HomeMy WebLinkAboutR94-091 first partial release for Blue Lake Filing V�a
Commissione 0, moved adoption
of the followi g Resol ion:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 94 - -_
i"
FIRST PARTIAL RELEASE of COLLATERAL
r "
BLUE LAKE SUBDIVISION
Filing V
WHEREAS, pursuant to C.R.S. 30 -28 -137, the Board of County
Commissioners of the County of Eagle, State of Colorado ( "Board ")
entered into a Subdivision Improvements Agreement dated March 14,
1994 ( "Agreement ") with Vantex Enterprises Inc., ("Subdivider"), as
a condition of final plat approval for Filing 5, Blue Lake
Subdivision; and
WHEREAS, the Subdivider provided collateral in the form of an
Escrow Agreement to guarantee the faithful completion of the public
improvements in the project; and
WHEREAS, Paragraph 2.2 of the Agreement allows the Subdivider
to apply for partial releases of collateral, all as described
therein; and
WHEREAS, Subdivider has represented to the Board, and members
of the County staff have corroborated the Subdivider's
representations, that improvements required under the Agreement
have been partially completed in a satisfactory manner (Exhibit A);
and
WHEREAS, the Subdivider has requested a reduction in the
amount of $376,13.7.45, leaving a balance of $1,140,981.05 to be
collateralized under the existing Escrow Account:
Original SIA $1,517,118.50
First Partial Release $ 376,137.45
Remaining Collateralized Improvements $1,140,981.05
Based upon the oral and written recommendations of the County
staff, THE BOARD FINDS that the Subdivider's obligations under the
Agreement have been partially satisfied.
540618 B -644 P -573 07/06/94 02:06P PG 1 OF 10 REC DOC
Sara J. Fisher Eagle County Clerk & Recorder 0.00
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, a reduction in the collateral in the amount of
$376,137.45 for a remaining balance of $1,140,981.05 is granted.
THAT, the partial.release of collateral granted hereby shall
not in any way abrogate the rights of the Board in enforcing the
Subdivider's performance of his outstanding obligations under the
Agreement.
THAT, the remaining balance of $1,140,981.05 which remains in
the Escrow Account is currently sufficient to cover the collateral
which will be required upon commencement of the warranty period as
defined in Paragraph 2.3 of the Agreement.
THAT, this partial release of collateral in no way signifies
the commencement of any warranty period; the warranty period shall
begin on the date all work is complete and accepted by the County,
pursuant to Paragraph 2.3 of the Agreement.
THAT, all other provisions of the Agreement shall remain in
full force and effect.
MOVED, READ AND ADOPTED by the Board of County Commissioners
of the County of Eagle, State of Colorado, this 6 day of
July, 1994.
ATTEST:
�L
Clerk to the Bdfird of
County Commissioners
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
BOARD OF COUNTY COMMISSIONERS
11
By:
ohnnette Phillips, Ch irman
s E. J ,
ommissioner
� 4
George A. Gates, Commissioner
540618 B -644 P -573 07/06/94 02:06P PG 2 OF 10
Commissioner seconded adoption of the
foregoing reso tion. The ro�hving been called, the vote was as
follows:
Commissioner Johnnette Phillips
Commissioner James E. Johnson, Jr.
Commissioner George A. Gates
This Resolution passed by 9 — 0 vote of the Board of
County Commissioners of the County of Eagle, State of Colorado.
r \blueV.par
sub # 84 -33
0
540618
B -644 P -573 07/06/94 02:06P PG 3
OF 10
-3-
MEMORANDUM
EAGLE COUNTY ENGINEERING
TO: Maureen Amundson, Attorney's Office
FROM: John Althoff, Engineering `
�/
DATE: June 24, 1994 ''VV
RE: Blue Lake Filing #5
This memo with the attached Collateral Release Summary replaces the
memo I sent to you on June 20, 1994. Recommend a first partial
release of $376,137.45.
