HomeMy WebLinkAboutR94-146 sixth partial release of collateral Cordillera filing 6j
Commissioner LIL �6� moved adoption
of the following (Resolution:
BOARD OF COUNTY
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 94 -�
AUTHORIZING THE SIXTH PARTIAL RELEASE OF COLLATERAL
CORDILLERA FILLING 6, PHASES I AND II
WHEREAS, on or about November 2, 1992, pursuant to Section 30-
28 -137, C.R.S., the Board of County Commissioners of the County of
Eagle, State of Colorado ( "Board ") entered into a Subdivision
Improvements Agreement ( "Agreement ") with Stag Gulch Partners, a
Colorado General Partnership ( "Subdivider ") as a condition of final
plat approval of Filing 6, Cordillera Subdivision; and
WHEREAS, in order to guarantee the faithful completion of
certain public improvements required under the Agreement, the Board
accepted as collateral a cash deposit in the amount of $797,425.88
for Phase I of Filing 6; and the sum of $1,996,972.52 for Phase II
of Filing 6; and
WHEREAS, by Resolution No. 92 -151, the Board approved a
reduction of collateral for Phase I to $462,689.92, and accepted a
cash deposit in said amount; and
WHEREAS, at Subdivider's request, by its Resolution No. 92-
173, the Board accepted a letter of credit in the amount of
$200,000 as substitute collateral for Phase I and directed the
Treasurer to pay over the Subdivider the like sum of $200,000; and
WHEREAS, by Resolution No. 92 -174, the Board approved a second
partial release of collateral for Phase I in the amount of
$163,454.64, resulting in a collateral balance of $299,235.28 for
Phase I; and
WHEREAS, by Resolution No. 93 -49 the Board accepted the
following letters of credit issued by BHF -Bank, New York Branch, as
collateral for Phase II of the Subdivision, and released the plat
restriction on the entire Subdivision:
Number Amount
58968359
$ 150,000.00
58969359
250,500.00
58970359
390,301.00
58971359
402,057.00
58972359
402,057.00
58973359
402,057.52
TOTAL $1,996,972.52
WHEREAS, by Resolution 93 -96 the following Letters of Credit
were released:
#58698259
$ 200,000.00
#58969359
250,500.00
#S8973359
402,057.52
#S8972359
402,057.00
and the following letters of credit were held:
#58968359
$ 150,000.00
#58970359
390,301.00
#58971359
402,057.00
Total
$ 942,358.00
WHEREAS, by Resolution No. 93 -140, Letter of Credit No.
58971359 in the amount of $402,057.00 was released and Letter of
Credit No. 59265359 in the amount of $81,392.08 was accepted.
WHEREAS, by Resolution No. 94 -105 the Board authorized a fifth
partial release of collateral in the amount of $105,317.08;
currently the Board holds the following letters of credit:
#58968359 $ 150,000.00
#59265359 $ 81,392,08
#58970359 $ 284,982.00
TOTAL $ 516,374.00
WHEREAS, Subdivider has represented to the Board that certain
of the improvements are complete, (as indicated on Exhibit A
attached hereto and incorporated herein) and has applied for a
sixth partial release of collateral in the amount of $236,936.16.
Based upon the oral and written recommendations of the
Department of Engineering, THE BOARD FINDS that the Subdivider's
obligations under the Agreement have been partially satisfied, and
T
a reduction in the collateral held by the Board is warranted, such
release of collateral is contingent upon the Subdivider depositing
with the County a new or amended Letter of Credit in a form
acceptable to the County Attorney.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, the Board hereby authorize the partial release of
collateral in the amount of $236,936.16 thereby reducing the
collateral to $279,437.84.
THAT, such release is contingent upon the Subdivider
depositing with the County a new or amended Letter of Credit in a
form acceptable to the County Attorney.
THAT, the partial release of collateral granted hereby shall
not in any way abrogate the rights of the Board in enforcing the
Subdivider's performance of his outstanding obligations under the
Agreement.
MOVED, READ AND ADOPTED by the Board of County Commissioners
of the County of Eagle, State of Colorado, this day of
October, 1994.
ATTEST:
County Commissioners
George A. Gates, Commissioner
Commissioner seconded adoption of the
foregoing resolution. Th6 roll having been called, the vote was as
follows:
Commissioner Johnnette Phillips �
Commissioner James E. Johnson, Jr.
Commissioner George A. Gates _
This Resolution passed by 0 — 0 vote of the Board of
County Commissioners of the County of Eagle, State of Colorado.
