Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR95-075 partial release of collateral for east west interconnect water mainCommissioner ~~~~ moved adoption
of the following Resolution:
BOARD OF COIINTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 95-_~
PARTIAL RELEASE OF COLLATERAL
AND
COMMENCEMENT OF TWO YEAR
WARRANTY PERIOD
FOR
THE EAST WEST INTER-CONNECT WATER MAIN
WHEREAS, on August 30, 1993, the County entered into a
Construction Improvements Agreement (hereinafter "CIA") with Stag
Gulch Partners, a Colorado General Partnership (hereinafter known
as "Owner"), as a condition of the County's approval for a permit
to construct a major new domestic water system to serve the
Cordillera Development; and
WHEREAS, the Owner provided collateral in the form of a check
in the amount of $35, 900.00 to guarantee the faithful completion of
certain public improvements; and
WHEREAS, the Owner requests the commencement of the warranty
period and a release of its collateral reducing the amount
currently held by the County from $35,900.00 to $3,590.00; and
WHEREAS, the Owner has represented to the Board, and members
of the County staff have corroborated the Owners's representations,
see Exhibit "A", that the public improvements appear to have been
completed in a satisfactory manner and that the commencement of the
warranty period would be appropriate.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, based upon the oral and written recommendations of the
Engineering Department, the Board finds that the public
improvements appear to have been satisfactorily completed and a
reduction in the collateral and commencement of the warranty period
is appropriate.
THAT, a reduction in the collateral to $3,590.00 (ten percent
of $35,900.00) is authorized, the $3,590.00 is to be held for the
duration of the two year warranty period.
THAT, the Board hereby directs the Eagle County Treasurer to
issue a warrant to Stag Gulch Partners, in the amount of
$32,310.00.
THAT, the two year warranty period shall commence with an
expiration date of May 22, 1997.
THAT, this release of collateral and commencement of the
warranty period shall not in any way abrogate the rights of the
Board in enforcing the Subdivider's performance of his outstanding
obligations under the Agreement.
MOVED, READ AND ADOPTED by the Board of County Commissioners
of the Count of Eagle, State o Colorado, at its regular meeting
held the day of 1995.
ATTEST:
Commissioners
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
iBOARD OF COUNTY COMMISSIONERS
ohnnette Phillips, Commi sinner
Commissioner ~- seconded adoption of the
foregoing resolution. The roll having been called, the vote was as
follows:
Commissioner James E. Johnson, Jr.
Commissioner George A. Gates
Commissioner Johnnette Phillips ~,N,P
This Resolution passed by L7 ~ I vote of the Board of
County Commissioners of the County of Eagle, State of Colorado.
mta\r\eastwst.rel
sub #87-84
-2-
G~ rge Gates, Commissioner
MEMORANDUM
EAGLE COUNTY ENGINEERING
TO: Maureen Amundson, Attorney's Office
FROM: John Althoff, Engineering
DATE: May 22, 1995
RE: Construction Improvement Agreement
East-West Inter-Connect Water Line
I was up to Cordillera on Friday, May 19, 1995, to review the
seeding of the east-west inter-connect water line. The areas
disturbed by construction have been seeded, and most areas have
good ground cover as of this date, and other areas are just
starting to show. Would suggest reducing the collateral to
$3,590.00 (10% of original $35,900.00) for the two year warranty
period. Construction Improvement Agreement number is C-93-15504.
cc: George Roussos
File