540618
CC:
B -644 P -573 07/06/94 02:06P PG 4 OF 10
Larry Metternick
File H181T A
1H
4 -;
540618 n °-�44 P -573 07/06/94 02:06P PG 5
COLLATERAL RELEASE SUMMARY
SIA: Blue Lake, Filing 5
First Partial Release
DATE: June 23, 1994
ORIGINAL EXHIBIT A:
ITEM
Site Work
Site Grading & Subgrade
Preparation
Landscaping, Trees,
Vegetation, Irrigation
OF 10
AMOUNT
QUANTITY COLLATERALIZED
Lump Sum $ 80,000.00
Lump Sum $ 39,000.00
Subtotal $119,000.00
Streets & Drainage
Class 2 (Pit Run)
Class 6 ABC
2 Asphalt
2 Asphalt Ped /Bike Path
Concrete Curb & Gutter
Concrete Sidewalk
Concrete Cross Pan
Sidewalk Ramps
Curb Openings
18" CMP w /Flared Ends
24" CMP w /Flared Ends
64 1 lx43" ACMP Culvert w /Bed
Concrete Culvert Headwalls
Riprap w /Bedding Material
Street Signs
36" Dia. RCP Blue Crek Conduit
(Class 3)
48 11 x36" Dia. RCP Transition
Conduit (Class 3)
36" Inlet Structure w /Trash Rack
5' Dia. Manhole w /Lid
12" SDR 26 PVC Pipe (Ditch Siphon)
71 1 lx47" CMPA Culvert
12" Flume (Parshall)
10,400
C. Y.
$
52,000.00
5,500
C. Y.
$
38,500.00
22,240
S. Y.
$113,424.00
2,373
S. Y.
$
13,051.50
10,560
L.F.
$100,320.00
42,240
S. F.
$
95,040.00
3,294
S. F.
$
16,470.00
8
Each
$
400.00
5
Each
$
4,250.00
96
Each
$
1,824.00
253
Each
$
5,566.00
240
L.F.
$
12,000.00
2
Each
$
8,000.00
290
S.Y.
$
7,250.00
7
Each
$
1,050.00
650
L.F.
$
32,500.00
8
L.F.
$
400.00
Lump Sum
$
800.00
2
Each
$
3,400.00
200
L.F.
$
3,200.00
50
L.F.
$
4,000.00
1
Each
$
900.00
Subtotal
Waterline
$514,345.50
CZ
C#
C�
8 DIP Class 52 w /Polywrap 5,180 L.F. $ 88,060.00
8" Gate Valve 18 Each $ 9,450.00
540618 D -,644 P -573 07/06/94 02:06 PG 6 OF 10
Collateral Release Summary
Blue Lake F5
Page 2
ORIGINAL EXHIBIT A (CONTINUED):
AMOUNT
ITEM QUANTITY COLLATERALIZED
Waterline (Continued
Fire Hydrant w /6" lateral,
valve & tee
13
Each
$
23,400.00
Tees
4
Each
$
800.00
3/4" Water Service w /Stops & Box
90
Each
$
54,000.00
Sleeve Interconnection
2
Each
$
1,000.00
Subtotal $176,710.00
Sewerline
4' Dia. Manholes w /Lids
27
Each
$
45,900.00
8 SDR35 PVC Sewer Pipe
3,321
L.F.
$
59,778.00
4 SDR26 PVC CL160 Pipe
750
L.F.
$
9,000.00
Concrete Encasement
55
L.F.
$
2,750.00
4 PVC service w /wyes
90
Each
$
54,000.00
Sanitary Sewer Lift Sta.
Lump
Sum
$
21,000.00
Subtotal $192,428.00
Utilities
4' Deep Trench
5,350
L.F.
$
16,050.00
3' Deep Trench
12,400
L.F.
$
24,800.00
Transformer Vault
22
Each
$
2,200.00
Gas
Lump
Sum
$
17,500.00
Electric
Lump
Sum
$120,400.00
Street Lights
4
Each
$
4,000.00
Subtotal $184,950.00
Irrigation Ditch Improvements (Arnold /Cerise
24" Ultraflo Pipe w /Gasket Joints
4' Dia. Manhole w /Lid
90" Dia. Manhole w /Lid & Headgates
24" Flared End Section
w /Trash Rack
Diversion Structure (concrete)
w /headgates and flume
24" CMP
8 DIP Drain Line
8 Gate Valve (Drain Line)
Riprap
2,000 L.F.