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
BOARD OF COUNTY COMMISSIONERS
z\oozd6.oio 87-84
MEMORANDUM
EAGLE COUNTY ENGINEERING
TO: Maureen Amundson, Attorney's Office
FROM: John Althoff, Engineering JCL\
DATE: September 9, 1994 U
RE: Collateral Releases for Cordillera Filings 1, 2, 6, 7, 8, 9, 10
Filing 1 & 2
Completed 2 overlay - shoulder work when I visited the site on
Wednesday, August 31, 1994. Reduce collateral to $69,168.74 (100 of
original SIA) and commence the two year warranty period (see enclosed
memo dated August 26, 1994).
Filing 6
Per site visit on Wednesday, August 31, 1994, all of the paving has been
done. Suggest reducing collateral to $279,439.84, which is down to the
100 of the original SIA, but not all of the work has been completed. Do
not start the warranty period for this filing.
Filings 7, 8, 9, 10
Per site visit, the work has been completed. Suggest reducing collateral
to the values listed below which is more than 10% of the original SIA.
Do not start the warranty period for any of these filings.
Filing #
Reduce Collateral to:
7 $245,263.44
8 $389,901.03
9 $955,523.82
10 $985,479.02
COLLATERAL RELEASE SUMMARY
SIA: Cordillera Filing #6
Sixth Partial Release
DATE: August 18, 1994
ORIGINAL AMOUNT OF
AMOUNT IMPROVEMENTS
PHASE I COLLATERALIZED COMPLETED
ROAD CONSTRUCTION
Mobilization
$
5,000.00
$
5,000.00
Clear and Grub
$
10,200.00
$
10,200.00
Topsoil Removal
$
15,315.00
$
15,315.00
Unclassified Excavation
$
172,412.50
$
172,412.50
Fine Grading
$
10,172.40
$
10,172.40
Rock Excavation
$
32,640.00
$
32,640.00
Aggregate Base Course
$
60,035.50
$
60,035.50
Testing
$
10,000.00
$
10,000.00
Street Signs
$
1,050.00
$
-0-
Place Topsoil
$
25,525.00
$
25,525.00
Grade Topsoil
$
7,399.20
$
7,399.20
Revegetation
$
3,884.58
$
3,884.58
Guardrail
$
18,750.00
$
18,750.00
Guardrail Anchors
$
3,600.00
$
3,600.00
Slope Protection
$
1,133.05
$
1,133.05
TOTAL ROAD CONSTRUCTION
$
377,117.23
$
376,067.23
DRAINAGE
Grouted Rip Rap
$
6,600.00
$
6,600.00
CMP Pipe 36"
$
3,400.00
$
3,400.00
CPP Pipe 18"
$
3,766.90
$
3,766.90
CPP Pipe 24"
$
904.75
$
904.75
18" End Sections
$
1,120.00
$
1,120.00
24" End Sections
$
370.00
$
370.00
36" End Sections
$
720.00
$
720.00
Cattle Underpass
$
21,600.00
$
21,600.00
Rip Rap
$
350.00
$
350.00
TOTAL DRAINAGE
$
38,831.65
$
38,831.65
WATER AND SEWER
8 Sewer Line
$
144,126.00
$
144,126.00
Sewer Manhole
$
70,000.00
$
70,000.00
Sewer Service
$
18,000.00
$
18,000.00
8 Waterline
$
60,480.00
$
60,480.00
6 Waterline -
$
41,720.00
$
41,720.00
8 Gate Valve
$
2,400.00
$
2,400.00
6 Gate Valve
$
1,500.00
$
1,500.00
TOTAL WATER AND SEWER
$
338,226.00
$
338,226.00
_
J%
Cordillera Filing 6
Sixth Partial Release
August 18, 1994
Page 2
ORIGINAL AMOUNT OF
AMOUNT IMPROVEMENTS
PHASE I COLLATERALIZED COMPLETED
Overhead Electric Line $ 18,000.00 $ 18,000.00
Engineering, Surveying, Testing $ 25,251.00 $ 25,251.00
TOTAL PRASE I $ 797,425.88 $ 796,375.88
PHASE II
ROAD CONSTRUCTION
Aggregate Base Course $ 60,035.50 $ 60,035.50
Asphalt $ 330,265.50 $ 330,265.50
TOTAL ROAD CONSTRUCTION $ 390,301.00 $ 390,301.00
WATER AND SEWER
8 Waterline
$
117,600.00
$
117,600.00
6 Waterline
$
53,900.00
$
53,900.00
4 Waterline
$
21,800.00
$
21,800.00
2 Waterline
$
13,200.00
$
13,200.00
Fire Hydrant
$
19,200.00
$
19,200.00
8 Gate Valves
$
4,800.00
$
4,800.00
6 Gate Valves
$
3,500.00
$
3,500.00
4 Gate Valves
$
900.00
$
900.00
2 Gate Valves
$
800.00
