HomeMy WebLinkAboutR94-145 second partial release of collateral Filing 7 CordilleraCommissioner �� moved adoption
of the following 'Resolution:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 94- / (/,�—
SECOND PARTIAL RELEASE OF COLLATERAL
Filing 7
Phase 1
CORDILLERA SUBDIVISION
WHEREAS, pursuant to C.R.S. 30 -28 -137, the Board of County
Commissioners of the County of Eagle, State of Colorado ( "Board ")
entered into a Subdivision Improvements Agreement dated April 27,
1993 ( "Agreement ") with Stag Gulch Partners, a Colorado General
Partnership ( "Subdivider "), as a condition of final plat approval
for Filing 7, Cordillera Subdivision; and
WHEREAS, the Subdivider provided collateral in the form of a
plat restriction to guarantee the faithful completion of the public
improvements remaining in the project; and
WHEREAS, Paragraph 2.4 of the Agreement allows the Subdivider
to provide Substitute Collateral in the form of a certain letter of
credit, together with an Enforceability Opinion, all as described
therein; and
WHEREAS, by Resolution No. 93 -109, the plat restriction was
released and Letter of Credit No. 59166359 in the amount of
$271,183.27 with an expiration date of November 30, 1994 was
accepted by the Board.
WHEREAS, by Resolution Number 94 -07 the Board approved a
reduction in collateral in the amount of $210,084.32 leaving a
balance of $61,098.95 which was collateralized by Irrevocable
Letter of Credit Number 59166359; and
WHEREAS, Subdivider has represented to the Board, and members
of the County staff have corroborated the Subdivider's
representations, that further improvements required under the
Agreement have been partially completed in a satisfactory manner
(Exhibit A) and therefore Subdivider has applied for a second
release of collateral; and
WHEREAS, the Subdivider has requested a reduction in the
amount of $10,274.62, leaving a balance of $50,824.33 to be
collateralized under an amended or new Letter of Credit acceptable
to the Board.
Based upon the oral and written recommendations of the
Department of Engineering, THE BOARD FINDS that the Subdivider's
obligations under the Agreement have been partially satisfied, and
a further reduction in the collateral held by the Board is
warranted.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, the Board hereby
collateral in the amount of
collateral to $50,824,.33
authorize the partial release of
$10,274.62, thereby reducing the
THAT, the Board hereby accepts an amendment to Letter of
Credit No. 59166359 in the amount of $50,824.33.
THAT, the partial release of collateral granted hereby shall
not in any way abrogate the rights of the Board in enforcing the
Subdivider's performance of his outstanding obligations under the
Agreement.
MOVED, READ AND ADOPTED by the Board of County Commissioners
of the County of Eagle, State of Colorado, this day of
October, 1994.
ATTEST: �r
Clerk to tlTe boara o
County Commissioners
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
BOARD OF COUNTY COMMISSIONERS
George A. Gates, Commissioner
ti -N
3
f�
Commissioner seconded adoption of the
foregoing resolution. Thd roll having been called, the vote was as
follows:
Commissioner Johnnette Phillips A p
Commissioner James E. Johnson, Jr.
Commissioner George A. Gates all
This Resolution passed by a - -0 vote of the Board of
County Commissioners of the County of Eagle, State of Colorado.
