTS 2 100%CD Edwards Phase 2 32 - Exterior Improvements 32 01 90 TREE AND SHRUB PRESERVATION 2 100%CD Edwards Phase 2 32 12 16 ASPHALT PAVING 0 100%CD Edwards Phase 2 32 13 13 CONCRETE PAVING 0 100%CD Edwards Phase 2 32 13 73 CONCRETE PAVING JOINT SEALANTS 0 100%CD Edwards Phase 2 32 17 23 PAVEMENT MARKINGS 0 100%CD Edwards Phase 2 32 31 13 SITE FENCES AND GATES 1 100%CD Edwards Phase 2 32 83 50 LANDSCAPE MAINTENANCE 2 100%CD Edwards Phase 2 32 84 00 IRRIGATION SYSTEM 2 100%CD Edwards Phase 2 32 91 00 FINE GRADING AND SOIL PREPARATION 2 100%CD Edwards Phase 2 32 92 00 TURF AND GRASSES 2 100%CD Edwards Phase 2 32 93 00 PLANTING 2 100%CD Edwards Phase 2 32 94 00 PLANTING ACCESSORIES 2 100%CD Edwards Phase 2 33 - Utilities 33 11 00 WATER UTILITY DISTRIBUTION PIPING 0 100%CD Edwards Phase 2 33 31 00 SANITARY UTILITY SEWERAGE PIPING 0 100%CD Edwards Phase 2 33 41 00 STORM UTILITY DRAINAGE PIPING 0 100%CD Edwards Phase 2 Shaw Construction Printed on Wed Sep 14, 2022 at 11:21 am MDT Job #: 20305 Colorado Mountain College Student Housing Steamboat, Breckenridge, Edwards & Spring Valley, Colorado Page 5 of 5 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B EXHIBIT I.2 All Addenda and Modifications Amendment 1 dated May 3, 2022 Amendment 2 dated __________October 10, 2022 DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Project: CMC Student Housing – Edwards Phase 2 100% CD Reconciliation Scope Narrative EXHIBIT I.3 Schedule of Values DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 2 of 11 GENERAL INFORMATION All work shall be complete pursuant to the 100% Construction documents unless clarified or noted below • Costs associated with any temporary monthly usage bills for electric and gas are included in the budget for the duration of construction as set forth in the project schedule or until substantial completion of the project is attained. o It is assumed that power is available at site for temp power; any use of generators is not included and if required would result in a change order. o Shaw has included costs to set up temporary electrical power. • Any special provisions required by the builder’s risk policy is not included, i.e. Fedora Security Systems, other than a Tattletale System and temporary site fencing • Shaw’s has included general liability insurance based on an all ‘for-rent’ product. • Project is assumed to be tax exempt • Anticipated costs associated with weather conditions included, but are not limited to, ground thaw machines and fuel, snow removal, temporary heat, concrete blankets, temporary window openings for dry in, building tenting/heating, concrete admixes, winter excavation/backfill requirements, etc. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 3 of 11 Section 002000 – Sitework A. Includes 1. Demolition where indicated 2. Excavated materials to be adequate as re-use for site fill 3. Excavation based on minimum 1:1 excavated slope 4. Building foundations to be over excavated and hauled off with pit run imported for backfill a. Edwards – 7 foot overex below slab on grade and 7 foot beyond footprint 5. Any other backfill to be reuse of existing material a. Outside of overex zone around perimeter foundations 6. 4” layer of gravel under garage slab on grade included as ¾” screened rock 7. 6” depth Class 6 beneath site concrete 8. 7” depth Class 6 beneath asphalt parking area and 8” Class 6 beneath asphalt drive lanes 9. Native material for utility trench backfill above pipe zone; no details provided 10. Pipe zone material included as Class 6 material for 6” below and 12” below pipe 11. Stormwater piping and flared end sections as shown 12. Foundation drain included as 4” perforated pipe 13. Trenching, conduits, and native backfill of site secondary power 14. Install only of utility provided and Owner paid transformer precast vaults 15. 4” depth asphalt at parking and drive lanes 16. Included 3’ unsuitable over-ex as encountered in phase one, as an allowance. 17. Assumed soils report will mirror soils report from phase 1 B. Excludes 1. Geofoam 2. Any modifications/upgrades to existing primary electric, low voltage, and gas utilities – by utility provider and paid by Owner 3. Restrained joints on utility piping 4. Foundation drywells 5. Rock excavation larger than 4’ diameter / 3 cy, blasting or rock removal that cannot be ripped with conventional backhoe 6. Permanent dewatering systems 7. 3rd party soils testing and inspections; by Owner 8. Utility tap/connection fees 9. Sewer manholes at tie in locations 10. Costs associated with Low Voltage and Primary Power providers including planning, engineering, coordination and construction fees; all costs paid by Owner. 11. Any new primary electrical work including trench/backfill, setting of transformers, conduits, and cable/connections 12. Supply/Install of gas piping/meters 13. Supply of water/electric meters; paid by owner, provided by utility, installed by Shaw 14. Soil stabilization, over excavation, removal, and disposal of any hazardous material nor unsuitable soils that may be found during construction. 15. Removal and disposal of any underground obstacles that may be found during construction that are not shown on the contract documents nor Geotech report. 16. Tree removal DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 4 of 11 Section 002750 – Site Concrete A. Includes 1. Curb and gutter 2. Valley pan 3. 4” site walks; grey with broom finish B. Excludes 1. Stained, colored, nor special finish concrete 2. Trash enclosure for 2nd phase as none is shown Section 002905 – Landscaping and Irrigation A. Includes 1. Trees and plantings per plantings list 2. Import of topsoil 3. Design/build irrigation as proposed by landscape contractor. A 3rd party design may result in an increase of costs. B. Excludes 1. Bike racks 2. Pervious pavers 3. Structural topsoil 4. Site furnishing – trash cans, benches, tables, umbrellas, dog waste stations, etc. 5. Winter tree watering 6. Landscape/irrigation maintenance after Certificate of Occupancy 7. Temporary irrigation lines as noted per Edwards civil and irrigation drawings. Existing irrigation system is assumed to stay active. Section 003310 – Cast in Place Concrete A. Includes 1. Foundations as drawn 2. Slab on grade with vapor barrier 3. 1” thick gypcrete with ¼” acoustic mat at all wood framed floor locations 4. Void form at Steamboat foundations and slab on grade only B. Excludes 1. Epoxy coated rebar 2. Exposed concrete wall finishes. Concrete to be Class B formed finish for any exposed formed concrete. 3. Admixes not specified in the drawing set 4. Single sided wall pours 5. Gypcrete wall isolation strips DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 5 of 11 Section 004410 – Masonry A. Excludes 1. Masonry of any kind; CMU block, brick, stone Section 005120 – Structural & Misc. Steel A. Includes 1. Exterior Juliette railings where indicated 2. Powder coated steel railings with ½” x ½” flat bar top and bottom rail, TS 1-1/2” end posts and ½” square bar pickets at 4” on center. 3. 3 rail pipe style railing at Steamboat exterior water entry room B. Excludes 1. Anodization nor galvanizing of exposed steel / railings 2. Stainless steel railings 3. Architectural grade steel 4. AWS welding fabricator certification 5. Stainless steel anchor bolts Section 006105 – Rough Carpentry/Siding/Decking A. Includes 1. Stud framing to be Doug Fir #2 or better 2. Single Bottom plate for wall plating and interior partition framing 3. Keep and turn Bl Mitek framing hardware 4. ¾” T&G OSB sheathing over floor joists 5. R6 Zip exterior wall sheathing 6. 23/32” OSB roof sheathing 7. Engineered Wood Products per structural drawings 8. Flexwrap for windows 9. Fiber cement siding 10. Fire rated 2x6 T&G soffits at porch locations, 1x6 T&G soffits under roof trusses & 1x12 fascia per drawings 11. Blocking for bathroom accessories and cabinets 12. Galvanized and Prefinished Flashings B. Excludes 1. FSC lumber designation 2. Fire treated dimensional lumber, sheathing, nor trusses 3. Interior furred out concrete walls at Steamboat storage 4. Stainless Steel Flashings Section 006220 – Millwork A. Includes 1. Entry level 2cm quartz Countertops in Maple White for unit kitchens and vanities as manufactured by Golden Stones 2. VMX Cabinets as manufactured by VBC to include: a. Frameless, ¾” particleboard boxes with white melamine interiors b. Edge banding c. Thermally fused laminate slab doors/drawers d. Soft close, full extension undermount drawer glides e. Soft close door hinges 3. 5/8” x 3-1/2” MDF pre-hung door casings DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 6 of 11 4. ½” x 4-1/2” MDF baseboards 5. MDF Window sills 6. Single ¾” x 11-1/2” MDF closet shelving with MDF cleat 7. Stairwell guardrails and handrails where shown B. Excludes 1. Crown moldings 2. Window jamb extensions 3. Notching of tab pulls into cabinet doors / drawers 4. Floating vanities 5. Wood wall paneling 6. AWI labeling/certification 7. Hallway lean rails nor chair rails Section 007120 – Waterproofing A. Includes 1. Damproofing at exterior face and R15XPS rigid insulation at interior face for foundations 2. 15 Mil Stego Wrap Vapor barrier under slab on grade 3. Passive radon mitigation piping B. Excludes 1. Blindside waterproofing 2. Underslab waterproofing for slab on grades 3. Stainless steel flashings 4. Waterproofing shop drawings Section 007210 – Building Insulation A. Includes 1. R60 fiberglass loose fill insulation at truss bottom cord 2. Baffles at truss soffits/eaves 3. 6 mil polyethylene vapor barrier at truss ceiling bottom cord 4. R23 fiberglass blown in batts with fire rated vapor barrier 5. Spray can foam at exterior windows and doors 6. R21 unfaced fiberglass batts at exterior rim joists/box seals 7. R11 unfaced fiberglass batts at midfloors 8. R11 unfaced fiberglass batts at unit demising walls 9. R11 unfaced fiberglass batts at unit corridor walls 10. R11 unfaced fiberglass batts at unit interior walls where indicated 11. Bottom and top plate air sealing with latex caulking at exterior walls B. Excludes 1. Rigid insulation at site concrete 2. Rigid insulation beneath SOG 3. Aluminum foil facing of batt/rigid insulation 4. Spray insulation Section 007410 –Roofing and Metal Panels A. Includes 1. Asphalt Shingle a. Certainteed Landmark, GAF Timberline HD limited lifetime shingles, or equal b. One layers ice and water underlayment DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 7 of 11 c. 26-gauge prefinished drip edge d. W style metal valleys e. Owens Corning ridge vent or equal back to black f. Rocky Mountain snow guards or equal 2. Metal Roofs where shown a. 22-gauge prefinished Corrugated metal roofing b. SharkSkin Ultra SA underlayment or equal c. Rocky Mountain snow guards or equal 3. 22-gauge Prefinished Metal Sales corrugated metal siding B. Excludes 1. Stainless steel flashings Section 008005 – Doors, Windows, Glass A. Includes 1. Windows a. VPI Endurance black interior and black exterior b. Glazing as Cardinal Low-e 270 c. Capillary tubes 2. Doors and Frames a. Unit interior wood doors as manufactured by Jeld-Wen, hardboard, with hollow core construction – Birkdale door, 1-3/8” thick b. Any hollow metal doors and frames to be as manufactured by Curries or equal c. Interior common area doors and unit entry doors as paint grade rotary cut natural birch 3. Shower glass bipanels included as 76” high x 8mm thick clear tempered glasswith channels at wall and floor. . B. Excludes 1. Awnings, premanufactured canopies, nor sunshades 2. Window opening control devices where not required by code 3. Special window coatings or film 4. Fire treated doors/frames 5. Access control hardware/software; by Owner’s security contractor 6. Section 009250 – Gypsum Wall Board A. Includes 1. Level 3 light skip trowel finish throughout. 2. 2-layer type x drywall at corridor and demising walls 3. Single layer type x drywall at all other walls 4. 7/8 hat channel and one layer type x drywall at ceilings 5. Any dropped soffits with light gauge metal framing 6. Mold/Moisture resistant substrates included as shown and specified. Drywall abuse board at 4’ AFF in hallways B. Excludes 1. Plaster 2. Sound isolation clips 3. Level 4 nor level 5 finishes 4. RC channel 5. Heavy duty grid systems 6. Expansion joint covers DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 8 of 11 Section 009310 / 009650 / 009680 – Ceramic Tile / Resilient Flooring / Carpet A. Includes 1. Unit LVT as Karndead Ktrade Levanzo PVP150; direct glue over concrete and primed gypcrete 2. Common area carpet as Milliken The Lowdwn with Wellbac Comfort Cushion 3. Entrance floor carpet tile as Milliken Obex Cutx with Wellback Comfort Cushion 4. LVT in common areas at level 2 and 3 as Ktrade Levanzo 5. Stair treads and risers as Flexco Heavy Duty Diamond 6. Unit Shower 96” high wall panels as manufactured by IMI a. One corner soap dish per shower 7. Unit Shower Pans as manufactured by IMI a. 60” x 30” with center drain b. 62” x 31” roll in with trench drain for ADA units B. Excludes 1. Marble, wood, or quartz transitions 2. Shower floor tile 3. Epoxy grout nor epoxy thinset at tile 4. Shower niches 5. Moisture mitigation 6. Unit bathroom floor tile 7. Epoxy grout 8. Epoxy thinset 9. Grout sealer 10. Preformed vinyl/rubber base corners Section 00910 – Painting A. Includes 1. Prime/paint of all specified walls and ceilings 2. Painting of all hollow metal doors/frames 3. Painting of any primed baseboards, door casings, window sills 4. Painting of exterior siding 5. Field finished of exposed T&G soffits B. Excludes 1. Any finishing of exterior mechanical louvers, caps, etc. 2. Painting/finishing of any exposed concrete nor masonry Division 10 Specialties A. Includes 1. Unit bathroom accessories 2. Mirrors as Shown and specified 3. Two recessed fire extinguisher cabinet with 10lb fire extinguisher per hallway B. Excludes 1. Wire cage storage units 2. flagpoles DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 9 of 11 Section 011450 – Residential Equipment A. Includes 1. Garbage disposal for each unit kitchen B. Excludes 1. Unit appliances and laundry equipment - OFOI 2. Custom cabinet panels for appliances 3. 