6 Each
Lump Sum
1 Each
$ 90,000.00
$ 10,200.00
$ 4,500.00
$ 450.00
Lump
Sum
$
5,000.00
170
L.F.
$
3,740.00
160
L.F.
$
2,880.00
1
Each
$
550.00
50
S.Y.
$
1,250.00
Subtotal
$118,570.00
f ">
P .�
540618 P °544 P -573 07/06/94 02:06P.,,PG 7 OF 10
r
Collateral Release Summary
Blue Lake F5
Page 3
ORIGINAL EXHIBIT A (CONTINUED):
AMOUNT
ITEM QUANTITY COLLATERALIZED
Park Area
Site Grading
Lump
Sum
$
15,000.00
2 Asphalt Paving
2,020
S.Y.
$
11,110.00
2" Asphalt Ped /Bike Path
890
S.Y.
$
4,895.00
Class 6 ABC
880
C.Y.
$
6,160.00
Beach Sand
250
C.Y.
$
5,000.00
Restroom Facility
Lump
Sum
$
22,000.00
San. Sewer Service
1
Each
$
900.00
Water Services
1
Each
$
1,050.00
Pavilion Structure & Pad
1
Each
$
30,000.00
Shelters & Docks
Lump
Sum
$
25,000.00
Game /Playground Area
Lump
Sum
$
10,000.00
Furnishings, Tables, Benches,
BBQ's, Trash Receptacles
Lump
Sum
$
8,000.00
Site Lights
8
Each
$
12,000.00
Landscaping, Trees, Vegetation,
Irrigation
Lump
Sum
$
60,000.00
Subtotal $211,115.00
ORIGINAL EXHIBIT A TOTAL $1,517,118.50
IMPROVEMENTS COMPLETED:
AMOUNT
ITEM QUANTITY COMPLETED
Site Work
Site Grading & Subgrade 500
Preparation Lump Sum $ 55,000.00
Landscaping, Trees, 0
Vegetation, Irrigation Lump Sum $ -0-
Subtotal $ 55,000.00
Streets & Drainaae
Class 2 (Pit Run)
1,000
C.Y.
$
11,000.00
Class 6 ABC
0
C.Y.
$
-0-
2 Asphalt
0
S.Y.
$
. -0-
2" Asphalt Ped /Bike Path
0
S.Y.
$
-0-
Concrete Curb & Gutter
0
L.F.
$
-0-
Concrete Sidewalk
0
S.F.
$
-0-
Concrete Cross Pan
0
S.F..
$
-0-
`A.
r,4
540618 x'944 P -573
07/06/94 02:06T �PG 8
-0-
OF 10
Rack 0 Lump Sum
$
-0-
59,778.00
0 Each
Collateral Release Summary
-0-
-0-
Siphon) 0 L.F.
$
Blue Lake FS
2,750.00
0 L.F.
$
-0-
Page 4
0 Each
$
-0-
a-
Subtotal
$
63,120.00
AMOUNT .
ITEM
QUANTITY
COMPLETED
Streets & Drainage (Continued)
Sidewalk Ramps
0
Each
$
-0-
Curb Openings
0
Each
$
-0-
18" CMP w /Flared Ends
0
Each
$
-0-
24" CMP w /Flared Ends
0
Each
$
-0-
64 "x43" ACMP Culvert w /Bed
210
L.F.
$
12,000.00
Concrete Culvert Headwalls
2
Each
$
8,000.00
Riprap w /Bedding Material
0
S.Y.