cord7.1PR
sub #87 -84
Mc
1►Il' ►I • a�►'1aul
TO:
FROM:
DATE:
RE:
• 1' " 1
Maureen Amundson, Attorney's Office
John Althoff, Engineering
July 26, 1994
Cordillera Filing #7
Collateral for Filing #7 should be as follows:
Phase I
Original SIA
First Release
This Release
Remaining SIA
$271,183.27
$210,084.32
$ 10.274.62
$ 50,824.33
cc: Larry Metternick
Mark Avery
File
Phase II
$661,899.41
$351,367.77
$ 76,492.53
$234,039.11
Total
$933,082.68
$561,452.09
$ 86,767.15
$284,863.44
HI 3
v
COLLATERAL RELEASE SUMMARY
SIA: Cordillera Filing #7
Third Partial Release
DATE: August 18, 1994
ORIGINAL AMOUNT OF
AMOUNT IMPROVEMENTS
PHASE I COLLATERALIZED COMPLETED
ROAD CONSTRUCTION
Mobilization
$
7,500.00
$
7,500.00
Clear and Grub
$
5,000.00
$
5,000.00
Topsoil Removal
$
16,444.00
$
16,444.00
Unclassified Excavation
$
19,218.50
$
19,218.50
Fine Grading
$
5,589.75
$
5,589.75
Aggregate Base Course
$
28,364.50
$
28,364.50
Asphalt
$
24,440.00
$
-0-
Testing
$
10,000.00
$
9,000.00
Street Signs
$
900.00
$
-0-
Place Topsoil
$
20,555.00
$
20,555.00
Landscaping:
Grade Topsoil
$
2,466.80
$
2,466.80
Grass
$
1,295.07
$
1,295.07
TOTAL ROAD CONSTRUCTION
$
141,773.62
$
115,433.62
WATER CONSTRUCTION
7' Trench B & C
$
8,740.00
$
8,740.00
8 Dip
$
15,686.00
$
15,686.00
8 Gate Valve
$
5,340.00
$
5,340.00
8 CI Tee
$
825.00
$
.825.00
Hydrant Assy.
$
3,000.00
$
3,000.00
TOTAL WATER CONSTRUCTION
$
33,591.00
$
33,591.00
SEWER CONSTRUCTION
Trench 12' B & C
$
6,125.00
$
6,125.00
8 PVC
$
2,254.00
$
2,254.00
Manholes 6' Deep
$
4,840.00
$
4,840.00
TOTAL SEWER CONSTRUCTION
$
13,219.00
$
13,219.00
WTTI
Rip Rap
$
210.00
$
210.00
18" CMP Pipe
$
542.00
$
542.00
18" CMP End Sections
$
280.00
$
280.00
TOTAL DRAINAGE
$
1,032.00
$
1,032.00
ELECTRICAL
4' Trench
$
6,000.00
$
6,000.00
f
Cordillera Filing #7
Third Partial Release
August 18, 1994
Page 2 ORIGINAL AMOUNT OF
AMOUNT IMPROVEMENTS
PHASE I COLLATERALIZED COMPLETED
ELECTRI (Continued
Conduit
$ 3,600.00
$
3,600.00
Cable 3Ph
$ 30,000.00
$
30,000.00
Vaults
$ 2,500.00
$
2,500.00
TOTAL ELECTRICAL
$ 42,100.00
$
42,100.00
TELEPHONE AND TV
Buried Cable
Pedestals
TV Cable
TOTAL TELEPHONE AND TV
NATURAL GAS
2 Gas Line
ENGINEERING, SURVEYING,
TESTING
TOTAL PHASE I
$ 4,800.00
$
4,800.00
$ 80.00
$
80.00
$ 4,000.00
$
4,000.00
$ 8,880.00
$
8,880.00
$ 10,500.00
$
10,500.00
$ 20,087.65 $ 20 087.65
$ 271,183.27 $ 244,843.27
PHASE IT
ROAD CONSTRUCTION
Mobilization
Clear and Grub
Topsoil Removal
Unclassified Excavation
Fine Grading
Aggregate Base Course
Asphalt
Testing
Street Signs
Place Topsoil
Landscaping:
Grade Topsoil
Grass
TOTAL ROAD CONSTRUCTION
WATER CONSTRUCTION
7' Trench B & C
6" Dip
$ 7,500.00
$
7,500.00
$ 10,000.00
$
10,000.00
$ 29,630.00
$
29,630.00
$ 33,715.50
$
33,715.50
$ 9,623.25
$
9,623.25
$ 48,832.50
$
48,832.50
$ 41,440.00
$
-
$ 10,000.00
$
9,000.00
$ 900.00
$
-0-
$ 37,037.50
$
37,037.50
$ 4,388.80
$
4,388.80
$ 2,304.12
$
-
$ 235,371.67
$
189,727.55
$ 42,275.00
$
42,275.00
$ 34,365.00
$
34,365.00
^1
Cordillera Filing #7
Third Partial Release
August 18, 1994
Page 3
m �
ORIGINAL AMOUNT OF
AMOUNT IMPROVEMENTS
PHASE II COLLATERALIZED COMPLETED
WATER CONSTRUCTION (Continued
6 Gate Valve
$
4,480.00
$
4,480.00
6 CI Elbow
$
2,875.00
$
2,875.00
6 CI Tee
$
350.00
$
350.00
Hydrant Assy.