2-year warranties 4. Trash compactors, sorters, bins, etc. Section 012490 – Window Treatments A. Includes 1. Springs Fashion or Royal Pro 2” faux wood horizontal with wand tilt/cord lift control 2. 3.5” pvc vertical blinds at sliders B. Excludes Power rough-ins for future useSection 013620 – Photovoltaic System (PV) A. Excludes 1. Any PV Systems Section 015100 – Plumbing & HVAC A. Plumbing includes 1. Drains, Waste, Vent piping in PVC at underground locations 2. Above grade waste and vent in PVC 3. Domestic water piping in PEX/Aquatherm 4. Unit electric water heaters 5. Condensate piping allowance for unit VRP’s 6. Insulation on domestic water piping per local codes B. HVAC includes 1. VRP / heat pumps systems for apartment units and laundry 2. Dryer venting 3. Bathroom exhaust 4. Transfer grilles 5. Hallway ERV’s 6. Standalone low volt controls 7. Test and Balance if required C. Exclusions 1. Transfer grills in doors 2. Building automation systems 3. Water, electric or gas meters or submeters with/without remote readout; purchased by Owner from utility and installed by contractor 4. 3rd party commissioning: by Owner if required 5. Domestic water booster pumps: pressure assumed to be adequate 6. Seismic restraints Section 015300 – Fire Protection A. Includes 1. NFPA 13R system 2. White concealed heads in all living areas, brass upright pendants in unfinished spaces DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 10 of 11 3. Dry sidewalls for entry canopy 4. Permit, plan review, and inspection fees; any changes by local AHJ may require a change in price B. Exclusions 1. Fire pump(s). Assume water pressure is sufficient. 2. Standpipes 3. Freeze protection 4. Holding/water storage tanks 5. Painting or prime coating of pipe and fittings 6. Dry flex hose pendants at entry canopy 7. Special hazard systems, i.e. clean agent, pre-action or deluge 8. Seismic restraints Section 016010 – Electrical A. Includes 1. Aluminum cable from transformer to main electrical gear 2. Aluminum SER or MC distribution cable from gear to panels 3. MC cable for branch distribution in common areas 4. Romex or MC cable for branch distribution in units 5. Temp power and lighting 6. Fire alarm priced per minimum requirements, any changes by local AHJ may require a change in price 7. Intercom System 8. LV cabling per Technology Matrix for phone/data/cable, WAPs, security camera, access control, and intercom system 9. Site fiber cable where indicated 10. Heat tape/trace cable where indicated; cable manufacturer as listed in specifications or as equal 11. Car charger infrastructure per drawings B. Excludes 1. Any car charging stations; provided and installed by Owner later 2. Car Chargers 3. Spare or attic stock fixtures, lamps, or breakers 4. Supply of decorative fixtures 5. Fire hats at recessed fixtures 6. Painting of equipment or conduits 7. Power wiring of shades 8. Eave rim panels for snowmelt 9. Landscape / site receptacles 10. Fire alarm voice evacuation, smoke control, or graphic map 11. Phone, data, television final hook-up 12. Backbone cabling from building to provider pedestal 13. Site Fiber Cable into existing CMC buildings 14. Access Control Hardware/Software including card readers, cabling and FOBs; by Owner’s security contractor 15. Security System hardware/software; by Owner’s security contractor 16. Audio / Visual Systems 17. Lightning Protection 18. Distributive Antenna System (radio nor cellular) DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B CMC Student Housing 9/14/2022 Edwards Phase 2 Page 11 of 11 19. Custom cover plate colors / metals 20. Decora switches 20.Seismic restraints Section 018000 – Allowance A. Includes 1. See allowance exhibit 2. Increased temp protection allowance $50K due to start date GENERAL EXCLUSIONS A. Cost for 3rd party inspections; By Owner B. Builder’s Risk Policy; By Owner C. Costs associated with LEED D. Building Information Modeling E. Exterior / Interior mock-ups F. Commissioning; By Owner G. Field trash sorting for separation of recyclable materials H. Customization of any units We look forward to working with you on this project. Sincerely, Jamie Neyers SHAW CONSTRUCTION CC: Sam Meyer – Shaw Construction DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 1 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Project name CMC Student Housing Edwards CO Estimator JN Labor rate table 1 Job size 24079 gsf Duration 13 mo CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 2 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Group Phase Description Takeoff Quantity Total Cost/Unit Total Amount Previous Budget/Notes 001000 GENERAL CONDITIONS 001005 GENERAL CONDITIONS GC's 1.00 ls 507,258.00 /ls 507,258 GENERAL CONDITIONS 24,079.00 sf 21.07 /sf 507,258 GENERAL CONDITIONS 24,079.00 sf 21.07 /sf 507,258 002000 SITEWORK 002050 SITEWORK SUPPORT Traffic Control *incl 0.00 /incl 0 w/ RFP GC's Temp Site Fencing *incl 0.00 /incl 0 Temp Barricades *incl 0.00 /incl 0 Temp Toilets (3 Total)*incl 0.00 /incl 0 Site Cleaning *incl 0.00 /incl 0 Cleanup and General Labor *incl 0.00 /incl 0 Forklift *incl 0.00 /incl 0 Dumpsters *incl 0.00 /incl 0 Construction Staking and Surveying 1.00 ls 28,000.00 /ls 28,000 Peak Land SITEWORK SUPPORT 24,079.00 sf 1.16 /sf 28,000 002220 SITE DEMOLITION Clear and Grub *ssf 0.00 /ssf 0 Strip Topsoil *incl 0.00 /incl 0 Haul Off Topsoil *incl 0.00 /incl 0 Miscellaneous Demo *ssf 0.00 /ssf 0 Tree Removal / Transplanting *ex /ex 002310 GRADING Earthwork 1.00 ls 521,162.00 /ls 521,162 CW GRADING 24,079.00 sf 21.64 /sf 521,162 002315 EXCAVATION & FILL Civil Contractor Mob / Lodging / Per Diem *ls 0.00 /ls 0 Overloat Grading *cy 0.00 /cy 0 Excavate Parking Lot and Site Concrete *incl /incl Class 6 Under Parking (5"), Drive Lanes (7") and Site Concrete (6") *tn 0.00 /tn 0 Final Grade *ssf 0.00 /ssf 0 Misc. Site Repairs *ls 0.00 /ls 0 Earthwork Traffic Control *hrs 0.00 /hrs 0 002320 BUILDING EXCAVATION Building Excavation *bldg 0.00 /bldg 0 Export Soils *cy 0.00 /cy 0 Import Pit Run Under Building *ton 0.00 /ton 0 Foundation Prep *sf 0.00 /sf 0 Excavation, 4" Layer of 3/4" Rock, Backfill *ton 0.00 /ton 0 Backfill Around Building *bldg 0.00 /bldg 0 Dewatering *ex 0.00 /ex 0 002370 EROSION CONTROL Erosion Control Install 1.00 ls 18,625.00 /ls 18,625 CW Erosion Control Maintenance - Additional to Phase 1 3.00 mo 2,000.00 /mo 6,000 SWMP Preparation - Modifications to Phase 1 Plan 1.00 ea 1,500.00 /ea 1,500 SWMP Monitoring - Additional to Phase 1 3.00 mo 400.00 /mo 1,200 Construction Entrance *incl 0.00 /incl 0 Dust Control *incl 0.00 /incl 0 Street Cleaning - Additional to Phase 1 3.00 mo 1,000.00 /mo 3,000 EROSION CONTROL 24,079.00 sf 1.26 /sf 30,325 CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 3 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Group Phase Description Takeoff Quantity Total Cost/Unit Total Amount Previous Budget/Notes 002505 UTILITIES Site Utilitiies 1.00 ls 208,279.00 /ls 208,279 CW UTILITIES 24,079.00 sf 8.65 /sf 208,279 002510 WATER DISTRIBUTION Tie Into Existing *ea 0.00 /ea 0 Tie In Patch and Traffic Control *ls 0.00 /ls 0 Building Services - 4" Water / Fire Combo *lf 0.00 /lf 0 Building Riser Assemblies *ea 0.00 /ea 0 Fire Hydrant Line - 6"*lf 0.00 /lf 0 Fire Hydrant Assembly *ea 0.00 /ea 0 Water Meters *ex /ex By Owner 002530 SANITARY SEWER Connect to Existing *ls 0.00 /ls 0 6" Service Piping *lf 0.00 /lf 0 Manholes *ex 0.00 /ex 0 002550 PIPED ENERGY DISTRIBUTION Natural Gas Main Trench/Backfill *ex 0.00 /ex 0 Natural Gas Main Pipe *ex /ex By Utility 002580 SITE ELECTRICAL Dry Utilities - TV, Phone, Power Conduits/Trenching *ssf 0.00 /ssf 0 Site Lighting Poles - Excavation, Fixture, and Foundations *incl 0.00 /incl 0 w/ 016010 002620 SUBSURFACE DRAINAGE Building Foundation Drain *lf 0.00 /lf 0 002630 STORM DRAINAGE Manholes *ex 0.00 /ex 0 18" RCP *lf 0.00 /lf 0 18" RCP FES *ea 0.00 /ea 0 Area / Curb Inlets *ex /ex Nyloplast Inlets *ex 0.00 /ex 0 Drywells / CDS Units *ex 0.00 /ex 0 002740 ASPHALT PAVING Asphalt Paving - Parking Lot 1.00 ls 89,920.00 /ls 89,920 United ASPHALT PAVING 24,079.00 sf 3.73 /sf 89,920 002750 CONCRETE PAVING Site Walks - 4"1.00 ls 71,453.00 /ls 71,453 RMS Curb and Gutter *incl 0.00 /incl 0 Handicap Ramps *incl 0.00 /incl 0 Trash Apron *incl 0.00 /incl 0 Bike Rack Pad *ex 0.00 /ex 0 Vpan *ex 0.00 /ex 0 CONCRETE PAVING 24,079.00 sf 2.97 /sf 71,453 002760 PAVEMENT MARKING Asphalt Striping 43.00 ea 30.00 /ea 1,290 Asphalt Striping - Handicap 2.00 ea 125.00 /ea 250 Parking Signage 4.00 ea 150.00 /ea 600 Parking Blocks *ex /ex PAVEMENT MARKING 24,079.00 sf 0.09 /sf 2,140 002780 UNIT PAVERS Permiable and Non-Premiable Pavers *ex /ex 002830 RETAINING WALLS CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 4 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Group Phase Description Takeoff Quantity Total Cost/Unit Total Amount Previous Budget/Notes 002830 RETAINING WALLS Site Concrete Walls *ex 0.00 /ex 0 Boulder Walls *ex 0.00 /ex 0 002870 SITE FURNISHINGS Bike Racks *ex 0.00 /ex 0 Trash Cans *ex /ex Tables, Chairs, Benches *ex /ex Dog Waste Stations *ex /ex 002905 LANDSCAPE Landscape and Irrigation 1.00 ls 213,431.00 /ls 213,431 GH Daniels LANDSCAPE 24,079.00 sf 8.86 /sf 213,431 SITEWORK 24,079.00 sf 48.37 /sf 1,164,710 003000 CONCRETE 003310 CAST-IN-PLACE CONCRETE Footings, Stem Walls, Columns 1.00 ls 312,744.00 /ls 312,744 RMS 4" SOG *incl 0.00 /incl 0 Patio SOG (Deleted for VE)*ex 0.00 /ex 0 Concrete Layout *incl 0.00 /incl 0 Concrete Washout *incl 0.00 /incl 0 CAST-IN-PLACE CONCRETE 24,079.00 sf 12.99 /sf 312,744 003510 CEMENTITIOUS DECK Poured Gypsum Deck w/ Soundmat 1.00 ls 52,363.00 /ls 52,363 InsulFlow Gypsum Deck Prep *incl 0.00 /incl 0 Tub Prepour *incl 0.00 /incl 0 CEMENTITIOUS DECK 24,079.00 sf 2.18 /sf 52,363 CONCRETE 24,079.00 sf 15.16 /sf 365,107 005000 METALS 005120 STRUCTURAL STEEL Anchor Bolt Allowance 24,079.00 sf 0.35 /sf 8,428 Structural Steel Infill *ex 0.00 /ex 0 STRUCTURAL STEEL 24,079.00 sf 0.35 /sf 8,428 005510 MISC. METALS Interior Stair Guardrails *ex 0.00 /ex 0 w/ 006220 Interior Stair Grabrail *ex 0.00 /ex 0 w/ 006220 Entry Canopies *ex 0.00 /ex 0 Juliette Railings, Powder Coated Finish 1.00 ls 28,227.00 /ls 28,227 Timberwolf MISC. METALS 24,079.00 sf 1.17 /sf 28,227 METALS 24,079.00 sf 1.52 /sf 36,655 006000 WOOD & PLASTICS 006110 WOOD FRAMING Rough Framing 1.00 ls 1,517,637.00 /ls 1,517,637 Shaw SPS Rzip Sheathing Premium *incl 0.00 /incl 0 Wood Stairs *incl 0.00 /incl 0 WOOD FRAMING 24,079.00 sf 63.03 /sf 1,517,637 006165 SIDING Lap Siding, Primed for Paint and Prefinished *incl 0.00 /incl 0 w/ 06110 006220 MILLWORK Millwork per Unit 1.00 ls 150,660.00 /ls 150,660 AMS Plywood Stair/Landing Railings *incl 0.00 /incl 0 Unit Entry Signage 1.00 ls 10,000.00 /ls 10,000 Allowance MILLWORK 24,079.00 sf 6.67 /sf 160,660 CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 5 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Group Phase Description Takeoff Quantity Total Cost/Unit Total Amount Previous Budget/Notes 006410 CABINETS Cabinets per Unit 1.00 ls 111,258.00 /ls 111,258 VBC CABINETS 24,079.00 sf 4.62 /sf 111,258 006415 COUNTER TOPS Quartz Counter Tops per Unit 1.00 ls 51,620.00 /ls 51,620 Golden Stones COUNTER TOPS 24,079.00 sf 2.14 /sf 51,620 WOOD & PLASTICS 24,079.00 sf 76.46 /sf 1,841,175 007000 THERMAL/MOISTURE PROTEC'N 007120 WATERPROOFING Dampproofing at Building Stemwalls 1.00 ls 10,960.00 /ls 10,960 AAA WATERPROOFING 24,079.00 sf 0.46 /sf 10,960 007210 BUILDING INSULATION Thermal/Acoustic Insulation 1.00 ls 88,000.00 /ls 88,000 Division 7 2" Continuous Rigid Insulation *ex /ex 2" Rigid Insulation at Stemwalls *incl 0.00 /incl 0 w/ 007120 2" Rigid Insulation Under SOG *ex /ex Phase 1 Addendum 1 *incl /incl BUILDING INSULATION 24,079.00 sf 3.66 /sf 88,000 007260 VAPOR RETARDERS Stegowrap Vapor Barrier *incl 0.00 /incl 0 w/ 003310 007270 AIR BARRIERS Exterior Building Wrap *incl 0.00 /incl 0 w/ 06110 007310 SHINGLES Shingle and Metal Roofing 1.00 ls 95,800.00 /ls 95,800 Cairn Snow Fence *incl 0.00 /incl 0 Roof Eave Snowmelt *incl 0.00 /incl 0 W/ 016010 Gutters / Downspouts with Heat Tape *incl 0.00 /incl 0 W/ 016010 SHINGLES 24,079.00 sf 3.98 /sf 95,800 007410 METAL ROOF/WALL PANELS Corrugated Metal Panel 1.00 ls 60,714.50 /ls 60,715 Storm King METAL ROOF/WALL PANELS 24,079.00 sf 2.52 /sf 60,715 007620 FLASHING & SHEET METAL Flashings & Sheet Metal 24,079.00 sf 1.35 /sf 32,507 FLASHING & SHEET METAL 24,079.00 sf 1.35 /sf 32,507 007840 FIRESTOPPING Fire Safing 24,079.00 sf 0.32 /sf 7,705 FIRESTOPPING 24,079.00 sf 0.32 /sf 7,705 007920 JOINT SEALANTS Joint Sealants 24,079.00 sf 0.55 /sf 13,243 Caulk Exterior of Windows 2,129.00 sf 2.00 /sf 4,258 Site Sealants 24,079.00 sf 0.40 /sf 9,632 JOINT SEALANTS 24,079.00 sf 1.13 /sf 27,133 THERMAL/MOISTURE PROTEC'N 24,079.00 sf 13.41 /sf 322,819 008000 DOORS & WINDOWS 008110 STEEL DOORS/FRAMES Common Area Doors and Hardware (Paint Grade Wood Doors at Interior Locations) 1.00 ls 225,354.00 /ls 225,354 Colorado Doorways Unit Entry Doors and Hardware (Paint Grade Wood Doors) *incl 0.00 /incl 0 CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 6 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Group Phase Description Takeoff Quantity Total Cost/Unit Total Amount Previous Budget/Notes 008110 STEEL DOORS/FRAMES Unload & Distribute *incl 0.00 /incl 0 STEEL DOORS/FRAMES 24,079.00 sf 9.36 /sf 225,354 008120 ALUMINUM DOORS/FRAMES Storefront Doors *ex /ex ADA Operator *incl 0.00 /incl 0 008250 PRE-HUNG WOOD DOORS Hollow Core Interior Doors and Hardware *incl 0.00 /incl 0 Unload & Distribute *incl 0.00 /incl 0 008310 ACCESS DOORS Mechanical/Plumbing Access Panels 36.00 ea 350.00 /ea 12,600 ACCESS DOORS 24,079.00 sf 0.52 /sf 12,600 008560 WINDOWS Vinyl Windows - Black / Black 1.00 ls 107,861.00 /ls 107,861 VPI Vinyl Sliders - Black / Black *incl 0.00 /incl 0 WINDOWS 24,079.00 sf 4.48 /sf 107,861 008810 GLASS & GLAZING Shower Glas Sliding Door *incl 0.00 /incl 0 w/ 009310 008830 MIRRORS Mirrors 36.00 ea 325.00 /ea 11,700 MIRRORS 24,079.00 sf 0.49 /sf 11,700 DOORS & WINDOWS 24,079.00 sf 14.85 /sf 357,515 009000 FINISHES 009010 INTERIOR FINISH Final Clean 24,079.00 sf 0.52 /sf 12,521 Ongoing Construction Cleaning *incl 0.00 /incl 0 w/ RFP GC's INTERIOR FINISH 24,079.00 sf 0.52 /sf 12,521 009250 GYPSUM WALL BOARD Drywall 1.00 ls 546,954.00 /ls 546,954 579 Construction Dropped Soffits for Exhaust Ductwork/Equipment *incl 0.00 /incl 0 Touch-up 36.00 ea 135.00 /ea 4,860 GYPSUM WALL BOARD 24,079.00 sf 22.92 /sf 551,814 009310 CERAMIC TILE Ceramic Tile; Kitchen Splash Material Allowance *ex 0.00 /ex 0 Install Kitchen Splash Tile *ex 0.00 /ex 0 Hotel Shower Pan and Wall Surround Assembly 1.00 ls 99,635.00 /ls 99,635 IMI CERAMIC TILE 24,079.00 sf 4.14 /sf 99,635 009650 RESILIENT FLOORING Floor Prep *sf 0.00 /sf 0 LVT in Units 1.00 ls 133,923.00 /ls 133,923 Guys LVT in Commons *incl 0.00 /incl 0 LVT or Rubber Treads at Interior Stairs *incl 0.00 /incl 0 LVT in Bathrooms *incl 0.00 /incl 0 Finished Floor Protec'n - Resilient *incl 0.00 /incl 0 RESILIENT FLOORING 24,079.00 sf 5.56 /sf 133,923 009680 CARPET Floor Prep *incl 0.00 /incl 0 Carpet and WOM in Commons *incl 0.00 /incl 0 Finished Floor Protec'n - Carpet *incl 0.00 /incl 0 CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 7 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Group Phase Description Takeoff Quantity Total Cost/Unit Total Amount Previous Budget/Notes 009910 PAINTING Painting Interior Wall / Ceilings at Units 1.00 ls 209,388.00 /ls 209,388 Performance Painting Painting Baseboards / Casings / Doors / Jambs *incl 0.00 /incl 0 Paint Exterior *incl 0.00 /incl 0 Touch Up *incl 0.00 /incl 0 PAINTING 24,079.00 sf 8.70 /sf 209,388 FINISHES 24,079.00 sf 41.83 /sf 1,007,281 010000 SPECIALTIES 010260 WALL & CORNER GUARDS Corner & Wall Guards 24,079.00 sf 0.10 /sf 2,408 WALL & CORNER GUARDS 24,079.00 sf 0.10 /sf 2,408 010430 EXTERIOR SIGNAGE Exterior Signage 1.00 ls 3,500.00 /ls 3,500 EXTERIOR SIGNAGE 24,079.00 sf 0.15 /sf 3,500 010440 INTERIOR SIGNAGE Interior Code Minimum Signage 24,079.00 sf 0.11 /sf 2,649 INTERIOR SIGNAGE 24,079.00 sf 0.11 /sf 2,649 010520 FIRE PROTECTION Extinguisher - 10 lb 6.00 ea 90.00 /ea 540 Cabinet 6.00 ea 175.00 /ea 1,050 FIRE PROTECTION 24,079.00 sf 0.07 /sf 1,590 010550 POSTAL SPECIALTIES Postal Specialties - Exterior Cluster Boxes *ex 0.00 /ex 0 Concierge Packaging *ex /ex 010810 TOILET ACCESSORIES Toilet Accessories 36.00 ea 400.00 /ea 14,400 Grab Bars 4.00 set 125.00 /set 500 TOILET ACCESSORIES 24,079.00 sf 0.62 /sf 14,900 SPECIALTIES 24,079.00 sf 1.04 /sf 25,047 011000 EQUIPMENT 011110 LAUNDRY EQUIP Central Laundry *ex 0.00 /ex 0 011450 RESIDENTIAL APPLIANCES Appliances - No Unit Laundry *ex 0.00 /ex 0 Appliances - Garbage Disposals *incl 0.00 /incl 0 w/ 015100 012000 FURNISHINGS 012490 WINDOW TREATMENTS Window Coverings 1.00 ls 16,660.00 /ls 16,660 Royal Textile WINDOW TREATMENTS 24,079.00 sf 0.69 /sf 16,660 FURNISHINGS 24,079.00 sf 0.69 /sf 16,660 013000 SPECIAL CONSTRUCTION 013610 SOLAR COLLECTORS Solar Equipment *ex /ex 015000 MECHANICAL 015100 PLUMBING Domestic Plumbing; Unit Electric Water Tanks 1.00 ls 735,060.00 /ls 735,060 JDL Plumbing Fixture - Standard Unit *incl 0.00 /incl 0 Plumbing Fixture - ADA Unit *incl 0.00 /incl 0 CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 8 Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Group Phase Description Takeoff Quantity Total Cost/Unit Total Amount Previous Budget/Notes 015100 PLUMBING Roof Drains *ex /ex Passive Radon Mitigation System Piping 1.00 ls 18,250.00 /ls 18,250 Stanton PLUMBING 24,079.00 sf 31.29 /sf 753,310 015300 FIRE PROTECTION Fire Protection - NFPA 13R 24,079.00 sf 2.53 /sf 60,961 Excel FIRE PROTECTION 24,079.00 sf 2.53 /sf 60,961 015510 HVAC Unit VTAC/VRP, Bathroom and Kitchen Exhaust 1.00 ls 782,133.00 /ls 782,133 Comfort Air Common Area ERV *incl /incl Laundry VTAC/VRP *incl /incl Misc. Unit Heaters *incl /incl Condensate Drain Lines 37.00 ea 337.84 /ea 12,500 ALLOWANCE HVAC 24,079.00 sf 33.00 /sf 794,633 MECHANICAL 24,079.00 sf 66.82 /sf 1,608,904 016000 ELECTRICAL 016010 ELECTRICAL Bldg Electrical / sf 1.00 ls 922,814.00 /ls 922,814 APhase - Service Equipment *incl /incl - Lighting and Power Circuits *incl /incl - Fixtures *incl /incl - Exterior Lighting; Fixtures and Power *incl /incl - Temp Power *incl /incl - Permit *incl /incl Electrical Consumption during Construction *incl /incl w/ RFP GC's Deduct EV Chargers -1.00 ls 22,440.00 /ls (22,440) Gear Escalation on 8/24 1.00 ls 18,900.00 /ls 18,900 ELECTRICAL 24,079.00 sf 38.18 /sf 919,274 016705 LOW VOLTAGE Fire Alarm System / sf 24,079.00 sf 1.09 /sf 26,294 Intermountain Tele / Data Raceways, Cable, and Terminations 36.00 ea 1,354.58 /ea 48,765 Conundrum Security Systems *ex /ex DAS (Public Safety or Cellular)*ex /ex Lightning Protection *ex /ex LOW VOLTAGE 24,079.00 sf 3.12 /sf 75,059 ELECTRICAL 24,079.00 sf 41.30 /sf 994,333 018000 ALLOWANCES 018005 ALLOWANCES Weather Protection, Snow Removal, and Temp Heat 1.00 ls 200,000.00 /ls 200,000 3' Additional Overex for Unsuitable Soils 1.00 ls 107,531.00 /ls 107,531 ALLOWANCES 24,079.00 sf 12.77 /sf 307,531 ALLOWANCES 24,079.00 sf 12.77 /sf 307,531 CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 9A Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee Estimate Totals Description Amount Totals Rate 8,554,995 8,554,995 General Liability 73,229 0.750 % Builders Risk (By Owner) 1 Year Warranty (w/ Fee) P & P Bond 63,465 0.650 % Cloud Tech 13,425 0.138 % 150,119 8,705,114 Bidding Contingency Construction Contingency 261,153 3.000 % Owner Contingency 261,153 3.000 % 522,306 9,227,420 Contractor Overhead and Fee 392,165 4.250 % Preconstruction 392,165 9,619,585 Escalation Thru Buyout 144,294 1.500 % Total 9,763,879 405.494 /gsf CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Colorado Mountain College Page 9B Edwards Phase 2 8/26/2022 9:45 AM 100% CD CMC-StudentHousing-EdwardsPhase2-22-08-26-Owner .pee CONFIDENTIAL: The information and data in this report are strictly confidential and are supplied on the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of Shaw Builders. DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B $8,428.00 $10,000.00 $12,500.00 $200,000.00 $107,531.00 Edwards Phase 2 Anchor Bolt Allowance Edwards Phase 2 Unit Entry Signage Allowance Edwards Phase 2 Condensate Drain Lines Allowance Edwards Phase 2 Weather Protection, Snow Removal, & Temp Heat Allowance Edwards Phase 2 3' Add'l Overex for Unsuitable Soils Allowance Total $338,459.00 EXHIBIT I.4 Allowance Schedule DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B EXHIBIT I.7 Property Insurance Certificate N/A DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Page 1 of 3 Notice to Proceed to Commence Construction Phase (CM/GC Contract) Date of Notice: September 23, 2022 Project: Construction of Multi-Site Student Housing Project Site: Edwards Phase 2 Contract Documents: Construction Manager/General Contractor (CM/GC) Agreement Between Colorado Mountain College and Shaw Builders LLC and General Conditions (the “Agreement”) dated April 27, 2022, First Amendment to the Agreement dated May 3, 2022 (“Amendment 1”), Second Amendment to the Agreement dated October 10, 2022 (“Amendment 2”) and this Third Amendment to the Agreement (“Amendment 3”). To: Shaw Builders, LLC 760 Horizon Drive, #201 Grand Junction, CO 81506 This is to advise you that your Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance for Edwards Phase 2 have been received. Our issuance of this Notice does not relieve you of responsibility to assure that the bond and insurance requirements of the Contract Documents are met for the duration of the Agreement. This Notice to Proceed will be attached to the Amendment # 3 for the Bid Package and scope of work described therein for Edwards Phase 2. You are hereby authorized and directed to proceed within ten (10) days from date of this Authorization as required in the Agreement. Any liquidated damages for failure to achieve Substantial Completion by the date agreed that may be applicable to this contract will be calculated using the date of this Notice for the date of the commencement of the Work. By______________________________ Julie S. Hanson Director of Purchasing & Contracts I.8 Julie S. Hanson Digitally signed by Julie S. Hanson Date: 2022.10.11 09:05:08 -06'00' DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m.CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 1 / 18 View Name: 03b - PRINT by WBS  CMC Residence Hall - Edwards - CONTRACT Schedule d -Feb- AA -Oct-  Preconstruction & General Planning d -Feb- AA -Nov-  Design d -Feb- AA -Jul- AA  GS  For Construction Drawings - % CD's d -Feb-  AA -Apr-  AA  GS  Design Development Drawings d -Feb-  AA  GS  Submit for Building Permit d -Apr-  AA -Apr-  AA  GS  AHJ - City Approval Process d -Apr-  AA -Jul-  AA  GS  Building Permit d -Jul-  AA -Jul-  AA  Estimating & Procurement d -Mar- AA -Nov-  GS  Finalize GMP Contract d -Mar-  AA -Apr-  AA  GS  Owner Approval of GMP d -Apr-  AA -Apr-  AA  GS  Shaw Subcontractor Buyout and Procurement d -Apr-  AA -Nov-  Building Construction Summary d -Jul- AA -Oct-  GS  Notice To Proceed d -Jul-  AA  GS  Delay - Eagle County - Planning Commission Meeting d -Jul-  AA  GS  Start Construction / Mobilization d -Jul-  AA -Jul-  AA  GS  Overall Construction Duration (Calendar Days) d -Jul-  AA -Aug-  GS  Complete Construction - Phase d -Aug-  CC  GS  Complete Construction - Phase d -Oct-  CC  Site Infrastructure d -Jul- AA -Jan-  E  Site Fence d -Jul-  AA -Jul-  AA  E  Clear & Grub d -Jul-  AA -Jul-  AA  E  Erosion Control - SWBMP's d -Jul-  AA -Jul-  AA  E  Surveying d -Jul-  AA -Jul-  AA  E  Relocate Water Line d -Jul-  AA -Jul-  AA  E  Temp Power for Trailer and Building d -Jul-  AA -Jul-  AA  E  Over Excavate Building & Recompact - Building d -Jul-  AA -Aug-  AA  E  Impact - Holy Cross Agreement for Site Electric d -Jul-  AA -Sep-  E  Building Pad Certication d -Aug-  AA -Aug-  AA  E  Over Excavate Building & Recompact - Building d -Sep-  CC -Oct-  E  Relocate Detention Pond d -Sep-  CC -Oct-  E  Storm Lines/Culvert d -Sep-  CC -Oct-  E  Electrical / Gas Distribution d -Oct--Oct-  E  Low Volt Distribution d -Oct--Oct-  Delay - Water and Sewer d -Jul- AA -Jan-  E  DELAY - ERWSD Submial Approval d -Jul-  AA -Sep-  E  DELAY - Pricing d -Sep--Oct- 2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M CMC Residence Hall - Edwards - CONTRACT ScheduleCMC Residence Hall - Edwards - CONTRACT ScheduleCMC Residence Hall - Edwards - CONTRACT ScheduleCMC Residence Hall - Edwards - CONTRACT ScheduleCMC Residence Hall - Edwards - CONTRACT Schedule Preconstruction & General PlanningPreconstruction & General PlanningPreconstruction & General PlanningPreconstruction & General PlanningPreconstruction & General Planning DesignDesignDesignDesignDesign For Construction Drawings - 100% CD'sFor Construction Drawings - 100% CD'sFor Construction Drawings - 100% CD'sFor Construction Drawings - 100% CD'sFor Construction Drawings - 100% CD's Design Development DrawingsDesign Development DrawingsDesign Development DrawingsDesign Development DrawingsDesign Development Drawings Submit for Building PermitSubmit for Building PermitSubmit for Building PermitSubmit for Building PermitSubmit for Building Permit AHJ - City Approval ProcessAHJ - City Approval ProcessAHJ - City Approval ProcessAHJ - City Approval ProcessAHJ - City Approval Process Building PermitBuilding PermitBuilding PermitBuilding PermitBuilding Permit Estimating & ProcurementEstimating & ProcurementEstimating & ProcurementEstimating & ProcurementEstimating & Procurement Finalize GMP ContractFinalize GMP ContractFinalize GMP ContractFinalize GMP ContractFinalize GMP Contract Owner Approval of GMPOwner Approval of GMPOwner Approval of GMPOwner Approval of GMPOwner Approval of GMP Shaw Subcontractor Buyout and ProcurementShaw Subcontractor Buyout and ProcurementShaw Subcontractor Buyout and ProcurementShaw Subcontractor Buyout and ProcurementShaw Subcontractor Buyout and Procurement Building Construction SummaryBuilding Construction SummaryBuilding Construction SummaryBuilding Construction SummaryBuilding Construction Summary Notice To ProceedNotice To ProceedNotice To ProceedNotice To ProceedNotice To Proceed Delay - Eagle County - Planning Commission MeetingDelay - Eagle County - Planning Commission MeetingDelay - Eagle County - Planning Commission MeetingDelay - Eagle County - Planning Commission MeetingDelay - Eagle County - Planning Commission Meeting Start Construction / MobilizationStart Construction / MobilizationStart Construction / MobilizationStart Construction / MobilizationStart Construction / Mobilization Overall Construction Duration (Calendar Days)Overall Construction Duration (Calendar Days)Overall Construction Duration (Calendar Days)Overall Construction Duration (Calendar Days)Overall Construction Duration (Calendar Days) Complete Construction - Phase 1Complete Construction - Phase 1Complete Construction - Phase 1Complete Construction - Phase 1Complete Construction - Phase 1 Complete Construction - Phase 2Complete Construction - Phase 2Complete Construction - Phase 2Complete Construction - Phase 2Complete Construction - Phase 2 Site InfrastructureSite InfrastructureSite InfrastructureSite InfrastructureSite Infrastructure Site FenceSite FenceSite FenceSite FenceSite Fence Clear & GrubClear & GrubClear & GrubClear & GrubClear & Grub Erosion Control - SWBMP'sErosion Control - SWBMP'sErosion Control - SWBMP'sErosion Control - SWBMP'sErosion Control - SWBMP's SurveyingSurveyingSurveyingSurveyingSurveying Relocate Water LineRelocate Water LineRelocate Water LineRelocate Water LineRelocate Water Line Temp Power for Trailer and BuildingTemp Power for Trailer and BuildingTemp Power for Trailer and BuildingTemp Power for Trailer and BuildingTemp Power for Trailer and Building Over Excavate Building & Recompact - Building 01Over Excavate Building & Recompact - Building 01Over Excavate Building & Recompact - Building 01Over Excavate Building & Recompact - Building 01Over Excavate