Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR94-161 partial release of collateral for Eby Creek Mesa IIBcommissioner _ moved adoption
of th following`Resolution:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 94 -_ /
SECOND PARTIAL RELEASE OF COLLATERAL
Eby Creek Mesa Subdivision
Phase IIB
WHEREAS, pursuant to C.R.S. 30- 28 -37, the Board of County
Commissioners of the County of Eagle, State of Colorado ( "Board ")
entered into a Subdivision Improvements Agreement dated September
26, 1994 ( "Agreement ") with Eby Creek Mesa Limited Partnership, a
Colorado Limited Partnership, whose general partner is Eagle River
Land Company, Inc., a Colorado corporation ( "Subdivider "), as a
condition of final plat approval for Eby Creek Mesa Subdivision
Phase IIB; and
WHEREAS, Subdivider installed public improvements prior to the
signing of the final plat and subdivision improvements agreement
thereby reducing the collateral amount to be held by the Board
consequently, the first partial release of collateral was
incorporated into the Agreement. As a condition of approval of the
Agreement the Subdivider provided the Board with Irrevocable Letter
of Credit No. 46 drawn on the Alpine Bank of Eagle, in the amount
of $665,034.60 thereby collateralizing the unfinished public
improvements associated with Eby Creek Mesa Subdivision Phase II -B;
and
WHEREAS, pursuant to the Agreement, the Subdivider may apply
to the County for a partial release of collateral based on its
progress in constructing the public improvements required by the
Agreement; and
WHEREAS, Subdivider has represented to the Board, that certain
public improvements required under the Agreement have been
partially completed (see the attached Exhibit " A " ) and therefore
Subdivider has applied for a partial release of collateral; and
WHEREAS, the Subdivider requests a partial release of its
collateral in the amount of $339,171.30 reducing the amount
currently held by the County from $665,034.60 to 325,863.30; and
WHEREAS, based on the finding of the Department of
Engineering, THE BOARD FINDS that the that public improvements
associated with Eby Creek Mesa Subdivision, Phase IIB appear to
have been partially completed and a reduction in the collateral
held by the Board is warranted if the Subdivider provides the
County a letter of credit in the amount of $325,863.30 in a form
acceptable to the County Attorney.
THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS
OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, the Board hereby authorizes the partial release of
collateral in the amount of $339,171.30, thereby reducing the
collateral to $325,863.30 which represents the balance of the
public improvements to be completed in Eby Creek Mesa Subdivision,
Phase IIB, on the delivery to the County of a letter of credit in
the amount of $325,863.30 in a form acceptable to the County
Attorney.
THAT, this partial release of collateral granted hereby does
not represent the County's acceptance of the work purportedly
completed by the Subdivider, nor does it in any way signify the
commencement of the warranty period; the warranty period shall
begin on the date all work is complete and accepted by the County,
pursuant to Paragraph 2.6 of the Agreement.
THAT, the partial release of collateral granted hereby shall
not in any way abrogate the rights of the Board in enforcing the
Subdivider's performance of his outstanding obligations under the
Agreement.
MOVED, READ AND ADOPTED by the Board of County Commissioners
of the County of Eagle, State of Colorado, this � day of
October, 1994.
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
BOARD OF COUNTY COMMISSIONERS
By:
f /bhn
o issione
i
George V Gates,'Jr.,
Commissioner
County Commissioners
Commissioner seconded adoption of the fore-
going resolution. The roll having been called, the vote was as
follows:
Commissioner Phillips
Commissioner Johnson
Commissioner Gates
This Resolution passed by vote of the Board of
County Commissioners of the County of Eagle, State of Colorado.
mt..iPN[\2p. rtIIB. eby
aubB2 -248
-3-
A
MEMORANDUM
EAGLE COUNTY ENGINEERING
TO: Nancy Lewis, Attorney's Office
///111 1
FROM: Phill Scott, Engineering / U/
DATE: October 11, 1994
RE: Eby Creek Mesa, Phase IIB
Second Partial Release of Collateral
The Engineering Department has inspected the improvements in the
referenced subdivision and agrees to the representations made by
High Country Engineering that they are complete. We recommend a
Second Partial Release of Collateral in the amount of $339,171.30
per the attached Collateral Release Summary.