$
800.00
PRV Vault
$
54,000.00
$
54,000.00
Water Services
$
27,000.00
$
27,000.00
TOTAL WATER AND SEWER
$
316,700.00
$
316,700.00
SQUAW CREEK INTERCEPTOR
10" Sewer Line
$
2,450.00
$
2,450.00
10" Sewer Line
$
161,920.00
$
161,920.00
10" Sewer Line
$
19,000.00
$
19,000.00
Aerial Crossing
$
85,000.00
$
85,000.00
8 Sewer Line
$
57,600.00
$
57,600.00
8 Sewer Line
$
84,510.00
$
84,510.00
8 Pressure Pipe
$
134,400.00
$
134,400.00
Sewer Manhole
$
90,000.00
$
90,000.00
Sewer Cleanout
$
10,800.00
$
10,800.00
Site Restoration
$
16,000.00
$
16,000.00
Revegetation
$
17,500.00
$
17,500.00
Squaw Creek Crossing
$
15,000.00
$
15,000.00
Pavement R and R
$
96,700.00
$
96,700.00
Trench Drain Ext
$
7,280.00
$
7,280.00
TOTAL INTERCEPTOR COSTS
$
798,160.00
$
798,160.00
Cordillera Filing 6
Sixth Partial Release
August 18, 1994
Page 3 ORIGINAL AMOUNT OF
AMOUNT IMPROVEMENTS
PHASE II COLLATERALIZED COMPLETED
OTHER COSTS
Water
Storage Tank
$ 150,000.00
$
-0-
Wells
& Chlorination
$ 66,000.00
$
66,000.00
Electric & Telephone
$ 250,500.00
$
250,500.00
Engineering, Surveying
$ 25,311.52
$
23,251.02
TOTAL
OTHER COSTS
$ 491,811.52
$
339,751.02
TOTAL
PHASE II
$1,996,972.52
$1,844,912.02
TOTAL
PHASE I
$ 797,425.88
$
796,375.88
TOTAL
PHASE II
$1,996,972.52
$1,844,912.02
Second Release
TOTAL
IMPROVEMENTS
$2,794,398.40
$2,641,287.90
Collateral held today = $516,376.00
New Method:
Filing 6
Phase I
Phase II
Total
Work Completed
$ 796,375.88
$1,844,912.02
$2,641,287.90
loo Retainage
$ 79,637.59
$ 184,491.20
$ 264,128.79
$ 716,738.29
$1,660,420.82
$2,377,159.11
Less total release
to date
$ 796,375.88
$1,481,646.52
$2,278,022.40
THIS RELEASE
($ 79,637.59)
$ 178,744.30
$ 99,136.71
Original SIA
$797,425.88
$1,996,972.52
$2,794,398.40
First Release
$334,735.96
-0-
$ 334,735.96
Second Release
$163,454.64
-0-
$ 163,454.64
Third Release
$291,327.70
$1,111,521.02
$1,402,848.72
Fourth Release
$ 2,973.00
$ 268,693.00
$ 271,666.00
Fifth Release
$ 3,884.58
$ 101,432.50
$ 105,317.08
This Release
($79,637.59)
$ 178,774.30
$ 99,136.71
Revised SIA
$ 80,687.59
$ 336,551.70
$ 417,239.29
Old method:
Phase I
Phase II
Total
Original SIA
$797,425.88
$1,996,972.52
$2,794,398.40
First Release
$334,735.96
-0-
$ 334,735.96
Second Release
$163,454.64
-0-
$ 163,454.64
Third Release
$291,327.70
$1,111,521.02
$1,402,848.72
Fourth Release
$ 2,973.00
$ 268,693.00
$ 271,666.00
Fifth Release
$ 3,884.58
$ 101,432.50
$ 105,317.08
This Release
$ -0-
$ 363,265.50
$ 363,265.50
Revised SIA
$ 1,050.00
$ 152,060.50
$ 153,110.50
Cordillera Filing 6
Sixth Partial Release
August 18, 1994
Page 4
If we release all work that is done to date, collateral will be below the
loo needed for the warranty period.
Release down to 10% retainage for warranty period with some work still
remaining:
Is Stag Gulch Court paved? If not, will have to remove some asphalt
Fenno Drive 500' past culvert to edge of Bentgrass.
Phase I
Phase II
Total
Original SIA
$797,425.88
$1,996,972.52
$2,794,398.40
First Release
$334,735.96
-0-
$ 334,735.96
Second Release
$163,454.64
-0-
$ 163,454.64
Third Release
$291,327.70
$1,111,521.02
$1,402,848.72
Fourth Release
$ 2,973.00
$ 268,693.00
$ 271,666.00
Fifth Release
$ 3,884.58
$ 101,432.50
$ 105,317.08
This Release
$ -0-
$ 236,936.16
$ 236,936.16
Revised SIA
$ 1,050.00
$ 278,398.84
$ 279,439.84
Is Stag Gulch Court paved? If not, will have to remove some asphalt
Fenno Drive 500' past culvert to edge of Bentgrass.