Building & Recompact - Building 01 Impact - Holy Cross Agreement for Site ElectricImpact - Holy Cross Agreement for Site ElectricImpact - Holy Cross Agreement for Site ElectricImpact - Holy Cross Agreement for Site ElectricImpact - Holy Cross Agreement for Site Electric Building Pad CerticationBuilding Pad CerticationBuilding Pad CerticationBuilding Pad CerticationBuilding Pad Certication Over Excavate Building & Recompact - Building 02Over Excavate Building & Recompact - Building 02Over Excavate Building & Recompact - Building 02Over Excavate Building & Recompact - Building 02Over Excavate Building & Recompact - Building 02 Relocate Detention PondRelocate Detention PondRelocate Detention PondRelocate Detention PondRelocate Detention Pond Storm Lines/CulvertStorm Lines/CulvertStorm Lines/CulvertStorm Lines/CulvertStorm Lines/Culvert Electrical / Gas DistributionElectrical / Gas DistributionElectrical / Gas DistributionElectrical / Gas DistributionElectrical / Gas Distribution Low Volt DistributionLow Volt DistributionLow Volt DistributionLow Volt DistributionLow Volt Distribution Delay - Water and SewerDelay - Water and SewerDelay - Water and SewerDelay - Water and SewerDelay - Water and Sewer DELAY - ERWSD Submial ApprovalDELAY - ERWSD Submial ApprovalDELAY - ERWSD Submial ApprovalDELAY - ERWSD Submial ApprovalDELAY - ERWSD Submial Approval DELAY - PricingDELAY - PricingDELAY - PricingDELAY - PricingDELAY - Pricing ID Name Planned Duration Start Finish EXHIBIT I.9DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 2 / 18 View Name: 03b - PRINT by WBS  E  DELAY - Material Procurement / Delivery d -Oct-  -Oct-    E  Sanitary Sewer d -Dec-  -Jan-    E  Waterline d -Jan-  -Jan-    Curb, Guer & Paving d -May- -Jun-     Surveying d -May-  CC -May-      Curb & Guer d -May-  -May-      Paving Prep, Pave & Stripe d -May-  -Jun-    Building d -Aug- AA -Jul-   Foundations d -Aug- AA -Oct-   FND  Excavate Perimeter Walls and Footings d -Aug-  AA -Aug-  AA  FND  Survey d -Aug-  AA -Aug-  AA  FND  Foundation Rebar d -Aug-  AA -Aug-  AA  FND  Pour Footings d -Aug-  AA -Aug-  AA  FND  Rebar Inspection d -Aug-  AA -Aug-  AA  FND  Form Foundation Walls d -Aug-  AA -Aug-  AA  FND  Rebar in Foundation Walls d -Aug-  AA -Aug-  AA  FND  Rebar Inspection d -Aug-  AA -Aug-  AA  FND  Pour Stem Walls d -Aug-  AA -Aug-  AA  FND  Backll d -Aug-  AA -Aug-  AA  FND  UG Shallow Plumb/ Elec Excavation d -Aug-  AA -Sep-  AA  FND  UG Shallow Plumb/ Elec Install/ Inspect/ Backll d -Sep-  AA -Sep-    FND  FRP Interior Footings d -Sep-  -Sep-    FND  Form Slab - Curbs / Rebar d -Sep-  -Oct-    FND  Radon System Install d -Sep-  -Sep-    FND  Vapor Barrier d -Sep-  -Oct-    FND  QAQC All MEPs d -Oct-  -Oct-    FND  Pour Slab d -Oct-  -Oct-    FND  FRP Patios d -Oct-  -Oct-    Framing d -Oct- -Dec-   FRM  st Floor Walls d -Oct-  -Oct-    FRM  nd Floor Trusses / Suboor d -Oct-  -Oct-    FRM  nd Floor Walls d -Oct-  -Nov-    FRM  rd Floor Trusses / Suboor d -Nov-  -Nov-    FRM  rd Floor Walls d -Nov-  -Dec-    FRM  Roof Truss and Sheathing d -Dec-  -Dec-    Exteriors d -Dec- -Jul-   EXT  Fascia Install d -Dec-  -Dec-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M DELAY - Material Procurement / DeliveryDELAY - Material Procurement / DeliveryDELAY - Material Procurement / DeliveryDELAY - Material Procurement / DeliveryDELAY - Material Procurement / Delivery Sanitary SewerSanitary SewerSanitary SewerSanitary SewerSanitary Sewer WaterlineWaterlineWaterlineWaterlineWaterline Curb, Guer & PavingCurb, Guer & PavingCurb, Guer & PavingCurb, Guer & PavingCurb, Guer & Paving SurveyingSurveyingSurveyingSurveyingSurveying Curb & GuerCurb & GuerCurb & GuerCurb & GuerCurb & Guer Paving Prep, Pave & StripePaving Prep, Pave & StripePaving Prep, Pave & StripePaving Prep, Pave & StripePaving Prep, Pave & Stripe Building 01Building 01Building 01Building 01Building 01 FoundationsFoundationsFoundationsFoundationsFoundations Excavate Perimeter Walls and FootingsExcavate Perimeter Walls and FootingsExcavate Perimeter Walls and FootingsExcavate Perimeter Walls and FootingsExcavate Perimeter Walls and Footings SurveySurveySurveySurveySurvey Foundation RebarFoundation RebarFoundation RebarFoundation RebarFoundation Rebar Pour FootingsPour FootingsPour FootingsPour FootingsPour Footings Rebar InspectionRebar InspectionRebar InspectionRebar InspectionRebar Inspection Form Foundation WallsForm Foundation WallsForm Foundation WallsForm Foundation WallsForm Foundation Walls Rebar in Foundation WallsRebar in Foundation WallsRebar in Foundation WallsRebar in Foundation WallsRebar in Foundation Walls Rebar InspectionRebar InspectionRebar InspectionRebar InspectionRebar Inspection Pour Stem WallsPour Stem WallsPour Stem WallsPour Stem WallsPour Stem Walls BackllBackllBackllBackllBackll UG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec Excavation UG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ Backll FRP Interior FootingsFRP Interior FootingsFRP Interior FootingsFRP Interior FootingsFRP Interior Footings Form Slab - Curbs / RebarForm Slab - Curbs / RebarForm Slab - Curbs / RebarForm Slab - Curbs / RebarForm Slab - Curbs / Rebar Radon System InstallRadon System InstallRadon System InstallRadon System InstallRadon System Install Vapor BarrierVapor BarrierVapor BarrierVapor BarrierVapor Barrier QAQC All MEPsQAQC All MEPsQAQC All MEPsQAQC All MEPsQAQC All MEPs Pour SlabPour SlabPour SlabPour SlabPour Slab FRP PatiosFRP PatiosFRP PatiosFRP PatiosFRP Patios FramingFramingFramingFramingFraming 1st Floor Walls1st Floor Walls1st Floor Walls1st Floor Walls1st Floor Walls 2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor 2nd Floor Walls2nd Floor Walls2nd Floor Walls2nd Floor Walls2nd Floor Walls 3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor 3rd Floor Walls3rd Floor Walls3rd Floor Walls3rd Floor Walls3rd Floor Walls Roof Truss and SheathingRoof Truss and SheathingRoof Truss and SheathingRoof Truss and SheathingRoof Truss and Sheathing ExteriorsExteriorsExteriorsExteriorsExteriors Fascia InstallFascia InstallFascia InstallFascia InstallFascia Install ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 3 / 18 View Name: 03b - PRINT by WBS  EXT  Building Wrap / Ext Doors / Windows d -Dec-  -Jan-    EXT  Dry In Roof d -Dec-  -Dec-    EXT  Roong d -Dec-  -Jan-    EXT  Stucco d -Jan-  -Mar-    EXT  Snow Fence d -Jan-  -Jan-    EXT  Siding Panels d -Mar-  -Mar-    EXT  Exterior Metal Panels d -Mar-  -Apr-    EXT  Ext Paint d -Apr-  -May-    EXT  Juliet Balcony Railings d -Apr-  -May-    EXT  Hardscape d -May-  -May-    EXT  Irrigation & Landscape d -May-  -Jun-    EXT  Shaw Work to Complete List d -Jun-  -Jun-    EXT  Corrective Work d -Jun-  -Jun-    EXT  Architect Punch LIst d -Jun-  -Jun-    EXT  Architect Punch List Corrections d -Jun-  -Jul-    st Floor d -Oct- -Jun-   Roughs d -Oct- -Mar-   A  Complete Shim & Shave d -Oct-  -Nov-    A  Framing QA/QC Walk d -Nov-  -Nov-    A  Backing & Blocking d -Nov-  -Nov-    A  Electrical Rough - Box & Drill d -Nov-  -Nov-    A  Pre-Rock/Gyp for Tubs & Showers d -Nov-  -Nov-    A  Fire Sprinkler Branch Lines d -Nov-  -Dec-    A  Drain, Waste, & Vent d -Nov-  -Dec-    A  Set Shower Pans d -Dec-  -Dec-    A  HVAC - Line Sets d -Dec-  -Dec-    A  HVAC - Exhaust d -Dec-  -Dec-    A  Set Tubs d -Dec-  -Dec-    A  Water Lines d -Dec-  -Dec-    A  Secondary Plumbing d -Dec-  -Dec-    A  Complete Fire Caulking d -Dec-  -Jan-    A  Electrical Rough - Pull Wire d -Dec-  -Jan-    A  Complete First Floor Rough Inspections d -Jan-  -Jan-    A  Framing Inspection d -Jan-  -Jan-    A  Ba Insulation d -Jan-  -Jan-    A  Hang Drywall in Units d -Jan-  -Jan-    A  HVAC - Set Units d -Jan-  -Feb-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Building Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / Windows Dry In RoofDry In RoofDry In RoofDry In RoofDry In Roof RoongRoongRoongRoongRoong StuccoStuccoStuccoStuccoStucco Snow FenceSnow FenceSnow FenceSnow FenceSnow Fence Siding PanelsSiding PanelsSiding PanelsSiding PanelsSiding Panels Exterior Metal PanelsExterior Metal PanelsExterior Metal PanelsExterior Metal PanelsExterior Metal Panels Ext PaintExt PaintExt PaintExt PaintExt Paint Juliet Balcony RailingsJuliet Balcony RailingsJuliet Balcony RailingsJuliet Balcony RailingsJuliet Balcony Railings HardscapeHardscapeHardscapeHardscapeHardscape Irrigation & LandscapeIrrigation & LandscapeIrrigation & LandscapeIrrigation & LandscapeIrrigation & Landscape Shaw Work to Complete ListShaw Work to Complete ListShaw Work to Complete ListShaw Work to Complete ListShaw Work to Complete List Corrective WorkCorrective WorkCorrective WorkCorrective WorkCorrective Work Architect Punch LIstArchitect Punch LIstArchitect Punch LIstArchitect Punch LIstArchitect Punch LIst Architect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List Corrections 1st Floor1st Floor1st Floor1st Floor1st Floor RoughsRoughsRoughsRoughsRoughs Complete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & Shave Framing QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC Walk Backing & BlockingBacking & BlockingBacking & BlockingBacking & BlockingBacking & Blocking Electrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & Drill Pre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & Showers Fire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch Lines Drain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & Vent Set Shower PansSet Shower PansSet Shower PansSet Shower PansSet Shower Pans HVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line Sets HVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - Exhaust Set TubsSet TubsSet TubsSet TubsSet Tubs Water LinesWater LinesWater LinesWater LinesWater Lines Secondary PlumbingSecondary PlumbingSecondary PlumbingSecondary PlumbingSecondary Plumbing Complete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire Caulking Electrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull Wire Complete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough Inspections Framing InspectionFraming InspectionFraming InspectionFraming InspectionFraming Inspection Ba InsulationBa InsulationBa InsulationBa InsulationBa Insulation Hang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in Units HVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set Units ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 4 / 18 View Name: 03b - PRINT by WBS  A  Frame Drops d -Feb-  -Feb-    A  Electrical Rough @ Drops d -Feb-  -Feb-    A  Rough Inspection @ Drops d -Feb-  -Feb-    A  Hang Drops & Remaining Drywall d -Feb-  -Feb-    A  Gypcrete d -Feb-  -Mar-    A  Complete Tape & Finish d -Mar-  -Mar-    A  Texture Walls & Ceilings d -Mar-  -Mar-    Corridor d -Jan- -Mar-   A  Top Out Walls & Ceiling d -Jan-  -Feb-    A  HVAC Rough - Corridor d -Feb-  -Feb-    A  Electrical Rough - Corridor d -Feb-  -Feb-    A  Fire Sprinkler Mains d -Feb-  -Feb-    A  Water Lines - Corridor d -Feb-  -Feb-    A  Fire Caulking d -Feb-  -Feb-    A  Corridor Inspections d -Feb-  -Feb-    A  Hang Drywall - Corridors d -Feb-  -Feb-    A  Tape & Finish d -Feb-  -Feb-    A  Texture d -Mar-  -Mar-    A  Prime Paint d -Mar-  -Mar-    A  Standing Running Trim d -Mar-  -Mar-    A  Paint d -Mar-  -Mar-    A  Electrical & Low Voltage Trim d -Mar-  -Mar-    A  Fire Sprinkler Trim d -Mar-  -Mar-    A  Signage d -Mar-  -Mar-    A  Carpet d -Mar-  -Mar-    Finishes d -Mar- -Jun-   A  Prime Walls & Ceilings d -Mar-  -Mar-    A  Install Doors d -Mar-  -Mar-    A  Tile Surrounds & Floors d -Mar-  -Apr-    A  Set Cabinets d -Mar-  -Mar-    A  Vinyl Flooring d -Mar-  -Apr-    A  Counter Tops d -Mar-  -Apr-    A  Standing Running Trim d -Mar-  -Apr-    A  Backsplash d -Apr-  -Apr-    A  Plumbing Trim d -Apr-  -Apr-    A  Appliances d -Apr-  -Apr-    A  Electrical Trim d -Apr-  -Apr-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Frame DropsFrame DropsFrame DropsFrame DropsFrame Drops Electrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ Drops Rough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ Drops Hang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining Drywall GypcreteGypcreteGypcreteGypcreteGypcrete Complete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & Finish Texture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & Ceilings CorridorCorridorCorridorCorridorCorridor Top Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & Ceiling HVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - Corridor Electrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - Corridor Fire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler Mains Water Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - Corridor Fire CaulkingFire CaulkingFire CaulkingFire CaulkingFire Caulking Corridor InspectionsCorridor InspectionsCorridor InspectionsCorridor InspectionsCorridor Inspections Hang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - Corridors Tape & FinishTape & FinishTape & FinishTape & FinishTape & Finish TextureTextureTextureTextureTexture Prime PaintPrime PaintPrime PaintPrime PaintPrime Paint Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim PaintPaintPaintPaintPaint Electrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage Trim Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim SignageSignageSignageSignageSignage CarpetCarpetCarpetCarpetCarpet FinishesFinishesFinishesFinishesFinishes Prime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & Ceilings Install DoorsInstall DoorsInstall DoorsInstall DoorsInstall Doors Tile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & Floors Set CabinetsSet CabinetsSet CabinetsSet CabinetsSet Cabinets Vinyl FlooringVinyl FlooringVinyl FlooringVinyl FlooringVinyl Flooring Counter TopsCounter TopsCounter TopsCounter TopsCounter Tops Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim BacksplashBacksplashBacksplashBacksplashBacksplash Plumbing TrimPlumbing TrimPlumbing TrimPlumbing TrimPlumbing Trim AppliancesAppliancesAppliancesAppliancesAppliances Electrical TrimElectrical TrimElectrical TrimElectrical TrimElectrical Trim ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 5 / 18 View Name: 03b - PRINT by WBS  A  Closet Trim d -Apr-  -Apr-    A  Paint Walls & Ceilings d -Apr-  -Apr-    A  Final Plumbing Inspections d -Apr-  -Apr-    A  Accessories d -Apr-  -May-    A  Low Voltage Trim d -Apr-  -May-    A  Fire Sprinkler Trim d -Apr-  -May-    A  Mechanical Trim d -Apr-  -May-    A  Carpet d -May-  -May-    A  Final Mechanical Inspections d -May-  -May-    A  Final Electrical Inspection d -May-  -May-    A  Rough Clean d -May-  -May-    A  Final Inspections d -May-  -May-    A  Shaw Work List d -May-  -May-    A  Work to Complete Corrections d -May-  -May-    A  Final Clean d -May-  -May-    A  Architects Punch List d -Jun-  -Jun-    A  Architect Punch List Corrections d -Jun-  -Jun-    A  First Touch up - Final Clean d -Jun-  -Jun-    A  Owner Punch List Walk d -Jun-  -Jun-    A  Owner Punch List Corrections d -Jun-  -Jun-    A  Final Clean Units d -Jun-  -Jun-    nd Floor d -Nov- -Jul-   Rough d -Nov- -Mar-   A  Complete Shim & Shave d -Nov-  -Nov-    A  Framing QA/QC Walk d -Nov-  -Dec-    A  Backing & Blocking d -Dec-  -Dec-    A  Electrical Rough - Box & Drill d -Dec-  -Dec-    A  Pre-Rock/Gyp for Tubs & Showers d -Dec-  -Dec-    A  Fire Sprinkler Branch Lines d -Dec-  -Dec-    A  Drain, Waste, & Vent d -Dec-  -Dec-    A  Set Shower Pans d -Dec-  -Dec-    A  HVAC - Line Sets d -Dec-  -Jan-    A  HVAC - Exhaust d -Dec-  -Jan-    A  Set Tubs d -Dec-  -Jan-    A  Water Lines d -Jan-  -Jan-    A  Secondary Plumbing d -Jan-  -Jan-    A  Electrical Rough - Pull Wire d -Jan-  -Jan-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Closet TrimCloset TrimCloset TrimCloset TrimCloset Trim Paint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & Ceilings Final Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing Inspections AccessoriesAccessoriesAccessoriesAccessoriesAccessories Low Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage Trim Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim Mechanical TrimMechanical TrimMechanical TrimMechanical TrimMechanical Trim CarpetCarpetCarpetCarpetCarpet Final Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical Inspections Final Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical Inspection Rough CleanRough CleanRough CleanRough CleanRough Clean Final InspectionsFinal InspectionsFinal InspectionsFinal InspectionsFinal Inspections Shaw Work ListShaw Work ListShaw Work ListShaw Work ListShaw Work List Work to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete Corrections Final CleanFinal CleanFinal CleanFinal CleanFinal Clean Architects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch List Architect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List Corrections First Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final Clean Owner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List Walk Owner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List Corrections Final Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean Units 2nd Floor2nd Floor2nd Floor2nd Floor2nd Floor RoughRoughRoughRoughRough Complete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & Shave Framing QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC Walk Backing & BlockingBacking & BlockingBacking & BlockingBacking & BlockingBacking & Blocking Electrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & Drill Pre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & Showers Fire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch Lines Drain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & Vent Set Shower PansSet Shower PansSet Shower PansSet Shower PansSet Shower Pans HVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line Sets HVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - Exhaust Set TubsSet TubsSet TubsSet TubsSet Tubs Water LinesWater LinesWater LinesWater LinesWater Lines Secondary PlumbingSecondary PlumbingSecondary PlumbingSecondary PlumbingSecondary Plumbing Electrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull Wire ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 6 / 18 View Name: 03b - PRINT by WBS  A  Complete Fire Caulking d -Jan-  -Jan-    A  Complete First Floor Rough Inspections d -Jan-  -Jan-    A  Framing Inspection d -Jan-  -Jan-    A  Ba Insulation d -Jan-  -Jan-    A  Hang Drywall in Units d -Jan-  -Feb-    A  HVAC - Set Units d -Feb-  -Feb-    A  Frame Drops d -Feb-  -Feb-    A  Electrical Rough @ Drops d -Feb-  -Feb-    A  Rough Inspection @ Drops d -Feb-  -Feb-    A  Hang Drops & Remaining Drywall d -Mar-  -Mar-    A  Gypcrete d -Mar-  -Mar-    A  Complete Tape & Finish d -Mar-  -Mar-    A  Texture Walls & Ceilings d -Mar-  -Mar-    Corridor d -Feb- -Apr-   A  Top Out Walls & Ceiling d -Feb-  -Feb-    A  Fire Sprinkler Mains d -Feb-  -Feb-    A  Water Lines - Corridor d -Feb-  -Feb-    A  Electrical Rough - Corridor d -Feb-  -Feb-    A  HVAC Rough - Corridor d -Feb-  -Feb-    A  Fire Caulking d -Feb-  -Feb-    A  Corridor Inspections d -Feb-  -Feb-    A  Hang Drywall - Corridors d -Feb-  -Mar-    A  Tape & Finish d -Mar-  -Mar-    A  Texture d -Mar-  -Mar-    A  Prime Paint d -Mar-  -Mar-    A  Standing Running Trim d -Mar-  -Mar-    A  Paint d -Mar-  -Mar-    A  Fire Sprinkler Trim d -Mar-  -Mar-    A  Signage d -Mar-  -Mar-    A  Electrical & Low Voltage Trim d -Mar-  -Mar-    A  Carpet d -Mar-  -Apr-    Finishes d -Mar- -Jul-   A  Prime Walls & Ceilings d -Mar-  -Apr-    A  Tile Surrounds & Floors d -Apr-  -Apr-    A  Install Doors d -Apr-  -Apr-    A  Set Cabinets d -Apr-  -Apr-    A  Counter Tops d -Apr-  -Apr-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Complete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire Caulking Complete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough Inspections Framing InspectionFraming InspectionFraming InspectionFraming InspectionFraming Inspection Ba InsulationBa InsulationBa InsulationBa InsulationBa Insulation Hang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in Units HVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set Units Frame DropsFrame DropsFrame DropsFrame DropsFrame Drops Electrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ Drops Rough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ Drops Hang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining Drywall GypcreteGypcreteGypcreteGypcreteGypcrete Complete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & Finish Texture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & Ceilings CorridorCorridorCorridorCorridorCorridor Top Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & Ceiling Fire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler Mains Water Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - Corridor Electrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - Corridor HVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - Corridor Fire CaulkingFire CaulkingFire CaulkingFire CaulkingFire Caulking Corridor InspectionsCorridor InspectionsCorridor InspectionsCorridor InspectionsCorridor Inspections Hang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - Corridors Tape & FinishTape & FinishTape & FinishTape & FinishTape & Finish TextureTextureTextureTextureTexture Prime PaintPrime PaintPrime PaintPrime PaintPrime Paint Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim PaintPaintPaintPaintPaint Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim SignageSignageSignageSignageSignage Electrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage Trim CarpetCarpetCarpetCarpetCarpet FinishesFinishesFinishesFinishesFinishes Prime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & Ceilings Tile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & Floors Install DoorsInstall DoorsInstall DoorsInstall DoorsInstall Doors Set CabinetsSet CabinetsSet CabinetsSet CabinetsSet Cabinets Counter TopsCounter TopsCounter TopsCounter TopsCounter Tops ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 7 / 18 View Name: 03b - PRINT by WBS  A  Standing Running Trim d -Apr-  -Apr-    A  Vinyl Flooring d -Apr-  -Apr-    A  Backsplash d -Apr-  -Apr-    A  Plumbing Trim d -Apr-  -May-    A  Electrical Trim d -Apr-  -May-    A  Appliances d -Apr-  -Apr-    A  Closet Trim d -Apr-  -Apr-    A  Paint Walls & Ceilings d -May-  -May-    A  Final Plumbing Inspections d -May-  -May-    A  Mechanical Trim d -May-  -May-    A  Low Voltage Trim d -May-  -May-    A  Accessories d -May-  -May-    A  Fire Sprinkler Trim d -May-  -May-    A  Carpet d -May-  -May-    A  Final Mechanical Inspections d -May-  -May-    A  Final Electrical Inspection d -May-  -May-    A  Rough Clean d -May-  -May-    A  Final Inspections d -May-  -May-    A  Shaw Work List d -May-  -May-    A  Work to Complete Corrections d -Jun-  -Jun-    A  Final Clean d -Jun-  -Jun-    A  Architects Punch List d -Jun-  -Jun-    A  Architect Punch List Corrections d -Jun-  -Jun-    A  First Touch up - Final Clean d -Jun-  -Jun-    A  Owner Punch List Walk d -Jun-  -Jun-    A  Owner Punch List Corrections d -Jun-  -Jun-    A  Final Clean Units d -Jun-  -Jul-    rd Floor d -Dec- -Jul-   Rough d -Dec- -Mar-   A  Complete Shim & Shave d -Dec-  -Dec-    A  Framing QA/QC Walk d -Dec-  -Dec-    A  Backing & Blocking d -Dec-  -Jan-    A  Fire Sprinkler Branch Lines d -Dec-  -Jan-    A  HVAC - Exhaust d -Dec-  -Jan-    A  Water Lines d -Dec-  -Jan-    A  HVAC - Line Sets d -Dec-  -Jan-    A  Drain, Waste, & Vent d -Dec-  -Jan-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim Vinyl FlooringVinyl FlooringVinyl FlooringVinyl FlooringVinyl Flooring BacksplashBacksplashBacksplashBacksplashBacksplash Plumbing TrimPlumbing TrimPlumbing TrimPlumbing TrimPlumbing Trim Electrical TrimElectrical TrimElectrical TrimElectrical TrimElectrical Trim AppliancesAppliancesAppliancesAppliancesAppliances Closet TrimCloset TrimCloset TrimCloset TrimCloset Trim Paint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & Ceilings Final Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing Inspections Mechanical TrimMechanical TrimMechanical TrimMechanical TrimMechanical Trim Low Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage Trim AccessoriesAccessoriesAccessoriesAccessoriesAccessories Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim CarpetCarpetCarpetCarpetCarpet Final Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical Inspections Final Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical Inspection Rough CleanRough CleanRough CleanRough CleanRough Clean Final InspectionsFinal InspectionsFinal InspectionsFinal InspectionsFinal Inspections Shaw Work ListShaw Work ListShaw Work ListShaw Work ListShaw Work List Work to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete Corrections Final CleanFinal CleanFinal CleanFinal CleanFinal Clean Architects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch List Architect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List Corrections First Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final Clean Owner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List Walk Owner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List Corrections Final Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean Units 3rd Floor3rd Floor3rd Floor3rd Floor3rd Floor RoughRoughRoughRoughRough Complete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & Shave Framing QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC Walk Backing & BlockingBacking & BlockingBacking & BlockingBacking & BlockingBacking & Blocking Fire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch Lines HVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - Exhaust Water LinesWater LinesWater LinesWater LinesWater Lines HVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line Sets Drain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & Vent ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 8 / 18 View Name: 03b - PRINT by WBS  A  Pre-Rock/Gyp for Tubs & Showers d -Jan-  -Jan-    A  Electrical Rough - Box & Drill d -Jan-  -Jan-    A  Secondary Plumbing d -Jan-  -Jan-    A  Set Shower Pans d -Jan-  -Jan-    A  Set Tubs d -Jan-  -Jan-    A  Complete Fire Caulking d -Jan-  -Jan-    A  Electrical Rough - Pull Wire d -Jan-  -Jan-    A  Complete First Floor Rough Inspections d -Jan-  -Jan-    A  Framing Inspection d -Jan-  -Jan-    A  Ba Insulation d -Jan-  -Feb-    A  Hang Drywall in Units d -Feb-  -Feb-    A  HVAC - Set Units d -Feb-  -Feb-    A  Frame Drops d -Feb-  -Feb-    A  Electrical Rough @ Drops d -Feb-  -Mar-    A  Rough Inspection @ Drops d -Mar-  -Mar-    A  Hang Drops & Remaining Drywall d -Mar-  -Mar-    A  Gypcrete d -Mar-  -Mar-    A  Complete Tape & Finish d -Mar-  -Mar-    A  Texture Walls & Ceilings d -Mar-  -Mar-    Corridor d -Feb- -Apr-   A  Top Out Walls & Ceiling d -Feb-  -Feb-    A  Electrical Rough - Corridor d -Feb-  -Feb-    A  HVAC Rough - Corridor d -Feb-  -Feb-    A  Water Lines - Corridor d -Feb-  -Feb-    A  Fire Sprinkler Mains d -Feb-  -Feb-    A  Fire Caulking d -Feb-  -Feb-    A  Corridor Inspections d -Feb-  -Feb-    A  Hang Drywall - Corridors d -Mar-  -Mar-    A  Tape & Finish d -Mar-  -Mar-    A  Texture d -Mar-  -Mar-    A  Prime Paint d -Mar-  -Mar-    A  Standing Running Trim d -Mar-  -Mar-    A  Paint d -Mar-  -Mar-    A  Electrical & Low Voltage Trim d -Mar-  -Apr-    A  Signage d -Mar-  -Mar-    A  Fire Sprinkler Trim d -Mar-  -Mar-    A  Carpet d -Apr-  -Apr-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Pre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & Showers Electrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & Drill Secondary PlumbingSecondary PlumbingSecondary PlumbingSecondary PlumbingSecondary Plumbing Set Shower PansSet Shower PansSet Shower PansSet Shower PansSet Shower Pans Set TubsSet TubsSet TubsSet TubsSet Tubs Complete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire Caulking Electrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull Wire Complete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough Inspections Framing InspectionFraming InspectionFraming