cc: John Althoff
Lloyd Powers
File
H181T
00000°
O
0000
00000
000
y
W
0 0 0 0 0 0
O
0 0 0 0
O O 999
O M
M
O
2
00 I I I 11 I 1 1 1 1 • I
00 V100000000 00000000000
I 1
00
00 0 00
Ul q
M
> W
0 0 0 0 0 0 0 0
b O 0 111 O O
O O O b 0 0 0 0
111
0
m b
b
P
1 1 1 1 1 1 1 1 P OOP I
t` W b W H
N
W M W lP
O 1f1 lt1 111 O
H b
q
q 111 O tf)
W M
ww
q b
H
o
w
111NOW HH
M
N W V1 f�
HH
H W
L�g111
rl N
O a
H O m
N
0
b n
N
o U
hmm
ooln00000lnoboln000booln00000b00000
q
W
O HN0001f101� r-I bL(1 t` t(IOOt� OOh ON W O W H 00000
h
a
1111111110
C
H H�
+
O
00
0000
00
000
y
1 1 1 1 1 1 1 I I I I I I I I I I I I I I I
0
00
0000
00
o�M
O I I I I I P H b 111 h 1 0 0 I I I 1 1 1 I I I I I
N q W
1 1
1 1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1 1
> W
0 0 0 0 0 0 0 0
b O 0 111 O O
O O O b 0 0 0 0
111
H
W
O 1 1
1 1 1 If10 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 P OOP I
I W H 1 1 1 1 I
m
h
q
M
L� H
q 111 O tf)
W M
ww
q b
H
o
w
In W
m
H
rl N
H
bh
H a
0
W
0000000000000000000000000000000
0
hmm
ooln00000lnoboln000booln00000b00000
q
W
O HN0001f101� r-I bL(1 t` t(IOOt� OOh ON W O W H 00000
h
Ew-1
1111111110
C
H H�
H
q W HHH H W b01 W Hbol N W u1 I�H H HH W
M
0 00000000
000
0 0 0 0 0 0 0 0 0
O b W
y
1 1 1 1 1 1 1 I I I I I I I I I I I I I I I
N
0 0 0 0 0 0 0 0 111 O b 0111 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
b N M
A W
O I I I I I P H b 111 h 1 0 0 I I I 1 1 1 I I I I I
N q W
O
111 LPMON1nOON
gala
�
> W
M H b m W
aloq
W a
In W H Hh
oNq
a
M a a�rvv
v vrvr rLrLrzr rLrmv v �rUrir nirvr nv}v
w
a
w
In
o
w
a
H
N
m
m
°000000000000000000000000000000
0
W
0000000000000000000000000000000
0
ro
ooln00000lnoboln000booln00000b00000
q
W
O HN0001f101� r-I bL(1 t` t(IOOt� OOh ON W O W H 00000
h
Ew-1
1111111110
C
H H�
H
q W HHH H W b01 W Hbol N W u1 I�H H HH W
M
H I
O H O
hH m
Ol W H HL� N
W
O
NNh
W
U O U
W
H
a
a
w
o
H
U
H
m
m
W
ro
ro
C7
pq
H
N
W
W
S1
N
I
ro
U ro>
7
a
m
f4 q
q >-H a) Sa :
U
m
m -.a
-H >, Sa a 3 a) m U
W
N
m a al 14 a) C N
H
w'
Co FC
x
u waa £
£ Ana) -a a w=
u
W H
£H
H
N
O
q \ tT a) .0
m 3'H5r S4
E .N (d \ W
P v S4 N>, O Sa Sa 4 O H t) 3N
u]
v] (a
H
m aj al m
a) m (D 3 S4,0 a) a) O C H
al
2 fi
m iJ � m E .ta
.0 m 41 m 0 3 3 C a) :S J_1 r_1 t71
a
W
WPI
w'
v
>H NT)�N
C U mM � ma) a) a) k m N Ya C, a)
(d
£ q
w
W
Sa
m a) a) # 'n m 3
a) 3 3 C. - £ W m )a H S) > m a) -H H
U
W W W
Coq
W
m
PI >> :j 10
> to -H C H (d > >. :1
m
>0 q
U2
O
W
rl Or.C
H3 r)a m P>,3 >,3 ?) mm
ro
099
O
H
W JJ��?1
roa)
malm NmN m Sa a) >, 11 m �� -r-10 ,0r
fX Z W
>1U
U
1x FCa
U U0 Xr-�Z
• >2 P W +a mza - IZ EUU X�-I �-1 U
m
aHa
W W
0
m 0 P1
FL ro PI X 1n a) t -H H Sa W U a) 0
a
£ FC W
W W
tob4M
CLHW (J 4u
a) >,OW E-Ht r -H t) OMPI C m
HH
w
bm9�
>4 CQ
0Ga)= a) ai AV ro C
U O ro G x
A
g
rtC
H
mm
== m� CC
gHW3 q = Pm
== E 0 -H s4E
HaeH
H
9
Sa r
�
= q M m m 0=
_= O-H1 o= �= 0 O O S) W W m m 3 m
- H
000
v)
q
C7 U
M H H U >£ U g
b q U W M a q W W U W M U H N N W y W FL
H
H H E+
v .�
October 4, 1994
Eagle County Engineering
Attn: Phill Scott
P.O. Box 850
Eagle, CO 81631
t
3
J �i
ail/ OC T t I�jU
0C l
RE: Eby Creek Mesa Subdivision Phase I113 Partial Release of Collateral
HCE Project No. 94026.02
On behalf of the Eagle River Land Company, we are requesting partial release of the collateral
being held by the county for the completed construction. Based on our field observations and
testing, we believe that the work as itemized in the pay request schedule has been completed in
accordance with the intent of the county approved plans and specifications.