$
-0-
Street Signs
0
Each
$
-0-
36" Dia. RCP Blue Creek Conduit
(Class 3)
48 1 lx36" Dia. RCP Transition
Conduit (Class 3)
36" Inlet Structure w /Trash
5' Dia. Manhole w /Lid
12" SDR 26 PVC Pipe (Ditch
71 1 lx47" CMPA Culvert
12" Flume (Parshall)
Waterline
8 DIP Class 52 w /Polywrap
8 Gate Valve
Fire Hydrant w /6" lateral,
valve & tee
Tees
3/4" Water Service w /Stops
Sleeve Interconnection
Sewerline
4' Dia. Manholes w /Lids
8 SDR35 PVC Sewer Pipe
4 SDR26 PVC CL160 Pipe
Concrete Encasement
4 PVC service w /wyes
Sanitary Sewer Lift Sta.
Utilities
4' Deep Trench
3' Deep Trench
584 L.F
$ 32,120.00
0 L.F.
$
-0-
45,000.00
Rack 0 Lump Sum
$
-0-
59,778.00
0 Each
$
-0-
-0-
Siphon) 0 L.F.
$
-0-
2,750.00
0 L.F.
$
-0-
C
0 Each
$
-0-
a-
Subtotal
$
63,120.00
2,62.8 L.F. $ 52,560.00
8 Each $ 4,800.00
6 Each $ 13,200.00
2 Each $ 300.00
& Box 0 Each $ -0-
2 Each $ 1,000.00
Subtotal $ 71,860.00
25
Each
$
45,000.00
4,983
L.F.
$
59,778.00
0
L.F.
$
-0-
55
L.F.
$
2,750.00
87
Each
$
52,200.00
0 Lump Sum
$
-0-
Subtotal $159,728.00
0 L.F. $ -0-
0 L.F. $ -0-
540618 :B -644 P -573 07/06/94 02 PG 9 OF 10
Collateral Release Summary
Blue Lake F5
Page 5
AMOUNT
ITEM QUANTITY COMPLETED
Utilities (Continued)
Transformer Vault
0 Each
$
-0-
Gas
0 Lump Sum
$
-0-
Electric
0 Lump Sum
$
-0-
Street Lights
0 Each
$
-0-
$
Subtotal
$
-0-
Irrigation Ditch Improvements (Arnold /Cerise
24" Ultraflo Pipe w /Gasket Joints
4' Dia. Manhole w /Lid
90" Dia. Manhole w /Lid & Headgates
24" Flared End Section
w /Trash Rack
Diversion Structure (concrete)
w /headgates and flume
24" CMP
8 DIP Drain Line
8" Gate Valve (Drain Line)
Riprap
Park Area
Site Grading
2 Asphalt Paving
2 Asphalt Ped /Bike Path
Class 6 ABC
Beach Sand
Restroom Facility
San. Sewer Service
Water Services
Pavilion Structure & Pad
Shelters & Docks
Game /Playground Area
Furnishings, Tables, Benches,
BBQ's, Trash Receptacles
Site Lights
Landscaping, Trees, Vegetation,
Irrigation
2,160 L.F.
$
64,800.00
0 Each
$
-0-
0 Lump Sum
$
-0-
1 Each
$
450.00
0 Lump Sum
$
-0-
145 L.F.
$
2,972.50
0 L.F.
$
-0-
0 Each
$
-0-
0 S.Y.
$
-0-
Subtotal
$ 68,222.50
0
Lump Sum
$
-0-
0 S.Y.
$
-0-
0. S.Y.
$
-0-
0 C.Y.
$
-0-
0 C.Y.
$
-0-
0
Lump Sum
$
-0-
0 Each
$
-0-
0 Each
$
-0-
0 Each
$
-0-
0
Lump Sum
$
-0-
0
Lump Sum
$
-0-
0
Lump Sum
$
-0-
0 Each
$
-0-
0
Lump Sum
$
-0-
Subtotal
$ -0-
�J
G
IMPROVEMENTS COMPLETED TOTAL $417,930.50
Collateral Release Summary
Blue Lake F5
Page 6
ORIGINAL EXHIBIT A $1,517,118.50
IMPROVEMENTS COMPLETED $417,930.50
LESS 10% RETAINAGE $ 41,793.05
TOTAL $376,137.45 $ 376,137.45
REVISED COLLATERAL RECOMMENDATION $1,140,981.05
540618 B -644 P -573 07/06/94 02:06P PG 10 OF 10