InspectionFraming InspectionFraming Inspection Ba InsulationBa InsulationBa InsulationBa InsulationBa Insulation Hang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in Units HVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set Units Frame DropsFrame DropsFrame DropsFrame DropsFrame Drops Electrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ Drops Rough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ Drops Hang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining Drywall GypcreteGypcreteGypcreteGypcreteGypcrete Complete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & Finish Texture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & Ceilings CorridorCorridorCorridorCorridorCorridor Top Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & Ceiling Electrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - Corridor HVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - Corridor Water Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - Corridor Fire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler Mains Fire CaulkingFire CaulkingFire CaulkingFire CaulkingFire Caulking Corridor InspectionsCorridor InspectionsCorridor InspectionsCorridor InspectionsCorridor Inspections Hang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - Corridors Tape & FinishTape & FinishTape & FinishTape & FinishTape & Finish TextureTextureTextureTextureTexture Prime PaintPrime PaintPrime PaintPrime PaintPrime Paint Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim PaintPaintPaintPaintPaint Electrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage Trim SignageSignageSignageSignageSignage Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim CarpetCarpetCarpetCarpetCarpet ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 9 / 18 View Name: 03b - PRINT by WBS  Finishes d -Mar- -Jul-   A  Prime Walls & Ceilings d -Mar-  -Apr-    A  Tile Surrounds & Floors d -Apr-  -Apr-    A  Install Doors d -Apr-  -Apr-    A  Set Cabinets d -Apr-  -Apr-    A  Standing Running Trim d -Apr-  -Apr-    A  Counter Tops d -Apr-  -Apr-    A  Vinyl Flooring d -Apr-  -Apr-    A  Backsplash d -Apr-  -Apr-    A  Plumbing Trim d -Apr-  -May-    A  Closet Trim d -Apr-  -May-    A  Appliances d -Apr-  -May-    A  Electrical Trim d -Apr-  -May-    A  Paint Walls & Ceilings d -May-  -May-    A  Final Plumbing Inspections d -May-  -May-    A  Low Voltage Trim d -May-  -May-    A  Fire Sprinkler Trim d -May-  -May-    A  Mechanical Trim d -May-  -May-    A  Accessories d -May-  -May-    A  Final Mechanical Inspections d -May-  -May-    A  Carpet d -May-  -May-    A  Final Electrical Inspection d -May-  -May-    A  Rough Clean d -May-  -May-    A  Final Inspections d -May-  -Jun-    A  Shaw Work List d -Jun-  -Jun-    A  Work to Complete Corrections d -Jun-  -Jun-    A  Final Clean d -Jun-  -Jun-    A  First Touch up - Final Clean d -Jun-  -Jun-    A  Owner Punch List Walk d -Jun-  -Jun-    A  Owner Punch List Corrections d -Jun-  -Jun-    A  Final Clean Units d -Jun-  -Jul-    Final Inspections & Completion - Phase d -Jun- -Aug-   A  Mechanical Final Inspection d -Jun-  -Jun-    A  Fire Alarm Final Inspection d -Jun-  -Jun-    A  Fire Sprinkler Final Inspection d -Jun-  -Jun-    A  Electrical Final Inspection d -Jun-  -Jun-    A  Fire Department Final Inspection d -Jun-  -Jun-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M FinishesFinishesFinishesFinishesFinishes Prime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & Ceilings Tile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & Floors Install DoorsInstall DoorsInstall DoorsInstall DoorsInstall Doors Set CabinetsSet CabinetsSet CabinetsSet CabinetsSet Cabinets Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim Counter TopsCounter TopsCounter TopsCounter TopsCounter Tops Vinyl FlooringVinyl FlooringVinyl FlooringVinyl FlooringVinyl Flooring BacksplashBacksplashBacksplashBacksplashBacksplash Plumbing TrimPlumbing TrimPlumbing TrimPlumbing TrimPlumbing Trim Closet TrimCloset TrimCloset TrimCloset TrimCloset Trim AppliancesAppliancesAppliancesAppliancesAppliances Electrical TrimElectrical TrimElectrical TrimElectrical TrimElectrical Trim Paint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & Ceilings Final Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing Inspections Low Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage Trim Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim Mechanical TrimMechanical TrimMechanical TrimMechanical TrimMechanical Trim AccessoriesAccessoriesAccessoriesAccessoriesAccessories Final Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical Inspections CarpetCarpetCarpetCarpetCarpet Final Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical Inspection Rough CleanRough CleanRough CleanRough CleanRough Clean Final InspectionsFinal InspectionsFinal InspectionsFinal InspectionsFinal Inspections Shaw Work ListShaw Work ListShaw Work ListShaw Work ListShaw Work List Work to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete Corrections Final CleanFinal CleanFinal CleanFinal CleanFinal Clean First Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final Clean Owner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List Walk Owner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List Corrections Final Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean Units Final Inspections & Completion - Phase 1Final Inspections & Completion - Phase 1Final Inspections & Completion - Phase 1Final Inspections & Completion - Phase 1Final Inspections & Completion - Phase 1 Mechanical Final InspectionMechanical Final InspectionMechanical Final InspectionMechanical Final InspectionMechanical Final Inspection Fire Alarm Final InspectionFire Alarm Final InspectionFire Alarm Final InspectionFire Alarm Final InspectionFire Alarm Final Inspection Fire Sprinkler Final InspectionFire Sprinkler Final InspectionFire Sprinkler Final InspectionFire Sprinkler Final InspectionFire Sprinkler Final Inspection Electrical Final InspectionElectrical Final InspectionElectrical Final InspectionElectrical Final InspectionElectrical Final Inspection Fire Department Final InspectionFire Department Final InspectionFire Department Final InspectionFire Department Final InspectionFire Department Final Inspection ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 10 / 18 View Name: 03b - PRINT by WBS  A  Plumbing Final Inspection d -Jun-  -Jun-    A  Interior Final Inspection d -Jul-  -Jul-    A  Exterior Final Inspection d -Jul-  -Jul-    A  Engineering/Zoning Final Inspection d -Jul-  -Jul-    A  Building Department Final Inspection d -Jul-  -Jul-    A  Weather Delays d -Jul-  -Aug-    A  CO - Final Completion d  -Aug-    Building d -Oct- -Sep-   Foundations d -Oct- -Dec-   FND  Survey d -Oct-  -Oct-    FND  Excavate Perimeter Walls and Footings d -Oct-  -Nov-    FND  Foundation Rebar d -Nov-  -Nov-    FND  Rebar Inspection d -Nov-  -Nov-    FND  Pour Footings d -Nov-  -Nov-    FND  Form Foundation Walls d -Nov-  -Dec-    FND  UG Shallow Plumb/ Elec Excavation d -Nov-  -Nov-    FND  Rebar in Foundation Walls d -Nov-  -Dec-    FND  UG Shallow Plumb/ Elec Install/ Inspect/ Backll d -Dec-  -Dec-    FND  Rebar Inspection d -Dec-  -Dec-    FND  Pour Stem Walls d -Dec-  -Dec-    FND  Dig Thickened Slab Areas d -Dec-  -Dec-    FND  Form Slab - Curbs / Rebar d -Dec-  -Dec-    FND  Radon System Install d -Dec-  -Dec-    FND  Vapor Barrier d -Dec-  -Dec-    FND  QAQC All MEPs d -Dec-  -Dec-    FND  Pour Slab d -Dec-  -Dec-    FND  FRP Patios d -Dec-  -Dec-    Framing d -Jan- -Mar-   FRM  st Floor Walls d -Jan-  -Jan-    FRM  nd Floor Trusses / Suboor d -Jan-  -Jan-    FRM  nd Floor Walls d -Jan-  -Feb-    FRM  rd Floor Trusses / Suboor d -Feb-  -Feb-    FRM  rd Floor Walls d -Feb-  -Feb-    FRM  Roof Truss and Sheathing d -Feb-  -Mar-    Exteriors d -Mar- -Sep-   EXT  Fascia Install d -Mar-  -Mar-    EXT  Building Wrap / Ext Doors / Windows d -Mar-  -Apr-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Plumbing Final InspectionPlumbing Final InspectionPlumbing Final InspectionPlumbing Final InspectionPlumbing Final Inspection Interior Final InspectionInterior Final InspectionInterior Final InspectionInterior Final InspectionInterior Final Inspection Exterior Final InspectionExterior Final InspectionExterior Final InspectionExterior Final InspectionExterior Final Inspection Engineering/Zoning Final InspectionEngineering/Zoning Final InspectionEngineering/Zoning Final InspectionEngineering/Zoning Final InspectionEngineering/Zoning Final Inspection Building Department Final InspectionBuilding Department Final InspectionBuilding Department Final InspectionBuilding Department Final InspectionBuilding Department Final Inspection Weather DelaysWeather DelaysWeather DelaysWeather DelaysWeather Delays CO - Final CompletionCO - Final CompletionCO - Final CompletionCO - Final CompletionCO - Final Completion Building 02Building 02Building 02Building 02Building 02 FoundationsFoundationsFoundationsFoundationsFoundations SurveySurveySurveySurveySurvey Excavate Perimeter Walls and FootingsExcavate Perimeter Walls and FootingsExcavate Perimeter Walls and FootingsExcavate Perimeter Walls and FootingsExcavate Perimeter Walls and Footings Foundation RebarFoundation RebarFoundation RebarFoundation RebarFoundation Rebar Rebar InspectionRebar InspectionRebar InspectionRebar InspectionRebar Inspection Pour FootingsPour FootingsPour FootingsPour FootingsPour Footings Form Foundation WallsForm Foundation WallsForm Foundation WallsForm Foundation WallsForm Foundation Walls UG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec ExcavationUG Shallow Plumb/ Elec Excavation Rebar in Foundation WallsRebar in Foundation WallsRebar in Foundation WallsRebar in Foundation WallsRebar in Foundation Walls UG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ BackllUG Shallow Plumb/ Elec Install/ Inspect/ Backll Rebar InspectionRebar InspectionRebar InspectionRebar InspectionRebar Inspection Pour Stem WallsPour Stem WallsPour Stem WallsPour Stem WallsPour Stem Walls Dig Thickened Slab AreasDig Thickened Slab AreasDig Thickened Slab AreasDig Thickened Slab AreasDig Thickened Slab Areas Form Slab - Curbs / RebarForm Slab - Curbs / RebarForm Slab - Curbs / RebarForm Slab - Curbs / RebarForm Slab - Curbs / Rebar Radon System InstallRadon System InstallRadon System InstallRadon System InstallRadon System Install Vapor BarrierVapor BarrierVapor BarrierVapor BarrierVapor Barrier QAQC All MEPsQAQC All MEPsQAQC All MEPsQAQC All MEPsQAQC All MEPs Pour SlabPour SlabPour SlabPour SlabPour Slab FRP PatiosFRP PatiosFRP PatiosFRP PatiosFRP Patios FramingFramingFramingFramingFraming 1st Floor Walls1st Floor Walls1st Floor Walls1st Floor Walls1st Floor Walls 2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor2nd Floor Trusses / Suboor 2nd Floor Walls2nd Floor Walls2nd Floor Walls2nd Floor Walls2nd Floor Walls 3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor3rd Floor Trusses / Suboor 3rd Floor Walls3rd Floor Walls3rd Floor Walls3rd Floor Walls3rd Floor Walls Roof Truss and SheathingRoof Truss and SheathingRoof Truss and SheathingRoof Truss and SheathingRoof Truss and Sheathing ExteriorsExteriorsExteriorsExteriorsExteriors Fascia InstallFascia InstallFascia InstallFascia InstallFascia Install Building Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / WindowsBuilding Wrap / Ext Doors / Windows ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 11 / 18 View Name: 03b - PRINT by WBS  EXT  Dry In Roof d -Mar-  -Mar-    EXT  Stucco d -Mar-  -May-    EXT  Roong d -Mar-  -Apr-    EXT  Snow Fence d -Apr-  -Apr-    EXT  Siding Panels d -May-  -May-    EXT  Exterior Metal Panels d -Jun-  -Jun-    EXT  Juliet Balcony Railings d -Jun-  -Jul-    EXT  Ext Paint d -Jun-  -Jul-    EXT  Hardscape d -Jul-  -Jul-    EXT  Irrigation & Landscape d -Jul-  -Aug-    EXT  Shaw Work to Complete List d -Aug-  -Aug-    EXT  Corrective Work d -Aug-  -Aug-    EXT  Architect Punch LIst d -Aug-  -Aug-    EXT  Architect Punch List Corrections d -Aug-  -Sep-    st Floor d -Jan- -Sep-   Roughs d -Jan- -Jun-   A  Complete Shim & Shave d -Jan-  -Jan-    A  Framing QA/QC Walk d -Feb-  -Feb-    A  Backing & Blocking d -Feb-  -Feb-    A  Electrical Rough - Box & Drill d -Feb-  -Feb-    A  Pre-Rock/Gyp for Tubs & Showers d -Feb-  -Feb-    A  Fire Sprinkler Branch Lines d -Feb-  -Feb-    A  Drain, Waste, & Vent d -Feb-  -Feb-    A  Set Shower Pans d -Feb-  -Mar-    A  HVAC - Line Sets d -Mar-  -Mar-    A  HVAC - Exhaust d -Mar-  -Mar-    A  Set Tubs d -Mar-  -Mar-    A  Water Lines d -Mar-  -Mar-    A  Secondary Plumbing d -Mar-  -Mar-    A  Complete Fire Caulking d -Mar-  -Mar-    A  Electrical Rough - Pull Wire d -Mar-  -Mar-    A  Complete First Floor Rough Inspections d -Mar-  -Mar-    A  Framing Inspection d -Apr-  -Apr-    A  Ba Insulation d -Apr-  -Apr-    A  Hang Drywall in Units d -Apr-  -Apr-    A  HVAC - Set Units d -Apr-  -Apr-    A  Frame Drops d -Apr-  -Apr-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Dry In RoofDry In RoofDry In RoofDry In RoofDry In Roof StuccoStuccoStuccoStuccoStucco RoongRoongRoongRoongRoong Snow FenceSnow FenceSnow FenceSnow FenceSnow Fence Siding PanelsSiding PanelsSiding PanelsSiding PanelsSiding Panels Exterior Metal PanelsExterior Metal PanelsExterior Metal PanelsExterior Metal PanelsExterior Metal Panels Juliet Balcony RailingsJuliet Balcony RailingsJuliet Balcony RailingsJuliet Balcony RailingsJuliet Balcony Railings Ext PaintExt PaintExt PaintExt PaintExt Paint HardscapeHardscapeHardscapeHardscapeHardscape Irrigation & LandscapeIrrigation & LandscapeIrrigation & LandscapeIrrigation & LandscapeIrrigation & Landscape Shaw Work to Complete ListShaw Work to Complete ListShaw Work to Complete ListShaw Work to Complete ListShaw Work to Complete List Corrective WorkCorrective WorkCorrective WorkCorrective WorkCorrective Work Architect Punch LIstArchitect Punch LIstArchitect Punch LIstArchitect Punch LIstArchitect Punch LIst Architect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List Corrections 1st Floor1st Floor1st Floor1st