Please contact me if you have any questions or need additional information.
Sincerely,
HIGH COUNTRY ENGINEERING, INC.
/ Yancy Zcho
Project Manager
YN /rjh
cc: Lester Finkelstein
923 Cooper Avenue • Glenwood Springs, CO 81601
Telephone: 303. 945.8676 • FAX: 303-945-2555
Revised SIA (First Release) $665,034.60
Second Release 339,171.30 _
Revised SIA $325,863.30
ORIGINAL
AMOUNT OF
AMOUNT
IMPROVEMENT
1994 PHASE IIB IMPROVEMENTS
COLLATERALIZED
COMPLETED
Grading & Earthwork
$ 78,500.00
$ 62,800.00
Class 6 ABC
102,410.00
3" Asphalt Pavement
90,625.00
18" ADS Culvert
4,400.00
18" CMP Culvert
Flared Ends
1,100.00
Class I Ground Sign
1,200.00
Valve Box Adjustment
1,750.00
1,750.00
Manhole Adjustment
100.00
100.00
Connect New Water Main
575.00
575.00
8" D.I.P.
41,310.00
41,310.00
6" D.I.P.
14,066.00
14,066.00
8" Gate Valve
550.00
550.00
Connect New Water Main
575.00
575.00
Fire Hydrant Assembly
16,050.00
16,050.00
3/4" Copper Water Service
79,000.00
79,000.00
Lower Exist. Waterline
4,200.00
4,200.00
8 SDR35 San. Sewer
231,876.00
231,876.00
4' Dia. Manhole
56,000.00
52,500.00
4 Sanitary Sewer
79,000.00
79,000.00
Connect New Sewerline
575.00
575.00
4' Utility Trench
22,400.00
30 Utility Trench
4,320.00
Conduit & Warn. Tape
5,440.00
Transformer Vault
7,600.00
24" ADS Culvert
1,440.00
1,440.00
24" CMP Culvert
Flared Ends
316.00
316.00
Remove Exist 24" Culvert
1,000.00
Sand Enclosure
500.00
Swing Set
1,500.00
Park Bench
1,500.00
Timber Landscape Structure
4,000.00
TOTAL
$853,878.00
$586,683.00
Phase IIB Improvements Completed
$586,683.00
10% Retainage
58,668.30
$528,014.70
First Release
188,843.40
Second Release
$339,171.30
Revised SIA (First Release) $665,034.60
Second Release 339,171.30 _
Revised SIA $325,863.30
(30945-=
FAX (303) 945.5948
im west (9h. Suite 200
Glenwood Spdngs, CO MGM
October 4, 1994
Mr. Mike Pacas, President
Eagle Sanitation District
P.O. Box 637
Eagle, Co. $1632
RE: Eby Creek Subdivision, Phase 11
Dear Mike:
The purpose of this letter is to recommend that the District accept the sewerlines installed for
Eby Creek Subdivision Phase ii. Our office has inspected these fines including air testing of
the sewedines, infiltration testing of the manholes and tamping the sewedine. The lines were
acceptable with the exception of manholes number P3 and A19 which have failed the
infiltration test. it is my understanding that the contractor is making corrective measures for
these manholes. I understand the contractor will notify us when they are ready for retesting.
for retesting.
We would request that the engineer provide us an as -built copy of the drawings on AUTOCAD
disk format so that we can incorporate them into the District's maps.
If you have any questions or comments, please don't hesitate to call.
Sincerely,
SCHMUESER GORDON MEYER, INC.
Louis Meyer, P.E.
Kate Foster
yancy Nichol, High Country Engineering =
Lwjja9011010.2