HomeMy WebLinkAboutC22-093 First Amendment SIA_Frost Creek_PDF-009126-2020UUTA. Ltll Eagle County, CO 202203486
Regina O'Brien 03/01 /2022
Pgs: 3 03:01-01 PM
REC: $0.00
DOC: $0.00
FIRST AMENDMENT TO
SUBDIVISION AND OFF -SITE IMPROVEMENTS AGREEMENT
FOR FINAL PLAT FROST CREEK PUD FILING NO. 5 FROST & SALT CREEK PUD
File No, PDF-009126-2020
THIS FIRST AMENDMENT to the Subdivision and Off -Site Improvements Agreement for Final
Plat Frost Creek Filing No. 5 Frost and Salt Creek PUD ("First Amendment") is entered on
3/1./2022 , by and between the Board of County Commissioners of the County of Eagle, State
of Colorado (hereinafter "County") and Hunters View JVCO Land, LLC, a Colorado limited liability
company (hereinafter "Subdivider").
WITNESSETH
WHEREAS, Subdivider and County entered into a Subdivision and Off -Site Improvements
Agreement for Final Plat Frost Creek Filing No. 5 Frost and Salt Creek PUD on the I` day of June, 2021
(hereinafter "SIA"); and
WHEREAS, Section 1.5 of the SIA, entitled "Date of Completion," provides that "all Subdivision
Improvements shall be completed prior to June 2, 2022"; and
WHEREAS, Subdivider has requested, and the Eagle County Engineering Department
recommends, an extension of the Date of Completion of the Subdivision Improvements as currently set
forth in the SIA because Subdivider desires to defer completion of some improvements until the fall of
2022, and this is acceptable to Eagle County Engineering Department; and
WHEREAS, Section 4.5 of the SIA provides that the SIA may be amended or modified from time
to time, provided that such amendment or modification be in writing and signed by all parties; and
WHEREAS, the Subdivider and County desire to amend the SIA to reflect a new Date of
Completion of November 15, 2022 for the Subdivision Improvements.
AGREEMENT
1. Section 1.5 of the Agreement is hereby amended and replaced to read as follows:
L5 pate of Completion. All Subdivision Improvements shall be completed prior to
November 15, 2022. The construction schedule is updated as reflected in Exhibit A of
this First Amendment, which is attached and incorporated herein.
2. Capitalized terms in this First Amendment will have the same meaning as in the SIA. To the
extent that the terms and provisions of the First Amendment conflict with, modify or
supplement portions of the SIA, the terms and provisions contained in this First Amendment
shall govern and control the rights and obligations of the parties.
DocuSign Envelope ID. 7172009D-3DED4692-9E57-06292A63B98G
3. Except as expressly altered, modified and changed in this First Amendment, all terms and
provisions of the SIA shall remain in full force and effect, and are hereby ratified and
confirmed in all respects as of the date hereof.
4. This First Amendment shall be binding on the parties hereto, their heirs, executors,
successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the SIA the
day and year first written above.
Attest:
DoctuSigned by:
(f" 1�u&
egina Brien, Clerk to the Board
COUNTY:
County of Eagle, State Of Colorado,
By and Through Its Board of County Commissioners
DoeuSigned by:
By:"""0"3
'KIMUeeney, Chair
SUBDIVIDER:
Hunters View JVCO Land, LLC
By: PDocuSigned by:
AU bAs
Authorize Signer
Its: Paul Books President of Manager
Uocubign
IU: /1/lUUEJU-3ULD-4b92-yL5/-UbZ9ZAb3139t3(:
EXHIBIT A
February 14, 2022
Maryland Creek Ranch Builders, LLC
148 Youngs Preserve
Silverthorne, Colorado 80498
RE: Frost Creek - Hunters View Filing 5
Updated Infrastructure Schedule
JVA Job Number 2476.15c
Dear Mr. Clark:
JVA, Incorporated
817 Colorado Avenue
Suite 301
Glenwood Springs.
Co 81601
970.404 3100
infoCkva3va.com
vvvvw.jvajva.Eom
Based on our discussions with the development team and the contractor, JVA has updated the
infrastructure construction schedule for the remainder of the work to be completed as part of the
Frost Creek PUD Filing No 5 SIA. All work under this schedule is to be completed by
November 15, 2022. Below is a detailed description of the proposed work.
April 2022 — June 2022
Extension and installation of existing services not yet complete for gas and electric services, data
and communication, potable and irrigation water service lines will be completed as well as
grading of existing drainage swales and installation of drainage culverts. Ongoing maintenance
of erosion controls measures will continue.
July 2022 -- August 2022
Grading of remaining unconstructed shared driveways and placement of shared driveway prep
material will be completed as well as installation of above grade utility boxes and structures.
Ongoing maintenance of erosion controls measures will continue.
September 2022 — November 2022
Shared driveways will be paved. The secondary fire department access and installation of fire
department bollards will be completed. Any punchlist items will be corrected and final site
cleanup will be done. Maintenance of erosion control measures will continue until final
stabilization has been approved.
Feel free to reach out with any questions on this schedule.