Floor1st Floor RoughsRoughsRoughsRoughsRoughs Complete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & Shave Framing QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC Walk Backing & BlockingBacking & BlockingBacking & BlockingBacking & BlockingBacking & Blocking Electrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & Drill Pre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & Showers Fire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch Lines Drain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & Vent Set Shower PansSet Shower PansSet Shower PansSet Shower PansSet Shower Pans HVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line Sets HVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - Exhaust Set TubsSet TubsSet TubsSet TubsSet Tubs Water LinesWater LinesWater LinesWater LinesWater Lines Secondary PlumbingSecondary PlumbingSecondary PlumbingSecondary PlumbingSecondary Plumbing Complete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire Caulking Electrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull Wire Complete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough Inspections Framing InspectionFraming InspectionFraming InspectionFraming InspectionFraming Inspection Ba InsulationBa InsulationBa InsulationBa InsulationBa Insulation Hang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in Units HVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set Units Frame DropsFrame DropsFrame DropsFrame DropsFrame Drops ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 12 / 18 View Name: 03b - PRINT by WBS  A  Electrical Rough @ Drops d -Apr-  -May-    A  Rough Inspection @ Drops d -May-  -May-    A  Hang Drops & Remaining Drywall d -May-  -May-    A  Gypcrete d -May-  -May-    A  Complete Tape & Finish d -May-  -May-    A  Texture Walls & Ceilings d -May-  -Jun-    Corridor d -Apr- -Jun-   A  Top Out Walls & Ceiling d -Apr-  -Apr-    A  Electrical Rough - Corridor d -Apr-  -Apr-    A  Fire Sprinkler Mains d -Apr-  -Apr-    A  HVAC Rough - Corridor d -Apr-  -Apr-    A  Water Lines - Corridor d -Apr-  -Apr-    A  Fire Caulking d -Apr-  -May-    A  Corridor Inspections d -May-  -May-    A  Hang Drywall - Corridors d -May-  -May-    A  Tape & Finish d -May-  -May-    A  Texture d -May-  -May-    A  Prime Paint d -May-  -May-    A  Standing Running Trim d -May-  -May-    A  Paint d -May-  -Jun-    A  Signage d -Jun-  -Jun-    A  Fire Sprinkler Trim d -Jun-  -Jun-    A  Electrical & Low Voltage Trim d -Jun-  -Jun-    A  Carpet d -Jun-  -Jun-    Finishes d -Jun- -Sep-   A  Prime Walls & Ceilings d -Jun-  -Jun-    A  Install Doors d -Jun-  -Jun-    A  Set Cabinets d -Jun-  -Jun-    A  Tile Surrounds & Floors d -Jun-  -Jun-    A  Counter Tops d -Jun-  -Jun-    A  Vinyl Flooring d -Jun-  -Jun-    A  Standing Running Trim d -Jun-  -Jul-    A  Backsplash d -Jun-  -Jun-    A  Electrical Trim d -Jul-  -Jul-    A  Appliances d -Jul-  -Jul-    A  Plumbing Trim d -Jul-  -Jul-    A  Closet Trim d -Jul-  -Jul-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Electrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ Drops Rough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ Drops Hang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining Drywall GypcreteGypcreteGypcreteGypcreteGypcrete Complete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & Finish Texture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & Ceilings CorridorCorridorCorridorCorridorCorridor Top Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & Ceiling Electrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - Corridor Fire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler Mains HVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - Corridor Water Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - Corridor Fire CaulkingFire CaulkingFire CaulkingFire CaulkingFire Caulking Corridor InspectionsCorridor InspectionsCorridor InspectionsCorridor InspectionsCorridor Inspections Hang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - Corridors Tape & FinishTape & FinishTape & FinishTape & FinishTape & Finish TextureTextureTextureTextureTexture Prime PaintPrime PaintPrime PaintPrime PaintPrime Paint Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim PaintPaintPaintPaintPaint SignageSignageSignageSignageSignage Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim Electrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage Trim CarpetCarpetCarpetCarpetCarpet FinishesFinishesFinishesFinishesFinishes Prime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & Ceilings Install DoorsInstall DoorsInstall DoorsInstall DoorsInstall Doors Set CabinetsSet CabinetsSet CabinetsSet CabinetsSet Cabinets Tile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & Floors Counter TopsCounter TopsCounter TopsCounter TopsCounter Tops Vinyl FlooringVinyl FlooringVinyl FlooringVinyl FlooringVinyl Flooring Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim BacksplashBacksplashBacksplashBacksplashBacksplash Electrical TrimElectrical TrimElectrical TrimElectrical TrimElectrical Trim AppliancesAppliancesAppliancesAppliancesAppliances Plumbing TrimPlumbing TrimPlumbing TrimPlumbing TrimPlumbing Trim Closet TrimCloset TrimCloset TrimCloset TrimCloset Trim ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 13 / 18 View Name: 03b - PRINT by WBS  A  Paint Walls & Ceilings d -Jul-  -Jul-    A  Final Plumbing Inspections d -Jul-  -Jul-    A  Mechanical Trim d -Jul-  -Jul-    A  Low Voltage Trim d -Jul-  -Jul-    A  Fire Sprinkler Trim d -Jul-  -Jul-    A  Accessories d -Jul-  -Jul-    A  Carpet d -Jul-  -Aug-    A  Final Electrical Inspection d -Jul-  -Jul-    A  Final Mechanical Inspections d -Jul-  -Jul-    A  Rough Clean d -Aug-  -Aug-    A  Final Inspections d -Aug-  -Aug-    A  Shaw Work List d -Aug-  -Aug-    A  Work to Complete Corrections d -Aug-  -Aug-    A  Final Clean d -Aug-  -Aug-    A  Architects Punch List d -Aug-  -Aug-    A  Architect Punch List Corrections d -Aug-  -Aug-    A  First Touch up - Final Clean d -Aug-  -Sep-    A  Owner Punch List Walk d -Sep-  -Sep-    A  Owner Punch List Corrections d -Sep-  -Sep-    A  Final Clean Units d -Sep-  -Sep-    nd Floor d -Feb- -Sep-   Rough d -Feb- -Jun-   A  Complete Shim & Shave d -Feb-  -Feb-    A  Framing QA/QC Walk d -Feb-  -Feb-    A  Backing & Blocking d -Feb-  -Mar-    A  Electrical Rough - Box & Drill d -Mar-  -Mar-    A  Pre-Rock/Gyp for Tubs & Showers d -Mar-  -Mar-    A  Drain, Waste, & Vent d -Mar-  -Mar-    A  Fire Sprinkler Branch Lines d -Mar-  -Mar-    A  Set Shower Pans d -Mar-  -Mar-    A  HVAC - Exhaust d -Mar-  -Mar-    A  HVAC - Line Sets d -Mar-  -Mar-    A  Set Tubs d -Mar-  -Mar-    A  Secondary Plumbing d -Mar-  -Mar-    A  Water Lines d -Mar-  -Mar-    A  Electrical Rough - Pull Wire d -Mar-  -Apr-    A  Complete Fire Caulking d -Apr-  -Apr-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Paint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & Ceilings Final Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing Inspections Mechanical TrimMechanical TrimMechanical TrimMechanical TrimMechanical Trim Low Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage Trim Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim AccessoriesAccessoriesAccessoriesAccessoriesAccessories CarpetCarpetCarpetCarpetCarpet Final Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical Inspection Final Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical Inspections Rough CleanRough CleanRough CleanRough CleanRough Clean Final InspectionsFinal InspectionsFinal InspectionsFinal InspectionsFinal Inspections Shaw Work ListShaw Work ListShaw Work ListShaw Work ListShaw Work List Work to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete Corrections Final CleanFinal CleanFinal CleanFinal CleanFinal Clean Architects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch List Architect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List Corrections First Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final Clean Owner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List Walk Owner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List Corrections Final Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean Units 2nd Floor2nd Floor2nd Floor2nd Floor2nd Floor RoughRoughRoughRoughRough Complete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & Shave Framing QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC Walk Backing & BlockingBacking & BlockingBacking & BlockingBacking & BlockingBacking & Blocking Electrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & Drill Pre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & Showers Drain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & Vent Fire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch Lines Set Shower PansSet Shower PansSet Shower PansSet Shower PansSet Shower Pans HVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - Exhaust HVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line Sets Set TubsSet TubsSet TubsSet TubsSet Tubs Secondary PlumbingSecondary PlumbingSecondary PlumbingSecondary PlumbingSecondary Plumbing Water LinesWater LinesWater LinesWater LinesWater Lines Electrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull Wire Complete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire Caulking ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 14 / 18 View Name: 03b - PRINT by WBS  A  Complete First Floor Rough Inspections d -Apr-  -Apr-    A  Framing Inspection d -Apr-  -Apr-    A  Ba Insulation d -Apr-  -Apr-    A  Hang Drywall in Units d -Apr-  -Apr-    A  HVAC - Set Units d -Apr-  -May-    A  Frame Drops d -May-  -May-    A  Electrical Rough @ Drops d -May-  -May-    A  Rough Inspection @ Drops d -May-  -May-    A  Hang Drops & Remaining Drywall d -May-  -May-    A  Gypcrete d -May-  -May-    A  Complete Tape & Finish d -May-  -Jun-    A  Texture Walls & Ceilings d -Jun-  -Jun-    Corridor d -Apr- -Jun-   A  Top Out Walls & Ceiling d -Apr-  -May-    A  HVAC Rough - Corridor d -May-  -May-    A  Electrical Rough - Corridor d -May-  -May-    A  Water Lines - Corridor d -May-  -May-    A  Fire Sprinkler Mains d -May-  -May-    A  Fire Caulking d -May-  -May-    A  Corridor Inspections d -May-  -May-    A  Hang Drywall - Corridors d -May-  -May-    A  Tape & Finish d -May-  -May-    A  Texture d -May-  -May-    A  Prime Paint d -May-  -Jun-    A  Standing Running Trim d -Jun-  -Jun-    A  Paint d -Jun-  -Jun-    A  Electrical & Low Voltage Trim d -Jun-  -Jun-    A  Fire Sprinkler Trim d -Jun-  -Jun-    A  Signage d -Jun-  -Jun-    A  Carpet d -Jun-  -Jun-    Finishes d -Jun- -Sep-   A  Prime Walls & Ceilings d -Jun-  -Jun-    A  Install Doors d -Jun-  -Jun-    A  Set Cabinets d -Jun-  -Jun-    A  Tile Surrounds & Floors d -Jun-  -Jul-    A  Counter Tops d -Jun-  -Jul-    A  Vinyl Flooring d -Jun-  -Jul-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Complete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough Inspections Framing InspectionFraming InspectionFraming InspectionFraming InspectionFraming Inspection Ba InsulationBa InsulationBa InsulationBa InsulationBa Insulation Hang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in Units HVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set Units Frame DropsFrame DropsFrame DropsFrame DropsFrame Drops Electrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ Drops Rough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ Drops Hang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining Drywall GypcreteGypcreteGypcreteGypcreteGypcrete Complete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & Finish Texture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & Ceilings CorridorCorridorCorridorCorridorCorridor Top Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & Ceiling HVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - Corridor Electrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - Corridor Water Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - Corridor Fire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler Mains Fire CaulkingFire CaulkingFire CaulkingFire CaulkingFire Caulking Corridor InspectionsCorridor InspectionsCorridor InspectionsCorridor InspectionsCorridor Inspections Hang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - Corridors Tape & FinishTape & FinishTape & FinishTape & FinishTape & Finish TextureTextureTextureTextureTexture Prime PaintPrime PaintPrime PaintPrime PaintPrime Paint Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim PaintPaintPaintPaintPaint Electrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage Trim Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim SignageSignageSignageSignageSignage CarpetCarpetCarpetCarpetCarpet FinishesFinishesFinishesFinishesFinishes Prime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & Ceilings Install DoorsInstall DoorsInstall DoorsInstall DoorsInstall Doors Set CabinetsSet CabinetsSet CabinetsSet CabinetsSet Cabinets Tile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & Floors Counter TopsCounter TopsCounter TopsCounter TopsCounter Tops Vinyl FlooringVinyl FlooringVinyl FlooringVinyl FlooringVinyl Flooring ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 15 / 18 View Name: 03b - PRINT by WBS  A  Standing Running Trim d -Jun-  -Jul-    A  Backsplash d -Jul-  -Jul-    A  Plumbing Trim d -Jul-  -Jul-    A  Electrical Trim d -Jul-  -Jul-    A  Appliances d -Jul-  -Jul-    A  Closet Trim d -Jul-  -Jul-    A  Paint Walls & Ceilings d -Jul-  -Jul-    A  Final Plumbing Inspections d -Jul-  -Jul-    A  Fire Sprinkler Trim d -Jul-  -Aug-    A  Low Voltage Trim d -Jul-  -Aug-    A  Mechanical Trim d -Jul-  -Aug-    A  Accessories d -Jul-  -Aug-    A  Final Electrical Inspection d -Aug-  -Aug-    A  Carpet d -Aug-  -Aug-    A  Final Mechanical Inspections d -Aug-  -Aug-    A  Rough Clean d -Aug-  -Aug-    A  Final Inspections d -Aug-  -Aug-    A  Shaw Work List d -Aug-  -Aug-    A  Work to Complete Corrections d -Aug-  -Aug-    A  Final Clean d -Aug-  -Aug-    A  Architects Punch List