$
7,500.00
$
7,500.00
Service Assy.
$
9,600.00
$
9,600.00
4 PRV
$
17,000.00
$
17,000.00
Air Release Valve
$
2,250.00
$
2,250.00
TOTAL WATER CONSTRUCTION
$
120,695.00
$
120,695.00
SEWER CONSTRUCTION
Trench 12' B
& C
$
27,925.00
$
27,925.00
8" PVC
3,861.75
$
10,276.40
$
10,276.40
Manholes 6'
Deep
$
2,420.00
$
2,420.00
Manholes 8'
Deep
$
6,380.00
$
6,380.00
Manholes 10'
Deep
$
17,160.00
$
17,160.00
Manholes 12'
Deep
$
2,585.00
$
2,585.00
Service Connection
$
11,200.00
$
1].,200.00
TOTAL SEWER
CONSTRUCTION
$
77,946.40
$
77,946.40
Rip Rap
$
1,785.00
$
1,785.00
18" CMP Pipe
$
3,861.75
$
3,861.75
18" CMP End Sections
$
1,680.00
$
1,680.00
TOTAL DRAINAGE
$
7,326.75
$
7,326.75
ELECTRICAL
4' Trench
$
22,000.00
$
22,000.00
Conduit
$
18,000.00
$
18,000.00
Cable
$
52,800.00
$
-0-
Transformers
$
10,500.00
$
10,500.00
Vaults
$
8,750.00
$
8,750.00
TOTAL ELECTRICAL
$
112,050.00
$
59,250.00
TELEPHONE AND TV
Buired Cable
$
12,800.00
$
4,480.00
Pedestals
$
280.00
$
280.00
TV Cable
$
12,800.00
$
4,480.00
TOTAL TELEPHONE AND TV
$
25,880.00
$
9,240.00
Cordillera Filing #7
Third Partial Release
August 18, 1994
Page 4
PHASE II
NATURAL GAS
2 Gas Line
ENGINEERING, SURVEYING,
TESTING
TOTAL PHASE II
TOTAL PHASE I
TOTAL PHASE II
TOTAL FILING #7
Filing #7
Improvements Completed
10e Retainage
First Release
Second Release
THIS RELEASE
Original SIA
First Release
Second Release
This Release
REVISED SIA
Phase I
I
ORIGINAL
AMOUNT
COLLATERALIZED
$ 33,600.00
$ 49,029.59
$ 661,899.41
$ 271,183.27
$ 661,899.41
$ 933,082.68
$244,843.27
$ 24,484.33
$220,358.94
$210,084.32
$ 10,274.62
$ -0-
$271,183.27
$210,084.32
$ 10,274.62
$ -0-
$ 50,824.33
Phase II
$519,400.33
$ 51,940.03
$467,460.30
$351,367.77
$ 76,492.53
$ 39,600.00
$661,899.41
$351,367.77
$ 76,492.53
$ 39,600.00
$194,439.11
AMOUNT OF
IMPROVEMENTS
COMPLETED
$ 11,088.00
$ 44,126.63
$ 519,400.33
$ 244,843.27
$ 519,400.33
$ 764,243.60
Total
$764,243.60
$ 76,424.36
$687,819.24
$561,452.09
$ 86,767.15
$ 39,600.00
$933,082.68
$561,452.09
$ 86,767.15
$ 39,600.00
$245,263.44
Need to see:
Compaction reports on electric trench - some site visit, but no test
taken.