d -Aug-  -Sep-    A  Architect Punch List Corrections d -Sep-  -Sep-    A  First Touch up - Final Clean d -Sep-  -Sep-    A  Owner Punch List Walk d -Sep-  -Sep-    A  Owner Punch List Corrections d -Sep-  -Sep-    A  Final Clean Units d -Sep-  -Sep-    rd Floor d -Mar- -Sep-   Rough d -Mar- -Jun-   A  Complete Shim & Shave d -Mar-  -Mar-    A  Framing QA/QC Walk d -Mar-  -Mar-    A  Backing & Blocking d -Mar-  -Mar-    A  HVAC - Line Sets d -Mar-  -Mar-    A  Water Lines d -Mar-  -Mar-    A  Fire Sprinkler Branch Lines d -Mar-  -Mar-    A  HVAC - Exhaust d -Mar-  -Mar-    A  Drain, Waste, & Vent d -Mar-  -Mar-    A  Pre-Rock/Gyp for Tubs & Showers d -Mar-  -Apr-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim BacksplashBacksplashBacksplashBacksplashBacksplash Plumbing TrimPlumbing TrimPlumbing TrimPlumbing TrimPlumbing Trim Electrical TrimElectrical TrimElectrical TrimElectrical TrimElectrical Trim AppliancesAppliancesAppliancesAppliancesAppliances Closet TrimCloset TrimCloset TrimCloset TrimCloset Trim Paint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & Ceilings Final Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing Inspections Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim Low Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage Trim Mechanical TrimMechanical TrimMechanical TrimMechanical TrimMechanical Trim AccessoriesAccessoriesAccessoriesAccessoriesAccessories Final Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical Inspection CarpetCarpetCarpetCarpetCarpet Final Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical Inspections Rough CleanRough CleanRough CleanRough CleanRough Clean Final InspectionsFinal InspectionsFinal InspectionsFinal InspectionsFinal Inspections Shaw Work ListShaw Work ListShaw Work ListShaw Work ListShaw Work List Work to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete Corrections Final CleanFinal CleanFinal CleanFinal CleanFinal Clean Architects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch ListArchitects Punch List Architect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List CorrectionsArchitect Punch List Corrections First Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final Clean Owner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List Walk Owner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List Corrections Final Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean Units 3rd Floor3rd Floor3rd Floor3rd Floor3rd Floor RoughRoughRoughRoughRough Complete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & ShaveComplete Shim & Shave Framing QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC WalkFraming QA/QC Walk Backing & BlockingBacking & BlockingBacking & BlockingBacking & BlockingBacking & Blocking HVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line SetsHVAC - Line Sets Water LinesWater LinesWater LinesWater LinesWater Lines Fire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch LinesFire Sprinkler Branch Lines HVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - ExhaustHVAC - Exhaust Drain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & VentDrain, Waste, & Vent Pre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & ShowersPre-Rock/Gyp for Tubs & Showers ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 16 / 18 View Name: 03b - PRINT by WBS  A  Electrical Rough - Box & Drill d -Mar-  -Apr-    A  Secondary Plumbing d -Mar-  -Apr-    A  Set Tubs d -Apr-  -Apr-    A  Set Shower Pans d -Apr-  -Apr-    A  Complete Fire Caulking d -Apr-  -Apr-    A  Electrical Rough - Pull Wire d -Apr-  -Apr-    A  Complete First Floor Rough Inspections d -Apr-  -Apr-    A  Framing Inspection d -Apr-  -Apr-    A  Ba Insulation d -Apr-  -Apr-    A  Hang Drywall in Units d -Apr-  -Apr-    A  HVAC - Set Units d -Apr-  -May-    A  Frame Drops d -May-  -May-    A  Electrical Rough @ Drops d -May-  -May-    A  Rough Inspection @ Drops d -May-  -May-    A  Hang Drops & Remaining Drywall d -May-  -May-    A  Gypcrete d -May-  -Jun-    A  Complete Tape & Finish d -Jun-  -Jun-    A  Texture Walls & Ceilings d -Jun-  -Jun-    Corridor d -Apr- -Jun-   A  Top Out Walls & Ceiling d -Apr-  -May-    A  Electrical Rough - Corridor d -May-  -May-    A  Fire Sprinkler Mains d -May-  -May-    A  HVAC Rough - Corridor d -May-  -May-    A  Water Lines - Corridor d -May-  -May-    A  Fire Caulking d -May-  -May-    A  Corridor Inspections d -May-  -May-    A  Hang Drywall - Corridors d -May-  -May-    A  Tape & Finish d -May-  -May-    A  Texture d -Jun-  -Jun-    A  Prime Paint d -Jun-  -Jun-    A  Standing Running Trim d -Jun-  -Jun-    A  Paint d -Jun-  -Jun-    A  Signage d -Jun-  -Jun-    A  Fire Sprinkler Trim d -Jun-  -Jun-    A  Electrical & Low Voltage Trim d -Jun-  -Jun-    A  Carpet d -Jun-  -Jun-    Finishes d -Jun- -Sep-  2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Electrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & DrillElectrical Rough - Box & Drill Secondary PlumbingSecondary PlumbingSecondary PlumbingSecondary PlumbingSecondary Plumbing Set TubsSet TubsSet TubsSet TubsSet Tubs Set Shower PansSet Shower PansSet Shower PansSet Shower PansSet Shower Pans Complete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire CaulkingComplete Fire Caulking Electrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull WireElectrical Rough - Pull Wire Complete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough InspectionsComplete First Floor Rough Inspections Framing InspectionFraming InspectionFraming InspectionFraming InspectionFraming Inspection Ba InsulationBa InsulationBa InsulationBa InsulationBa Insulation Hang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in UnitsHang Drywall in Units HVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set UnitsHVAC - Set Units Frame DropsFrame DropsFrame DropsFrame DropsFrame Drops Electrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ DropsElectrical Rough @ Drops Rough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ DropsRough Inspection @ Drops Hang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining DrywallHang Drops & Remaining Drywall GypcreteGypcreteGypcreteGypcreteGypcrete Complete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & FinishComplete Tape & Finish Texture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & CeilingsTexture Walls & Ceilings CorridorCorridorCorridorCorridorCorridor Top Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & CeilingTop Out Walls & Ceiling Electrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - CorridorElectrical Rough - Corridor Fire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler MainsFire Sprinkler Mains HVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - CorridorHVAC Rough - Corridor Water Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - CorridorWater Lines - Corridor Fire CaulkingFire CaulkingFire CaulkingFire CaulkingFire Caulking Corridor InspectionsCorridor InspectionsCorridor InspectionsCorridor InspectionsCorridor Inspections Hang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - CorridorsHang Drywall - Corridors Tape & FinishTape & FinishTape & FinishTape & FinishTape & Finish TextureTextureTextureTextureTexture Prime PaintPrime PaintPrime PaintPrime PaintPrime Paint Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim PaintPaintPaintPaintPaint SignageSignageSignageSignageSignage Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim Electrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage TrimElectrical & Low Voltage Trim CarpetCarpetCarpetCarpetCarpet FinishesFinishesFinishesFinishesFinishes ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 17 / 18 View Name: 03b - PRINT by WBS  A  Prime Walls & Ceilings d -Jun-  -Jun-    A  Install Doors d -Jun-  -Jul-    A  Tile Surrounds & Floors d -Jun-  -Jul-    A  Set Cabinets d -Jun-  -Jul-    A  Standing Running Trim d -Jul-  -Jul-    A  Vinyl Flooring d -Jul-  -Jul-    A  Counter Tops d -Jul-  -Jul-    A  Backsplash d -Jul-  -Jul-    A  Appliances d -Jul-  -Jul-    A  Electrical Trim d -Jul-  -Jul-    A  Closet Trim d -Jul-  -Jul-    A  Plumbing Trim d -Jul-  -Jul-    A  Paint Walls & Ceilings d -Jul-  -Aug-    A  Final Plumbing Inspections d -Jul-  -Aug-    A  Fire Sprinkler Trim d -Aug-  -Aug-    A  Low Voltage Trim d -Aug-  -Aug-    A  Accessories d -Aug-  -Aug-    A  Mechanical Trim d -Aug-  -Aug-    A  Carpet d -Aug-  -Aug-    A  Final Mechanical Inspections d -Aug-  -Aug-    A  Final Electrical Inspection d -Aug-  -Aug-    A  Rough Clean d -Aug-  -Aug-    A  Final Inspections d -Aug-  -Aug-    A  Shaw Work List d -Aug-  -Aug-    A  Work to Complete Corrections d -Aug-  -Sep-    A  Final Clean d -Sep-  -Sep-    A  First Touch up - Final Clean d -Sep-  -Sep-    A  Owner Punch List Walk d -Sep-  -Sep-    A  Owner Punch List Corrections d -Sep-  -Sep-    A  Final Clean Units d -Sep-  -Sep-    Final Inspections & Completion- Phase d -Aug- -Oct-   A  Mechanical Final Inspection d -Aug-  -Aug-    A  Fire Alarm Final Inspection d -Aug-  -Aug-    A  Fire Sprinkler Final Inspection d -Aug-  -Aug-    A  Electrical Final Inspection d -Aug-  -Aug-    A  Fire Department Final Inspection d -Aug-  -Aug-    A  Plumbing Final Inspection d -Aug-  -Aug-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Prime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & CeilingsPrime Walls & Ceilings Install DoorsInstall DoorsInstall DoorsInstall DoorsInstall Doors Tile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & FloorsTile Surrounds & Floors Set CabinetsSet CabinetsSet CabinetsSet CabinetsSet Cabinets Standing Running TrimStanding Running TrimStanding Running TrimStanding Running TrimStanding Running Trim Vinyl FlooringVinyl FlooringVinyl FlooringVinyl FlooringVinyl Flooring Counter TopsCounter TopsCounter TopsCounter TopsCounter Tops BacksplashBacksplashBacksplashBacksplashBacksplash AppliancesAppliancesAppliancesAppliancesAppliances Electrical TrimElectrical TrimElectrical TrimElectrical TrimElectrical Trim Closet TrimCloset TrimCloset TrimCloset TrimCloset Trim Plumbing TrimPlumbing TrimPlumbing TrimPlumbing TrimPlumbing Trim Paint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & CeilingsPaint Walls & Ceilings Final Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing InspectionsFinal Plumbing Inspections Fire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler TrimFire Sprinkler Trim Low Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage TrimLow Voltage Trim AccessoriesAccessoriesAccessoriesAccessoriesAccessories Mechanical TrimMechanical TrimMechanical TrimMechanical TrimMechanical Trim CarpetCarpetCarpetCarpetCarpet Final Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical InspectionsFinal Mechanical Inspections Final Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical InspectionFinal Electrical Inspection Rough CleanRough CleanRough CleanRough CleanRough Clean Final InspectionsFinal InspectionsFinal InspectionsFinal InspectionsFinal Inspections Shaw Work ListShaw Work ListShaw Work ListShaw Work ListShaw Work List Work to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete CorrectionsWork to Complete Corrections Final CleanFinal CleanFinal CleanFinal CleanFinal Clean First Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final CleanFirst Touch up - Final Clean Owner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List WalkOwner Punch List Walk Owner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List CorrectionsOwner Punch List Corrections Final Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean UnitsFinal Clean Units Final Inspections & Completion- Phase 2Final Inspections & Completion- Phase 2Final Inspections & Completion- Phase 2Final Inspections & Completion- Phase 2Final Inspections & Completion- Phase 2 Mechanical Final InspectionMechanical Final InspectionMechanical Final InspectionMechanical Final InspectionMechanical Final Inspection Fire Alarm Final InspectionFire Alarm Final InspectionFire Alarm Final InspectionFire Alarm Final InspectionFire Alarm Final Inspection Fire Sprinkler Final InspectionFire Sprinkler Final InspectionFire Sprinkler Final InspectionFire Sprinkler Final InspectionFire Sprinkler Final Inspection Electrical Final InspectionElectrical Final InspectionElectrical Final InspectionElectrical Final InspectionElectrical Final Inspection Fire Depar tment Final InspectionFire Depar tment Final InspectionFire Department Final InspectionFire Department Final InspectionFire Depar tment Final Inspection Plumbing Final InspectionPlumbing Final InspectionPlumbing Final InspectionPlumbing Final InspectionPlumbing Final Inspection ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B Data Date: 13-Sep-22 Print Date: 14-Sep-22 02:12 p.m. CMC Residence Hall - Edwards - CONTRACT Schedule SHAW Filter: No Filter 18 / 18 View Name: 03b - PRINT by WBS  A  Engineering/Zoning Final Inspection d -Sep-  -Sep-    A  Exterior Final Inspection d -Sep-  -Sep-    A  Building Department Final Inspection d -Sep-  -Sep-    A  Interior Final Inspection d -Sep-  -Sep-    A  Weather Delays d -Sep-  -Oct-    A  CO - Final Completion d  -Oct-   2022 2023 2024 2025 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Engineering/Zoning Final InspectionEngineering/Zoning Final InspectionEngineering/Zoning Final InspectionEngineering/Zoning Final InspectionEngineering/Zoning Final Inspection Exterior Final InspectionExterior Final InspectionExterior Final InspectionExterior Final InspectionExterior Final Inspection Building Depar tment Final InspectionBuilding Depar tment Final InspectionBuilding Department Final InspectionBuilding Department Final InspectionBuilding Depar tment Final Inspection Interior Final InspectionInterior Final InspectionInterior Final InspectionInterior Final InspectionInterior Final Inspection Weather DelaysWeather DelaysWeather DelaysWeather DelaysWeather Delays CO - Final CompletionCO - Final CompletionCO - Final CompletionCO - Final CompletionCO - Final Completion ID Name Planned Duration Start Finish DocuSign Envelope ID: B8F408A0-20D3-4628-A2CB-ED623BF9218B